Jian's Builder Corp
- Based in
- San Francisco
- On San Francisco permits
- Feb 2012 to Jul 2026
- Last 24 months
- 16 permits filed
100 permits since 2000: 81 completed, 3 in progress, 5 never finaled, 11 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2026 | In progress issued Jul 2026 | 2008 Lombard St | unit #a: conversion of existing bedroom to a 3 fixture bath to a wet bar.Details
unit #a: conversion of existing bedroom to a 3 fixture bath to a wet bar. | $20,000 |
| Apr 28, 2026 | Completed final sign-off Aug 2026 | 3892 Sacramento St | unit 5: remodel kitchen and bathroom. tub to shower conversion.Details
unit 5: remodel kitchen and bathroom. tub to shower conversion. | $35,000 |
| Apr 28, 2026 | Completed final sign-off Jul 2026 | 162 Lunado Ct | conversion of existing ground floor storage/garage into an office with a 2 fixture bath. switch existing door and window on west yard. open a new window facing east yard. relocate existing furnace and water heater.Details
conversion of existing ground floor storage/garage into an office with a 2 fixture bath. switch existing door and window on west yard. open a new window facing east yard. relocate existing furnace and water heater. | $10,000 |
| Dec 30, 2025 | In progress issued Feb 2026 | 230 Niagara Av | to comply w/ nov#202425976: legalize 1st floor including 2 bedrooms, 1 3-fixture bath, family room, 495 sq ft. demo unpermitted walls on 2nd fl and restore space back to family. add a hallway connecting to back yard. restore and relocate washer/dryer. add a wetbar and burner to 1st floor.Details
to comply w/ nov#202425976: legalize 1st floor including 2 bedrooms, 1 3-fixture bath, family room, 495 sq ft. demo unpermitted walls on 2nd fl and restore space back to family. add a hallway connecting to back yard. restore and relocate washer/dryer. add a wetbar and burner to 1st floor. | $8,000 |
| Sep 18, 2025 | Completed final sign-off Dec 2025 | 1979 O'farrell St | unit e9: replace 2 45 mm fire rated door min in kind in kitchen area.Details
unit e9: replace 2 45 mm fire rated door min in kind in kitchen area. | $2,000 |
| Sep 18, 2025 | Completed final sign-off Dec 2025 | 1977 Ofarrell St | unit b4: replace 1 fire rated door min in kind in kitchen area.Details
unit b4: replace 1 fire rated door min in kind in kitchen area. | $2,500 |
| Aug 7, 2025 | Completed final sign-off Sep 2025 | 1979 O'farrell St | replace one 45mins fire rated door inkind, back exit door.Details
replace one 45mins fire rated door inkind, back exit door. | $1,200 |
| Jul 7, 2025 | Completed final sign-off Sep 2025 | 1977 O'farrell St | unit f: replace two fire rated door in-kind.Details
unit f: replace two fire rated door in-kind. | $1,000 |
| Jul 7, 2025 | Completed final sign-off Sep 2025 | 1977 Ofarrell St | unit c: replace two doors in-kind (45 minute fire-rated).Details
unit c: replace two doors in-kind (45 minute fire-rated). | $1,000 |
| Jul 7, 2025 | Completed final sign-off Sep 2025 | 1862 Ellis St | unit 48: replace 1 fire rated door in kind, door only for side doorDetails
unit 48: replace 1 fire rated door in kind, door only for side door | $1,000 |
| Jul 7, 2025 | Completed final sign-off Sep 2025 | 1977 O'farrell St | unit 1: replace 1 fire rated door (side door) in kind. door only.Details
unit 1: replace 1 fire rated door (side door) in kind. door only. | $1,000 |
| Mar 31, 2025 | In progress issued Jan 2026 | 99 Onondaga Av | convert (e) commercial space into new dwelling unit with 1 kit,2 bath, 3 bed; convert (e) 2-car garage into 1 adu (state) with 1 kit, 1 bath,2 bed. new roof deck and exterior stair to roof deckDetails
convert (e) commercial space into new dwelling unit with 1 kit,2 bath, 3 bed; convert (e) 2-car garage into 1 adu (state) with 1 kit, 1 bath,2 bed. new roof deck and exterior stair to roof deck | $90,000 |
| Feb 3, 2025 | Completed final sign-off Jun 2025 | 725 Hyde St | repair 3 window pane glass in-kind. repair dryrot if needed, repair stucco in kind, no more than 500sf at front dryrot repair in kind no changes.Details
repair 3 window pane glass in-kind. repair dryrot if needed, repair stucco in kind, no more than 500sf at front dryrot repair in kind no changes. | $20,000 |
| Dec 23, 2024 | Completed final sign-off May 2025 | 2474 46th Av | remodel 2 bath and 1 kitchen in kind. replace in kind flooring cabinets countertop, vanity, toilet shower and related electrical and plumbing.Details
remodel 2 bath and 1 kitchen in kind. replace in kind flooring cabinets countertop, vanity, toilet shower and related electrical and plumbing. | $60,000 |
| Nov 1, 2024 | Completed final sign-off Sep 2025 | 746 18th Av | to comply with nov #202426380 2nd fl: remodel (e) kitchen & bathroom. add toilet room. 1st fl: install (n) bathroom, 2 bedrooms & family roomDetails
to comply with nov #202426380 2nd fl: remodel (e) kitchen & bathroom. add toilet room. 1st fl: install (n) bathroom, 2 bedrooms & family room | $60,000 |
| Oct 7, 2024 | Completed final sign-off Sep 2025 | 149 Seville St | master bathroom remodel and replace 1 window within the same opening. . install (n) sheet rock for 2x bedrooms and replace 2 windows within the same opening. no work is visible from street and is in kind. no wall removal.Details
master bathroom remodel and replace 1 window within the same opening. . install (n) sheet rock for 2x bedrooms and replace 2 windows within the same opening. no work is visible from street and is in kind. no wall removal. | $15,000 |
| Sep 24, 2024 | Completed final sign-off Sep 2025 | 149 Seville St | remodel bathroom in 3rd floor- repair window in the diningroom. replace drywall in 3rd floor sunroom and repair the window. whole house change to laminate flooring. paint the whole inside out. window not visible from street; max u-factor 0.30; repair in kind.Details
remodel bathroom in 3rd floor- repair window in the diningroom. replace drywall in 3rd floor sunroom and repair the window. whole house change to laminate flooring. paint the whole inside out. window not visible from street; max u-factor 0.30; repair in kind. | $20,000 |
| Sep 17, 2024 | Completed final sign-off Jul 2025 | 635 41st Av | comply w/ nov # 202425531: legalize the as-built concrete retaining wall at rear yard.Details
comply w/ nov # 202425531: legalize the as-built concrete retaining wall at rear yard. | $8,000 |
| Sep 17, 2024 | Completed final sign-off Sep 2025 | 643 41st Av | comply w/ nov # 202425795: legalize the as-built concrete retaining wall at rear yard.Details
comply w/ nov # 202425795: legalize the as-built concrete retaining wall at rear yard. | $8,000 |
| Aug 22, 2024 | Completed final sign-off Oct 2024 | 1654 42nd Av | ground floor: upgrade wall between hallway to yard and bedroom.Details
ground floor: upgrade wall between hallway to yard and bedroom. | $3,000 |
| Apr 2, 2024 | Completed final sign-off Aug 2024 | 925 Divisadero St | apts 925 & 927: legalize (e) bathroom at 4th fl. and 3rd fl. proposed installing new furnance at 4th & 3rd fl.Details
apts 925 & 927: legalize (e) bathroom at 4th fl. and 3rd fl. proposed installing new furnance at 4th & 3rd fl. | $38,000 |
| Sep 6, 2023 | Completed final sign-off Oct 2023 | 246 Brighton Av | repair dry rot deck less than 50% and replace siding 200 sqDetails
repair dry rot deck less than 50% and replace siding 200 sq | $12,000 |
| Jun 21, 2023 | Completed final sign-off Aug 2023 | 259 20th Av | 1. repair interior concrete steps, less than 50%/ 2. replace railing up to code. d3. comply w/ nov# 202308707Details
1. repair interior concrete steps, less than 50%/ 2. replace railing up to code. d3. comply w/ nov# 202308707 | $25,000 |
| May 30, 2023 | Completed final sign-off Jun 2023 | 48 Peabody St | replace two kitchen cabinets in-kind, one upper and one lower.Details
replace two kitchen cabinets in-kind, one upper and one lower. | $10,000 |
| May 18, 2023 | Completed final sign-off May 2024 | 148 Terra Vista Av | to obtain final inspection for work approved under pa# 200505233203, pa# 201401105988 & pa# 201409055506. all work is complete.Details
to obtain final inspection for work approved under pa# 200505233203, pa# 201401105988 & pa# 201409055506. all work is complete. | |
| May 18, 2023 | Completed final sign-off May 2024 | 148 Terra Vista Av | to obtain final inspection for work approved under pa# 201309066142, pa# 201704073468. all work is complete.Details
to obtain final inspection for work approved under pa# 201309066142, pa# 201704073468. all work is complete. | |
| May 3, 2023 | Completed final sign-off Jun 2023 | 142 Geneva Av | replace backyard siding in kind around 500 sqftDetails
replace backyard siding in kind around 500 sqft | $8,000 |
| Mar 8, 2023 | Completed final sign-off Feb 2024 | 272 Oxford St | recommencement and completion of work approved under permit 201909252745Details
recommencement and completion of work approved under permit 201909252745 | |
| Jan 26, 2023 | Completed final sign-off Feb 2023 | 308 Crescent Av | repair leaking sliding doors - not visible from the street. repair water damage deck (partial - non structural) for 2nd and 3rd floor deck - less than 50% repair. no replacement of any columns, beams or joists.Details
repair leaking sliding doors - not visible from the street. repair water damage deck (partial - non structural) for 2nd and 3rd floor deck - less than 50% repair. no replacement of any columns, beams or joists. | $13,000 |
| Jun 28, 2022 | Completed final sign-off Jun 2023 | 1211 Monterey Bl | remodel living, dining, & bathrooms. relocate kitchen, add full bath, replace stairs, remove walls on 2nd floor. add media and office on 1st floor. replace windows at front and side. upgrade electrical and plumbing system. replace roof.Details
remodel living, dining, & bathrooms. relocate kitchen, add full bath, replace stairs, remove walls on 2nd floor. add media and office on 1st floor. replace windows at front and side. upgrade electrical and plumbing system. replace roof. | $200,000 |
| Apr 13, 2022 | Completed final sign-off May 2022 | 17 De Soto St | add 1 full bath & laundry room in lower floor per planDetails
add 1 full bath & laundry room in lower floor per plan | $15,888 |
| Mar 15, 2022 | Completed final sign-off Aug 2022 | 71 Navajo Av | repair front side siding around 600sqft: repair front stair in kind. less than 50%.Details
repair front side siding around 600sqft: repair front stair in kind. less than 50%. | $17,000 |
| Oct 15, 2021 | Completed final sign-off Apr 2022 | 1254 Quesada Av | 2nd fl: remove a section of wall btw kitchen and livimg, install new roof beam, remove all interior finish to install new insulation and replace w/ 5/8" gymsum board. no exterior work.Details
2nd fl: remove a section of wall btw kitchen and livimg, install new roof beam, remove all interior finish to install new insulation and replace w/ 5/8" gymsum board. no exterior work. | $10,000 |
| Sep 28, 2021 | Completed final sign-off Mar 2022 | 815 Rolph St | roof deck repair in kind- less than 50% (no structural), nonvisible from streetDetails
roof deck repair in kind- less than 50% (no structural), nonvisible from street | $7,000 |
| Sep 9, 2021 | Completed final sign-off Oct 2021 | 3025 San Bruno Av | renew application # 201510069003. all work completed and need final inspection.Details
renew application # 201510069003. all work completed and need final inspection. | |
| Jul 6, 2021 | Completed final sign-off Apr 2022 | 1254 Quesada Av | replace 3 windows in kind. front window facing street. no size change. alum milgard windowsDetails
replace 3 windows in kind. front window facing street. no size change. alum milgard windows | $10,000 |
| Jun 28, 2021 | Completed final sign-off Dec 2021 | 1254 Plymouth Av | remodel ground floor bonus room to family room with bath and closet. add 1/2 bath at hallway. add 1 storage at front of garage.Details
remodel ground floor bonus room to family room with bath and closet. add 1/2 bath at hallway. add 1 storage at front of garage. | $50,888 |
| May 13, 2021 | Completed final sign-off Apr 2022 | 1254 Quesada Av | reroofingDetails
reroofing | $7,000 |
| May 13, 2021 | Completed final sign-off Apr 2022 | 1254 Quesada Av | remodel 2 bathroom & 1 kitchen in kind. replace 4 rear windows in kind. u factor 0.30max. replace double sliding door in kind at rear.Details
remodel 2 bathroom & 1 kitchen in kind. replace 4 rear windows in kind. u factor 0.30max. replace double sliding door in kind at rear. | $20,000 |
| Nov 24, 2020 | Completed final sign-off Oct 2023 | 972 Rutland St | comply with nov#: 201566560. remove rear structure. 1st floor : add adu per ordinance 95-17. add 2 bedrooms, kitchen, media room and 2 full baths.Details
comply with nov#: 201566560. remove rear structure. 1st floor : add adu per ordinance 95-17. add 2 bedrooms, kitchen, media room and 2 full baths. | $60,000 |
| Jul 10, 2020 | Expired or cancelled expired May 2024 | 148 Terra Vista Av | renew and obtain final inspection for pa# 200505233203Details
renew and obtain final inspection for pa# 200505233203 | |
| Mar 3, 2020 | Completed final sign-off Aug 2021 | 3700 Cabrillo St | replace (e) exterior metal fire escape and ladders with new in like kind in accordance with sfbc 1011.12.3 & cbc2019-403.1Details
replace (e) exterior metal fire escape and ladders with new in like kind in accordance with sfbc 1011.12.3 & cbc2019-403.1 | $30,000 |
| Feb 27, 2020 | Completed final sign-off Aug 2023 | 2248 Jerrold Av | unit 7: to comply with nov 202010511 reduce non-permitted mezzanine to 1/3 of existing area (all 3 buildings add up to less than 255k sf).Details
unit 7: to comply with nov 202010511 reduce non-permitted mezzanine to 1/3 of existing area (all 3 buildings add up to less than 255k sf). | $20,000 |
| Jan 24, 2020 | Expired or cancelled expired Mar 2022 | 2248 Jerrold Av | unit #7: to adjust complaint #202010511 and install shelves for storage room. not exceeding 5'-9" (69 inches) in heightDetails
unit #7: to adjust complaint #202010511 and install shelves for storage room. not exceeding 5'-9" (69 inches) in height | $2,000 |
| Dec 13, 2019 | Never finaled issued Apr 2022, no final | 5088 Mission St | to comply w/ complaint 201982245 & 201972951. change of occupancy from commercial to residential units(two new residential units at 2nd story).**maher n/a**Details
to comply w/ complaint 201982245 & 201972951. change of occupancy from commercial to residential units(two new residential units at 2nd story).**maher n/a** | $150,000 |
| Oct 15, 2019 | Expired or cancelled expired Nov 2023 | 1317 Masonic Av | commencement of work approved under prevous permit pa#201708094367.Details
commencement of work approved under prevous permit pa#201708094367. | $60,000 |
| Sep 30, 2019 | Completed final sign-off Sep 2020 | 140 Winston Dr | lower 1st flr - add 2 bedrms, 1 laundry and 2 full bath. 1st flr - remodel kitchen, din rm, add 1 full bath. 2nd flr - remodel bedrms and bathrms add 1 full bathDetails
lower 1st flr - add 2 bedrms, 1 laundry and 2 full bath. 1st flr - remodel kitchen, din rm, add 1 full bath. 2nd flr - remodel bedrms and bathrms add 1 full bath | $63,000 |
| Apr 26, 2019 | Completed final sign-off Jan 2021 | 2701 Jackson St | repair wood & plywood in garage, non structural 2 pcs 4x8 plywood replace in kind, upgrade main electrical service from 220 amp to 400 amp in same locationDetails
repair wood & plywood in garage, non structural 2 pcs 4x8 plywood replace in kind, upgrade main electrical service from 220 amp to 400 amp in same location | $4,000 |
| Apr 22, 2019 | Completed final sign-off May 2024 | 4638 Balboa St | administration permit for add and change address at pa #201612195272 from 4640 balboa street to 4638, 4642, 4644, 4646, 4648 balboa street.Details
administration permit for add and change address at pa #201612195272 from 4640 balboa street to 4638, 4642, 4644, 4646, 4648 balboa street. | |
| Jan 14, 2019 | Completed final sign-off Apr 2019 | 2150 33rd Av | upgrade existing family room, bathroom, media room & bed room. all work at ground floor. ref pa #200905269131Details
upgrade existing family room, bathroom, media room & bed room. all work at ground floor. ref pa #200905269131 | $65,000 |
| Dec 26, 2018 | Expired or cancelled cancelled Jan 2026 | 1441 Stevenson St | construction phase revision to p.a. #201609228538. 1) grout injection where required to stabilize neighbor's foundation, 2) temporary shoring to brace existing wall during construction. less than 50 cubic yard excavation.Details
construction phase revision to p.a. #201609228538. 1) grout injection where required to stabilize neighbor's foundation, 2) temporary shoring to brace existing wall during construction. less than 50 cubic yard excavation. | $5,000 |
| Nov 14, 2018 | Completed final sign-off Mar 2024 | 4640 Balboa St | construct 100 square foot new accessory building at rear yardDetails
construct 100 square foot new accessory building at rear yard | $8,000 |
| Aug 21, 2018 | Never finaled filed Aug 2018, never issued | 1441 Stevenson St | to comply with nov 201880401, demo all fire damage joist and replace with new. replace everything in kind. no dimension change for replacement roof structure maher naDetails
to comply with nov 201880401, demo all fire damage joist and replace with new. replace everything in kind. no dimension change for replacement roof structure maher na | $80,000 |
| Jun 26, 2018 | Expired or cancelled expired Mar 2023 | 1441 Stevenson St | revision to app#201609228538 s1 to change extg to all concrete foundations/slap. n/a for maherDetails
revision to app#201609228538 s1 to change extg to all concrete foundations/slap. n/a for maher | |
| Jun 11, 2018 | Completed final sign-off Aug 2018 | 560 Ramsell St | in-kind repair front stairway - less than 50% repair.Details
in-kind repair front stairway - less than 50% repair. | $3,000 |
| Mar 1, 2018 | Completed final sign-off Oct 2018 | 1771 16th Av | two bathrooms tile repair (floor tile only). repair in-kind.Details
two bathrooms tile repair (floor tile only). repair in-kind. | $8,000 |
| Mar 1, 2018 | Completed final sign-off Jul 2018 | 1771 16th Av | stucco repair approx 40% of the house visible in/front of the house repair in-kind.Details
stucco repair approx 40% of the house visible in/front of the house repair in-kind. | $5,000 |
| Oct 24, 2017 | Completed final sign-off Mar 2018 | 261 Beverly St | legalize two bedrooms, one full bathroom. construct one new bathroom & laundry room. all work at ground floor.Details
legalize two bedrooms, one full bathroom. construct one new bathroom & laundry room. all work at ground floor. | $52,000 |
| Oct 24, 2017 | Completed final sign-off Dec 2017 | 2323 19th Av | remodel bathroom, repair all tiles on the bath tub area and floor. replace new bath tub at vanity and toilet. floor around 45 sq ft, bath tub around 80 sq ft. bathroom remodel in kind.Details
remodel bathroom, repair all tiles on the bath tub area and floor. replace new bath tub at vanity and toilet. floor around 45 sq ft, bath tub around 80 sq ft. bathroom remodel in kind. | $4,000 |
| Sep 25, 2017 | Completed final sign-off Mar 2018 | 261 Beverly St | remodel e kitchen. convert 1 e bath to two bathroom, convert e dining rm to bedroom, construct 1 skylight. all work at 2nd fl. no work on g/f.Details
remodel e kitchen. convert 1 e bath to two bathroom, convert e dining rm to bedroom, construct 1 skylight. all work at 2nd fl. no work on g/f. | $38,000 |
| Aug 16, 2017 | Completed final sign-off Oct 2017 | 331 17th Av | install new toilet/sink unit & shower on 2nd fl.Details
install new toilet/sink unit & shower on 2nd fl. | $8,000 |
| Aug 4, 2017 | Completed final sign-off Oct 2017 | 210 Claremont Bl | replace 6 windows at the front façade and 3 on the north façade - existing wood with wood windows. at the front façade the windows will be hung windows - all within the existing openings. the rear façade windows to be replace with vinyl.Details
replace 6 windows at the front façade and 3 on the north façade - existing wood with wood windows. at the front façade the windows will be hung windows - all within the existing openings. the rear façade windows to be replace with vinyl. | $7,000 |
| Jul 12, 2017 | Completed final sign-off Oct 2017 | 210 Claremont Bl | concrete wall replacement (5'x30') around 150 sq ft. concrete driveway replacment around 160 sq ft.Details
concrete wall replacement (5'x30') around 150 sq ft. concrete driveway replacment around 160 sq ft. | $2,000 |
| Jun 6, 2017 | Completed final sign-off Oct 2017 | 210 Claremont Bl | repair right side house dry rock. non visible from the street.Details
repair right side house dry rock. non visible from the street. | $5,000 |
| Apr 7, 2017 | Expired or cancelled expired May 2024 | 148 Terra Vista Av | to complete work and obtain final for app#2005-05-23-3203Details
to complete work and obtain final for app#2005-05-23-3203 | |
| Jan 12, 2017 | Completed final sign-off Jun 2017 | 1151 York St | remodel existing kitchen & bathroom @ 3/f, add a new bathroom & new electrical for whole 3/f.Details
remodel existing kitchen & bathroom @ 3/f, add a new bathroom & new electrical for whole 3/f. | $40,000 |
| Jan 11, 2017 | Completed final sign-off Jun 2017 | 80 Taraval St | kitchen remodel in-kind.Details
kitchen remodel in-kind. | $20,000 |
| Dec 29, 2016 | Completed final sign-off Jun 2017 | 1151 York St | window replacement. one window visible to the street. no change in size.Details
window replacement. one window visible to the street. no change in size. | $1,000 |
| Dec 19, 2016 | Completed final sign-off Apr 2024 | 4640 Balboa St | additional of dwelling units per planning ordinance no 162-16. refer to app#201612195267- conver (e) storage space @ 2nd flr to one new unit, convert (e) garage and crawl space to 7 separate units. revision to structural pa# 2016-1219-5267 to accomodate this adu permit.Details
additional of dwelling units per planning ordinance no 162-16. refer to app#201612195267- conver (e) storage space @ 2nd flr to one new unit, convert (e) garage and crawl space to 7 separate units. revision to structural pa# 2016-1219-5267 to accomodate this adu permit. | $50,000 |
| Dec 19, 2016 | Completed final sign-off May 2021 | 4640 Balboa St | provide mandatory retrofit program to (e) apartment per city code chapter 34b, engineering 2012 iebc appendix a-4.Details
provide mandatory retrofit program to (e) apartment per city code chapter 34b, engineering 2012 iebc appendix a-4. | $20,000 |
| Nov 17, 2016 | Completed final sign-off Jan 2017 | 3518 Santiago St | remodel kitchen, new sub panel, repair some wall studs in kindDetails
remodel kitchen, new sub panel, repair some wall studs in kind | $8,000 |
| Nov 10, 2016 | Completed final sign-off Jun 2017 | 1219 21st Av | replace the old window in garage(on the right side). not visible from the streetDetails
replace the old window in garage(on the right side). not visible from the street | $2,000 |
| Sep 22, 2016 | Expired or cancelled expired Mar 2023 | 1441 Stevenson St | upgrade fire exits, disable access. add truck doors. enclose low roof area. parcial compliance with voilation# 201450471. reverting back to original use from residential back to commercial use. ** maher: **Details
upgrade fire exits, disable access. add truck doors. enclose low roof area. parcial compliance with voilation# 201450471. reverting back to original use from residential back to commercial use. ** maher: ** | $150,000 |
| Sep 21, 2016 | Completed final sign-off Oct 2016 | 4448 24th St | remodel a bathroom, install new tiles.Details
remodel a bathroom, install new tiles. | $3,500 |
| Aug 15, 2016 | Completed final sign-off Oct 2016 | 809 Columbus Av | remodel hallway bathroom, no change on walls.Details
remodel hallway bathroom, no change on walls. | $9,000 |
| Aug 11, 2016 | Completed final sign-off Dec 2016 | 330 18th Av | replace fence in back of home/ replace in kind.Details
replace fence in back of home/ replace in kind. | $6,500 |
| Jul 28, 2016 | Completed final sign-off Oct 2016 | 181 States St | remodel 1 bathroom & 1 kitchen @ ground floor , no changes to walls.Details
remodel 1 bathroom & 1 kitchen @ ground floor , no changes to walls. | $25,000 |
| Jul 28, 2016 | Completed final sign-off Aug 2016 | 1436 17th Av | repair back stair less 50% in kind.Details
repair back stair less 50% in kind. | $2,500 |
| Jun 27, 2016 | Completed final sign-off Aug 2016 | 2729 34th Av | repair back stairs, less than 50%Details
repair back stairs, less than 50% | $3,000 |
| Apr 22, 2016 | Completed final sign-off Aug 2016 | 330 18th Av | construct new stairs @ rear, remove exisitng window, install new door at window location.Details
construct new stairs @ rear, remove exisitng window, install new door at window location. | $10,000 |
| Apr 19, 2016 | Completed final sign-off Jul 2016 | 232 10th Av | bathroom and kitchen remodel. no structural. same configurationDetails
bathroom and kitchen remodel. no structural. same configuration | $25,000 |
| Feb 23, 2016 | Completed final sign-off Aug 2016 | 330 18th Av | remodel 4 bathrooms, two kitchens and replace 15 windows in back not visable from street, rear and & side windows u-factor 0.32.Details
remodel 4 bathrooms, two kitchens and replace 15 windows in back not visable from street, rear and & side windows u-factor 0.32. | $90,000 |
| Sep 3, 2015 | Completed final sign-off Nov 2016 | 142 Bosworth St | 1)legalize extg home office. construct one full bath room at ground floor. 2)remodel extg bath room at 2nd floor.Details
1)legalize extg home office. construct one full bath room at ground floor. 2)remodel extg bath room at 2nd floor. | $42,000 |
| Jul 2, 2015 | Completed final sign-off Oct 2015 | 2215 Webster St | remodel kitchen in kind. n/a maher ord. 155-13Details
remodel kitchen in kind. n/a maher ord. 155-13 | $8,000 |
| Jun 22, 2015 | Never finaled issued Jun 2015, no final | 1430 35th Av | repair front stairs & dryrot, less than 50%Details
repair front stairs & dryrot, less than 50% | $4,000 |
| Apr 30, 2015 | Completed final sign-off Jun 2015 | 127 Amazon Av | repair 25% of roof, remove & replace siding at rear, approx. 200 sq.ft. +/-, all work not visable from street. replace tile @ bathroom (minor remodeling). n/a ordinance #155-13Details
repair 25% of roof, remove & replace siding at rear, approx. 200 sq.ft. +/-, all work not visable from street. replace tile @ bathroom (minor remodeling). n/a ordinance #155-13 | $7,000 |
| Mar 17, 2015 | Completed final sign-off Dec 2015 | 1771 16th Av | replace rod wood & enlarge front door stairsDetails
replace rod wood & enlarge front door stairs | $8,900 |
| Feb 19, 2015 | Completed final sign-off May 2021 | 3333 24th St | remodel of (e) unit #3333: including demo & construction, no changes to bldg envelope, remodel & relocate (e)kitchen, remodel (e) bathroom, bedroom, & living.new closets @ (e) bedroom &convert living room to bedroom; new wall mounted w/h new light fixture & outlets maher n/aDetails
remodel of (e) unit #3333: including demo & construction, no changes to bldg envelope, remodel & relocate (e)kitchen, remodel (e) bathroom, bedroom, & living.new closets @ (e) bedroom &convert living room to bedroom; new wall mounted w/h new light fixture & outlets maher n/a | $20,000 |
| Dec 29, 2014 | Completed final sign-off May 2015 | 1125 Revere Av | change of use from s-1 to u greenhouse. install 1-hour rated door between north & south space. install (2) new ada toilet rooms.Details
change of use from s-1 to u greenhouse. install 1-hour rated door between north & south space. install (2) new ada toilet rooms. | $35,000 |
| Nov 19, 2014 | Completed final sign-off Jan 2015 | 1125 Revere Av | repair existing mezzanine dry rot less than 50%Details
repair existing mezzanine dry rot less than 50% | $2,000 |
| Sep 5, 2014 | Never finaled issued Sep 2014, no final | 1471 Jackson St | remodel bathroom and kitchen in unit 12Details
remodel bathroom and kitchen in unit 12 | $18,000 |
| Sep 5, 2014 | Expired or cancelled expired May 2024 | 148 Terra Vista Av | revision to approved building permit 200505233203& pa#2014-0110-5988; interior work on segment 2 ground floor only, remove bathroom #2 and revise interior walls.Details
revision to approved building permit 200505233203& pa#2014-0110-5988; interior work on segment 2 ground floor only, remove bathroom #2 and revise interior walls. | |
| Jul 7, 2014 | Never finaled issued Jul 2014, no final | 2154 Jones St | remodel (e) kitchen and bath, at unit #2154 on 2nd flr; no chang eon wallsDetails
remodel (e) kitchen and bath, at unit #2154 on 2nd flr; no chang eon walls | $11,000 |
| Jan 10, 2014 | Expired or cancelled expired May 2024 | 148 Terra Vista Av | revision to pa# 200505233203: segment 2 ground floor- remove common stair #3, add unit #1 internal stair to garage and relay out non-bearing walls in unit #1, underpinning & shoringDetails
revision to pa# 200505233203: segment 2 ground floor- remove common stair #3, add unit #1 internal stair to garage and relay out non-bearing walls in unit #1, underpinning & shoring | |
| Dec 31, 2013 | Completed final sign-off Jul 2014 | 12 Sears St | to comply with noc # 201340781. remove illegal stove at 1st floor. also, remove bathtub within existing toilet room. return back to original approved floor plan app. 9004301. restore washer and dryer per approved plan.Details
to comply with noc # 201340781. remove illegal stove at 1st floor. also, remove bathtub within existing toilet room. return back to original approved floor plan app. 9004301. restore washer and dryer per approved plan. | $1,000 |
| Nov 26, 2013 | Completed final sign-off Mar 2014 | 322 Connecticut St | add (1) sink & cabinet in bathroom 1, add toilet in bathroom 2, relocate shower but for bathroom 2Details
add (1) sink & cabinet in bathroom 1, add toilet in bathroom 2, relocate shower but for bathroom 2 | $4,500 |
| Sep 30, 2013 | Completed final sign-off Jun 2014 | 1816 16th Av | remodel (e) kitchen, replace counter & cabinets. add one full bath room, rewire electrical & lighting. all work at 2nd floor.Details
remodel (e) kitchen, replace counter & cabinets. add one full bath room, rewire electrical & lighting. all work at 2nd floor. | $18,000 |
| Sep 9, 2013 | Completed final sign-off Mar 2014 | 1500 Ortega St | legalize family room. storage room, and remove extg unpermitted bath room. convert into half bath room. all work at ground floor.Details
legalize family room. storage room, and remove extg unpermitted bath room. convert into half bath room. all work at ground floor. | $28,000 |
| Sep 6, 2013 | Expired or cancelled expired May 2024 | 148 Terra Vista Av | install temporary shoring & hand dug piers to facilatate the excavation & construction of the proposed remodel & addition per pa# 2005-0523-3203 (s/r5) & 2012-0223-4753Details
install temporary shoring & hand dug piers to facilatate the excavation & construction of the proposed remodel & addition per pa# 2005-0523-3203 (s/r5) & 2012-0223-4753 | $9,500 |
| Feb 23, 2012 | Expired or cancelled expired May 2024 | 148 Terra Vista Av | renew pa#200505233203 to complete work and obtain final inspection. job never started.Details
renew pa#200505233203 to complete work and obtain final inspection. job never started. |