Block 0492, lot 004
2008 Lombard St
- City’s use
- Multi-Family Residential
- Built
- 1909
- Stories
- 3
- Units
- 7
- Rooms
- 18 bedrooms, 6 bathrooms
- Building
- 5,847 sq ft
- Lot
- 3,000 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2026 | In progress issued Jul 2026 | 2008 Lombard St | Jian's Builder Corp | unit #a: conversion of existing bedroom to a 3 fixture bath to a wet bar.Details
unit #a: conversion of existing bedroom to a 3 fixture bath to a wet bar. | $20,000 |
| Mar 10, 2023 | Expired or cancelled cancelled Jan 2026 | 2008 Lombard St | conversion of bedroom to bathroom. and wetbar to create master suite.Details
conversion of bedroom to bathroom. and wetbar to create master suite. | $28,000 | |
| Jan 9, 2023 | Never finaled filed Jan 2023, never issued | 2006 Lombard St | addition of two (2) accessory dwelling units within the existing building envelope, located at the basement level per ordinance 162-16Details
addition of two (2) accessory dwelling units within the existing building envelope, located at the basement level per ordinance 162-16 | $150,000 | |
| Jan 9, 2023 | Never finaled filed Jan 2023, never issued | 2006 Lombard St | addition of two (2) accessory dwelling units within the existing building envelope of rear yard accessory stru, located at the basement level per ordinance 162-16Details
addition of two (2) accessory dwelling units within the existing building envelope of rear yard accessory stru, located at the basement level per ordinance 162-16 | $150,000 | |
| Aug 28, 2018 | Completed final sign-off Feb 2019 | 2010 Lombard St | John Construction Builder | 3rd flr - interior remodel (e) kitchen adn add a full bathroom in unit 2010bDetails
3rd flr - interior remodel (e) kitchen adn add a full bathroom in unit 2010b | $25,000 |
| Apr 17, 2018 | Never finaled issued Apr 2018, no final | 2006 Lombard St | street space permit (scaffolding)Details
street space permit (scaffolding) | ||
| Jan 22, 2018 | Completed final sign-off Sep 2018 | 2012 Lombard St | John Construction Builder | unit a: 4th fl - remodel existing kitchen and bathroom; add full bathroomDetails
unit a: 4th fl - remodel existing kitchen and bathroom; add full bathroom | $30,000 |
| Dec 7, 2017 | Completed final sign-off Sep 2018 | 2012 Lombard St | John Construction Builder | unit b - remodel kitchen and add a full bathroomDetails
unit b - remodel kitchen and add a full bathroom | $30,000 |
| May 31, 2017 | Completed final sign-off Mar 2018 | 2008 Lombard St | P F Construction Co | unit b: interior remodel - kitchen and bathroom. add a bathroomDetails
unit b: interior remodel - kitchen and bathroom. add a bathroom | $20,000 |
| Jan 5, 2017 | Never finaled issued Jan 2017, no final | 2010 Lombard St | P F Construction Co | add a bath, remodel kitchen, and replace furnace on 2nd floor. n/a for maherDetails
add a bath, remodel kitchen, and replace furnace on 2nd floor. n/a for maher | $15,000 |
| Jan 5, 2015 | Completed final sign-off Feb 2015 | 2006 Lombard St | Fastnet Engineering & Const Inc | repair existing rear egress in kind. comply with nov 201403221Details
repair existing rear egress in kind. comply with nov 201403221 | $6,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- John Construction Builder (3), P F Construction Co (2), Fastnet Engineering & Const Inc, Jian's Builder Corp
- Architects
- Jason Chan (3), Jong Zhan Chen
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.