Doug Tom
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Tef Design
- Based in
- San Francisco
- On San Francisco permits
- Jan 2005 to Feb 2025
168 permits since 2000 (architect on 161 permits, designer on 5 permits, engineer on 3 permits, authorized agent-others on 1 permit): 116 completed, 39 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 168.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2025 | Completed final sign-off Jul 2025 | 660 03rd St | C C I Commercial Construction & Improv | ground floor- minor interior office upgrade at level 1. (n) single user restroom/shower. connecting suites 100 and 110 by removing and relocating common corridor walls.Details
ground floor- minor interior office upgrade at level 1. (n) single user restroom/shower. connecting suites 100 and 110 by removing and relocating common corridor walls. | $73,000 |
| Jun 15, 2023 | Completed final sign-off Oct 2023 | 450 Sansome St | Gci, Inc | 16/f: operable partition wall ref pa 2022-1223-9077 & 2021-0728-5242Details
16/f: operable partition wall ref pa 2022-1223-9077 & 2021-0728-5242 | $2,000 |
| Jun 9, 2023 | Completed final sign-off Apr 2024 | 660 03rd St | C C I Commercial Construction & Improv | interior office renovation at level 1, suite 110a/b, interior main lobby renovation, new interior walls, storefront glazing, finishes, doors, hardware, access control, millwork at break area, plumbing area, lighting controls, power/data outlet. ref: 202205265059. fire alarm/fire sprinklers deferred.Details
interior office renovation at level 1, suite 110a/b, interior main lobby renovation, new interior walls, storefront glazing, finishes, doors, hardware, access control, millwork at break area, plumbing area, lighting controls, power/data outlet. ref: 202205265059. fire alarm/fire sprinklers deferred. | $850,000 |
| Dec 23, 2022 | Completed final sign-off May 2023 | 450 Sansome St | Gci, Inc | revision to pa# 2021-0728-5242, removing operable wall from scope along w/ structural supportDetails
revision to pa# 2021-0728-5242, removing operable wall from scope along w/ structural support | |
| Dec 9, 2022 | Completed final sign-off Apr 2023 | 660 03rd St | C C I Commercial Construction & Improv | ground flr - (n) opening at (e) brick wall. reloacation of (e) electrical panel currently located at proposed (n) brick opening. removing gyp/mtl stud wall & associated doors @ (e) brick opening. portion of (n) concrete infill wall to be gyp/mtl stud wall for potnetial future double doors....Details
ground flr - (n) opening at (e) brick wall. reloacation of (e) electrical panel currently located at proposed (n) brick opening. removing gyp/mtl stud wall & associated doors @ (e) brick opening. portion of (n) concrete infill wall to be gyp/mtl stud wall for potnetial future double doors.... | $150,000 |
| May 26, 2022 | Completed final sign-off Feb 2025 | 660 03rd St | adminstrative permit to document a change of use from retail to office. total conversion is approx 40,212 sqft change to building occupancy code. no change of use to basement. change of use approved under pc motion no. 21025Details
adminstrative permit to document a change of use from retail to office. total conversion is approx 40,212 sqft change to building occupancy code. no change of use to basement. change of use approved under pc motion no. 21025 | ||
| Sep 2, 2021 | Never finaled issued Sep 2021, no final | 116 Channel | Hasz Construction Inc | amend to pa 202103186794-s1. erect fence around playground. details requested by bid. the fence was already approved on pa# 202103186794. this permit is to specify the foundation details of this fence.Details
amend to pa 202103186794-s1. erect fence around playground. details requested by bid. the fence was already approved on pa# 202103186794. this permit is to specify the foundation details of this fence. | |
| Jul 28, 2021 | Completed final sign-off May 2023 | 450 Sansome St | Gci, Inc | 16/f: demo non-structural partitions, fixtures, millwork & finishes. construction of new non-structural partitions, fixtures, millwork & finishes. structural support (1) moveable partitionDetails
16/f: demo non-structural partitions, fixtures, millwork & finishes. construction of new non-structural partitions, fixtures, millwork & finishes. structural support (1) moveable partition | $692,514 |
| Mar 18, 2021 | Never finaled issued Jun 2021, no final | 116 Channel | Hasz Construction Inc | first time ti of level 1 suite. the dahlia school of sf is building a child care center w/ 2 main rooms: toddler & pre-school room, 2 admin spaces, multi-purpose space, & new fenced exterior play area. mep deferred.Details
first time ti of level 1 suite. the dahlia school of sf is building a child care center w/ 2 main rooms: toddler & pre-school room, 2 admin spaces, multi-purpose space, & new fenced exterior play area. mep deferred. | $525,000 |
| Dec 19, 2019 | Expired or cancelled cancelled Jan 2026 | 855 Howard St | ti to the 1st fl entry lobby to 2nd fl. 2nd fl demolition of (e) non-structural partitions, fixtures, millwork & finishes. construction of (n) non-structural partitions, fixtures, millwork & finishes. change of use to office on 2nd floor.Details
ti to the 1st fl entry lobby to 2nd fl. 2nd fl demolition of (e) non-structural partitions, fixtures, millwork & finishes. construction of (n) non-structural partitions, fixtures, millwork & finishes. change of use to office on 2nd floor. | $340,121 | |
| Dec 17, 2019 | Never finaled filed Dec 2019, never issued | 2550 Van Ness Av | priority process - change of use.r1(hotel to r-2(dormitory).pursuant dcp case 20080586-fr last legal tourist hotel use to 136 grp hsing bedrooms&306 beds w/student housing use char.add wk incl new curb cut&infill.class 1&2 bicycle parking & signage.maher n/a.Details
priority process - change of use.r1(hotel to r-2(dormitory).pursuant dcp case 20080586-fr last legal tourist hotel use to 136 grp hsing bedrooms&306 beds w/student housing use char.add wk incl new curb cut&infill.class 1&2 bicycle parking & signage.maher n/a. | $25,000 | |
| Oct 22, 2019 | Expired or cancelled cancelled Jan 2026 | 660 03rd St | replace main entry doors maher not reqDetails
replace main entry doors maher not req | $1,200 | |
| Aug 23, 2019 | Never finaled issued Sep 2019, no final | 1061 Market St | Premier Structures Inc | addition of 2 meeting rooms to existing office space on 2nd floor. no demo, existing ceiling, lighting & sprinklers to remain. work on 2nd story.Details
addition of 2 meeting rooms to existing office space on 2nd floor. no demo, existing ceiling, lighting & sprinklers to remain. work on 2nd story. | $8,838 |
| Apr 23, 2019 | Never finaled issued May 2019, no final | 499 Alabama St | E B W Builders Inc | replacement of (e) entry doors, add (n) door & wall to separate entry vestibule, flooring mod for (n) sloped plane, add (n) exterior courtyard rolling door which is not visible from right of way, all work in theater space only.Details
replacement of (e) entry doors, add (n) door & wall to separate entry vestibule, flooring mod for (n) sloped plane, add (n) exterior courtyard rolling door which is not visible from right of way, all work in theater space only. | $25,235 |
| Dec 13, 2018 | Completed final sign-off Jun 2019 | 575 Market St | Field Construction Inc. | 18th fl, ste 1850 ti demo of (e) non-structural partitions, doors, glazing & ceiling etc. mep, life safety and sprinklers under separate permitDetails
18th fl, ste 1850 ti demo of (e) non-structural partitions, doors, glazing & ceiling etc. mep, life safety and sprinklers under separate permit | $416,000 |
| Nov 15, 2018 | Completed final sign-off Jun 2019 | 575 Market St | Field Construction Inc. | 18/19/20/29th floors: renovation of common areas, corridors and restrooms. n/a for maher.Details
18/19/20/29th floors: renovation of common areas, corridors and restrooms. n/a for maher. | $850,000 |
| Nov 1, 2018 | Completed final sign-off Apr 2019 | 660 03rd St | Novo Construction Inc | t.i to (e) offices to incl (n) finishes at restrooms and kitchen areas w/ plumbing fixture replacement. 3rd and 4th floor only.Details
t.i to (e) offices to incl (n) finishes at restrooms and kitchen areas w/ plumbing fixture replacement. 3rd and 4th floor only. | $149,850 |
| Sep 24, 2018 | Completed final sign-off Nov 2018 | 312 Sutter St | E B W Builders Inc | t.i. on level 4. scope of work includes: removal and construction of interior non-load bearing partitions, ceiling. electrical lighting and mechanical to be completed under a sep permit. no sturctural orplumbing work.Details
t.i. on level 4. scope of work includes: removal and construction of interior non-load bearing partitions, ceiling. electrical lighting and mechanical to be completed under a sep permit. no sturctural orplumbing work. | $71,250 |
| Jun 22, 2018 | Never finaled issued Jul 2018, no final | 450 Guerrero St | replacement of (e) entry doors to building.Details
replacement of (e) entry doors to building. | $20,000 | |
| Jun 20, 2018 | Completed final sign-off Mar 2023 | 538 Eddy St | remove (e) fencing-fence foundation and pylor. install (n) security & gates & fencing. work is on eddy stDetails
remove (e) fencing-fence foundation and pylor. install (n) security & gates & fencing. work is on eddy st | $50,000 | |
| Jun 15, 2018 | Completed final sign-off Jan 2019 | 575 Market St | Field Construction Inc. | 12th fl suite 1200 ti demo of e non structural partitions, doors, glazing, ceiling etc. new non structural partitions, doors, ceiling, etc, mep, ls and sprinklers under sep permitDetails
12th fl suite 1200 ti demo of e non structural partitions, doors, glazing, ceiling etc. new non structural partitions, doors, ceiling, etc, mep, ls and sprinklers under sep permit | $600,000 |
| May 31, 2018 | Completed final sign-off Feb 2021 | 1800 Mission St | Eco Bay Services Inc. | selective demo work of basement, level 2 & level 3. no changes to demo of structure & rated construction. no exterior work. no work to landmark areas. space to remain vacant per ab017. n/a for maherDetails
selective demo work of basement, level 2 & level 3. no changes to demo of structure & rated construction. no exterior work. no work to landmark areas. space to remain vacant per ab017. n/a for maher | $35,000 |
| May 2, 2018 | Completed final sign-off Feb 2019 | 900 North Point St | Bhogal Brothers Construction Inc | space j102: renovation of (e) tenant space, rmeoval of (e) abandoned electrical data & features (mirrors and lockers) update finishes.Details
space j102: renovation of (e) tenant space, rmeoval of (e) abandoned electrical data & features (mirrors and lockers) update finishes. | $50,000 |
| Apr 13, 2018 | Completed final sign-off Jun 2018 | 660 03rd St | Novo Construction Inc | ti of (e) offices. work includes patch and repair of finishes at partitions previously demoed under pa #201804035417. maher naDetails
ti of (e) offices. work includes patch and repair of finishes at partitions previously demoed under pa #201804035417. maher na | $40,000 |
| Feb 21, 2018 | Completed final sign-off Jul 2018 | 851 Beach St | interior t.i. for extg retail space to include demo & new ada restrooms, storage room and counter , new rolling door in interior. fire protection & mep under seperate permits. n/a for maherDetails
interior t.i. for extg retail space to include demo & new ada restrooms, storage room and counter , new rolling door in interior. fire protection & mep under seperate permits. n/a for maher | $175,000 | |
| Feb 9, 2018 | Completed final sign-off Mar 2019 | 575 Market St | Field Construction Inc. | office , minor partition and door relocation, millwork, selective demo. ti lighting and electrical work deferred maher not reqDetails
office , minor partition and door relocation, millwork, selective demo. ti lighting and electrical work deferred maher not req | $250,000 |
| Jan 26, 2018 | Completed final sign-off Apr 2018 | 1011 Turk St | tenant improvement 2nd fl training rm 251-b, training managers 251-c. maher naDetails
tenant improvement 2nd fl training rm 251-b, training managers 251-c. maher na | $103,000 | |
| Jan 22, 2018 | Completed final sign-off Nov 2018 | 1501 Mariposa St | Plant Construction Co, Lp | ti to expand the middle school classrooms to the 2nd floor (change of use), adding classrooms, wc's, study hall and offices. create new opening at extg 2nd floor, non-bearing cmu wall to connect to 1555 mariposa. new stair at southeast corner for exiting from 1st & 2nd floor.Details
ti to expand the middle school classrooms to the 2nd floor (change of use), adding classrooms, wc's, study hall and offices. create new opening at extg 2nd floor, non-bearing cmu wall to connect to 1555 mariposa. new stair at southeast corner for exiting from 1st & 2nd floor. | $950,000 |
| Nov 8, 2017 | Never finaled issued Nov 2017, no final | 625 Polk St | roof leak detection and repair of existing slate roof and flashing at the southwest corner of the roof.Details
roof leak detection and repair of existing slate roof and flashing at the southwest corner of the roof. | $5,000 | |
| Oct 26, 2017 | Completed final sign-off Aug 2018 | 37 Grove St | exterior storefront modification at level 1 at both market st and grove st. change of use under pa# 2017-0815-4941.Details
exterior storefront modification at level 1 at both market st and grove st. change of use under pa# 2017-0815-4941. | $8,000 | |
| Oct 23, 2017 | Completed final sign-off Aug 2018 | 37 Grove St | all floors- interior t.i. to includes toilets, stairs, ada upgrades, seperate permits for mep work is design build including modification to (e) fire sprinkler system. ext. storefront modification under seperate permit. change of use pa#201708154941, change of useDetails
all floors- interior t.i. to includes toilets, stairs, ada upgrades, seperate permits for mep work is design build including modification to (e) fire sprinkler system. ext. storefront modification under seperate permit. change of use pa#201708154941, change of use | $1,000,000 | |
| Oct 10, 2017 | Never finaled issued Oct 2017, no final | 1011 Turk St | t.i. to rooms 102 and 251a to facilitate (n) training room furniture installation. including finishes, electrical and metal framing/gyp brd work. maher n/a.Details
t.i. to rooms 102 and 251a to facilitate (n) training room furniture installation. including finishes, electrical and metal framing/gyp brd work. maher n/a. | $150,000 | |
| Sep 19, 2017 | Completed final sign-off Feb 2018 | 312 Sutter St | E B W Builders Inc | 2nd floor - removal & construction of interior non-rated non-load bearing partitions, ceiling & lighting modifications & finish patching. electrical & fire life safety under separate permit.Details
2nd floor - removal & construction of interior non-rated non-load bearing partitions, ceiling & lighting modifications & finish patching. electrical & fire life safety under separate permit. | $37,702 |
| Aug 24, 2017 | Completed final sign-off Oct 2018 | 1136 Sutter St | Palmera Construction Co | demo interior of storage room down to framing. no structural workDetails
demo interior of storage room down to framing. no structural work | $5,000 |
| Jul 14, 2017 | Never finaled issued Jul 2017, no final | 3004 16th St | Premier Structures Inc | ti to include upgrade to (1) existing single occupant toilet, new non-structural interior partitions. mep, fire alarm & sprinkler under separate permitDetails
ti to include upgrade to (1) existing single occupant toilet, new non-structural interior partitions. mep, fire alarm & sprinkler under separate permit | $200,000 |
| Jun 2, 2017 | Expired or cancelled withdrawn Feb 2018 | 1501 Mariposa St | Plant Construction Co, Lp | addition of 2/f to (e) school (change of use) addition of exit & exit stair, new restrms, removal of 2 columns, demo of (e) 2/f finishes communicating opening to 1555 mariposa (mahner ordinance n/a)Details
addition of 2/f to (e) school (change of use) addition of exit & exit stair, new restrms, removal of 2 columns, demo of (e) 2/f finishes communicating opening to 1555 mariposa (mahner ordinance n/a) | $1,600,000 |
| Jun 2, 2017 | Completed final sign-off Mar 2019 | 1555 Mariposa St | Plant Construction Co, Lp | demolition of (e) exit stairs, addition of new stair. addition of communicating opening to 1501 mariposa. demolition of stair, new roof top play area. new topping slab @ roof (mahner n/a). fire alarm and sprinklers deferred, if necessary.Details
demolition of (e) exit stairs, addition of new stair. addition of communicating opening to 1501 mariposa. demolition of stair, new roof top play area. new topping slab @ roof (mahner n/a). fire alarm and sprinklers deferred, if necessary. | $1,200,000 |
| Dec 13, 2016 | Never finaled issued Dec 2016, no final | 731 Sansome St | Commercial Interior Builders Inc | 5th floor: revision to 201610281369 - ada restroom change; n/a maherDetails
5th floor: revision to 201610281369 - ada restroom change; n/a maher | |
| Sep 22, 2016 | Completed final sign-off Dec 2016 | 3000 16th St | C C I Commercial Construction & Improv | as builts for ref 201504214138, 201605187737 & 201603041226Details
as builts for ref 201504214138, 201605187737 & 201603041226 | |
| Aug 26, 2016 | Never finaled filed Aug 2016, never issued | 79 New Montgomery St | Hathaway Dinwiddie Co. | this permit is for a change of use from office to office/post secondary educaional institution. ** maher: n/a **Details
this permit is for a change of use from office to office/post secondary educaional institution. ** maher: n/a ** | $71,000 |
| Aug 26, 2016 | Never finaled filed Aug 2016, never issued | 180 New Montgomery St | Hathaway Dinwiddie Co. | this permit is for a change of use from office to office/post secondary education institution. ** maher: n/a **Details
this permit is for a change of use from office to office/post secondary education institution. ** maher: n/a ** | $53,000 |
| Jul 21, 2016 | Never finaled filed Jul 2016, never issued | 2801 Leavenworth St | first floor t.i to include non structural partitions, new restrooms, and finish upgrades. mep included. no exterior work. n/a for maher ordinance no. 155-13Details
first floor t.i to include non structural partitions, new restrooms, and finish upgrades. mep included. no exterior work. n/a for maher ordinance no. 155-13 | $165,540 | |
| Jul 20, 2016 | Completed final sign-off Aug 2016 | 860 Sutter St | Hathaway Dinwiddie Co. | replace gyp board ceiling in (e) 4th floor bathroom. new accessible door hardware at main entrance door to replace existing. maher naDetails
replace gyp board ceiling in (e) 4th floor bathroom. new accessible door hardware at main entrance door to replace existing. maher na | $1,000 |
| Apr 7, 2016 | Completed final sign-off Dec 2016 | 333 14th St | construct 3 vestibules on north end of drill court to improve sound attenuation vestibules will include egress doors. no impact on extg use occupancy. all work wil be interior. n/a for maherDetails
construct 3 vestibules on north end of drill court to improve sound attenuation vestibules will include egress doors. no impact on extg use occupancy. all work wil be interior. n/a for maher | $20,000 | |
| Feb 19, 2016 | Completed final sign-off Jul 2016 | 312 Sutter St | E B W Builders Inc | 6th floor: partial remodel including under ceiling partition demolition, new finishes, and ada upgrades. electrical and mechanical deferred submittal.Details
6th floor: partial remodel including under ceiling partition demolition, new finishes, and ada upgrades. electrical and mechanical deferred submittal. | $82,720 |
| Dec 23, 2015 | Expired or cancelled withdrawn Jan 2016 | 1555 Mariposa St | Plant Construction Co, Lp | partial remodel (t.i.) of ground floor of (e) school (k-8). convert shell space to commerical kitche. (n) partitions, (n) ceilings, (n) lighting, equipment connections to (e) utilities. mep under separate permitDetails
partial remodel (t.i.) of ground floor of (e) school (k-8). convert shell space to commerical kitche. (n) partitions, (n) ceilings, (n) lighting, equipment connections to (e) utilities. mep under separate permit | $100,000 |
| Aug 10, 2015 | Never finaled issued Aug 2015, no final | 499 Alabama St | this drawing is for an egress plan check only. there is no construction. the only change to the space is new maximum occupancy signage for the dance studio area; maher n/aDetails
this drawing is for an egress plan check only. there is no construction. the only change to the space is new maximum occupancy signage for the dance studio area; maher n/a | ||
| Jul 6, 2015 | Completed final sign-off Nov 2015 | 1501 Mariposa St | Plant Construction Co, Lp | revision to permit 201506118731; adds new lighting, fan coil units and fire sprinkler drain.; maher n/aDetails
revision to permit 201506118731; adds new lighting, fan coil units and fire sprinkler drain.; maher n/a | $45,000 |
| Apr 21, 2015 | Completed final sign-off Dec 2016 | 3000 16th St | C C I Commercial Construction & Improv | revision to pa# 2015.0402.2593; grnd leevel: add an exterior egress doorDetails
revision to pa# 2015.0402.2593; grnd leevel: add an exterior egress door | $5,000 |
| Apr 3, 2015 | Completed final sign-off Dec 2015 | 3450 03rd St | Plant Construction Co, Lp | addition of single unisex ada restroom and minor alterations, include roof sleeper frame work above roof, for future mechanical equipment under seperate permit. maher - not req'dDetails
addition of single unisex ada restroom and minor alterations, include roof sleeper frame work above roof, for future mechanical equipment under seperate permit. maher - not req'd | $14,500 |
| Apr 2, 2015 | Completed final sign-off Dec 2016 | 3000 16th St | C C I Commercial Construction & Improv | voulntary code and life safety upgrade of (e) retail and office space within the bldg - demo of (e) elevator, stairs, mechanical equip and ele as req'd - new partitions, elevator & stairsDetails
voulntary code and life safety upgrade of (e) retail and office space within the bldg - demo of (e) elevator, stairs, mechanical equip and ele as req'd - new partitions, elevator & stairs | $825,000 |
| Feb 5, 2015 | Completed final sign-off Nov 2015 | 1555 Mariposa St | Plant Construction Company Lp | partial remodel on g/f and 1/f of the k-8 school and includes a voluntary seismic rtrofit. this project moves an (e) stair, creates an office area. adds restrooms, adds shear walls and creates three openings to the adjacent buildingDetails
partial remodel on g/f and 1/f of the k-8 school and includes a voluntary seismic rtrofit. this project moves an (e) stair, creates an office area. adds restrooms, adds shear walls and creates three openings to the adjacent building | $1,250,000 |
| Jan 29, 2015 | Completed final sign-off Oct 2016 | 1244 Sutter St | C C I Commercial Construction & Improv | proposed project consists entirely of barrier removal. 1) altering extg toilet facilities on basement, 1st floor and 2nd floor to meet accessibility requirements. 2) replacing extg elevator to meet accessibily requirments. 3)comply with n.o.v. #201314821.Details
proposed project consists entirely of barrier removal. 1) altering extg toilet facilities on basement, 1st floor and 2nd floor to meet accessibility requirements. 2) replacing extg elevator to meet accessibily requirments. 3)comply with n.o.v. #201314821. | $225,000 |
| Nov 25, 2014 | Completed final sign-off Nov 2015 | 660 03rd St | for record purpose only, no work proposed per sf planning commission motion number 19235. change of use only at the 3rd & 4th floors, per the attached nrs. (no construction is proposed.) n/a for maher ordinance.Details
for record purpose only, no work proposed per sf planning commission motion number 19235. change of use only at the 3rd & 4th floors, per the attached nrs. (no construction is proposed.) n/a for maher ordinance. | ||
| Aug 26, 2014 | Expired or cancelled withdrawn Mar 2018 | 1501 Mariposa St | Plant Construction Company Lp | revision to appl #2014.0519.6166 & 2014.0616.8444 - to add one additional room & to modify vestibule dimensions. n/a maher ordinanceDetails
revision to appl #2014.0519.6166 & 2014.0616.8444 - to add one additional room & to modify vestibule dimensions. n/a maher ordinance | $10,000 |
| Jul 24, 2014 | Never finaled issued Jul 2014, no final | 620 Sutter St | Hathaway Dinwiddie Co. | renovate two (e) non compliant restrooms on ground level to full accessibity compliance. install new transition at ground level to meet accessibility compliance.Details
renovate two (e) non compliant restrooms on ground level to full accessibity compliance. install new transition at ground level to meet accessibility compliance. | $35,000 |
| Nov 26, 2013 | Never finaled issued Dec 2013, no final | 450 Mission St | Hathaway Dinwiddie Co. | 4th floor suite 402 t.i. fo r3,116 sf office space, extent of work to include new aull height & partial height partitions & additoin of power/data as needed per layout shown on furniture plan. no new electrical fixtures, no plumbing.Details
4th floor suite 402 t.i. fo r3,116 sf office space, extent of work to include new aull height & partial height partitions & additoin of power/data as needed per layout shown on furniture plan. no new electrical fixtures, no plumbing. | $140,000 |
| Aug 21, 2013 | Completed final sign-off Mar 2014 | 1420 Sutter St | Cci Com'l Constr & Improv**See 985808*** | change use from retail to office. tenant improvement of 2nd fl space and porton of gr fl. ada improvement to 2nd fl restrooms, kitchen , stairs. demo of ceiling and floor finishes of gr fl space. installation of new storefront in e opening at gr level, rear of building. mep sep permitDetails
change use from retail to office. tenant improvement of 2nd fl space and porton of gr fl. ada improvement to 2nd fl restrooms, kitchen , stairs. demo of ceiling and floor finishes of gr fl space. installation of new storefront in e opening at gr level, rear of building. mep sep permit | $350,000 |
| Aug 7, 2013 | Never finaled issued Sep 2013, no final | 180 New Montgomery St | Hathaway Dinwiddie Co. | modification to existing partition to increase acoustical performance. remove existing partition to increase storage room space, improving exiting and allowing accessibility and improving life safety. mep under separate permit.Details
modification to existing partition to increase acoustical performance. remove existing partition to increase storage room space, improving exiting and allowing accessibility and improving life safety. mep under separate permit. | $10,000 |
| Mar 27, 2013 | Completed final sign-off Dec 2013 | 66 08th St | Paradigm General Contractors | revision to bldg permit 201206213148 to accommodate the installation of a new driveway gate & lighting around the gate area, all directed to the ground.Details
revision to bldg permit 201206213148 to accommodate the installation of a new driveway gate & lighting around the gate area, all directed to the ground. | $50,000 |
| Mar 22, 2013 | Completed final sign-off Mar 2015 | 380 Fulton St | erect 4 story, no basement, club house/gym/pool office building.Details
erect 4 story, no basement, club house/gym/pool office building. | $11,500,000 | |
| Jan 23, 2013 | Never finaled filed Jan 2013, never issued | 1727 Lombard St | to ducument change of use under planning code section 182 (c). from hotel to group housing.Details
to ducument change of use under planning code section 182 (c). from hotel to group housing. | ||
| Jan 23, 2013 | Never finaled filed Jan 2013, never issued | 620 Sutter St | to ducument change of use from hotel to group housing.Details
to ducument change of use from hotel to group housing. | ||
| Jan 23, 2013 | Never finaled filed Jan 2013, never issued | 1071 Pine St | to comply to complaint 201050891. to document change of use under planning code section 182(c) in response to complaint 201050891.Details
to comply to complaint 201050891. to document change of use under planning code section 182(c) in response to complaint 201050891. | ||
| Nov 21, 2012 | Completed final sign-off Oct 2013 | 3450 03rd St | Plant Construction Company Lp | unit #2a - soft demolition, non-bearing partitions, acoustical ceilings, doors, paint, carpte (plumbing, electrical, hvac under separate permit)Details
unit #2a - soft demolition, non-bearing partitions, acoustical ceilings, doors, paint, carpte (plumbing, electrical, hvac under separate permit) | $475,000 |
| Nov 21, 2012 | Completed final sign-off Oct 2013 | 3450 03rd St | Plant Construction Company Lp | unit #2b - soft demolition, non-bearing partitions, acoustical ceilings, doors, paint, carpte (plumbing, electrical, hvac under separate permits) no additional office space.Details
unit #2b - soft demolition, non-bearing partitions, acoustical ceilings, doors, paint, carpte (plumbing, electrical, hvac under separate permits) no additional office space. | $475,000 |
| Nov 13, 2012 | Expired or cancelled withdrawn Oct 2021 | 2225 Jerrold Av | Hathaway Dinwiddie Co. | this permit is for a change in use from industrial to vehicle storage/accessory office.Details
this permit is for a change in use from industrial to vehicle storage/accessory office. | $50,000 |
| Nov 13, 2012 | Never finaled filed Nov 2012, never issued | 60 Federal St | Hathaway Dinwiddie Co. | this permit is for a change of use from industrial to post-secondary education institution.Details
this permit is for a change of use from industrial to post-secondary education institution. | $50,000 |
| Nov 13, 2012 | Expired or cancelled cancelled Mar 2016 | 121 Wisconsin St | this permit is for the legitimization for commercial vehicle parking and storage.Details
this permit is for the legitimization for commercial vehicle parking and storage. | ||
| Nov 13, 2012 | Never finaled filed Nov 2012, never issued | 2340 Stockton St | Hathaway Dinwiddie Co. | this permit is for a change of use from office to post-secondary educational institution.Details
this permit is for a change of use from office to post-secondary educational institution. | $50,000 |
| Nov 13, 2012 | Never finaled filed Nov 2012, never issued | 491 Post St | Hathaway Dinwiddie Co. | this permit is for a change of use from church to post-secondary educational institution.Details
this permit is for a change of use from church to post-secondary educational institution. | $50,000 |
| Nov 13, 2012 | Never finaled filed Nov 2012, never issued | 2801 Leavenworth St | Hathaway Dinwiddie Co. | this permit is to add post-secondary educational institution use to existing office and retail.Details
this permit is to add post-secondary educational institution use to existing office and retail. | $50,000 |
| Jul 25, 2012 | Expired or cancelled cancelled Jan 2026 | 180 New Montgomery St | respond to notice of correct fire hazards work to include fire & life safety upgrades on all floors. no exterior work, no change of use.Details
respond to notice of correct fire hazards work to include fire & life safety upgrades on all floors. no exterior work, no change of use. | $25,000 | |
| Jul 25, 2012 | Never finaled issued Aug 2012, no final | 180 New Montgomery St | Hathaway Dinwiddie Co. | addition of full height walls to create computer labs on 4th & 7th floors. accessibility upgrades on th 5th floor restrooms. no exterior work, no change of use.Details
addition of full height walls to create computer labs on 4th & 7th floors. accessibility upgrades on th 5th floor restrooms. no exterior work, no change of use. | $25,000 |
| Jun 26, 2012 | Never finaled filed Jun 2012, never issued | 150 Hayes St | to comply w/nov #201298713: install prefabricated man door with panic hardware at hayes st, install chainlink fence for security.Details
to comply w/nov #201298713: install prefabricated man door with panic hardware at hayes st, install chainlink fence for security. | $2,000 | |
| Nov 16, 2011 | Expired or cancelled cancelled Mar 2020 | 2300 Stockton St | Hathaway Dinwiddie Co. | accessibility upgrades & minor modifications to egress system.Details
accessibility upgrades & minor modifications to egress system. | $45,000 |
| Apr 28, 2011 | Completed final sign-off Mar 2012 | 79 New Montgomery St | Hathaway Dinwiddie Co. | replace deteriorated and cracked concrete at the encased beams with new concrete located at 4th floor. in response to nov #201117541.Details
replace deteriorated and cracked concrete at the encased beams with new concrete located at 4th floor. in response to nov #201117541. | $4,000 |
| Apr 7, 2011 | Completed final sign-off May 2011 | 460 Townsend St | Hathaway Dinwiddie Co. | revision to appl #201005051801 to provide structural details for (n) stair. no change of use & no change to approve design of stair.Details
revision to appl #201005051801 to provide structural details for (n) stair. no change of use & no change to approve design of stair. | |
| Mar 30, 2011 | Completed final sign-off May 2011 | 460 Townsend St | renew pa#200008036856 to obtain final inspection.Details
renew pa#200008036856 to obtain final inspection. | ||
| Mar 30, 2011 | Completed final sign-off May 2011 | 460 Townsend St | renew pa#9715311 to obtain final inspection.Details
renew pa#9715311 to obtain final inspection. | ||
| Mar 30, 2011 | Completed final sign-off May 2011 | 460 Townsend St | renew pa#9808792 to obtain final inspection.Details
renew pa#9808792 to obtain final inspection. | ||
| Mar 21, 2011 | Completed final sign-off Apr 2011 | 655 Sutter St | renew pa#9619566 to obtain final inspection.Details
renew pa#9619566 to obtain final inspection. | ||
| Mar 9, 2011 | Never finaled issued Mar 2019, no final | 60 Federal St | Hathaway Dinwiddie Co. | life safety upgrades. response to nov 201054769. new stairway, 5th fl steps and accessible ramp. 3rd floor steps. alterations to modular partitions. response to plumbing nov date 6/24/10. and plumbing work. all moveable partitions are non-permanent. ramp is omitted from this permit.Details
life safety upgrades. response to nov 201054769. new stairway, 5th fl steps and accessible ramp. 3rd floor steps. alterations to modular partitions. response to plumbing nov date 6/24/10. and plumbing work. all moveable partitions are non-permanent. ramp is omitted from this permit. | $325,000 |
| Jan 12, 2011 | Completed final sign-off Oct 2011 | 601 Brannan St | Hathaway Dinwiddie Co. | interior renovations to (e) cafe (450th).Details
interior renovations to (e) cafe (450th). | $10,000 |
| Dec 15, 2010 | Never finaled issued Dec 2010, no final | 180 New Montgomery St | Hathaway Dinwiddie Co. | 5th floor - construct one interior partition with entry door to provide new office & accessibility upgrades.Details
5th floor - construct one interior partition with entry door to provide new office & accessibility upgrades. | $2,500 |
| Sep 13, 2010 | Never finaled filed Sep 2010, never issued | 860 Sutter St | Hathaway Dinwiddie Co. | to comply with nov# 201052696. replace existing deteriorating windows on building exterior.Details
to comply with nov# 201052696. replace existing deteriorating windows on building exterior. | $25,000 |
| Sep 13, 2010 | Never finaled filed Sep 2010, never issued | 2211 Van Ness Av | Hathaway Dinwiddie Co. | respond to nov# 201056926 to obtain permit for new partitions at first floor dining area and construction of a kitchen @ unit #202.Details
respond to nov# 201056926 to obtain permit for new partitions at first floor dining area and construction of a kitchen @ unit #202. | $5,000 |
| Sep 7, 2010 | Never finaled filed Sep 2010, never issued | 680 Sutter St | Hathaway Dinwiddie Co. | work @ unit# 204 only. respond to nov# 201052694 for window replacement & kitchen remodel without permit.Details
work @ unit# 204 only. respond to nov# 201052694 for window replacement & kitchen remodel without permit. | $11,000 |
| Aug 24, 2010 | Completed final sign-off Oct 2010 | 180 New Montgomery St | Hathaway Dinwiddie Co. | 6th floor:remove 1 extg interior partition and construct new door opening to suite 606Details
6th floor:remove 1 extg interior partition and construct new door opening to suite 606 | $3,000 |
| Aug 17, 2010 | Expired or cancelled cancelled Jan 2020 | 1153 Bush St | Hathaway Dinwiddie Co. | revision to approved pa# 9816385 & respond to nov# 201051135. new handrails & as-built drawings.Details
revision to approved pa# 9816385 & respond to nov# 201051135. new handrails & as-built drawings. | $3,000 |
| Aug 17, 2010 | Never finaled issued Jul 2012, no final | 79 New Montgomery St | Hathaway Dinwiddie Co. | respond to nov# 201052238. legalize work done without permit. verify occupant load of (e) assembly areas. all interior work.Details
respond to nov# 201052238. legalize work done without permit. verify occupant load of (e) assembly areas. all interior work. | $300,000 |
| Aug 9, 2010 | Never finaled filed Aug 2010, never issued | 410 Bush St | Hathaway Dinwiddie Co. | replace (e) deteriorating windows on east elevation.Details
replace (e) deteriorating windows on east elevation. | $20,000 |
| Jul 29, 2010 | Never finaled issued Aug 2010, no final | 410 Bush St | Hathaway Dinwiddie Co. | replace (2) existing kilns and minor adjustments to 1-hr passageway. no change of use no exterior work.Details
replace (2) existing kilns and minor adjustments to 1-hr passageway. no change of use no exterior work. | $20,000 |
| Jul 22, 2010 | Expired or cancelled cancelled Jul 2016 | 2151 Van Ness Av | Hathaway Dinwiddie Co. | revision to approv pa# 2007/01/17/1874 r1. install an accessible ramp in lieu of accessible lift.Details
revision to approv pa# 2007/01/17/1874 r1. install an accessible ramp in lieu of accessible lift. | $15,000 |
| Jul 20, 2010 | Completed final sign-off Aug 2010 | 1060 Key Av | Atlantis Fire Protection | install new overhead sprinkler system in 3 modular units used as classrooms. 19 new sprinkler heads total & underground.Details
install new overhead sprinkler system in 3 modular units used as classrooms. 19 new sprinkler heads total & underground. | $8,000 |
| Jan 21, 2010 | Never finaled issued Apr 2010, no final | 901 Alabama St | Nibbi Bros Assoc Inc. | fire dept review per sffd request and as-builts for clubhouse remodel under pa# 2008/05/30/3289 which was not originally routed to sffd.Details
fire dept review per sffd request and as-builts for clubhouse remodel under pa# 2008/05/30/3289 which was not originally routed to sffd. | |
| Oct 15, 2009 | Completed final sign-off Mar 2010 | 1950 Page St | install roll down gate to secure game room during hours club is closedDetails
install roll down gate to secure game room during hours club is closed | $7,000 | |
| May 30, 2008 | Completed final sign-off Oct 2010 | 901 Alabama St | Nibbi Bros Assoc Inc. | renovation of (e) clubhouse. demolition of (e)rear gym & construction of new gym & 2-story support sp. incl new exit stair,elevator,baths,dock. existing front bldg to be renovated,including seismic reinforcing of structure, upgrading infrastructure to current codes, and exterior restoration work.Details
renovation of (e) clubhouse. demolition of (e)rear gym & construction of new gym & 2-story support sp. incl new exit stair,elevator,baths,dock. existing front bldg to be renovated,including seismic reinforcing of structure, upgrading infrastructure to current codes, and exterior restoration work. | $200,000 |
| Feb 28, 2008 | Completed final sign-off Apr 2011 | 1011 Turk St | Vila Construction Co | revisions to work approved pa# 200709182974-deletion of exterior exit stair (req to comply with 2001 cbc table 10a), addition of required 2nd exit into (e) corridor, permitted under 2007 cbc, section 1015.2.1, except #2, value engineering changes.Details
revisions to work approved pa# 200709182974-deletion of exterior exit stair (req to comply with 2001 cbc table 10a), addition of required 2nd exit into (e) corridor, permitted under 2007 cbc, section 1015.2.1, except #2, value engineering changes. | |
| Jan 11, 2008 | Expired or cancelled expired Aug 2011 | 491 Post St | legalize installation of 2 statues in front of bldg.(post st. elevation) app filed to comply nov complaint #200722712Details
legalize installation of 2 statues in front of bldg.(post st. elevation) app filed to comply nov complaint #200722712 | $10,000 |