Block 2717, lot 055
3420 Market St
- City’s use
- Multi-Family Residential
- Built
- 1957
- Stories
- 4
- Units
- 13
- Rooms
- 13 bathrooms
- Building
- 8,367 sq ft
- Lot
- 10,290 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 12, 2026 | Completed final sign-off Apr 2026 | 3420 Market St | Byington Electric Corp | replace fire alarm system to meet sf/ca code & add lf horns inside all units & add wireless radio monitorDetails
replace fire alarm system to meet sf/ca code & add lf horns inside all units & add wireless radio monitor | $38,000 |
| May 22, 2025 | Completed final sign-off Feb 2026 | 3420 Market St | Sandbank Construction, Inc | existing decks repair/replacement, addition of new columns and exterior of deck. no dimension changes to decks.Details
existing decks repair/replacement, addition of new columns and exterior of deck. no dimension changes to decks. | $60,000 |
| May 25, 2023 | Expired or cancelled withdrawn Mar 2026 | 3420 Market St | Halyard Inc | fire alarm replacement system to comply with sffd ab#3.08 and ab# 2.01.Details
fire alarm replacement system to comply with sffd ab#3.08 and ab# 2.01. | $5,000 |
| Sep 16, 2021 | Never finaled issued Sep 2021, no final | 3420 Market St | Young's Roofing, Inc. | reroofing. tear off (e) flat roofing approx 3,400 sq. ft., install new bse #28, nail down as new underlayment, apply modified bitumen torch down as final surface, all flashings will be replaced newDetails
reroofing. tear off (e) flat roofing approx 3,400 sq. ft., install new bse #28, nail down as new underlayment, apply modified bitumen torch down as final surface, all flashings will be replaced new | $36,850 |
| Sep 27, 2018 | Completed final sign-off Feb 2019 | 3420 Market St | Dcs Plumbing Llc | work in unit 10: remodel (1) kitchen and (1) bathroom. no work visible from the street. no alteration of wall, window, or door.Details
work in unit 10: remodel (1) kitchen and (1) bathroom. no work visible from the street. no alteration of wall, window, or door. | $20,000 |
| Mar 9, 2017 | Completed final sign-off Apr 2017 | 3420 Market St | Brighter Bay Builders Inc | #8, #10, #12- new heatersDetails
#8, #10, #12- new heaters | $15,000 |
| Oct 21, 2016 | Completed final sign-off Nov 2016 | 3420 Market St | San Francisco Fire Protection | like for like voluntary fire system replacement w/new control panel,smoke & heat det,pull stns @the same location.install monitor modules to tie-in (e)waterflow & tamper switches to new panel,tie-in(e)6 bells to new panel,install aes radio.Details
like for like voluntary fire system replacement w/new control panel,smoke & heat det,pull stns @the same location.install monitor modules to tie-in (e)waterflow & tamper switches to new panel,tie-in(e)6 bells to new panel,install aes radio. | $6,000 |
| Oct 12, 2016 | Never finaled issued Oct 2016, no final | 3420 Market St | Ca Sunrise Construction Solution Inc | apt. #1, #3, #5: exploratory demo. remove heater vent coverf and confirm flu run on all 3 units. verify joist location on unit #1.Details
apt. #1, #3, #5: exploratory demo. remove heater vent coverf and confirm flu run on all 3 units. verify joist location on unit #1. | $500 |
| Oct 4, 2016 | Completed final sign-off Dec 2016 | 3420 Market St | Ca Sunrise Construction Solution Inc | 2nd floor interior renovation of one existing apartment. new lighting, electrical, plumbing, new heaters on apts 1,3,5. no work visible form street, no sprinkler or fire alarm.Details
2nd floor interior renovation of one existing apartment. new lighting, electrical, plumbing, new heaters on apts 1,3,5. no work visible form street, no sprinkler or fire alarm. | $80,000 |
| Sep 28, 2016 | Completed final sign-off Oct 2016 | 3420 Market St | Station 1 Fire Protection | install 93' of 2" brazgo copper underground piping to fire sprinkler nfpa 13r systemDetails
install 93' of 2" brazgo copper underground piping to fire sprinkler nfpa 13r system | $5,000 |
| Jun 30, 2016 | Completed final sign-off Oct 2016 | 3420 Market St | Station 1 Fire Protection | install 18 new sprinklers for new dwelling unit & egress nfpa 13r; ti 201601217573.Details
install 18 new sprinklers for new dwelling unit & egress nfpa 13r; ti 201601217573. | $7,000 |
| Apr 25, 2016 | Completed final sign-off Jun 2016 | 3420 Market St | Ca Sunrise Construction Solution Inc | to comply with nov 2016 08731: show location of (n) wall furnaces in bedrooms. units 2,4,6,7,9 & 11. 2nd & 3rd floorsDetails
to comply with nov 2016 08731: show location of (n) wall furnaces in bedrooms. units 2,4,6,7,9 & 11. 2nd & 3rd floors | |
| Apr 7, 2016 | Completed final sign-off Oct 2016 | 3420 Market St | S4s Construction Inc | revision to app#2015-1026-0718. discovery of extg moment frames, modification to structural details.Details
revision to app#2015-1026-0718. discovery of extg moment frames, modification to structural details. | |
| Mar 28, 2016 | Completed final sign-off Jun 2016 | 3420 Market St | Ca Sunrise Construction Solution Inc | units 2,4, 9: minor revision to pa#201510270855 to clarify unit numbers and ductwork repairs.Details
units 2,4, 9: minor revision to pa#201510270855 to clarify unit numbers and ductwork repairs. | |
| Jan 21, 2016 | Completed final sign-off Oct 2016 | 3420 Market St | S4s Construction Inc | one new dwelling unit within (e) envelope, new kitchen and bath. new windows & doors visible from street. no sprinkler or f.a. under this application.Details
one new dwelling unit within (e) envelope, new kitchen and bath. new windows & doors visible from street. no sprinkler or f.a. under this application. | $150,000 |
| Oct 27, 2015 | Completed final sign-off Jun 2016 | 3420 Market St | Ca Sunrise Construction Solution Inc | demo of non structural walls, new cabinet, plumbing fixtures, electricatl fixtures, new wood flooring new balcony guardrailDetails
demo of non structural walls, new cabinet, plumbing fixtures, electricatl fixtures, new wood flooring new balcony guardrail | $40,000 |
| Oct 26, 2015 | Completed final sign-off Oct 2016 | 3420 Market St | S4s Construction Inc | install (n) steel moment frames at garage for soft-story seismic retrofit in accordance w/sf mandatory soft-story program. design criteria per 2012 iebc appendix a-4Details
install (n) steel moment frames at garage for soft-story seismic retrofit in accordance w/sf mandatory soft-story program. design criteria per 2012 iebc appendix a-4 | $50,000 |
| Jul 15, 2011 | Completed final sign-off Jan 2012 | 3420 Market St | H L S. Inc Dba Wolf General | deck over crawl space.repair light weight concrete deck over wood framed structure, replace terazzo stairs in kind , metal railing and lighting.Details
deck over crawl space.repair light weight concrete deck over wood framed structure, replace terazzo stairs in kind , metal railing and lighting. | $125,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ca Sunrise Construction Solution Inc (5), S4s Construction Inc (3), Station 1 Fire Protection (2), Brighter Bay Builders Inc, Byington Electric Corp, Dcs Plumbing Llc, H L S. Inc Dba Wolf General, Halyard Inc, San Francisco Fire Protection, Sandbank Construction, Inc, Young's Roofing, Inc.
- Architects
- Jacob Herczeg (3)
- Engineers
- A Urrutia, Lawrence Wong, Lawrence Wong
- Authorized agent-otherss
- Rosario Jalate
- Designers
- Jacob Herczeg
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.