Block 3587, lot 030
589 Dolores St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 4
- Units
- 9
- Rooms
- 18 bedrooms, 11 bathrooms
- Building
- 7,555 sq ft
- Lot
- 2,896 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
22 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 31, 2022 | Completed final sign-off Nov 2022 | 589 Dolores St | Halyard Inc | replace the existing tub with a new standard tub, new plumbing, new wall tile surrounding bathtub. install (1) new ceiling light in hall with (1) simple switch. replace bedroom carpet with new vinyl plank flooring (around 100 sq ft).Details
replace the existing tub with a new standard tub, new plumbing, new wall tile surrounding bathtub. install (1) new ceiling light in hall with (1) simple switch. replace bedroom carpet with new vinyl plank flooring (around 100 sq ft). | $5,000 |
| Oct 30, 2019 | Completed final sign-off Apr 2021 | 589 Dolores St | Sure, Inc. | to comply with nov#201992811, 201947481. repair stairs in kind, less than 50%Details
to comply with nov#201992811, 201947481. repair stairs in kind, less than 50% | $5,000 |
| Jan 15, 2019 | Completed final sign-off May 2019 | 589 Dolores St | San Francisco Fire Protection | like for like fire alarm replacement. replacing facp, smoke detectors and manual pull. existing bells will be used as originally designed. adding horns to bedrooms and living rooms in basement floor to adu units. installing(n) monitoring modules on water flow and tamper switch ref #201604074236Details
like for like fire alarm replacement. replacing facp, smoke detectors and manual pull. existing bells will be used as originally designed. adding horns to bedrooms and living rooms in basement floor to adu units. installing(n) monitoring modules on water flow and tamper switch ref #201604074236 | $7,000 |
| Dec 18, 2018 | Never finaled issued Dec 2018, no final | 589 Dolores St | street spaceDetails
street space | ||
| Oct 9, 2018 | Never finaled issued Oct 2018, no final | 589 Dolores St | street spaceDetails
street space | ||
| Sep 13, 2018 | Completed final sign-off May 2019 | 589 Dolores St | Station 1 Fire Protection | as-built for 201807265633- new calcualtion, heads and pipe loaction- the meter request issued under orginal.Details
as-built for 201807265633- new calcualtion, heads and pipe loaction- the meter request issued under orginal. | |
| Jul 26, 2018 | Completed final sign-off May 2019 | 589 Dolores St | Station 1 Fire Protection | install nfpa 13 fire sprinklers system. 27 sprinklers and 12'0" pro press copper from the curb to fire sprinkler riser including a new 2" deringer backflow device.Details
install nfpa 13 fire sprinklers system. 27 sprinklers and 12'0" pro press copper from the curb to fire sprinkler riser including a new 2" deringer backflow device. | $16,500 |
| Jul 20, 2018 | Never finaled issued Jul 2018, no final | 589 Dolores St | street spaceDetails
street space | ||
| May 3, 2018 | Never finaled issued May 2018, no final | 589 Dolores St | street space permitDetails
street space permit | ||
| Apr 18, 2018 | Completed final sign-off Aug 2020 | 589 Dolores St | Grizzly Builders Inc. | structural work for adu permit #201801188962, for remaining structural work for soft story see permit # 201804136368Details
structural work for adu permit #201801188962, for remaining structural work for soft story see permit # 201804136368 | $20,000 |
| Apr 13, 2018 | Completed final sign-off Aug 2020 | 589 Dolores St | Sandbank Construction, Inc | revision to soft story 201603232842. for remaining structural work for adu see pa# 201804186714Details
revision to soft story 201603232842. for remaining structural work for adu see pa# 201804186714 | $50,000 |
| Mar 19, 2018 | Never finaled issued Mar 2018, no final | 589 Dolores St | street spaceDetails
street space | ||
| Mar 1, 2018 | Never finaled issued Mar 2018, no final | 589 Dolores St | street spaceDetails
street space | ||
| Jan 18, 2018 | Completed final sign-off Oct 2019 | 589 Dolores St | Grizzly Builders Inc. | revision to 201604074236 to comply with nov 201720941 - layout changes in units and add bedroom in unit 591c, to comply with nov. 201720941Details
revision to 201604074236 to comply with nov 201720941 - layout changes in units and add bedroom in unit 591c, to comply with nov. 201720941 | |
| Dec 8, 2017 | Never finaled issued Dec 2017, no final | 589 Dolores St | street spaceDetails
street space | ||
| Aug 7, 2017 | Completed final sign-off Apr 2018 | 589 Dolores St | Grizzly Builders Inc. | renovation of 2 apartments unit 591 on 2nd floor, unit 591b on 4th floor. new kitchen cabinets. nw plmg fixtures, new lighting, no change to mechanical. no exterior work. no fire alarm or sprinkler work. new laundry in unitsDetails
renovation of 2 apartments unit 591 on 2nd floor, unit 591b on 4th floor. new kitchen cabinets. nw plmg fixtures, new lighting, no change to mechanical. no exterior work. no fire alarm or sprinkler work. new laundry in units | $80,000 |
| Nov 22, 2016 | Completed final sign-off Mar 2017 | 591 Dolores St | Alex R Construction | remodel kitchen, bathroom & rewire unit #a.Details
remodel kitchen, bathroom & rewire unit #a. | $50,000 |
| Apr 7, 2016 | Completed final sign-off Oct 2019 | 589 Dolores St | S F Garage Company Inc. | addition of 3 units to basement floor per ordinance# 30-15. seismic pa# 2016/03/23/2842. sprinklers, fire alarm, mechanical and plubming under separate permit. p/a#201603232842.Details
addition of 3 units to basement floor per ordinance# 30-15. seismic pa# 2016/03/23/2842. sprinklers, fire alarm, mechanical and plubming under separate permit. p/a#201603232842. | $250,000 |
| Mar 23, 2016 | Completed final sign-off Aug 2020 | 589 Dolores St | S F Garage Company Inc. | soft story retrofit per sfbc chapter 34b engineering criteria, 2012 iebc appendix a-4. excavate < 50 cubic yard for (n) 8'-0" ceiling height. install (n) moment frames and (n) shearwalls.Details
soft story retrofit per sfbc chapter 34b engineering criteria, 2012 iebc appendix a-4. excavate < 50 cubic yard for (n) 8'-0" ceiling height. install (n) moment frames and (n) shearwalls. | $30,000 |
| Jul 10, 2013 | Never finaled issued Jul 2013, no final | 589 Dolores St | street spaceDetails
street space | ||
| Jan 13, 2011 | Completed final sign-off Jan 2011 | 589 Dolores St | Rivera Construction | repair dry rot in backstairs as existing, comply with nov 201065247; less than 50% stair repairDetails
repair dry rot in backstairs as existing, comply with nov 201065247; less than 50% stair repair | $2,000 |
| Jul 29, 2002 | Completed final sign-off Nov 2002 | 589 Dolores St | J B Kohler Plumbing | repair rear stairs ,less than 50 % complaint 200228987Details
repair rear stairs ,less than 50 % complaint 200228987 | $6,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.