Jian's Builder Corp
- Based in
- San Francisco
- On San Francisco permits
- Feb 2012 to Jul 2026
- Last 24 months
- 16 permits filed
100 permits since 2000: 81 completed, 3 in progress, 5 never finaled, 11 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
36 bathroom remodel permits: 30 completed, 3 in progress, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2026 | In progress issued Jul 2026 | 2008 Lombard St | unit #a: conversion of existing bedroom to a 3 fixture bath to a wet bar.Details
unit #a: conversion of existing bedroom to a 3 fixture bath to a wet bar. | $20,000 |
| Apr 28, 2026 | Completed final sign-off Aug 2026 | 3892 Sacramento St | unit 5: remodel kitchen and bathroom. tub to shower conversion.Details
unit 5: remodel kitchen and bathroom. tub to shower conversion. | $35,000 |
| Apr 28, 2026 | Completed final sign-off Jul 2026 | 162 Lunado Ct | conversion of existing ground floor storage/garage into an office with a 2 fixture bath. switch existing door and window on west yard. open a new window facing east yard. relocate existing furnace and water heater.Details
conversion of existing ground floor storage/garage into an office with a 2 fixture bath. switch existing door and window on west yard. open a new window facing east yard. relocate existing furnace and water heater. | $10,000 |
| Dec 30, 2025 | In progress issued Feb 2026 | 230 Niagara Av | to comply w/ nov#202425976: legalize 1st floor including 2 bedrooms, 1 3-fixture bath, family room, 495 sq ft. demo unpermitted walls on 2nd fl and restore space back to family. add a hallway connecting to back yard. restore and relocate washer/dryer. add a wetbar and burner to 1st floor.Details
to comply w/ nov#202425976: legalize 1st floor including 2 bedrooms, 1 3-fixture bath, family room, 495 sq ft. demo unpermitted walls on 2nd fl and restore space back to family. add a hallway connecting to back yard. restore and relocate washer/dryer. add a wetbar and burner to 1st floor. | $8,000 |
| Mar 31, 2025 | In progress issued Jan 2026 | 99 Onondaga Av | convert (e) commercial space into new dwelling unit with 1 kit,2 bath, 3 bed; convert (e) 2-car garage into 1 adu (state) with 1 kit, 1 bath,2 bed. new roof deck and exterior stair to roof deckDetails
convert (e) commercial space into new dwelling unit with 1 kit,2 bath, 3 bed; convert (e) 2-car garage into 1 adu (state) with 1 kit, 1 bath,2 bed. new roof deck and exterior stair to roof deck | $90,000 |
| Dec 23, 2024 | Completed final sign-off May 2025 | 2474 46th Av | remodel 2 bath and 1 kitchen in kind. replace in kind flooring cabinets countertop, vanity, toilet shower and related electrical and plumbing.Details
remodel 2 bath and 1 kitchen in kind. replace in kind flooring cabinets countertop, vanity, toilet shower and related electrical and plumbing. | $60,000 |
| Nov 1, 2024 | Completed final sign-off Sep 2025 | 746 18th Av | to comply with nov #202426380 2nd fl: remodel (e) kitchen & bathroom. add toilet room. 1st fl: install (n) bathroom, 2 bedrooms & family roomDetails
to comply with nov #202426380 2nd fl: remodel (e) kitchen & bathroom. add toilet room. 1st fl: install (n) bathroom, 2 bedrooms & family room | $60,000 |
| Oct 7, 2024 | Completed final sign-off Sep 2025 | 149 Seville St | master bathroom remodel and replace 1 window within the same opening. . install (n) sheet rock for 2x bedrooms and replace 2 windows within the same opening. no work is visible from street and is in kind. no wall removal.Details
master bathroom remodel and replace 1 window within the same opening. . install (n) sheet rock for 2x bedrooms and replace 2 windows within the same opening. no work is visible from street and is in kind. no wall removal. | $15,000 |
| Sep 24, 2024 | Completed final sign-off Sep 2025 | 149 Seville St | remodel bathroom in 3rd floor- repair window in the diningroom. replace drywall in 3rd floor sunroom and repair the window. whole house change to laminate flooring. paint the whole inside out. window not visible from street; max u-factor 0.30; repair in kind.Details
remodel bathroom in 3rd floor- repair window in the diningroom. replace drywall in 3rd floor sunroom and repair the window. whole house change to laminate flooring. paint the whole inside out. window not visible from street; max u-factor 0.30; repair in kind. | $20,000 |
| Apr 2, 2024 | Completed final sign-off Aug 2024 | 925 Divisadero St | apts 925 & 927: legalize (e) bathroom at 4th fl. and 3rd fl. proposed installing new furnance at 4th & 3rd fl.Details
apts 925 & 927: legalize (e) bathroom at 4th fl. and 3rd fl. proposed installing new furnance at 4th & 3rd fl. | $38,000 |
| Jun 28, 2022 | Completed final sign-off Jun 2023 | 1211 Monterey Bl | remodel living, dining, & bathrooms. relocate kitchen, add full bath, replace stairs, remove walls on 2nd floor. add media and office on 1st floor. replace windows at front and side. upgrade electrical and plumbing system. replace roof.Details
remodel living, dining, & bathrooms. relocate kitchen, add full bath, replace stairs, remove walls on 2nd floor. add media and office on 1st floor. replace windows at front and side. upgrade electrical and plumbing system. replace roof. | $200,000 |
| Apr 13, 2022 | Completed final sign-off May 2022 | 17 De Soto St | add 1 full bath & laundry room in lower floor per planDetails
add 1 full bath & laundry room in lower floor per plan | $15,888 |
| Jun 28, 2021 | Completed final sign-off Dec 2021 | 1254 Plymouth Av | remodel ground floor bonus room to family room with bath and closet. add 1/2 bath at hallway. add 1 storage at front of garage.Details
remodel ground floor bonus room to family room with bath and closet. add 1/2 bath at hallway. add 1 storage at front of garage. | $50,888 |
| May 13, 2021 | Completed final sign-off Apr 2022 | 1254 Quesada Av | remodel 2 bathroom & 1 kitchen in kind. replace 4 rear windows in kind. u factor 0.30max. replace double sliding door in kind at rear.Details
remodel 2 bathroom & 1 kitchen in kind. replace 4 rear windows in kind. u factor 0.30max. replace double sliding door in kind at rear. | $20,000 |
| Nov 24, 2020 | Completed final sign-off Oct 2023 | 972 Rutland St | comply with nov#: 201566560. remove rear structure. 1st floor : add adu per ordinance 95-17. add 2 bedrooms, kitchen, media room and 2 full baths.Details
comply with nov#: 201566560. remove rear structure. 1st floor : add adu per ordinance 95-17. add 2 bedrooms, kitchen, media room and 2 full baths. | $60,000 |
| Sep 30, 2019 | Completed final sign-off Sep 2020 | 140 Winston Dr | lower 1st flr - add 2 bedrms, 1 laundry and 2 full bath. 1st flr - remodel kitchen, din rm, add 1 full bath. 2nd flr - remodel bedrms and bathrms add 1 full bathDetails
lower 1st flr - add 2 bedrms, 1 laundry and 2 full bath. 1st flr - remodel kitchen, din rm, add 1 full bath. 2nd flr - remodel bedrms and bathrms add 1 full bath | $63,000 |
| Jan 14, 2019 | Completed final sign-off Apr 2019 | 2150 33rd Av | upgrade existing family room, bathroom, media room & bed room. all work at ground floor. ref pa #200905269131Details
upgrade existing family room, bathroom, media room & bed room. all work at ground floor. ref pa #200905269131 | $65,000 |
| Mar 1, 2018 | Completed final sign-off Oct 2018 | 1771 16th Av | two bathrooms tile repair (floor tile only). repair in-kind.Details
two bathrooms tile repair (floor tile only). repair in-kind. | $8,000 |
| Oct 24, 2017 | Completed final sign-off Mar 2018 | 261 Beverly St | legalize two bedrooms, one full bathroom. construct one new bathroom & laundry room. all work at ground floor.Details
legalize two bedrooms, one full bathroom. construct one new bathroom & laundry room. all work at ground floor. | $52,000 |
| Oct 24, 2017 | Completed final sign-off Dec 2017 | 2323 19th Av | remodel bathroom, repair all tiles on the bath tub area and floor. replace new bath tub at vanity and toilet. floor around 45 sq ft, bath tub around 80 sq ft. bathroom remodel in kind.Details
remodel bathroom, repair all tiles on the bath tub area and floor. replace new bath tub at vanity and toilet. floor around 45 sq ft, bath tub around 80 sq ft. bathroom remodel in kind. | $4,000 |
| Sep 25, 2017 | Completed final sign-off Mar 2018 | 261 Beverly St | remodel e kitchen. convert 1 e bath to two bathroom, convert e dining rm to bedroom, construct 1 skylight. all work at 2nd fl. no work on g/f.Details
remodel e kitchen. convert 1 e bath to two bathroom, convert e dining rm to bedroom, construct 1 skylight. all work at 2nd fl. no work on g/f. | $38,000 |
| Jan 12, 2017 | Completed final sign-off Jun 2017 | 1151 York St | remodel existing kitchen & bathroom @ 3/f, add a new bathroom & new electrical for whole 3/f.Details
remodel existing kitchen & bathroom @ 3/f, add a new bathroom & new electrical for whole 3/f. | $40,000 |
| Sep 21, 2016 | Completed final sign-off Oct 2016 | 4448 24th St | remodel a bathroom, install new tiles.Details
remodel a bathroom, install new tiles. | $3,500 |
| Aug 15, 2016 | Completed final sign-off Oct 2016 | 809 Columbus Av | remodel hallway bathroom, no change on walls.Details
remodel hallway bathroom, no change on walls. | $9,000 |
| Jul 28, 2016 | Completed final sign-off Oct 2016 | 181 States St | remodel 1 bathroom & 1 kitchen @ ground floor , no changes to walls.Details
remodel 1 bathroom & 1 kitchen @ ground floor , no changes to walls. | $25,000 |
| Apr 19, 2016 | Completed final sign-off Jul 2016 | 232 10th Av | bathroom and kitchen remodel. no structural. same configurationDetails
bathroom and kitchen remodel. no structural. same configuration | $25,000 |
| Feb 23, 2016 | Completed final sign-off Aug 2016 | 330 18th Av | remodel 4 bathrooms, two kitchens and replace 15 windows in back not visable from street, rear and & side windows u-factor 0.32.Details
remodel 4 bathrooms, two kitchens and replace 15 windows in back not visable from street, rear and & side windows u-factor 0.32. | $90,000 |
| Sep 3, 2015 | Completed final sign-off Nov 2016 | 142 Bosworth St | 1)legalize extg home office. construct one full bath room at ground floor. 2)remodel extg bath room at 2nd floor.Details
1)legalize extg home office. construct one full bath room at ground floor. 2)remodel extg bath room at 2nd floor. | $42,000 |
| Apr 30, 2015 | Completed final sign-off Jun 2015 | 127 Amazon Av | repair 25% of roof, remove & replace siding at rear, approx. 200 sq.ft. +/-, all work not visable from street. replace tile @ bathroom (minor remodeling). n/a ordinance #155-13Details
repair 25% of roof, remove & replace siding at rear, approx. 200 sq.ft. +/-, all work not visable from street. replace tile @ bathroom (minor remodeling). n/a ordinance #155-13 | $7,000 |
| Feb 19, 2015 | Completed final sign-off May 2021 | 3333 24th St | remodel of (e) unit #3333: including demo & construction, no changes to bldg envelope, remodel & relocate (e)kitchen, remodel (e) bathroom, bedroom, & living.new closets @ (e) bedroom &convert living room to bedroom; new wall mounted w/h new light fixture & outlets maher n/aDetails
remodel of (e) unit #3333: including demo & construction, no changes to bldg envelope, remodel & relocate (e)kitchen, remodel (e) bathroom, bedroom, & living.new closets @ (e) bedroom &convert living room to bedroom; new wall mounted w/h new light fixture & outlets maher n/a | $20,000 |
| Sep 5, 2014 | Expired or cancelled expired May 2024 | 148 Terra Vista Av | revision to approved building permit 200505233203& pa#2014-0110-5988; interior work on segment 2 ground floor only, remove bathroom #2 and revise interior walls.Details
revision to approved building permit 200505233203& pa#2014-0110-5988; interior work on segment 2 ground floor only, remove bathroom #2 and revise interior walls. | |
| Sep 5, 2014 | Never finaled issued Sep 2014, no final | 1471 Jackson St | remodel bathroom and kitchen in unit 12Details
remodel bathroom and kitchen in unit 12 | $18,000 |
| Jul 7, 2014 | Never finaled issued Jul 2014, no final | 2154 Jones St | remodel (e) kitchen and bath, at unit #2154 on 2nd flr; no chang eon wallsDetails
remodel (e) kitchen and bath, at unit #2154 on 2nd flr; no chang eon walls | $11,000 |
| Nov 26, 2013 | Completed final sign-off Mar 2014 | 322 Connecticut St | add (1) sink & cabinet in bathroom 1, add toilet in bathroom 2, relocate shower but for bathroom 2Details
add (1) sink & cabinet in bathroom 1, add toilet in bathroom 2, relocate shower but for bathroom 2 | $4,500 |
| Sep 30, 2013 | Completed final sign-off Jun 2014 | 1816 16th Av | remodel (e) kitchen, replace counter & cabinets. add one full bath room, rewire electrical & lighting. all work at 2nd floor.Details
remodel (e) kitchen, replace counter & cabinets. add one full bath room, rewire electrical & lighting. all work at 2nd floor. | $18,000 |
| Sep 9, 2013 | Completed final sign-off Mar 2014 | 1500 Ortega St | legalize family room. storage room, and remove extg unpermitted bath room. convert into half bath room. all work at ground floor.Details
legalize family room. storage room, and remove extg unpermitted bath room. convert into half bath room. all work at ground floor. | $28,000 |