Matthew Burns
- Listed as
- authorized agent-others, contractor, subcontractor
- Firm
- Sandbank Construction, Inc
- Based in
- Novato
- On San Francisco permits
- Aug 2012 to Sep 2026
151 permits since 2000 (contractor on 150 permits, authorized agent-others on 1 permit, subcontractor on 1 permit): 119 completed, 6 in progress, 20 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 151.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 3, 2026 | In progress issued Sep 2026 | 2293 Powell St | Sandbank Construction, Inc | foundation work compacted fill and backfilling, pured in place concrete and masonaryDetails
foundation work compacted fill and backfilling, pured in place concrete and masonary | $50,000 |
| Sep 1, 2026 | In progress issued Sep 2026 | 1935 Franklin St | Sandbank Construction, Inc | demo portion of (e) wall, provide (n) 60 min fire-rated door. provide n laundry w/ flush threshold & handrail 36". provide 1 hr fire-rated separation. provide sprinkler coverage at trash area. comply w nov 202546864 #3. provide min 200 si. vent @ garage. 1(n) garbage, recycle & compostDetails
demo portion of (e) wall, provide (n) 60 min fire-rated door. provide n laundry w/ flush threshold & handrail 36". provide 1 hr fire-rated separation. provide sprinkler coverage at trash area. comply w nov 202546864 #3. provide min 200 si. vent @ garage. 1(n) garbage, recycle & compost | $20,000 |
| Jun 4, 2026 | Completed final sign-off Jun 2026 | 2105 O'farrell St | Sandbank Construction, Inc | recommencement and completion of work approved under pa#: 202410233535.Details
recommencement and completion of work approved under pa#: 202410233535. | $10,000 |
| Oct 2, 2025 | Completed final sign-off Feb 2026 | 229 Chattanooga St | Sandbank Construction, Inc | revision to 202508294235 to gas & electrical wall heaters to be replaced w/ heat pump split system. bathrooom layout reconfiguredDetails
revision to 202508294235 to gas & electrical wall heaters to be replaced w/ heat pump split system. bathrooom layout reconfigured | $10,000 |
| Sep 15, 2025 | In progress issued Nov 2025 | 1290 Grove St | Sandbank Construction, Inc | revision to approved adu permit 202002043526. remove all 4 adus and replace garages to original condition. new electrical room. new common laundry. comply with nov 202293711 item 2-7.Details
revision to approved adu permit 202002043526. remove all 4 adus and replace garages to original condition. new electrical room. new common laundry. comply with nov 202293711 item 2-7. | $10,000 |
| Aug 29, 2025 | Completed final sign-off Feb 2026 | 229 Chattanooga St | Sandbank Construction, Inc | interior remodel, including kitchen and bathroom with new finishes, cabinetry and appliances. all new wiring, electric heat pump to replace existing heat. no structural work, no changes visible from street.Details
interior remodel, including kitchen and bathroom with new finishes, cabinetry and appliances. all new wiring, electric heat pump to replace existing heat. no structural work, no changes visible from street. | $43,000 |
| Jun 27, 2025 | Completed final sign-off Oct 2025 | 2835 Van Ness Av | Sandbank Construction, Inc | stair repair at entry courtyard. repair & bracing. less than 50% replacement.Details
stair repair at entry courtyard. repair & bracing. less than 50% replacement. | $25,000 |
| May 22, 2025 | Completed final sign-off Feb 2026 | 3420 Market St | Sandbank Construction, Inc | existing decks repair/replacement, addition of new columns and exterior of deck. no dimension changes to decks.Details
existing decks repair/replacement, addition of new columns and exterior of deck. no dimension changes to decks. | $60,000 |
| Apr 16, 2025 | In progress issued Apr 2025 | 1801 California St | Sandbank Construction, Inc | removal of (e) trash chute to allow for sorting of disposal debris not visibile streetDetails
removal of (e) trash chute to allow for sorting of disposal debris not visibile street | $5,000 |
| Apr 14, 2025 | In progress issued Jun 2025 | 1801 California St | Sandbank Construction, Inc | revision to pa# 201811206437: removing a bedroom in unit #34 and adding a trash room in that location - no work proposed at exterior at public way.Details
revision to pa# 201811206437: removing a bedroom in unit #34 and adding a trash room in that location - no work proposed at exterior at public way. | $7,500 |
| Oct 23, 2024 | Expired or cancelled expired Jun 2026 | 2105 O'farrell St | Sandbank Construction, Inc | replacement of exising 3000 liter oxygen tank with 7000 liter oxygen tank in an existing enclosureDetails
replacement of exising 3000 liter oxygen tank with 7000 liter oxygen tank in an existing enclosure | $10,000 |
| Mar 21, 2024 | Expired or cancelled withdrawn Sep 2026 | 2293 Powell St | Sandbank Construction, Inc | build retaining wall, fence wall, and fillDetails
build retaining wall, fence wall, and fill | $30,000 |
| Dec 1, 2023 | Completed final sign-off Dec 2024 | 227 Chattanooga St | Sandbank Construction, Inc | basement storage area to be connected via internal stair to unit above, adding 2 bedrooms, 1 office, 2 baths.Details
basement storage area to be connected via internal stair to unit above, adding 2 bedrooms, 1 office, 2 baths. | $213,538 |
| Nov 30, 2023 | Completed final sign-off Mar 2024 | 1077 Ashbury St | Sandbank Construction, Inc | revision to pa# 202303133566, new foundation segment to soft story retrofit, per cebc 2022 chap4, comply with 201490833, including (e) condition construction revisions.Details
revision to pa# 202303133566, new foundation segment to soft story retrofit, per cebc 2022 chap4, comply with 201490833, including (e) condition construction revisions. | |
| Jun 2, 2023 | Completed final sign-off Jun 2023 | 1600 Fell St | Sandbank Construction, Inc | revision to pa# 201609066856, to accommodate existing conditions, shearwall relocated to avoid e boiler room and 3 laundry room , e windows now shown and shearwalls updated accordingly, layout of e bldg corrected on plan.Details
revision to pa# 201609066856, to accommodate existing conditions, shearwall relocated to avoid e boiler room and 3 laundry room , e windows now shown and shearwalls updated accordingly, layout of e bldg corrected on plan. | |
| May 17, 2023 | Completed final sign-off Jun 2023 | 1720 Leavenworth St | Sandbank Construction, Inc | revision to pa#: 202010076105. to show as built condition. update drawings to show alteration under adu permit 202203018962 n.i.c. revise shear wall along grid 1,3 and 5. on plans s2.1. refer to pa 202012080517 for architectural dwgDetails
revision to pa#: 202010076105. to show as built condition. update drawings to show alteration under adu permit 202203018962 n.i.c. revise shear wall along grid 1,3 and 5. on plans s2.1. refer to pa 202012080517 for architectural dwg | |
| Mar 13, 2023 | Completed final sign-off Mar 2024 | 1077 Ashbury St | Sandbank Construction, Inc | soft story retrofit per cebc 2022 appendix a-4. to satisfy the city of sf ssr ma incld. addition of moment frames, sheated walls and bolted sills. comply w/ 2019 90833.Details
soft story retrofit per cebc 2022 appendix a-4. to satisfy the city of sf ssr ma incld. addition of moment frames, sheated walls and bolted sills. comply w/ 2019 90833. | $100,000 |
| Feb 22, 2023 | Completed final sign-off Feb 2024 | 3099 Washington St | Sandbank Construction, Inc | revision to pa# 201805038157, 202111092129. no change to unit mix. no change to mechanical or structural, extend new permanent fire escape steps and wall mounted ladder to ground flr. non-combustible metalDetails
revision to pa# 201805038157, 202111092129. no change to unit mix. no change to mechanical or structural, extend new permanent fire escape steps and wall mounted ladder to ground flr. non-combustible metal | $5,200 |
| Oct 11, 2022 | In progress issued Mar 2025 | 801 Crescent Av | The Sustainable Cbo Inc Dba Oliver Macki | 2 story horizontal addition with connection to the main house. addition to include laundry and storage at l1, bedroom and bath @ l2 and roof deck above. reference pa# 2022-1012-4161 for demo of (e) detached garageDetails
2 story horizontal addition with connection to the main house. addition to include laundry and storage at l1, bedroom and bath @ l2 and roof deck above. reference pa# 2022-1012-4161 for demo of (e) detached garage | $200,000 |
| Sep 14, 2022 | Completed final sign-off Mar 2023 | 1234 Grove St | Sandbank Construction, Inc | retrofit to comply with nov 202294960. soft story retrofit of the ground story with additional wood sheathed shear walls with new and retrofitted foundations and diaphragm connections under the first floor. (asce 41-13 enginnering criteria)Details
retrofit to comply with nov 202294960. soft story retrofit of the ground story with additional wood sheathed shear walls with new and retrofitted foundations and diaphragm connections under the first floor. (asce 41-13 enginnering criteria) | $100,000 |
| Mar 1, 2022 | Completed final sign-off Feb 2024 | 1720 Leavenworth St | Sandbank Construction, Inc | revision to 202012080517. replace (e) post & pad footing along grid d2 btw 1 to 5 and grid b5 btw 2 to 5 with continous strip footing. replace (e) footing for (n) continous footing along grid e grid 1 and grid a btw 1 to 2.Details
revision to 202012080517. replace (e) post & pad footing along grid d2 btw 1 to 5 and grid b5 btw 2 to 5 with continous strip footing. replace (e) footing for (n) continous footing along grid e grid 1 and grid a btw 1 to 2. | $10,000 |
| Feb 3, 2022 | Completed final sign-off May 2022 | 2110 Baker St | Sandbank Construction, Inc | temporary shoring of framing at crawl space to allow work for partial foundation replacement in-kind. encapsulate brick flue with concrete walls at crawl space. continue dryrot repair at rear, 202201125858. replace dryrot members in-kind, replace all finishes in-kind. dryrot repair <50%.Details
temporary shoring of framing at crawl space to allow work for partial foundation replacement in-kind. encapsulate brick flue with concrete walls at crawl space. continue dryrot repair at rear, 202201125858. replace dryrot members in-kind, replace all finishes in-kind. dryrot repair <50%. | $30,000 |
| Nov 15, 2021 | Completed final sign-off Nov 2022 | 3099 Washington St | Sandbank Construction, Inc | revision to 2019 0328 6493 to accomodate (e) conditions. revision include adjustments to (e) framing layout and addition of new steel framing to support (e) chimney.Details
revision to 2019 0328 6493 to accomodate (e) conditions. revision include adjustments to (e) framing layout and addition of new steel framing to support (e) chimney. | |
| Nov 9, 2021 | Completed final sign-off Feb 2024 | 3099 Washington St | Sandbank Construction, Inc | revision to pa 201805038157. architectural layout revised to accomodate existing conditions. revision to structural scope. no change to unit mix. no change to exterior. no change to mechanical. sprinkler system filed under pa 202109228938.Details
revision to pa 201805038157. architectural layout revised to accomodate existing conditions. revision to structural scope. no change to unit mix. no change to exterior. no change to mechanical. sprinkler system filed under pa 202109228938. | |
| Jul 20, 2021 | Completed final sign-off May 2022 | 2425 Buchanan St | Sandbank Construction, Inc | unit #102 2nd fl: renovation of 1 apartment: new media room. new kitchen cabinets and plumbing fixtures, new washer/dryer and dishwasher, new lighting at (e) j-boxes. no change to mechaniical, no exterior work, fire alarm, sprinkler workDetails
unit #102 2nd fl: renovation of 1 apartment: new media room. new kitchen cabinets and plumbing fixtures, new washer/dryer and dishwasher, new lighting at (e) j-boxes. no change to mechaniical, no exterior work, fire alarm, sprinkler work | $65,000 |
| Jul 2, 2021 | Completed final sign-off Feb 2023 | 820 Waller St | Sandbank Construction, Inc | revision to pa# 201801259554. revised concrete retaining walls.Details
revision to pa# 201801259554. revised concrete retaining walls. | $15,000 |
| Dec 8, 2020 | Completed final sign-off Feb 2024 | 1720 Leavenworth St | Sandbank Construction, Inc | the scope of the work is to add three new accessory dwelling units to the ground floor per ordinance no. 162-16. there will be two studio units and one one-bedroom unit.Details
the scope of the work is to add three new accessory dwelling units to the ground floor per ordinance no. 162-16. there will be two studio units and one one-bedroom unit. | $210,000 |
| Nov 21, 2020 | Never finaled issued Dec 2022, no final | 1234 Jones St | Sandbank Construction, Inc | structural repair & stabilization of 1 bay window along pleasant street.Details
structural repair & stabilization of 1 bay window along pleasant street. | $40,000 |
| Nov 16, 2020 | Never finaled issued Aug 2022, no final | 1234 Jones St | Sandbank Construction, Inc | add 1 adu at existing storage per ordinance 162-16.Details
add 1 adu at existing storage per ordinance 162-16. | $50,000 |
| Oct 27, 2020 | Completed final sign-off Oct 2021 | 2425 Buchanan St | Sandbank Construction, Inc | unit 104, 2nd fl: new media room. (n) kitchen cabinets and plumbing fixtures. (n) washer/dryer & dishwasher. (n) lighting at (e) j-boxes. no change to mechanical. no exterior work, fire alarm, sprinkler work.Details
unit 104, 2nd fl: new media room. (n) kitchen cabinets and plumbing fixtures. (n) washer/dryer & dishwasher. (n) lighting at (e) j-boxes. no change to mechanical. no exterior work, fire alarm, sprinkler work. | $65,000 |
| Oct 7, 2020 | Completed final sign-off Jun 2023 | 1720 Leavenworth St | Sandbank Construction, Inc | soft story retrofit in accordance with sfbc mandatory soft story program using iebc appendix a4. new shearwalls, holdowns, collectors, & grade beamsDetails
soft story retrofit in accordance with sfbc mandatory soft story program using iebc appendix a4. new shearwalls, holdowns, collectors, & grade beams | $55,000 |
| Sep 14, 2020 | Completed final sign-off Mar 2021 | 748 Page St | Halyard Inc, Sandbank Construction, Inc | revision to pa 201805108844. revision to proposed units to accommodate stair landing & circulation. changes made to unit 11 to revise layout & bedroom count. reduction in sq ft at unit 10 & revised path of travel. structural has been revised with layout changes.Details
revision to pa 201805108844. revision to proposed units to accommodate stair landing & circulation. changes made to unit 11 to revise layout & bedroom count. reduction in sq ft at unit 10 & revised path of travel. structural has been revised with layout changes. | |
| Aug 22, 2020 | Completed final sign-off Jun 2021 | 201 Divisadero St | Sandbank Construction, Inc | unit 207:renovation of 1 apartment on 2nd fl. new kitchen cabinets, new dishwasher, new kitchen applicances & plumbing fixtures, new washer/dryer, new lighting @ (e) j-box locations. no change to mechanical, no exterior work/fire alarm/sprinkler work. minor structural work.Details
unit 207:renovation of 1 apartment on 2nd fl. new kitchen cabinets, new dishwasher, new kitchen applicances & plumbing fixtures, new washer/dryer, new lighting @ (e) j-box locations. no change to mechanical, no exterior work/fire alarm/sprinkler work. minor structural work. | $65,000 |
| Aug 8, 2020 | Completed final sign-off Feb 2024 | 1725 Turk St | Sandbank Construction, Inc | the scope of work is to add three new accessory dwelling units to the ground level per ordinance no. 162-16. the three new adu's will be one-bedroom units. new retaining wall at rear yard for patio extension. exavation of 28 cubic yards of soil for extended patio at rear.Details
the scope of work is to add three new accessory dwelling units to the ground level per ordinance no. 162-16. the three new adu's will be one-bedroom units. new retaining wall at rear yard for patio extension. exavation of 28 cubic yards of soil for extended patio at rear. | $230,000 |
| Mar 10, 2020 | Completed final sign-off May 2023 | 2425 Buchanan St | Sandbank Construction, Inc | revision to pa #201703020485. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
revision to pa #201703020485. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $20,000 |
| Feb 24, 2020 | Completed final sign-off Nov 2021 | 533 Clayton St | Sandbank Construction, Inc | revision to pa#201704063386 s1/r1 to include detailed shoring plan per field inspectors request.Details
revision to pa#201704063386 s1/r1 to include detailed shoring plan per field inspectors request. | |
| Feb 4, 2020 | Never finaled issued Nov 2021, no final | 1290 Grove St | Sandbank Construction, Inc | add (4) units (#37-40) @ ground fl per ord #162-16. convert (e) storage & garage space to (n) dwelling units within (e) envelope. (n) bedrooms, kitchens, baths, plumbing, electrical & structural. (n) washer/dryers & dishwashers, (n) windows facing street. fire alarm & sprinkler under separate permitDetails
add (4) units (#37-40) @ ground fl per ord #162-16. convert (e) storage & garage space to (n) dwelling units within (e) envelope. (n) bedrooms, kitchens, baths, plumbing, electrical & structural. (n) washer/dryers & dishwashers, (n) windows facing street. fire alarm & sprinkler under separate permit | $800,000 |
| Jan 9, 2020 | Completed final sign-off Aug 2020 | 533 Clayton St | Sandbank Construction, Inc | unit 533-a revision to pa 2019-0522-1419 - architectural layout revised to accommodate existing conditions. structural scope revised. no change to proposed bedrooms, bathrooms & fixture countsDetails
unit 533-a revision to pa 2019-0522-1419 - architectural layout revised to accommodate existing conditions. structural scope revised. no change to proposed bedrooms, bathrooms & fixture counts | |
| Dec 24, 2019 | Completed final sign-off Dec 2019 | 1599 Green St | Sandbank Construction, Inc | administrative only. revise scope description at pa# 2019-0322-6031, to supercede and replace in its entirety pa# 2016-0818-5390 including all special inspection and structural observation requirements.Details
administrative only. revise scope description at pa# 2019-0322-6031, to supercede and replace in its entirety pa# 2016-0818-5390 including all special inspection and structural observation requirements. | |
| Oct 1, 2019 | Never finaled issued Nov 2019, no final | 748 Page St | Sandbank Construction, Inc | renovation of 1 apt, unit 1 2nd level. relocate kitchen and bedroom, new bathroom. new kitchen cabinets and plumbing fixtures. new washer dryers dishwasher. new lighting at e j box locations. 2 new offices. relocate (1) bedroom and (1) kitchen.Details
renovation of 1 apt, unit 1 2nd level. relocate kitchen and bedroom, new bathroom. new kitchen cabinets and plumbing fixtures. new washer dryers dishwasher. new lighting at e j box locations. 2 new offices. relocate (1) bedroom and (1) kitchen. | $65,000 |
| Sep 19, 2019 | Completed final sign-off Jul 2020 | 250 Fell St | Sandbank Construction, Inc | reinforce columns in accordance with asce 41-13.Details
reinforce columns in accordance with asce 41-13. | $40,000 |
| Jul 19, 2019 | Never finaled issued Jul 2019, no final | 748 Page St | Sandbank Construction, Inc | demolish (e) drywall at ground level-garage walls and ceiling- and ceiling, replace in kind with (n) drywall. 5/8"type x gwb. (n) insulation @ ground floor. r-19@ ceiling and r-13 @ walls.Details
demolish (e) drywall at ground level-garage walls and ceiling- and ceiling, replace in kind with (n) drywall. 5/8"type x gwb. (n) insulation @ ground floor. r-19@ ceiling and r-13 @ walls. | $8,000 |
| Mar 22, 2019 | Completed final sign-off Dec 2019 | 1599 Green St | Sandbank Construction, Inc | revision to 201608185390: mandatory soft story retrofit per fema p807.Details
revision to 201608185390: mandatory soft story retrofit per fema p807. | |
| Mar 21, 2019 | Completed final sign-off Dec 2019 | 1801 Leavenworth St | Sandbank Construction, Inc | revision to app#201812057533. at basement, replace plywood shear wall at ground with concrete shear wall.Details
revision to app#201812057533. at basement, replace plywood shear wall at ground with concrete shear wall. | |
| Jan 25, 2019 | Never finaled issued Jul 2019, no final | 756 Page St | Sandbank Construction, Inc | unit # 3: comply with 201803982. renovation of 1 unit #3 3rd level. new bedroom, new bath, new kitchen, new washer dryer. new dishwasher, plumb fixtures, lighting, no mech changes, no exterior or alarm or sprinklerDetails
unit # 3: comply with 201803982. renovation of 1 unit #3 3rd level. new bedroom, new bath, new kitchen, new washer dryer. new dishwasher, plumb fixtures, lighting, no mech changes, no exterior or alarm or sprinkler | $40,000 |
| Dec 19, 2018 | Completed final sign-off Sep 2023 | 2425 Buchanan St | Sandbank Construction, Inc | convert garage into (4) dwelling units per ord 162-16 (unit 113-116) within (e) envelope. (n) bedrooms, (n) kitchen & bath fixtures. (n) dishwashers & washer dryers. (n) windows visible from street. sprinkler & fire alarm under separate permit.Details
convert garage into (4) dwelling units per ord 162-16 (unit 113-116) within (e) envelope. (n) bedrooms, (n) kitchen & bath fixtures. (n) dishwashers & washer dryers. (n) windows visible from street. sprinkler & fire alarm under separate permit. | $500,000 |
| Dec 11, 2018 | Never finaled issued Dec 2018, no final | 1591 Page St | Sandbank Construction, Inc | removal of drywall @ (e) ground floor garages. for limited exploratory holes. replace and patch back in kind.Details
removal of drywall @ (e) ground floor garages. for limited exploratory holes. replace and patch back in kind. | $5,000 |
| Dec 5, 2018 | Never finaled issued Jan 2019, no final | 1801 Leavenworth St | Sandbank Construction, Inc | voluntary partial structural strenghtening. not to any standards. not qualifided for future adu.Details
voluntary partial structural strenghtening. not to any standards. not qualifided for future adu. | $100,000 |
| Aug 10, 2018 | Completed final sign-off Feb 2023 | 820 Waller St | Sandbank Construction, Inc | seismic retrofit of soft-story. comply with sfebc 4d mandatory seismic retrofit per 2016cebc appendix a-4Details
seismic retrofit of soft-story. comply with sfebc 4d mandatory seismic retrofit per 2016cebc appendix a-4 | $100,000 |
| Aug 7, 2018 | Completed final sign-off Jul 2020 | 756 Page St | Sandbank Construction, Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $50,000 |
| May 21, 2018 | Completed final sign-off May 2020 | 326 Pierce St | Sandbank Construction, Inc | soft story retrofit utilizing plywood shearwalls in accordance with 2016 cebc chapter a4Details
soft story retrofit utilizing plywood shearwalls in accordance with 2016 cebc chapter a4 | $60,000 |
| May 10, 2018 | Completed final sign-off Mar 2021 | 748 Page St | Halyard Inc, Sandbank Construction, Inc | convert 9-dwelling unit to 11 dwelling unit. add 2 accessory dwelling units, unit 10/11 within (e) bldg per ord 162-16 by converting (e) garage & storage space @ground flr of (e) 3-story over garage. add (n) windows @south elevation. add (n) doors & windows at east & west elevations. (n) kitchen,Details
convert 9-dwelling unit to 11 dwelling unit. add 2 accessory dwelling units, unit 10/11 within (e) bldg per ord 162-16 by converting (e) garage & storage space @ground flr of (e) 3-story over garage. add (n) windows @south elevation. add (n) doors & windows at east & west elevations. (n) kitchen, | $200,000 |
| Apr 13, 2018 | Completed final sign-off Aug 2020 | 589 Dolores St | Sandbank Construction, Inc | revision to soft story 201603232842. for remaining structural work for adu see pa# 201804186714Details
revision to soft story 201603232842. for remaining structural work for adu see pa# 201804186714 | $50,000 |
| Jan 25, 2018 | Completed final sign-off Feb 2023 | 820 Waller St | Halyard Inc, Sandbank Construction, Inc | add (1) unit at ground flr per ord 162-16. convert (e) storage space into (n) dwelling unit within (e) envelope. (n) kitchen, bath & entry door. sprinkler/fire done under seperate application. maher n/a.Details
add (1) unit at ground flr per ord 162-16. convert (e) storage space into (n) dwelling unit within (e) envelope. (n) kitchen, bath & entry door. sprinkler/fire done under seperate application. maher n/a. | $100,000 |
| Jan 25, 2018 | Completed final sign-off Feb 2023 | 201 Divisadero St | Halyard Inc, Sandbank Construction, Inc | add (2) units per ord 162-16 within envelope @ ground flr. convert (e) garage to (n) dwellings. (n) kitchen, bath. sprinkler & fire alarm done under seperate application. maher n/a.Details
add (2) units per ord 162-16 within envelope @ ground flr. convert (e) garage to (n) dwellings. (n) kitchen, bath. sprinkler & fire alarm done under seperate application. maher n/a. | $100,000 |
| Jan 8, 2018 | Completed final sign-off Feb 2021 | 1101 Clay St | Sandbank Construction, Inc | addition of entry vesitblue and trash room in (e) first and commercial space. new electrical. no exterior work. no structural work. no fire alarm or sprinkler workDetails
addition of entry vesitblue and trash room in (e) first and commercial space. new electrical. no exterior work. no structural work. no fire alarm or sprinkler work | $40,000 |
| Dec 18, 2017 | Expired or cancelled cancelled Jan 2026 | 275 Grattan St | Sandbank Construction, Inc | revision to app#201601268006. structural detail revisions only.Details
revision to app#201601268006. structural detail revisions only. | |
| Dec 14, 2017 | Completed final sign-off Nov 2018 | 3744 16th St | Sandbank Construction, Inc | seismic retrofit to address nov 201719242; soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
seismic retrofit to address nov 201719242; soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $30,000 |
| Sep 12, 2017 | Completed final sign-off Nov 2019 | 2288 Fulton St | Sandbank Construction, Inc | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a maher ordinanceDetails
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a maher ordinance | $40,000 |
| Aug 18, 2017 | Completed final sign-off Jun 2020 | 625 Guerrero St | Sandbank Construction, Inc | soft story retrofit in accordance with chapter 4a of 2016 cebc. reference app #2017-0622-0138.Details
soft story retrofit in accordance with chapter 4a of 2016 cebc. reference app #2017-0622-0138. | $75,000 |
| Aug 8, 2017 | Completed final sign-off Sep 2017 | 3345 18th St | Sandbank Construction, Inc | replace electrical in restaurant and laundrymat. ref. to app#201705176835Details
replace electrical in restaurant and laundrymat. ref. to app#201705176835 | $75,000 |
| Jul 5, 2017 | Completed final sign-off Sep 2017 | 3345 18th St | Sandbank Construction, Inc | revision to 201705176835. reswing door in basement stairwell from lobby, reconfigure storefront entry into laundromat, remove doors in front of electrical closetDetails
revision to 201705176835. reswing door in basement stairwell from lobby, reconfigure storefront entry into laundromat, remove doors in front of electrical closet | $2,500 |
| May 17, 2017 | Completed final sign-off Sep 2017 | 3345 18th St | Sandbank Construction, Inc | new trash room enclosure, new stair from residential lobby to basement, new stair from restaurant to basement, new ada toilet at laundry mat.Details
new trash room enclosure, new stair from residential lobby to basement, new stair from restaurant to basement, new ada toilet at laundry mat. | $20,000 |
| May 5, 2017 | Completed final sign-off Mar 2018 | 1431 Grove St | Sandbank Construction, Inc | revision to pa #2015-1026-0722. revisions include changes to shear wall locations. n/a maherDetails
revision to pa #2015-1026-0722. revisions include changes to shear wall locations. n/a maher | |
| May 4, 2017 | Completed final sign-off Aug 2018 | 1431 Grove St | Sandbank Construction, Inc | revision to pa 2015-1120-3237 add bathroom in unit 1, reconfiture units 1 & 2 @ 1st floor. n/a maherDetails
revision to pa 2015-1120-3237 add bathroom in unit 1, reconfiture units 1 & 2 @ 1st floor. n/a maher | |
| Mar 21, 2017 | Never finaled issued Mar 2023, no final | 120 Gardenside Dr | Sandbank Construction, Inc | add unit per ordinance 162-16. convert (e) garage space to new dwelling units, within (e) envelope. new kitchen, baths, and entry doors. new windows visisble from street. sprinkler & fire alarm under separat permit.Details
add unit per ordinance 162-16. convert (e) garage space to new dwelling units, within (e) envelope. new kitchen, baths, and entry doors. new windows visisble from street. sprinkler & fire alarm under separat permit. | $300,000 |
| Nov 3, 2016 | Completed final sign-off Feb 2019 | 1255 Columbus Av | Pacific General Construction, Sandbank Construction, Inc | revision to 201404012202. replace internal bracing system at beams 5-12 with internal rakers. see separarte permit for tiebacks into adj propertyDetails
revision to 201404012202. replace internal bracing system at beams 5-12 with internal rakers. see separarte permit for tiebacks into adj property | |
| Nov 3, 2016 | Never finaled issued Jan 2017, no final | 672 Bay St | Pacific General Construction, Sandbank Construction, Inc | install tiebacks in conjunction with temporary shoring at 1255-1275 columbus ave under 201404012202Details
install tiebacks in conjunction with temporary shoring at 1255-1275 columbus ave under 201404012202 | |
| Sep 12, 2016 | Completed final sign-off Jan 2019 | 1440 Sutter St | Sandbank Construction, Inc | soft story retrofit per 2012 sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per 2012 sfebc chapter 4d: 2016 cebc appendix a-4 | $80,000 |
| Sep 6, 2016 | Completed final sign-off Jun 2023 | 1600 Fell St | Adobe Soil & Structures, Sandbank Construction, Inc | soft story seismic retrofit per sf mandatory soft story program. design criteria 2016 - cebc app a4Details
soft story seismic retrofit per sf mandatory soft story program. design criteria 2016 - cebc app a4 | $75,000 |
| Sep 6, 2016 | Completed final sign-off Dec 2023 | 120 Gardenside Dr | Sandbank Construction, Inc | soft story seismic retrofit per sf mandatory soft story program. design criteria 2022 - cebc app a4Details
soft story seismic retrofit per sf mandatory soft story program. design criteria 2022 - cebc app a4 | $50,000 |
| Sep 6, 2016 | Completed final sign-off Nov 2022 | 2740 Greenwich St | Adobe Soil & Structures, Sandbank Construction, Inc | soft story seismic retrofit per sf mandatory soft story program. design criteria 2012 - iebc app a4Details
soft story seismic retrofit per sf mandatory soft story program. design criteria 2012 - iebc app a4 | $75,000 |
| Aug 17, 2016 | Completed final sign-off Sep 2016 | 1433 Clay St | Sandbank Construction, Inc | minnor revision to 201601298330 - correct the name of bedroom 106 to media roomDetails
minnor revision to 201601298330 - correct the name of bedroom 106 to media room | |
| Jul 27, 2016 | Completed final sign-off Mar 2017 | 1431 Grove St | Sandbank Construction, Inc | renovate units 4 & 5, 2nd floor - demo of walls, new cabinets, plumbing, lighting, electrical. no change to mecn, no exterior work. no f/a or sprinkler. add 1 bedroom in 5. maher naDetails
renovate units 4 & 5, 2nd floor - demo of walls, new cabinets, plumbing, lighting, electrical. no change to mecn, no exterior work. no f/a or sprinkler. add 1 bedroom in 5. maher na | $75,000 |
| Jun 16, 2016 | Completed final sign-off May 2019 | 1985 Fulton St | Sandbank Construction, Inc | add units per ord 30-15. convert (e) garage space to (n) dwelling units within (e) envelope. (n) kitchen, bathrs & entry doors. (n) windows visible from street. no structural work - under sep permit #201605096950. sprinkler & fire alarm under sep permitDetails
add units per ord 30-15. convert (e) garage space to (n) dwelling units within (e) envelope. (n) kitchen, bathrs & entry doors. (n) windows visible from street. no structural work - under sep permit #201605096950. sprinkler & fire alarm under sep permit | $350,000 |
| May 9, 2016 | Completed final sign-off May 2019 | 1985 Fulton St | Sandbank Construction, Inc | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. n/a maherDetails
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. n/a maher | $125,000 |
| Mar 21, 2016 | Completed final sign-off Aug 2016 | 950 Franklin St | Sandbank Construction, Inc | #78- remodel unit #78 (studio), remodel existing bathroom, relocate & remodel existing kitchen, convert existing dining into study room (not for sleeping), add washer and dryer. unit to remain a studioDetails
#78- remodel unit #78 (studio), remodel existing bathroom, relocate & remodel existing kitchen, convert existing dining into study room (not for sleeping), add washer and dryer. unit to remain a studio | $27,000 |
| Mar 8, 2016 | Completed final sign-off Apr 2017 | 3345 18th St | Markoff Structural Pest Control, Sandbank Construction, Inc | repair fungus damage at rear porch and stairs. remove corrugated plastic cover. comply with nov #201568902 items 2 & 3 less than 50%Details
repair fungus damage at rear porch and stairs. remove corrugated plastic cover. comply with nov #201568902 items 2 & 3 less than 50% | $30,000 |
| Feb 16, 2016 | Expired or cancelled suspend Oct 2026 | 275 Grattan St | Sandbank Construction, Inc | add units per ord. 30-15. convert (e) garage space to new dwelling units within (e) envelope, new kitchen, baths, entry doors. new windows visible from street. no structural-under seperate permit# 2016-0126-8006. sprinkler and fire alarm under seperate permit.Details
add units per ord. 30-15. convert (e) garage space to new dwelling units within (e) envelope, new kitchen, baths, entry doors. new windows visible from street. no structural-under seperate permit# 2016-0126-8006. sprinkler and fire alarm under seperate permit. | $200,000 |
| Feb 10, 2016 | Completed final sign-off Apr 2016 | 65 Buena Vista East Av | Sandbank Construction, Inc | remodel unit 202, at 3rd floor - remodel (e) kitchen and bathroom, add washer and dryer. maher naDetails
remodel unit 202, at 3rd floor - remodel (e) kitchen and bathroom, add washer and dryer. maher na | $25,000 |
| Jan 29, 2016 | Completed final sign-off Sep 2016 | 1433 Clay St | Sandbank Construction, Inc | unit b, 1st floor: demo walls, new kitchen cabinets, new plumbing fixtures, lighting, electrical. no change to mech. no exterior work, fire alarm under separate permit. create new bathroom and relocate one bath. maher n/aDetails
unit b, 1st floor: demo walls, new kitchen cabinets, new plumbing fixtures, lighting, electrical. no change to mech. no exterior work, fire alarm under separate permit. create new bathroom and relocate one bath. maher n/a | $60,000 |
| Jan 26, 2016 | Completed final sign-off Jun 2020 | 275 Grattan St | Sandbank Construction, Inc | soft story seismic retrofit in accordance with sf mandatory soft story program. removal of (e) posts on 1st floor. new foundation & slab on grade. 2012 iebc appendix a-4. (structural work only).Details
soft story seismic retrofit in accordance with sf mandatory soft story program. removal of (e) posts on 1st floor. new foundation & slab on grade. 2012 iebc appendix a-4. (structural work only). | $75,000 |
| Jan 22, 2016 | Completed final sign-off Aug 2016 | 533 Clayton St | Sandbank Construction, Inc | demo non-structural walls, new kitchen cabinets, plumbing, lights & electrical. no mechanical or fire. addition of full bathroom, powder room to bathroom. reconfigue livable space from 2 bedroom to 4 bedroom.Details
demo non-structural walls, new kitchen cabinets, plumbing, lights & electrical. no mechanical or fire. addition of full bathroom, powder room to bathroom. reconfigue livable space from 2 bedroom to 4 bedroom. | $99,000 |
| Nov 20, 2015 | Completed final sign-off Aug 2018 | 1431 Grove St | Sandbank Construction, Inc | grd fl:add 2 new dwelling units per ord. #30-15, convert storage areas to additional dwelling unit within (e) envelope, (n) windows in (e) garage door opening, (n) door & covered entry, structural under pa#2015-1026-0722. n/a maher ordinance #155-13. sprinkler to nfpa-13 deferred.Details
grd fl:add 2 new dwelling units per ord. #30-15, convert storage areas to additional dwelling unit within (e) envelope, (n) windows in (e) garage door opening, (n) door & covered entry, structural under pa#2015-1026-0722. n/a maher ordinance #155-13. sprinkler to nfpa-13 deferred. | $125,000 |
| Nov 18, 2015 | Completed final sign-off Dec 2015 | 691 Ofarrell St | Sandbank Construction, Inc | unit 201: ref pa201504234502. remodel kitchen & bathroom.Details
unit 201: ref pa201504234502. remodel kitchen & bathroom. | $20,000 |
| Nov 18, 2015 | Completed final sign-off Dec 2015 | 691 Ofarrell St | Sandbank Construction, Inc | unit 308: reference pa#201504234506: remodel kitchen & bathroom only.Details
unit 308: reference pa#201504234506: remodel kitchen & bathroom only. | $20,000 |
| Nov 18, 2015 | Completed final sign-off Dec 2015 | 691 Ofarrell St | Sandbank Construction, Inc | unit 203: ref 201504234503, remodel kitchen & bathroom.Details
unit 203: ref 201504234503, remodel kitchen & bathroom. | $20,000 |
| Nov 18, 2015 | Completed final sign-off Dec 2015 | 691 Ofarrell St | Sandbank Construction, Inc | unit 204: ref pa201504234507 (washer/dryer). remodel kitchen & bathroom.Details
unit 204: ref pa201504234507 (washer/dryer). remodel kitchen & bathroom. | $20,000 |
| Oct 26, 2015 | Completed final sign-off Mar 2018 | 1431 Grove St | Sandbank Construction, Inc | install plywood shear walls at 1st floor garage for soft-story seismic retrofit in accordance with the sf mandatory soft story program. design criteria per 2012 iebc appendix a-4. (addition of dwelling units ordinance 30-15 under #201511203237). maher naDetails
install plywood shear walls at 1st floor garage for soft-story seismic retrofit in accordance with the sf mandatory soft story program. design criteria per 2012 iebc appendix a-4. (addition of dwelling units ordinance 30-15 under #201511203237). maher na | $80,000 |
| Aug 24, 2015 | Completed final sign-off Dec 2016 | 1960 Jones St | Capomastro Group:Acalifornia Corp., Sandbank Construction, Inc | revision to 2014 0401 2176 s2 replace (e) retaining wallsDetails
revision to 2014 0401 2176 s2 replace (e) retaining walls | $5,000 |
| Jul 31, 2015 | Completed final sign-off Mar 2016 | 950 Franklin St | Sandbank Construction, Inc | 1) remodel unit #44 at the 4th floor. 2)add washer and dryer. 3)relocate kitchen. 4)remodel extg bathroom.Details
1) remodel unit #44 at the 4th floor. 2)add washer and dryer. 3)relocate kitchen. 4)remodel extg bathroom. | $35,000 |
| Jul 16, 2015 | Completed final sign-off Feb 2016 | 1340 Lombard St | Sandbank Construction, Inc | unit #501, 5th floor - relocate existing kitchen & additoin of dishwasher, remodel exisitng bathroom, add washer & dryer, convert (e) kitchen/dining to den. n/a maher ordinanceDetails
unit #501, 5th floor - relocate existing kitchen & additoin of dishwasher, remodel exisitng bathroom, add washer & dryer, convert (e) kitchen/dining to den. n/a maher ordinance | $30,000 |
| Jul 16, 2015 | Completed final sign-off Jan 2016 | 1340 Lombard St | Sandbank Construction, Inc | unit #305, 3rd floor - remodel existing kitchen & addition of dishwasher, add washer & dryer. n/a maher ordinanceDetails
unit #305, 3rd floor - remodel existing kitchen & addition of dishwasher, add washer & dryer. n/a maher ordinance | $20,000 |
| Jul 16, 2015 | Completed final sign-off Jan 2016 | 1320 Lombard St | Sandbank Construction, Inc | unit #403, 4th floor - remodel existing bathroom, relocate existing kitchen & & additoin of dishwasher, add washer & dryer. n/a maher ordinanceDetails
unit #403, 4th floor - remodel existing bathroom, relocate existing kitchen & & additoin of dishwasher, add washer & dryer. n/a maher ordinance | $30,000 |
| Jul 16, 2015 | Completed final sign-off Jan 2016 | 1340 Lombard St | Sandbank Construction, Inc | unit #206, 2nd floor - remodel existing bathroom, addition of one new bathroom, relocate existing kitchen & addition of dishwasher, add washer/dryer, convert (e) kitchen/dining to den. n/a maher ordinanceDetails
unit #206, 2nd floor - remodel existing bathroom, addition of one new bathroom, relocate existing kitchen & addition of dishwasher, add washer/dryer, convert (e) kitchen/dining to den. n/a maher ordinance | $50,000 |
| Jul 16, 2015 | Expired or cancelled withdrawn Aug 2017 | 3345 18th St | Sandbank Construction, Inc | upgrade of header above ground floor bay windows. upgrade of ada compiance in commercial space.Details
upgrade of header above ground floor bay windows. upgrade of ada compiance in commercial space. | $60,074 |
| Jul 16, 2015 | Completed final sign-off Sep 2017 | 3345 18th St | Sandbank Construction, Inc | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $128,305 |
| Jul 15, 2015 | Completed final sign-off Jan 2016 | 950 Franklin St | Sandbank Construction, Inc | unit 31 - rev. to 201503261999 - interior alterations to unit 31 on 3rd fl. relocate kitchen, remodel bathroom, add washer/dryerDetails
unit 31 - rev. to 201503261999 - interior alterations to unit 31 on 3rd fl. relocate kitchen, remodel bathroom, add washer/dryer | |
| Jul 1, 2015 | Never finaled issued Jul 2015, no final | 1340 Lombard St | Sandbank Construction, Inc | #403 at 4th floor- remodel (e) bathroom, remodel (e) kitchen & addition of dishwasher. add washer and dryer.Details
#403 at 4th floor- remodel (e) bathroom, remodel (e) kitchen & addition of dishwasher. add washer and dryer. | $25,000 |
| Jun 9, 2015 | Completed final sign-off Oct 2015 | 1360 Lombard St | Sandbank Construction, Inc | unit #204: interior alterations to kitchen and bathroom, add washer/dryer; maher n/aDetails
unit #204: interior alterations to kitchen and bathroom, add washer/dryer; maher n/a | $30,000 |