Block 3547, lot 001
1800 Mission St
- City’s use
- Commercial Retail
- Built
- 1914
- Stories
- 4
- Building
- 210,935 sq ft
- Lot
- 68,772 sq ft
- Zoning
- UMU
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
80 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 11, 2022 | Completed final sign-off Oct 2022 | 1800 Mission St | Pacific Auxiliary Fire Alarm | as-built: fire alarm record st: drawning set feflects removal of f/a devices isntall temporaitly under f/a 202205275132.Details
as-built: fire alarm record st: drawning set feflects removal of f/a devices isntall temporaitly under f/a 202205275132. | |
| May 27, 2022 | Never finaled issued May 2022, no final | 1800 Mission St | Pacific Auxiliary Fire Alarm | fire alarm only. tenant improvement where new equipment and devices will be added. 1 backup amplifier, 2 power supply, 1 control module, 1 isolation relay, 39 speaker strobes. these devices are being added for a temporary event on the building courtDetails
fire alarm only. tenant improvement where new equipment and devices will be added. 1 backup amplifier, 2 power supply, 1 control module, 1 isolation relay, 39 speaker strobes. these devices are being added for a temporary event on the building court | $6,500 |
| May 16, 2022 | Expired or cancelled cancelled Jan 2026 | 1800 Mission St | temp installation for event at sf armory drill court. temp wall and rigging to be installed and removed after 10/1/22. temp extension of life safety system ( at sffd request.Details
temp installation for event at sf armory drill court. temp wall and rigging to be installed and removed after 10/1/22. temp extension of life safety system ( at sffd request. | $100,000 | |
| Feb 9, 2021 | Completed final sign-off Mar 2021 | 1800 Mission St | Plant Construction Co, Lp | installation of evacuation maps andDetails
installation of evacuation maps and | |
| Nov 9, 2020 | Completed final sign-off Mar 2021 | 1800 Mission St | Pribuss Engineering Inc | as-built for pa #201909111304. install new 6" fire service, back flow & fire pump. install new fdc standpipe system & automatic sprinkler system throughout. (total 1672 heads) $514.62Details
as-built for pa #201909111304. install new 6" fire service, back flow & fire pump. install new fdc standpipe system & automatic sprinkler system throughout. (total 1672 heads) $514.62 | $860,444 |
| Sep 17, 2020 | Completed final sign-off May 2021 | 1800 Mission St | Pacific Auxiliary Fire Alarm | fire alarm only, as build drawings. added heat detector & speaker to roof elevator landing and misc changes to system. ref bldg cDetails
fire alarm only, as build drawings. added heat detector & speaker to roof elevator landing and misc changes to system. ref bldg c | $1,000 |
| Aug 7, 2020 | Completed final sign-off May 2021 | 1800 Mission St | Plant Construction Co, Lp | deferred submittal for stairs and railings. new stairs #4 and #5. revision to app#201809190782Details
deferred submittal for stairs and railings. new stairs #4 and #5. revision to app#201809190782 | |
| Aug 7, 2020 | Completed final sign-off May 2021 | 1800 Mission St | Plant Construction Co, Lp | deferred submittal for stairs and railings. new stairs #3 within the building. revision to app#201809190782Details
deferred submittal for stairs and railings. new stairs #3 within the building. revision to app#201809190782 | |
| Jul 16, 2020 | Never finaled issued Jul 2020, no final | 1800 Mission St | street spaceDetails
street space | ||
| Jun 9, 2020 | Completed final sign-off May 2021 | 1800 Mission St | Plant Construction Co, Lp | revision to permit # 201809190782. this package revises approved basement elevator machine room, level 1; gender neutral restroom removal, level 1 men's and women's restrooms reconfiguration, and the removal of restrooms on levels 2, 3 and 4. previously approved mechanical scope has been revised.Details
revision to permit # 201809190782. this package revises approved basement elevator machine room, level 1; gender neutral restroom removal, level 1 men's and women's restrooms reconfiguration, and the removal of restrooms on levels 2, 3 and 4. previously approved mechanical scope has been revised. | |
| May 14, 2020 | Completed final sign-off Mar 2021 | 1800 Mission St | Pacific Auxiliary Fire Alarm | fire alarm (e) notifier nfs2-640 will remain, add to cellular communicator, annunciator, amplifier & strobe power supplies, 19 smoke, 2 heat detectors, 1 manual pull, 2 pull mods, 10 dual input mods, 9 control mods, 5 isolator mods, 91 speaker strobes. ref pa#201809190782Details
fire alarm (e) notifier nfs2-640 will remain, add to cellular communicator, annunciator, amplifier & strobe power supplies, 19 smoke, 2 heat detectors, 1 manual pull, 2 pull mods, 10 dual input mods, 9 control mods, 5 isolator mods, 91 speaker strobes. ref pa#201809190782 | $85,000 |
| Oct 28, 2019 | Completed final sign-off May 2021 | 1800 Mission St | Plant Construction Co, Lp | revision to app#201809190782. revision to stair #3 only. n/a for maherDetails
revision to app#201809190782. revision to stair #3 only. n/a for maher | |
| Oct 8, 2019 | Never finaled issued Oct 2019, no final | 1800 Mission St | street space onlyDetails
street space only | ||
| Sep 11, 2019 | Completed final sign-off May 2021 | 1800 Mission St | Pribuss Engineering Inc | reference appln #201809190782. install (n) 6" fire service, backflor & fire pump. install (n) fdc, standpipe system & automatic sprinkler system throughout (total 1672 heads)Details
reference appln #201809190782. install (n) 6" fire service, backflor & fire pump. install (n) fdc, standpipe system & automatic sprinkler system throughout (total 1672 heads) | $860,444 |
| May 13, 2019 | Completed final sign-off May 2021 | 1800 Mission St | Plant Construction Co, Lp | revisio to 201809190778. revision to previously approved seismic retrofit to accomodate additional roof loads of future occupancy at roof. roof occupancy under future permitDetails
revisio to 201809190778. revision to previously approved seismic retrofit to accomodate additional roof loads of future occupancy at roof. roof occupancy under future permit | |
| Apr 4, 2019 | Never finaled issued Apr 2019, no final | 1800 Mission St | street spaceDetails
street space | ||
| Feb 28, 2019 | Never finaled issued Feb 2019, no final | 333 14th St | street space onlyDetails
street space only | ||
| Sep 19, 2018 | Never finaled issued Sep 2018, no final | 1800 Mission St | street spaceDetails
street space | ||
| Sep 19, 2018 | Completed final sign-off May 2021 | 1800 Mission St | Plant Construction Co, Lp | voluntary seismic retrofit of administration wing. work include new concrete shear walls, associated foundation & localized strengthening. ** maher: n/a **Details
voluntary seismic retrofit of administration wing. work include new concrete shear walls, associated foundation & localized strengthening. ** maher: n/a ** | $9,000,000 |
| Sep 19, 2018 | Completed final sign-off May 2021 | 1800 Mission St | Plant Construction Co, Lp | core & shell renovation. work includes improvements to vertical circulation. hvac & plumbing systems. accessibility upgrades, localized window replacement / repair & localized facade repair. ** maher: n/a **Details
core & shell renovation. work includes improvements to vertical circulation. hvac & plumbing systems. accessibility upgrades, localized window replacement / repair & localized facade repair. ** maher: n/a ** | $5,000,000 |
| Sep 19, 2018 | Completed final sign-off May 2021 | 1800 Mission St | Plant Construction Co, Lp | voluntary stabilization of the existing masonry parapet at the west facade, gable end walls. work to occur above ground floor.Details
voluntary stabilization of the existing masonry parapet at the west facade, gable end walls. work to occur above ground floor. | $1,000,000 |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 1800 Mission St | street spaceDetails
street space | ||
| Sep 5, 2018 | Never finaled issued Sep 2018, no final | 1800 Mission St | street spaceDetails
street space | ||
| Aug 6, 2018 | Never finaled issued Aug 2018, no final | 1800 Mission St | street spaceDetails
street space | ||
| May 31, 2018 | Completed final sign-off Feb 2021 | 1800 Mission St | Eco Bay Services Inc. | selective demo work of basement, level 2 & level 3. no changes to demo of structure & rated construction. no exterior work. no work to landmark areas. space to remain vacant per ab017. n/a for maherDetails
selective demo work of basement, level 2 & level 3. no changes to demo of structure & rated construction. no exterior work. no work to landmark areas. space to remain vacant per ab017. n/a for maher | $35,000 |
| Apr 9, 2018 | Never finaled issued Apr 2018, no final | 333 14th St | street spaceDetails
street space | ||
| Feb 1, 2018 | Never finaled issued Feb 2018, no final | 333 14th St | street spaceDetails
street space | ||
| Oct 18, 2017 | Never finaled issued Oct 2017, no final | 333 14th St | street space permitDetails
street space permit | ||
| Aug 2, 2017 | Never finaled issued Aug 2017, no final | 333 14th St | street spaceDetails
street space | ||
| Jul 18, 2017 | Never finaled issued Jul 2017, no final | 333 14th St | streets spaceDetails
streets space | ||
| May 12, 2017 | Completed final sign-off Jun 2018 | 1800 Mission St | Pacific Auxiliary Fire Alarm | g/f- fire alarm, (3) new speaker/strobes. t.i. pa#201607142293. n/a ordinance #155-13Details
g/f- fire alarm, (3) new speaker/strobes. t.i. pa#201607142293. n/a ordinance #155-13 | $5,000 |
| May 5, 2017 | Never finaled issued May 2017, no final | 333 14th St | street space.Details
street space. | ||
| Apr 5, 2017 | Completed final sign-off Jul 2018 | 1800 Mission St | Yerba Buena Builders Inc | 1/f- revisioon to pa#201607142293, relocate gender inclusive restroom in different area of the project on level 1 (same floor). n/a ordinance #155-13Details
1/f- revisioon to pa#201607142293, relocate gender inclusive restroom in different area of the project on level 1 (same floor). n/a ordinance #155-13 | |
| Mar 15, 2017 | Never finaled filed Mar 2017, never issued | 1800 Mission St | replacement of existing non-historic loading dock coiling door on julian street with new perforated coiling door, new air intake & exhaust vents on roof.Details
replacement of existing non-historic loading dock coiling door on julian street with new perforated coiling door, new air intake & exhaust vents on roof. | $12,000 | |
| Feb 3, 2017 | Never finaled issued Feb 2017, no final | 333 14th St | street space permitDetails
street space permit | ||
| Jan 10, 2017 | Completed final sign-off Sep 2017 | 333 14th St | D C Taylor Co | reroofingDetails
reroofing | $624,357 |
| Oct 28, 2016 | Completed final sign-off Nov 2017 | 1800 Mission St | Yerba Buena Builders Inc | administrative certificate of approrriateness for exploratory investgation work @ masonry parapet facing julian street & 14th st. purpose to determine condition of structural support of parapet to aid in developing reinforcement solution. n/a for maher ordinance.Details
administrative certificate of approrriateness for exploratory investgation work @ masonry parapet facing julian street & 14th st. purpose to determine condition of structural support of parapet to aid in developing reinforcement solution. n/a for maher ordinance. | $84,000 |
| Oct 14, 2016 | Completed final sign-off Mar 2017 | 1800 Mission St | Dylan Arrants Construction | revision to pa 2015-0320-1505 - submittal of electrical, mechanical title 24. also floor plan change (number and arrangement of fixtures)Details
revision to pa 2015-0320-1505 - submittal of electrical, mechanical title 24. also floor plan change (number and arrangement of fixtures) | |
| Oct 12, 2016 | Never finaled issued Oct 2016, no final | 1800 Mission St | Pacific Auxiliary Fire Alarm | 1st fl: t.i. 1 new speaker strobe added, 5 extg speaker strobes, and 6 extg manual pull station relocated, 1 extg speaker replaced with new speaker strobe, 1 high cd speaker strobe replaced with standard cd speaker strobe. ref app# 201608034112. original fa permit 2011-0721-0703. n/a for maher.Details
1st fl: t.i. 1 new speaker strobe added, 5 extg speaker strobes, and 6 extg manual pull station relocated, 1 extg speaker replaced with new speaker strobe, 1 high cd speaker strobe replaced with standard cd speaker strobe. ref app# 201608034112. original fa permit 2011-0721-0703. n/a for maher. | $5,500 |
| Aug 3, 2016 | Completed final sign-off Dec 2016 | 1800 Mission St | tenant improvement including addition of (3) new vestibules within a-4/drill court space to improve acoustical performance, no chane in exiting width as proposed; maher n/aDetails
tenant improvement including addition of (3) new vestibules within a-4/drill court space to improve acoustical performance, no chane in exiting width as proposed; maher n/a | $18,000 | |
| Jul 14, 2016 | Completed final sign-off Jul 2018 | 1800 Mission St | tenant improvement consisting of new gender neutral restroom on ground floor (above code minimum required fixtures), new storage room & small accessory lounge space. scope of work is all on ground floor. maher naDetails
tenant improvement consisting of new gender neutral restroom on ground floor (above code minimum required fixtures), new storage room & small accessory lounge space. scope of work is all on ground floor. maher na | $285,000 | |
| Apr 7, 2016 | Completed final sign-off Dec 2016 | 333 14th St | construct 3 vestibules on north end of drill court to improve sound attenuation vestibules will include egress doors. no impact on extg use occupancy. all work wil be interior. n/a for maherDetails
construct 3 vestibules on north end of drill court to improve sound attenuation vestibules will include egress doors. no impact on extg use occupancy. all work wil be interior. n/a for maher | $20,000 | |
| Feb 26, 2016 | Never finaled issued Feb 2016, no final | 333 14th St | Pacific Auxiliary Fire Alarm | fire alarm: add one speaker/strobe & two stroves to existing fire alarm system as part of restroom renovation project on the 1st floor. ref pa 2015-0320-1505. maher naDetails
fire alarm: add one speaker/strobe & two stroves to existing fire alarm system as part of restroom renovation project on the 1st floor. ref pa 2015-0320-1505. maher na | $1,700 |
| Jan 6, 2016 | Completed final sign-off Apr 2016 | 1800 Mission St | administrative permit for planning request to establish change of use of drill court area from arts activity (planning code sec. 843.55) to principally permitted entertaiment use per (planning code sec.843.56) no construction. n/a for maher ordinance no 155-13Details
administrative permit for planning request to establish change of use of drill court area from arts activity (planning code sec. 843.55) to principally permitted entertaiment use per (planning code sec.843.56) no construction. n/a for maher ordinance no 155-13 | ||
| Apr 16, 2015 | Never finaled issued Apr 2015, no final | 1800 Mission St | documentation purposes only. no work done. to establish use of existing non conforming a-4 public assembly. see attached pre application documentation. located at the drill court area. also to establish occupant load for dance part configuration/useDetails
documentation purposes only. no work done. to establish use of existing non conforming a-4 public assembly. see attached pre application documentation. located at the drill court area. also to establish occupant load for dance part configuration/use | ||
| Mar 20, 2015 | Completed final sign-off May 2017 | 1800 Mission St | Dylan Arrants Construction | enlarge existing bathroom to a new womens's restroom for patrons at events at the drill court. upgrade of finishes in men's room. all work is within building envelope. maher n/a.Details
enlarge existing bathroom to a new womens's restroom for patrons at events at the drill court. upgrade of finishes in men's room. all work is within building envelope. maher n/a. | $89,000 |
| Jul 24, 2014 | Never finaled issued Jul 2014, no final | 1800 Mission St | street spaceDetails
street space | ||
| Feb 25, 2013 | Completed final sign-off Apr 2013 | 1800 Mission St | remove four non load bearing walls of claytile and plaster between column-plasters as shown and below beams to create larger spaces. patch sealand paint openings as required after demolition is complete.Details
remove four non load bearing walls of claytile and plaster between column-plasters as shown and below beams to create larger spaces. patch sealand paint openings as required after demolition is complete. | $8,000 | |
| Jan 15, 2013 | Never finaled issued Feb 2013, no final | 1800 Mission St | Tom Ehline | replace e broken glass, paint e truss and metal work. install insulation panels on walls and ceilings, install maple floor to replace in kindDetails
replace e broken glass, paint e truss and metal work. install insulation panels on walls and ceilings, install maple floor to replace in kind | $200,000 |
| Dec 28, 2011 | Never finaled issued Dec 2011, no final | 333 14th St | additional address at building on 14th street as main entrance.Details
additional address at building on 14th street as main entrance. | ||
| Dec 6, 2011 | Never finaled issued Dec 2011, no final | 1800 Mission St | install 2" fiberglass sound blanket material to the entire surface of interior drill court ceiling, no other work. product name: theater-shield accoustical system.Details
install 2" fiberglass sound blanket material to the entire surface of interior drill court ceiling, no other work. product name: theater-shield accoustical system. | $40,000 | |
| Oct 31, 2011 | Completed final sign-off Nov 2011 | 1800 Mission St | remove note from sheet a4.0 all doors to be connected to bldg life-saftey system & to fail safe for fire fighter access to all evels as per app#201104063576.Details
remove note from sheet a4.0 all doors to be connected to bldg life-saftey system & to fail safe for fire fighter access to all evels as per app#201104063576. | ||
| Jul 21, 2011 | Completed final sign-off Mar 2015 | 1800 Mission St | Pacific Auxiliary Fire Alarm | 1st floor-installation of new fire alarm system for the drill court & building coreDetails
1st floor-installation of new fire alarm system for the drill court & building core | $23,000 |
| Jun 1, 2011 | Never finaled issued Jun 2011, no final | 1800 Mission St | street spaceDetails
street space | ||
| May 10, 2011 | Completed final sign-off Aug 2011 | 1800 Mission St | reference to app#201007076118.change extg office kitchen to a catering kitchen. no sale of food. provide food prep sink with floor sink,3 compartment sink with grease trap. hand wash sink.Details
reference to app#201007076118.change extg office kitchen to a catering kitchen. no sale of food. provide food prep sink with floor sink,3 compartment sink with grease trap. hand wash sink. | $3,500 | |
| Apr 28, 2011 | Completed final sign-off May 2011 | 1800 Mission St | provide 2-hr. separation between wood & metal shop in basement, including rated doors & frames and fire seal all penetrations.Details
provide 2-hr. separation between wood & metal shop in basement, including rated doors & frames and fire seal all penetrations. | $4,200 | |
| Apr 6, 2011 | Completed final sign-off Nov 2011 | 1800 Mission St | refer to sfdbi dept pre-application review minutes attached-new rated partitions & doors to enclose the central stairs @ bsmt level. new tempered glass security wall, tempered glass doors @ 2nd/3rd/4th floors. accessibility modifications to men's & women's restrms,emergency signage under sep permDetails
refer to sfdbi dept pre-application review minutes attached-new rated partitions & doors to enclose the central stairs @ bsmt level. new tempered glass security wall, tempered glass doors @ 2nd/3rd/4th floors. accessibility modifications to men's & women's restrms,emergency signage under sep perm | $75,000 | |
| Apr 4, 2011 | Never finaled issued Apr 2011, no final | 1800 Mission St | street space permitDetails
street space permit | ||
| Oct 8, 2010 | Completed final sign-off Jan 2011 | 1800 Mission St | International Fire Equip | as built for fire suppression system ref app 201008209216Details
as built for fire suppression system ref app 201008209216 | $800 |
| Aug 23, 2010 | Expired or cancelled withdrawn Jul 2012 | 1800 Mission St | install kitchen exhaust hood with grease flue; install make-up air system, and exhaust fan on roof; (for employee kitchen, only)Details
install kitchen exhaust hood with grease flue; install make-up air system, and exhaust fan on roof; (for employee kitchen, only) | $23,515 | |
| Aug 20, 2010 | Completed final sign-off Jan 2011 | 1800 Mission St | International Fire Equip | installation of ul-300 kitchen fire systemDetails
installation of ul-300 kitchen fire system | $800 |
| Aug 19, 2010 | Completed final sign-off May 2012 | 1800 Mission St | Novo Construction Inc | provide accessible railings at entry, close off upper mezzanine, provide required exit doors, repair pipe casings per sffd. fire alarm and emergency lighting, and mech & electrical all under separate permitDetails
provide accessible railings at entry, close off upper mezzanine, provide required exit doors, repair pipe casings per sffd. fire alarm and emergency lighting, and mech & electrical all under separate permit | $100,000 |
| Jul 7, 2010 | Completed final sign-off Mar 2011 | 1800 Mission St | relocate (e) kitchen from the basement floor to the 4th floor room for new kitchen employeesDetails
relocate (e) kitchen from the basement floor to the 4th floor room for new kitchen employees | $50,000 | |
| Jun 25, 2010 | Never finaled issued Jun 2010, no final | 1800 Mission St | street space and mtaDetails
street space and mta | ||
| Oct 23, 2009 | Completed final sign-off Nov 2009 | 1800 Mission St | Platinum Roofing Inc | reroofingDetails
reroofing | $82,308 |
| Aug 10, 2009 | Never finaled issued Aug 2009, no final | 1800 Mission St | street space & sidewalk permit.Details
street space & sidewalk permit. | ||
| Jun 4, 2009 | Never finaled issued Oct 2009, no final | 1800 Mission St | reinforce (e) brick parapet with (n) steel and (n) shotcrete. not visible from exterior.Details
reinforce (e) brick parapet with (n) steel and (n) shotcrete. not visible from exterior. | $15,000 | |
| Mar 25, 2009 | Never finaled issued Mar 2009, no final | 1800 Mission St | street space permit only.Details
street space permit only. | ||
| Jan 15, 2009 | Never finaled issued Jan 2009, no final | 1800 Mission St | street space only.Details
street space only. | ||
| May 22, 2008 | Never finaled issued May 2008, no final | 1800 Mission St | street space permit only.Details
street space permit only. | ||
| Mar 26, 2008 | Never finaled issued Mar 2008, no final | 1800 Mission St | street space permit.Details
street space permit. | ||
| Feb 12, 2008 | Never finaled issued Feb 2008, no final | 1800 Mission St | street spaceDetails
street space | ||
| Feb 6, 2008 | Never finaled issued Feb 2008, no final | 1800 Mission St | street space permit only.Details
street space permit only. | ||
| Feb 5, 2008 | Completed final sign-off Aug 2008 | 1800 Mission St | replace (3) sets of double doors on julian street side of building in kindDetails
replace (3) sets of double doors on julian street side of building in kind | $20,000 | |
| Aug 9, 2007 | Completed final sign-off Aug 2008 | 1800 Mission St | window replacment in kind, repair e windows per plans, repair and restore e wood windows and replacment of selected deteriorated windows in accordance w/approved cert of appropriatenessDetails
window replacment in kind, repair e windows per plans, repair and restore e wood windows and replacment of selected deteriorated windows in accordance w/approved cert of appropriateness | $80,000 | |
| Oct 19, 2005 | Never finaled issued Oct 2005, no final | 1800 Mission St | Golden Gatetank Removal,Inc | the scope of work includes a new curb cut for an (e) roll up door. the new curb cut will improve an (e) non dpw compliant driveway entrance. this entrance & driveway has been the building's primary vehicle entrance for approximately 80 yearsDetails
the scope of work includes a new curb cut for an (e) roll up door. the new curb cut will improve an (e) non dpw compliant driveway entrance. this entrance & driveway has been the building's primary vehicle entrance for approximately 80 years | $800 |
| Nov 17, 2004 | Never finaled issued Nov 2004, no final | 1800 Mission St | streetspaceDetails
streetspace | ||
| Feb 14, 2001 | Expired or cancelled expired May 2003 | 1800 Mission St | asbestos abatement soft ddmo remove existing asbestos and lead containing material fr site prep siteDetails
asbestos abatement soft ddmo remove existing asbestos and lead containing material fr site prep site | $150,000 | |
| Sep 5, 2000 | Never finaled issued Nov 2000, no final | 1800 Mission St | seismic demo parking ada include new elevatorsDetails
seismic demo parking ada include new elevators | $2,000,000 | |
| Mar 29, 2000 | Expired or cancelled expired Oct 2000 | 1800 Mission St | remove wall finishing to expose structural for seismic upgrade 3rd floorDetails
remove wall finishing to expose structural for seismic upgrade 3rd floor | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Plant Construction Co, Lp (9), Pacific Auxiliary Fire Alarm (8), Dylan Arrants Construction (2), International Fire Equip (2), Pribuss Engineering Inc (2), Yerba Buena Builders Inc (2), D C Taylor Co, Eco Bay Services Inc., Golden Gatetank Removal,Inc, Novo Construction Inc, Platinum Roofing Inc, Tom Ehline
- Architects
- Andrew Wolfram (5), Andrew Wokfram (2), Douglas G. Tom (2), John Fisher (2)
- Engineers
- Alexander Sivyer (2), Julian White (2), Antonio Jakosalem, Justin Schultz, Meng Hsiu Chen, William E. Tremayne
- Designers
- Andrew Wolfram, Pacific Auxiliary Fire Alarm
- Pmt consultant/expediters
- David Fraser
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.