Block 1240, lot 007
201 Divisadero St
- City’s use
- Multi-Family Residential
- Built
- 1921
- Stories
- 2
- Units
- 11
- Rooms
- 8 bathrooms
- Building
- 10,194 sq ft
- Lot
- 3,998 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 18, 2021 | Completed final sign-off Jan 2022 | 201 Divisadero St | Fire & Security & Alarm Co/ F.S.A.C. | installation of new fire system w/ control unit, radio comm, smoke detectors & pull stations due to new units adding on ground floor. install lf horns inside all unit, modules to tie-in flow & tamper. ref pa# 202102255396, 201808107098, 201801259554Details
installation of new fire system w/ control unit, radio comm, smoke detectors & pull stations due to new units adding on ground floor. install lf horns inside all unit, modules to tie-in flow & tamper. ref pa# 202102255396, 201808107098, 201801259554 | $15,000 |
| Jul 2, 2021 | Completed final sign-off Feb 2023 | 820 Waller St | Sandbank Construction, Inc | revision to pa# 201801259554. revised concrete retaining walls.Details
revision to pa# 201801259554. revised concrete retaining walls. | $15,000 |
| Feb 25, 2021 | Completed final sign-off Mar 2022 | 820 Waller St | Fire Guard Protection Inc. | install fire sprinkler system per nfpa-13 in first floor only-new adu units. building 2018-0125-9558-r1Details
install fire sprinkler system per nfpa-13 in first floor only-new adu units. building 2018-0125-9558-r1 | $18,000 |
| Jan 26, 2021 | Completed final sign-off Jan 2023 | 820 Waller St | revised layout of interior walls in unit 205, bath change in unit 105. relocate receptacles in the rear building. revision to pa 201801259558 and pa 201801259554.Details
revised layout of interior walls in unit 205, bath change in unit 105. relocate receptacles in the rear building. revision to pa 201801259558 and pa 201801259554. | ||
| Aug 22, 2020 | Completed final sign-off Jun 2021 | 201 Divisadero St | Sandbank Construction, Inc | unit 207:renovation of 1 apartment on 2nd fl. new kitchen cabinets, new dishwasher, new kitchen applicances & plumbing fixtures, new washer/dryer, new lighting @ (e) j-box locations. no change to mechanical, no exterior work/fire alarm/sprinkler work. minor structural work.Details
unit 207:renovation of 1 apartment on 2nd fl. new kitchen cabinets, new dishwasher, new kitchen applicances & plumbing fixtures, new washer/dryer, new lighting @ (e) j-box locations. no change to mechanical, no exterior work/fire alarm/sprinkler work. minor structural work. | $65,000 |
| Jul 2, 2020 | Never finaled issued Jul 2020, no final | 820 Waller St | street spaceDetails
street space | ||
| Jun 30, 2020 | Never finaled issued Jul 2020, no final | 820 Waller St | street spaceDetails
street space | ||
| Feb 25, 2020 | Never finaled issued Feb 2020, no final | 201 Divisadero St | Halyard Inc | remodel kitchen and bathroom in kind.Details
remodel kitchen and bathroom in kind. | $10,000 |
| Apr 11, 2019 | Completed final sign-off Dec 2019 | 203 Divisadero St | Us Construction California, Inc | unit 203, 3rd flr: renovation of 1 apt. add 1 bedroom, (n) kitchen cabs, plumbing, fixtures, dishwashers, w/d's, lighting at (e) j boxes. change to mech, exterior, fire alarm or sprinklers. no structural work.Details
unit 203, 3rd flr: renovation of 1 apt. add 1 bedroom, (n) kitchen cabs, plumbing, fixtures, dishwashers, w/d's, lighting at (e) j boxes. change to mech, exterior, fire alarm or sprinklers. no structural work. | $45,000 |
| Aug 10, 2018 | Completed final sign-off Feb 2023 | 820 Waller St | Sandbank Construction, Inc | seismic retrofit of soft-story. comply with sfebc 4d mandatory seismic retrofit per 2016cebc appendix a-4Details
seismic retrofit of soft-story. comply with sfebc 4d mandatory seismic retrofit per 2016cebc appendix a-4 | $100,000 |
| Feb 1, 2018 | Never finaled issued Feb 2018, no final | 201 Divisadero St | street spaceDetails
street space | ||
| Jan 25, 2018 | Completed final sign-off Feb 2023 | 201 Divisadero St | Halyard Inc, Sandbank Construction, Inc | add (2) units per ord 162-16 within envelope @ ground flr. convert (e) garage to (n) dwellings. (n) kitchen, bath. sprinkler & fire alarm done under seperate application. maher n/a.Details
add (2) units per ord 162-16 within envelope @ ground flr. convert (e) garage to (n) dwellings. (n) kitchen, bath. sprinkler & fire alarm done under seperate application. maher n/a. | $100,000 |
| Jan 25, 2018 | Completed final sign-off Feb 2023 | 820 Waller St | Halyard Inc, Sandbank Construction, Inc | add (1) unit at ground flr per ord 162-16. convert (e) storage space into (n) dwelling unit within (e) envelope. (n) kitchen, bath & entry door. sprinkler/fire done under seperate application. maher n/a.Details
add (1) unit at ground flr per ord 162-16. convert (e) storage space into (n) dwelling unit within (e) envelope. (n) kitchen, bath & entry door. sprinkler/fire done under seperate application. maher n/a. | $100,000 |
| Jan 16, 2018 | Never finaled issued Jan 2018, no final | 201 Divisadero St | Us Construction California, Inc | unit#201 retile kitchen & bath floors. replace kitchen & bath countertop. n/a for maher.Details
unit#201 retile kitchen & bath floors. replace kitchen & bath countertop. n/a for maher. | $15,000 |
| Sep 28, 2017 | Never finaled issued Jan 2018, no final | 818 Waller St | Us Construction California, Inc | #818 - interior renovation on 3rd fl. adding one bedroom. remodel kitchen. new kitchen cabinets, new plumbing fixtures, new lighting & (e) j-boxes. no change to mech. no ext. f/a & sprinkler under sep permit. add w/d. #201 - new dishwasher & install w/d.Details
#818 - interior renovation on 3rd fl. adding one bedroom. remodel kitchen. new kitchen cabinets, new plumbing fixtures, new lighting & (e) j-boxes. no change to mech. no ext. f/a & sprinkler under sep permit. add w/d. #201 - new dishwasher & install w/d. | $85,000 |
| Aug 4, 2017 | Never finaled issued Aug 2017, no final | 822 Waller St | Ocho 5 Custom Home Builders & Asphalt Pa | replace and kitchen cabinets, sinks, and counter tops. all accessible features if provide shall be maintained.Details
replace and kitchen cabinets, sinks, and counter tops. all accessible features if provide shall be maintained. | $12,000 |
| Mar 28, 2013 | Completed final sign-off Aug 2013 | 201 Divisadero St | 2 H | remodel kitchen: new cabinets, fixtures, floor. remodel bathroom, new tile walls, plumbing fixtures, floor. instlal sub panel in unit, new outlets, switches, lights, smoke detectors in unit with co detectors.Details
remodel kitchen: new cabinets, fixtures, floor. remodel bathroom, new tile walls, plumbing fixtures, floor. instlal sub panel in unit, new outlets, switches, lights, smoke detectors in unit with co detectors. | $19,000 |
| Sep 22, 2011 | Completed final sign-off Dec 2011 | 822 Waller St | Ha's Construction | all work in unit # 822: remodel kitchen: replace fixtures, update plumbing, electrical. remodel bathroom: replace fixtures updatge plumbing electrical. install new electrical sup-panel in unit. repair walls, ceiling, new paint. floor plan to remain the same. no structural work.Details
all work in unit # 822: remodel kitchen: replace fixtures, update plumbing, electrical. remodel bathroom: replace fixtures updatge plumbing electrical. install new electrical sup-panel in unit. repair walls, ceiling, new paint. floor plan to remain the same. no structural work. | $18,000 |
| Jul 26, 2010 | Completed final sign-off Nov 2010 | 201 Divisadero St | 2 H | unit#818 - kitchen: replace cabinetry, counters, floor, fixtures. bathroom: replace sink, toilet, bathtub convert to shower stall, new floor and tile. kitchen & bath floor plan to remain the same. no structural work. wall & ceiling repairs, new paint, electrical: new sub-service panel,Details
unit#818 - kitchen: replace cabinetry, counters, floor, fixtures. bathroom: replace sink, toilet, bathtub convert to shower stall, new floor and tile. kitchen & bath floor plan to remain the same. no structural work. wall & ceiling repairs, new paint, electrical: new sub-service panel, | $21,000 |
| Aug 26, 2009 | Completed final sign-off Sep 2009 | 201 Divisadero St | Bay West Construction Corp | replace 7 feet of mudsill in kind. and damage strips in basement. epoxy 5/8" threaded rod bolt to mudsill. replace exteriro siding & repaint to match. min embedment into (e) concrete 7" . replace siding visible from street.Details
replace 7 feet of mudsill in kind. and damage strips in basement. epoxy 5/8" threaded rod bolt to mudsill. replace exteriro siding & repaint to match. min embedment into (e) concrete 7" . replace siding visible from street. | $8,200 |
| Oct 23, 2002 | Never finaled issued Oct 2002, no final | 201 Divisadero St | Abc Roofing Inc | reroofingDetails
reroofing | $5,950 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.