Jose Antonio Farias
- Listed as
- authorized agent-others, contractor
- Firm
- Rain Defense
- Based in
- Alameda
- On San Francisco permits
- Oct 2010 to Jul 2026
156 permits since 2000 (contractor on 156 permits, authorized agent-others on 3 permits): 137 completed, 5 in progress, 11 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 156.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 29, 2026 | In progress issued Aug 2026 | 1060 Bush St | Rei Build Up Construction Corp, Rain Defense | repair damaged exterior concrete wall areas, including removal of deteriorated concrete, patching, and restoration to match (e)Details
repair damaged exterior concrete wall areas, including removal of deteriorated concrete, patching, and restoration to match (e) | $45,000 |
| Jun 3, 2026 | In progress issued Jun 2026 | 495 32nd Av | Rain Defense | general building maintenance on building for the facade: re-pointing masonary (~30sqft), and paintingDetails
general building maintenance on building for the facade: re-pointing masonary (~30sqft), and painting | $104,081 |
| Mar 16, 2026 | Completed final sign-off Aug 2026 | 1125 Union St | Rain Defense | reroofing: tear off (e) roof membrane. fasten fiberglass 28# base sheet & all weather empire base. apply 1 layer of flintastic iltraglass sa modified bitumen; replace all drip edge metal. torch apply 1 layer of gta class b fire-rated.Details
reroofing: tear off (e) roof membrane. fasten fiberglass 28# base sheet & all weather empire base. apply 1 layer of flintastic iltraglass sa modified bitumen; replace all drip edge metal. torch apply 1 layer of gta class b fire-rated. | $26,233 |
| Feb 2, 2026 | Completed final sign-off Mar 2026 | 226 Granville Wy | Rain Defense | reroof, remove all existingroofing material down to the wood deck, install gutters/clean up & prep. install felt paper synthetic underlayment per certainteed 5 star requirements. install landmark shingles. no hotworksDetails
reroof, remove all existingroofing material down to the wood deck, install gutters/clean up & prep. install felt paper synthetic underlayment per certainteed 5 star requirements. install landmark shingles. no hotworks | $15,899 |
| Jan 29, 2026 | Completed final sign-off May 2026 | 3605 20th St | Rain Defense | repair water damaged areas. work to be done at lightwell windows walls and floor. install water resisting barrier & seal window & apply flasing around lightwellDetails
repair water damaged areas. work to be done at lightwell windows walls and floor. install water resisting barrier & seal window & apply flasing around lightwell | $16,542 |
| Jan 20, 2026 | Completed final sign-off Jul 2026 | 555 Buena Vista West Av | Rain Defense | re-roofing: remove existing roof mechanically fasten 28 fiberglass base sheet, replace all drip edge metal, fasten all metal with 1-1/4" roofing nails, torch apply 1 layer of flintlastic gta class b fire rated.Details
re-roofing: remove existing roof mechanically fasten 28 fiberglass base sheet, replace all drip edge metal, fasten all metal with 1-1/4" roofing nails, torch apply 1 layer of flintlastic gta class b fire rated. | $52,673 |
| Jan 2, 2026 | Completed final sign-off Jan 2026 | 90 Alhambra St | Rain Defense | the (e) wood deck shall be set on dollies & rolled out of the way to allow work on the roof underneath. install stucco deck hd roof board with 3" insulation plates. install flintlastic ultraglass sa modified bitumen mid-ply. replace all drip esge material & torch apply 1 layer of flintlastic gtaDetails
the (e) wood deck shall be set on dollies & rolled out of the way to allow work on the roof underneath. install stucco deck hd roof board with 3" insulation plates. install flintlastic ultraglass sa modified bitumen mid-ply. replace all drip esge material & torch apply 1 layer of flintlastic gta | $44,132 |
| Jan 2, 2026 | Completed final sign-off Jan 2026 | 750 Guerrero St | Rain Defense | (e) roof membrane shall be removed/disposed of. mechanically fasten a #28 fiberglass base sheet to the roof deck w/1-1/4" square head nails. replace all drip edge metal, install new roof scuppers at all (e) scupper locations. torh apply 1 layer of flintlastic gta class b fire rated app modifiedDetails
(e) roof membrane shall be removed/disposed of. mechanically fasten a #28 fiberglass base sheet to the roof deck w/1-1/4" square head nails. replace all drip edge metal, install new roof scuppers at all (e) scupper locations. torh apply 1 layer of flintlastic gta class b fire rated app modified | $25,933 |
| Dec 17, 2025 | Completed final sign-off Jan 2026 | 2942 Franklin St | Rain Defense | reroof. torch down.Details
reroof. torch down. | $38,127 |
| Dec 2, 2025 | Completed final sign-off Dec 2025 | 1801 Gough St | Rain Defense | recommencement and completion of work approved under pa # 202209122241.Details
recommencement and completion of work approved under pa # 202209122241. | $28,500 |
| Nov 19, 2025 | Completed final sign-off Jan 2026 | 425 Barneveld Av | Rain Defense | reroofing torch down.Details
reroofing torch down. | $48,924 |
| Oct 15, 2025 | Completed final sign-off Jan 2026 | 1096 Fulton St | Rain Defense | re-roofing with hot works.Details
re-roofing with hot works. | $23,895 |
| Oct 8, 2025 | In progress issued Oct 2025 | 1060 Bush St | Rain Defense | exploratory demo: repairs to distressed concrete wall, removing spalling areas and patching with sika voh, grinding out cracks and resealing. opening up larger areas and engineer draw up plans for repairs. to partially comply with nov#202544152Details
exploratory demo: repairs to distressed concrete wall, removing spalling areas and patching with sika voh, grinding out cracks and resealing. opening up larger areas and engineer draw up plans for repairs. to partially comply with nov#202544152 | $10,000 |
| Oct 2, 2025 | Completed final sign-off Nov 2025 | 1055 Mason St | Rain Defense | re roofing: torch down.Details
re roofing: torch down. | $29,406 |
| Aug 28, 2025 | Completed final sign-off Oct 2025 | 756 Page St | Rain Defense | reroofing with torch down.Details
reroofing with torch down. | $22,689 |
| Aug 20, 2025 | In progress issued Aug 2025 | 1345 Lombard St | Rain Defense | re-roofing (w/ torch)Details
re-roofing (w/ torch) | $13,219 |
| Aug 20, 2025 | Completed final sign-off Dec 2025 | 740 Rhode Island St | Rain Defense | re-roofing (w/ torch)Details
re-roofing (w/ torch) | $36,363 |
| Jul 30, 2025 | Completed final sign-off Aug 2025 | 585 Dolores St | Rain Defense | reroofing. torch applied 1 layer of flintlastic gta class b fire-rated app modified bitumen sheet.Details
reroofing. torch applied 1 layer of flintlastic gta class b fire-rated app modified bitumen sheet. | $12,559 |
| Jul 30, 2025 | Completed final sign-off Aug 2025 | 736 Leavenworth St | Rain Defense | reroofing. torch applied 1 layer of flintlastic gta class b fire-rated app modified bitumen sheet.Details
reroofing. torch applied 1 layer of flintlastic gta class b fire-rated app modified bitumen sheet. | $12,722 |
| Jul 7, 2025 | Completed final sign-off Jul 2025 | 1338 Stevenson St | Rain Defense | re-roof. hot. remove (e) membrane, drainage corrections, mechanically fasten (28) fiber glass base sheet with 1 1/4" sq head nails. all standard size roofing flashings penetration will be required with new. install new scuppers, torch apply (1) layer of flintlastic gta class b fire rated clean up.Details
re-roof. hot. remove (e) membrane, drainage corrections, mechanically fasten (28) fiber glass base sheet with 1 1/4" sq head nails. all standard size roofing flashings penetration will be required with new. install new scuppers, torch apply (1) layer of flintlastic gta class b fire rated clean up. | $17,722 |
| Jun 25, 2025 | Completed final sign-off Jul 2025 | 726 Fillmore St | Rain Defense | re-roofing with torch down.Details
re-roofing with torch down. | $9,385 |
| Mar 21, 2025 | Completed final sign-off Dec 2025 | 590 06th St | Rain Defense | reroofing 11,600 sqft with torch downDetails
reroofing 11,600 sqft with torch down | $110,350 |
| Jan 2, 2025 | Completed final sign-off Feb 2025 | 870 Filbert St | Rain Defense | refooring(no hot works)Details
refooring(no hot works) | $21,225 |
| Oct 29, 2024 | Completed final sign-off Jan 2025 | 1474 Sacramento St | Rain Defense | re-roof. power wash (e) roof mem to remove all loose dirt/aluminum coating. instl (n) roof scuppers at all (e) scuppers locs. caulk the ext nipple of the scupper with np-1 urethane caulkins. repl all pene flashing with new apply asphalt is primer to the en. torch-down.Details
re-roof. power wash (e) roof mem to remove all loose dirt/aluminum coating. instl (n) roof scuppers at all (e) scuppers locs. caulk the ext nipple of the scupper with np-1 urethane caulkins. repl all pene flashing with new apply asphalt is primer to the en. torch-down. | $39,478 |
| Oct 15, 2024 | Completed final sign-off Sep 2025 | 945 Union St | Rain Defense | re-roofing about 4800 sq. ft.Details
re-roofing about 4800 sq. ft. | $61,918 |
| Oct 15, 2024 | Completed final sign-off Jan 2025 | 540 Ofarrell St | Rain Defense | re-roofing, flat roof, about 6200 sq. ft.Details
re-roofing, flat roof, about 6200 sq. ft. | $30,434 |
| Jul 17, 2024 | Completed final sign-off Sep 2024 | 3450 03rd St | Rain Defense | reroofing-no visible from street crrc 0668-0133bDetails
reroofing-no visible from street crrc 0668-0133b | $73,390 |
| Jul 8, 2024 | In progress filed Jul 2024, not yet issued | 3450 03rd St | Rain Defense | building #2: re-roofingDetails
building #2: re-roofing | $75,394 |
| Jun 24, 2024 | Completed final sign-off Aug 2024 | 861 Sutter St | Rain Defense | reroofingDetails
reroofing | $51,297 |
| Apr 17, 2024 | Completed final sign-off Jun 2024 | 1401 Haight St | Rain Defense | reroofingDetails
reroofing | $24,815 |
| Apr 17, 2024 | Completed final sign-off Jan 2025 | 3659 20th St | Rain Defense | reroofingDetails
reroofing | $36,973 |
| Aug 30, 2023 | Completed final sign-off Oct 2023 | 1865 Green St | Rain Defense | reroofingDetails
reroofing | $25,169 |
| Aug 1, 2023 | Completed final sign-off Nov 2023 | 101 Cervantes Bl | Rain Defense | re-roofingDetails
re-roofing | $45,937 |
| Jul 7, 2023 | Completed final sign-off Sep 2023 | 737 Pine St | Rain Defense | re-roofing.Details
re-roofing. | $19,000 |
| Jun 28, 2023 | Completed final sign-off Nov 2023 | 300 Buchanan St | Rain Defense | remove the existing 3 windows. install the new dual panel, wood windows to rough opening. visible from street. like for like replacement. same sizes , same locations. u-factor = 0.30.Details
remove the existing 3 windows. install the new dual panel, wood windows to rough opening. visible from street. like for like replacement. same sizes , same locations. u-factor = 0.30. | $7,900 |
| Jun 1, 2023 | Completed final sign-off Feb 2024 | 642 Alvarado St | Rain Defense | southwest corner staircase windows need replacement wih fiberglass windows. this matches the style and material as the rest of the building. 4 windows total. tempered glazingDetails
southwest corner staircase windows need replacement wih fiberglass windows. this matches the style and material as the rest of the building. 4 windows total. tempered glazing | $18,000 |
| May 4, 2023 | Completed final sign-off Jun 2023 | 1624 Sacramento St | Rain Defense | reroofingDetails
reroofing | $58,000 |
| Mar 10, 2023 | Completed final sign-off Mar 2023 | 630 Alvarado St | Rain Defense | revision to pa#202203089475 we are removing the sliding door off the permit and leaving just the windows and reduce the scope of the work to exclude sliding doors.Details
revision to pa#202203089475 we are removing the sliding door off the permit and leaving just the windows and reduce the scope of the work to exclude sliding doors. | |
| Mar 10, 2023 | Completed final sign-off Jan 2024 | 630 Alvarado St | Rain Defense | comply with nov# 202184370 #4: remove (6) sliding doors. remove and reinstall deck surface, remove and install new deck railing system. floor doors 102,202,302,203,206,304. deck membranes 102,202,302,203,206,304,303,305,307. less than 50% of deckingDetails
comply with nov# 202184370 #4: remove (6) sliding doors. remove and reinstall deck surface, remove and install new deck railing system. floor doors 102,202,302,203,206,304. deck membranes 102,202,302,203,206,304,303,305,307. less than 50% of decking | $140,000 |
| Jan 13, 2023 | Completed final sign-off Feb 2023 | 430 Baker St | Rain Defense | reroofingDetails
reroofing | $10,000 |
| Dec 22, 2022 | Completed final sign-off Jun 2023 | 10 Glendale St | Rain Defense | roof deck: remove existing railing system, install new railingDetails
roof deck: remove existing railing system, install new railing | $30,000 |
| Oct 28, 2022 | Completed final sign-off Feb 2023 | 3560 Divisadero St | Rain Defense | replace (11) windows in the south lightwell (lightwell is blocked in on all 4 sides-- can not see from street). u = 0.30 maxDetails
replace (11) windows in the south lightwell (lightwell is blocked in on all 4 sides-- can not see from street). u = 0.30 max | $60,000 |
| Sep 16, 2022 | Completed final sign-off Oct 2022 | 925 Jones St | Rain Defense | reroofingDetails
reroofing | $50,000 |
| Sep 16, 2022 | Completed final sign-off Oct 2022 | 175 21st Av | Rain Defense | reroofingDetails
reroofing | $75,000 |
| Sep 14, 2022 | Completed final sign-off Oct 2022 | 1737 Chestnut St | Rain Defense | reroofingDetails
reroofing | $40,000 |
| Sep 12, 2022 | Expired or cancelled expired Dec 2025 | 1801 Gough St | Rain Defense | remove (e) deck and fencing, repair parapet wall, replace roof over top deck replace decking and fenceDetails
remove (e) deck and fencing, repair parapet wall, replace roof over top deck replace decking and fence | $30,000 |
| Sep 12, 2022 | Completed final sign-off Sep 2023 | 1424 Polk St | Rain Defense | install structural engineering bracing for south wall to return to its original. no change to windows and/or openings.Details
install structural engineering bracing for south wall to return to its original. no change to windows and/or openings. | $50,000 |
| Jul 15, 2022 | Never finaled issued Jul 2022, no final | 1424 Polk St | Rain Defense | additional structural engineering needed for original window permit, ref bpa#202203089456.Details
additional structural engineering needed for original window permit, ref bpa#202203089456. | $40,000 |
| Jul 15, 2022 | Completed final sign-off Aug 2022 | 200 Industrial St | Rain Defense | refoofing. tear off (e) roof, install base sheet, mod bit & class a fire-rated cap sheet, emittance > 0.75, aged reflectance > 0.63, sp1275Details
refoofing. tear off (e) roof, install base sheet, mod bit & class a fire-rated cap sheet, emittance > 0.75, aged reflectance > 0.63, sp1275 | $70,000 |
| Jun 23, 2022 | Completed final sign-off Aug 2022 | 1850 Sacramento St | Rain Defense | reroofingDetails
reroofing | $70,000 |
| Mar 8, 2022 | Completed final sign-off Jun 2023 | 1424 Polk St | Rain Defense | reroofingDetails
reroofing | $25,000 |
| Mar 8, 2022 | Completed final sign-off Mar 2023 | 630 Alvarado St | Rain Defense | #302: replace one slider door and 2 windows in kind. front winndows in the streets. fixing item #4. item #3 per nov 202184370 replacement fenestration max u-factor = 0.40Details
#302: replace one slider door and 2 windows in kind. front winndows in the streets. fixing item #4. item #3 per nov 202184370 replacement fenestration max u-factor = 0.40 | $18,000 |
| Mar 8, 2022 | Completed final sign-off Jun 2023 | 1424 Polk St | Rain Defense | remove 6 windows on north elevation and remove 4 windows on south elevation and replace with shorter in height due to manufacterur limitations. the remaining 10" will be framed in to match. not facing street.Details
remove 6 windows on north elevation and remove 4 windows on south elevation and replace with shorter in height due to manufacterur limitations. the remaining 10" will be framed in to match. not facing street. | $40,000 |
| Jun 9, 2021 | Completed final sign-off Jul 2021 | 1483 Mcallister St | Rain Defense | reroofingDetails
reroofing | $13,600 |
| Jun 1, 2021 | Completed final sign-off Apr 2022 | 845 Pine St | Rain Defense | revision to 20202102033893: revision of concrete wall spalling repairs and structural bracing. improvement to wall anchors where parapet is replaced.Details
revision to 20202102033893: revision of concrete wall spalling repairs and structural bracing. improvement to wall anchors where parapet is replaced. | $15,000 |
| Mar 26, 2021 | Completed final sign-off Apr 2021 | 82 Delano Av | Rain Defense | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $10,000 |
| Mar 26, 2021 | Completed final sign-off Apr 2021 | 1376 South Van Ness Av | Rain Defense | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $10,000 |
| Mar 25, 2021 | Completed final sign-off Jun 2021 | 5519 Mission St | Rain Defense | reroofingDetails
reroofing | $30,000 |
| Mar 25, 2021 | Completed final sign-off Apr 2022 | 947 Bush St | Rain Defense | reroofingDetails
reroofing | $80,000 |
| Feb 4, 2021 | Completed final sign-off May 2021 | 945 Haight St | Rain Defense | reroofingDetails
reroofing | $50,000 |
| Feb 3, 2021 | Completed final sign-off Apr 2022 | 845 Pine St | Rain Defense | concrete wall spalling repaires. remove visiby spalling concrete + parge with new.Details
concrete wall spalling repaires. remove visiby spalling concrete + parge with new. | $115,000 |
| Jan 21, 2021 | Completed final sign-off Jun 2021 | 621 Stockton St | Rain Defense | 12 windows replacement (wood frame, fiberglass clad/pella) and replace siding in kind (1x6 ship lad redwood or ceder)Details
12 windows replacement (wood frame, fiberglass clad/pella) and replace siding in kind (1x6 ship lad redwood or ceder) | $70,000 |
| Jan 14, 2021 | Completed final sign-off Jan 2022 | 1035 Sutter St | Rain Defense | reroofing - overlay + torch apply 1 layer of flintlasic gta class b fire rated app mod bit cap sheet.Details
reroofing - overlay + torch apply 1 layer of flintlasic gta class b fire rated app mod bit cap sheet. | $30,000 |
| Jan 13, 2021 | Completed final sign-off May 2022 | 1035 Sutter St | Rain Defense, Wickman Development And Construction | parapet and roof bracing/anchorage.Details
parapet and roof bracing/anchorage. | $125,000 |
| Nov 2, 2020 | Completed final sign-off Nov 2020 | 69 Mill St | Rain Defense | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $10,000 |
| Aug 6, 2020 | Completed final sign-off Sep 2020 | 166 Brighton Av | Rain Defense | reroofing - tear off existing roofing. install 1 layer of flintlastic gta class b fire rated app modified bitumen. install new composition shingles.Details
reroofing - tear off existing roofing. install 1 layer of flintlastic gta class b fire rated app modified bitumen. install new composition shingles. | $10,000 |
| Jul 15, 2020 | Completed final sign-off Aug 2020 | 2045 Hyde St | Rain Defense | reroofing. remove the entire roofing system down to the substrate. mechanically fasten dens-deck fire rated board over the plywood substrate. install 80 mil white dura-tuff roofing.Details
reroofing. remove the entire roofing system down to the substrate. mechanically fasten dens-deck fire rated board over the plywood substrate. install 80 mil white dura-tuff roofing. | $75,000 |
| Jun 12, 2020 | Completed final sign-off Jul 2020 | 1220 Hayes St | Rain Defense | reroofing: the existing 2 layers of asphalt roofing system shall be removed from the roof and disposed of off site. mechanically fasten a 28# fiberglass base sheet to the roof deck. torch-apply 1 layer of sta-app modified bitumen. torch-apply 1 layer of class b fire-rated app modified bitumen cap shDetails
reroofing: the existing 2 layers of asphalt roofing system shall be removed from the roof and disposed of off site. mechanically fasten a 28# fiberglass base sheet to the roof deck. torch-apply 1 layer of sta-app modified bitumen. torch-apply 1 layer of class b fire-rated app modified bitumen cap sh | $30,000 |
| Jul 25, 2019 | Completed final sign-off Aug 2019 | 260 Chattanooga St | Rain Defense | reroofing.Details
reroofing. | $22,000 |
| Jul 25, 2019 | Completed final sign-off Sep 2019 | 310 06th Av | Rain Defense | unit 21: remove existing window install new dual pane alum frame window.Details
unit 21: remove existing window install new dual pane alum frame window. | $5,000 |
| Jul 15, 2019 | Completed final sign-off Sep 2019 | 50 Fell St | Rain Defense | reroofing. remove existing underlayment and existing red tile and install certainteed's ultra glass sa roofing underlayment. reinstall salvaged roof tile with copper wire and nails. no other work under this permit. this is like-for-like. no structural work without a new permit - mr **maher n/a**Details
reroofing. remove existing underlayment and existing red tile and install certainteed's ultra glass sa roofing underlayment. reinstall salvaged roof tile with copper wire and nails. no other work under this permit. this is like-for-like. no structural work without a new permit - mr **maher n/a** | $80,000 |
| Jun 26, 2019 | Completed final sign-off Jul 2019 | 1538 19th Av | Rain Defense | reroofingDetails
reroofing | $15,000 |
| Jun 4, 2019 | Completed final sign-off Jul 2019 | 390 Liberty St | Rain Defense | reroofingDetails
reroofing | $40,000 |
| Mar 15, 2019 | Completed final sign-off Apr 2019 | 3560 Divisadero St | Rain Defense | reroofingDetails
reroofing | $10,000 |
| Feb 26, 2019 | Completed final sign-off Apr 2019 | 310 06th Av | Rain Defense | at 2nd floor (unit 12), replace one visible window at far left w/aluminum slider w/in (e) opening to match other original windows & sliding doors. no other work.Details
at 2nd floor (unit 12), replace one visible window at far left w/aluminum slider w/in (e) opening to match other original windows & sliding doors. no other work. | $3,500 |
| Nov 6, 2018 | Completed final sign-off Feb 2019 | 1955 Leavenworth St | Rain Defense | reroofing.Details
reroofing. | $30,000 |
| Sep 13, 2018 | Completed final sign-off Nov 2018 | 642 Alvarado St | Rain Defense | re-roofingDetails
re-roofing | $71,000 |
| Aug 6, 2018 | Completed final sign-off Oct 2018 | 99 Lupine Av | Rain Defense | reroofingDetails
reroofing | $24,500 |
| Aug 6, 2018 | Completed final sign-off Sep 2018 | 2301 Larkin St | Rain Defense | reroofingDetails
reroofing | $54,000 |
| Aug 2, 2018 | Completed final sign-off Aug 2018 | 2898 Jackson St | Rain Defense | seal 3 penetrations through with weather coating and poly fabric. repair crack, removed and replace expansion joint to comply with nov# 201720407 & 201720408in kind.Details
seal 3 penetrations through with weather coating and poly fabric. repair crack, removed and replace expansion joint to comply with nov# 201720407 & 201720408in kind. | $6,000 |
| Jun 14, 2018 | Completed final sign-off Jun 2018 | 455 Eddy St | Rain Defense | to obtain a final inspectoin for work approevd under pa201507080925 & 201507302969. both roofing related.Details
to obtain a final inspectoin for work approevd under pa201507080925 & 201507302969. both roofing related. | |
| Jun 7, 2018 | Completed final sign-off Aug 2018 | 320 Turk St | Rain Defense | demo of (e) not-in-use rooftop beams & providing parapet braces in place. re-roof permit #201805310659Details
demo of (e) not-in-use rooftop beams & providing parapet braces in place. re-roof permit #201805310659 | $16,000 |
| Jun 5, 2018 | Completed final sign-off Sep 2018 | 2115 Hyde St | Rain Defense | re-roofing (no sheathing); red/orange roof areas to match (e) matrials & finish.Details
re-roofing (no sheathing); red/orange roof areas to match (e) matrials & finish. | $23,000 |
| May 31, 2018 | Completed final sign-off Aug 2018 | 320 Turk St | Rain Defense | reroof existing main roof and two lower lightwells (around 6,000 sf) with modified bitumen. min 1/2: 12 slope, comply with 151 (f) 12.Details
reroof existing main roof and two lower lightwells (around 6,000 sf) with modified bitumen. min 1/2: 12 slope, comply with 151 (f) 12. | $42,000 |
| May 22, 2018 | Completed final sign-off May 2019 | 350 Judah St | Rain Defense | reroofing.Details
reroofing. | $55,000 |
| Apr 30, 2018 | Completed final sign-off May 2018 | 45 Ora Wy | Rain Defense | reroofingDetails
reroofing | $16,500 |
| Apr 24, 2018 | Completed final sign-off Jun 2018 | 345 Fulton St | Rain Defense | re-roofingDetails
re-roofing | $69,000 |
| Mar 22, 2018 | Never finaled issued Mar 2018, no final | 645 Stockton St | Rain Defense | repair 100 square feet of front façade in-kind, located at top floor. inspect rest of façade and repair in-kind as needed. same materials and same design(s).Details
repair 100 square feet of front façade in-kind, located at top floor. inspect rest of façade and repair in-kind as needed. same materials and same design(s). | $8,000 |
| Mar 19, 2018 | Completed final sign-off Sep 2018 | 516 Ellis St | Rain Defense | reroofingDetails
reroofing | $39,650 |
| Feb 16, 2018 | Completed final sign-off Apr 2018 | 460 Duboce Av | Rain Defense | reroofingDetails
reroofing | $23,999 |
| Jan 29, 2018 | Completed final sign-off Sep 2018 | 724 Pine St | Rain Defense | re-roofingDetails
re-roofing | $36,999 |
| Nov 30, 2017 | Completed final sign-off Dec 2017 | 2 Maddux Av | Rain Defense | reroofingDetails
reroofing | $12,900 |
| Oct 27, 2017 | Completed final sign-off Dec 2017 | 83 Duboce Av | Rain Defense | re-roofingDetails
re-roofing | $29,000 |
| Sep 28, 2017 | Completed final sign-off May 2018 | 3440 20th St | Rain Defense | to comply with nov 201704961 stucco/exterior finish will be like kind to match. revision to pa 2017-0808-4260 structural repairs discovered after removing dryrot. dryrot was discovered during work done on pa 2017-0522-7311Details
to comply with nov 201704961 stucco/exterior finish will be like kind to match. revision to pa 2017-0808-4260 structural repairs discovered after removing dryrot. dryrot was discovered during work done on pa 2017-0522-7311 | $24,999 |
| Aug 29, 2017 | Completed final sign-off Jun 2018 | 1520 Gough St | Rain Defense | reroofing.Details
reroofing. | $52,000 |
| Aug 29, 2017 | Completed final sign-off Jan 2018 | 916 Pacific Av | Rain Defense | reroofing.Details
reroofing. | $54,000 |
| Aug 25, 2017 | Completed final sign-off Dec 2017 | 1025 Sutter St | Rain Defense | reroofingDetails
reroofing | $37,000 |
| Aug 8, 2017 | Completed final sign-off Feb 2018 | 3440 20th St | Rain Defense | modification of pa # 201705227311. replace termite damage and dryrot on the botton balcony above the garage door. inkind repair of approx 20 sf of siding due to dry rot. less than 50%. in kind street facing.Details
modification of pa # 201705227311. replace termite damage and dryrot on the botton balcony above the garage door. inkind repair of approx 20 sf of siding due to dry rot. less than 50%. in kind street facing. | |
| Jul 31, 2017 | Completed final sign-off Dec 2017 | 2619 Mission St | Rain Defense | tear off existing main roof section (10,000 sf) and install new app modified bitumen roof system. reroof only.Details
tear off existing main roof section (10,000 sf) and install new app modified bitumen roof system. reroof only. | $73,450 |
| Jul 31, 2017 | Completed final sign-off Sep 2017 | 149 Collingwood St | Rain Defense | reroofingDetails
reroofing | $18,000 |