Block 1188, lot 013C
1985 Fulton St
- City’s use
- Multi-Family Residential
- Built
- 1925
- Stories
- 3
- Units
- 11
- Rooms
- 11 bathrooms
- Building
- 8,665 sq ft
- Lot
- 2,652 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 14, 2020 | Never finaled filed Jul 2020, never issued | 1985 Fulton St | street spaceDetails
street space | ||
| Nov 4, 2019 | Completed final sign-off Jul 2025 | 1985 Fulton St | San Francisco Fire Protection | addition and relocate on e fire alarm system, add new low fequ in unit 203. relocate e low freq in unit 203. revision to pa#2019-0308-4796Details
addition and relocate on e fire alarm system, add new low fequ in unit 203. relocate e low freq in unit 203. revision to pa#2019-0308-4796 | |
| Aug 15, 2019 | Completed final sign-off Feb 2020 | 1985 Fulton St | Us Construction California, Inc | reno of 1 apt unit 203 on 2nd flr - new kitchen, bedrooms, bathroom, d/w, w/d, plm fixtures. no chage to mech. no ext work. no fa or sprinkler work no structural. new lighting at (e) j-box locationsDetails
reno of 1 apt unit 203 on 2nd flr - new kitchen, bedrooms, bathroom, d/w, w/d, plm fixtures. no chage to mech. no ext work. no fa or sprinkler work no structural. new lighting at (e) j-box locations | $65,000 |
| May 1, 2019 | Never finaled issued May 2019, no final | 1985 Fulton St | street spaceDetails
street space | ||
| Mar 8, 2019 | Completed final sign-off Apr 2019 | 1985 Fulton St | San Francisco Fire Protection | new - ifp 75 power supply, smokes, pull station, low frequency horns, waterflow, tamper, aes radio.Details
new - ifp 75 power supply, smokes, pull station, low frequency horns, waterflow, tamper, aes radio. | $4,000 |
| Dec 17, 2018 | Never finaled issued Dec 2018, no final | 1985 Fulton St | streetspaceDetails
streetspace | ||
| Sep 18, 2018 | Completed final sign-off Apr 2019 | 1985 Fulton St | International Fire Equip | ref pa# 201606160127; installation of new fire srinkler system in 2 legalization units and install location of new 2" fire service ug.Details
ref pa# 201606160127; installation of new fire srinkler system in 2 legalization units and install location of new 2" fire service ug. | $18,000 |
| May 17, 2018 | Never finaled issued May 2018, no final | 1985 Fulton St | street spaceDetails
street space | ||
| Jul 20, 2017 | Completed final sign-off Oct 2017 | 1985 Fulton St | Grizzly Builders Inc. | replace existing aluminum windows with double hung wood windows 9 in unit 102, 11 in unit 103; u factor not >.32; total 20 windows. visible from street. n/a for maher.Details
replace existing aluminum windows with double hung wood windows 9 in unit 102, 11 in unit 103; u factor not >.32; total 20 windows. visible from street. n/a for maher. | $8,000 |
| Apr 6, 2017 | Completed final sign-off Oct 2017 | 1985 Fulton St | Grizzly Builders Inc. | units 102 and 103 renovations on 2nd flr. change layout from living room to new bedrooms. new kit appliances and cabinets, plm fixtures, lighting. addl new bath in unit 102, new washer and dryer in both units. no change to mech or exterior. fire and life safety under separate permits. maher naDetails
units 102 and 103 renovations on 2nd flr. change layout from living room to new bedrooms. new kit appliances and cabinets, plm fixtures, lighting. addl new bath in unit 102, new washer and dryer in both units. no change to mech or exterior. fire and life safety under separate permits. maher na | $95,000 |
| Jun 16, 2016 | Completed final sign-off May 2019 | 1985 Fulton St | Sandbank Construction, Inc | add units per ord 30-15. convert (e) garage space to (n) dwelling units within (e) envelope. (n) kitchen, bathrs & entry doors. (n) windows visible from street. no structural work - under sep permit #201605096950. sprinkler & fire alarm under sep permitDetails
add units per ord 30-15. convert (e) garage space to (n) dwelling units within (e) envelope. (n) kitchen, bathrs & entry doors. (n) windows visible from street. no structural work - under sep permit #201605096950. sprinkler & fire alarm under sep permit | $350,000 |
| May 9, 2016 | Completed final sign-off May 2019 | 1985 Fulton St | Sandbank Construction, Inc | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. n/a maherDetails
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. n/a maher | $125,000 |
| Jul 14, 2015 | Never finaled issued Jul 2015, no final | 1985 Fulton St | Markoff Structural Pest Control | markoff structural termite report #15360, item #2. less than 50% repair.Details
markoff structural termite report #15360, item #2. less than 50% repair. | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Grizzly Builders Inc. (2), San Francisco Fire Protection (2), Sandbank Construction, Inc (2), International Fire Equip, Markoff Structural Pest Control, Us Construction California, Inc
- Architects
- Jacob Herczeg (3)
- Engineers
- Lawrence Wong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.