Block 3608, lot 060
3677 20th St
- City’s use
- Multi-Family Residential
- Built
- 1906
- Stories
- 2
- Units
- 20
- Rooms
- 20 bathrooms
- Building
- 12,814 sq ft
- Lot
- 11,499 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
30 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Aug 2026 | 3677 20th St | Stone And Stryder Llc | unit 3677a: one kitchen and one bathroom remodel like for like. no tub conversions. no new wall and no existing wall relocation. number of plumbing fixtures remain unchange. new lighting shall comply with cec 150.0(k)3 and (k)5.Details
unit 3677a: one kitchen and one bathroom remodel like for like. no tub conversions. no new wall and no existing wall relocation. number of plumbing fixtures remain unchange. new lighting shall comply with cec 150.0(k)3 and (k)5. | $45,000 |
| May 28, 2025 | In progress issued May 2025 | 3659 20th St | Byington Electric Corp | revision to pa# 202504154397: change of as-built drawings. device countin new f/a system has changed.Details
revision to pa# 202504154397: change of as-built drawings. device countin new f/a system has changed. | |
| Apr 15, 2025 | Completed final sign-off Jun 2025 | 3659 20th St | Byington Electric Corp | replacement fof the fa system to the sf/ca code interpretation 1103.6.71 and wire in the lf horn inside of the units plus wireless monitoring.Details
replacement fof the fa system to the sf/ca code interpretation 1103.6.71 and wire in the lf horn inside of the units plus wireless monitoring. | $40,000 |
| Jul 3, 2024 | Completed final sign-off Dec 2024 | 3659 20th St | to comply with nov 202040071, tier-iii mandatory soft story retrofit.Details
to comply with nov 202040071, tier-iii mandatory soft story retrofit. | $45,000 | |
| Apr 17, 2024 | Completed final sign-off Jan 2025 | 3659 20th St | Rain Defense | reroofingDetails
reroofing | $36,973 |
| Feb 15, 2022 | Never finaled issued Feb 2022, no final | 3659 20th St | Synergy Enterprises Inc. | remove damaged plaster in entry ceiling, bedroom ceiling, and one living room wall. no elec. or plumbing or mechanical will be demoed. no studs will be demoed.drywall will be put back in it's place. if 5/8" type x is removed. it will be replaced with 5/8" type x.Details
remove damaged plaster in entry ceiling, bedroom ceiling, and one living room wall. no elec. or plumbing or mechanical will be demoed. no studs will be demoed.drywall will be put back in it's place. if 5/8" type x is removed. it will be replaced with 5/8" type x. | $10,000 |
| Dec 13, 2021 | Expired or cancelled cancelled Sep 2026 | 3659 20th St | add 3 adu's per ordinance 162-16 at existing first floor parking.Details
add 3 adu's per ordinance 162-16 at existing first floor parking. | $200,000 | |
| Oct 23, 2019 | Never finaled issued Oct 2019, no final | 3659 20th St | Axel8 Construction | street spaceDetails
street space | |
| Aug 16, 2019 | Never finaled issued Sep 2019, no final | 3659 20th St | Axel8 Construction | rev to pa# 201505126043; seismic retrofit using iebc a4Details
rev to pa# 201505126043; seismic retrofit using iebc a4 | |
| Aug 16, 2019 | Never finaled issued Aug 2019, no final | 3659 20th St | Axel8 Construction | convert (e) living room to bedroom. relocate kitchen. rehabilitate (e) bathroom. unit 3661a 3rd floor.Details
convert (e) living room to bedroom. relocate kitchen. rehabilitate (e) bathroom. unit 3661a 3rd floor. | $32,000 |
| Dec 13, 2017 | Never finaled issued Dec 2017, no final | 3659 20th St | B-Side Inc. | installing bathroom fan with rough electric and exhaust. #aDetails
installing bathroom fan with rough electric and exhaust. #a | $2,000 |
| Nov 13, 2017 | Never finaled issued Nov 2017, no final | 3659 20th St | street space permitDetails
street space permit | ||
| Jul 17, 2017 | Expired or cancelled cancelled Jan 2026 | 3659 20th St | exploratory work to the exterior per 2016.007202coaDetails
exploratory work to the exterior per 2016.007202coa | ||
| Mar 1, 2017 | Never finaled issued Mar 2017, no final | 3671 20th St | D F K Y Construction Inc | unit 3671, 3rd floor - rehabilitate existing kitchen, relocate bathroom, install washer & dryer, no exterior changes.Details
unit 3671, 3rd floor - rehabilitate existing kitchen, relocate bathroom, install washer & dryer, no exterior changes. | $40,000 |
| Feb 7, 2017 | Completed final sign-off May 2017 | 3659 20th St | D F K Y Construction Inc | apt #3661: rehab (e) bathrrom and kitchen. add w/dDetails
apt #3661: rehab (e) bathrrom and kitchen. add w/d | $40,000 |
| Feb 11, 2016 | Expired or cancelled withdrawn Oct 2021 | 3659 20th St | remodel ground floor. convert ground floor garage to (5) studio units that include a kitchen & bathroom in each unit per ord. #30-15.Details
remodel ground floor. convert ground floor garage to (5) studio units that include a kitchen & bathroom in each unit per ord. #30-15. | $500,000 | |
| May 18, 2015 | Completed final sign-off Sep 2015 | 3667 20th St | Boss Construction Inc. | 2nd floor/unit # 3667: remodel unit - relocate kitchen, relocaate bathroom, add a laundry room and add a dishwasher in kitchen.Details
2nd floor/unit # 3667: remodel unit - relocate kitchen, relocaate bathroom, add a laundry room and add a dishwasher in kitchen. | $35,000 |
| May 12, 2015 | Never finaled issued Jul 2019, no final | 3659 20th St | Axel8 Construction | soft story retrofit per sfbc chapter 34b. engineering criteria 2012 iebc appendix a4.Details
soft story retrofit per sfbc chapter 34b. engineering criteria 2012 iebc appendix a4. | $80,000 |
| Dec 1, 2014 | Completed final sign-off May 2015 | 3659 20th St | Markoff Structural Pest Control | install handrail per complaint #201450021 at secondary stairs in rear. also comply w his nov#201404651 dated 2/18/2014.Details
install handrail per complaint #201450021 at secondary stairs in rear. also comply w his nov#201404651 dated 2/18/2014. | $500 |
| Sep 16, 2014 | Completed final sign-off Oct 2014 | 3669 20th St | revision previous permit no 201311071428, cancel all the structural details, no new roof deck is needed.Details
revision previous permit no 201311071428, cancel all the structural details, no new roof deck is needed. | ||
| Mar 27, 2014 | Completed final sign-off Aug 2014 | 3659 20th St | Sandbank Construction, Inc | add plywood to south rear wall at 1st level, for voluntary seismic strengthening.Details
add plywood to south rear wall at 1st level, for voluntary seismic strengthening. | $7,500 |
| Jan 15, 2014 | Never finaled issued Feb 2014, no final | 3663 20th St | Apex Construction & Maintenance Inc. | #3663a- remodel #3663a, add laundry outlet, remove non-bearing partition walls, relocate of kitchen fixture and cabinets, remodel bathroom, new shower, toilet and vanity and newly created bedroom - field veirfy access from n bdrm to public wayDetails
#3663a- remodel #3663a, add laundry outlet, remove non-bearing partition walls, relocate of kitchen fixture and cabinets, remodel bathroom, new shower, toilet and vanity and newly created bedroom - field veirfy access from n bdrm to public way | $30,000 |
| Jan 15, 2014 | Never finaled issued Feb 2014, no final | 3665 20th St | Apex Construction & Maintenance Inc. | #3665a- remodel #3665a, add new closets, new laundry outlet, remove non-bearing partition walls, relocate of kitchen fixture and cabinets, remodel bathroom, new shower, toilet and vanity and new bedroomDetails
#3665a- remodel #3665a, add new closets, new laundry outlet, remove non-bearing partition walls, relocate of kitchen fixture and cabinets, remodel bathroom, new shower, toilet and vanity and new bedroom | $30,000 |
| Dec 4, 2013 | Completed final sign-off Nov 2014 | 3675 20th St | Community First Construction Corp | ref 201308305666 adjust detail 4/s4 structural plans to show additional floor joists supporting removal of bearing wall. units 3675 & 3675 a.Details
ref 201308305666 adjust detail 4/s4 structural plans to show additional floor joists supporting removal of bearing wall. units 3675 & 3675 a. | |
| Nov 8, 2013 | Completed final sign-off Oct 2014 | 3667 20th St | unit #3667a-new closets & laundry outlet. remove non structural walls. relocate kitchen, remodel bathroom. re-route plumbing & electrical lines as required.Details
unit #3667a-new closets & laundry outlet. remove non structural walls. relocate kitchen, remodel bathroom. re-route plumbing & electrical lines as required. | $20,000 | |
| Nov 8, 2013 | Completed final sign-off Oct 2014 | 3669 20th St | unit #3669a-new closets & laundry outlet, relocate kitchen, remodel bathroom. upgrade plumbing, electrical fixtures & wiresDetails
unit #3669a-new closets & laundry outlet, relocate kitchen, remodel bathroom. upgrade plumbing, electrical fixtures & wires | $20,000 | |
| Nov 7, 2013 | Completed final sign-off Oct 2014 | 3669 20th St | new split bathroom, new bedroom, relocate kitchen, new closet, new laundry outlet 2nd floor. new bedroom, relocate (e) bathroom, new gas heater @ 3rd (upper) floor.Details
new split bathroom, new bedroom, relocate kitchen, new closet, new laundry outlet 2nd floor. new bedroom, relocate (e) bathroom, new gas heater @ 3rd (upper) floor. | $20,000 | |
| Sep 13, 2013 | Completed final sign-off Aug 2014 | 3659 20th St | Community First Construction Corp | remodel units #3673a: add new closets, add laundry outlets, remove non bearing walls, relocate kitchen fixtures and cabinets, remodel bathroom, new tile, toilet and vanity. upgrade electrical & plumbing fixtures, reroute elec wires and plumbing as needed. add new gas heater in bedroom.Details
remodel units #3673a: add new closets, add laundry outlets, remove non bearing walls, relocate kitchen fixtures and cabinets, remodel bathroom, new tile, toilet and vanity. upgrade electrical & plumbing fixtures, reroute elec wires and plumbing as needed. add new gas heater in bedroom. | $25,000 |
| Aug 30, 2013 | Completed final sign-off Aug 2014 | 3659 20th St | Community First Construction Corp | remodel units #3675, 3675a: add new closets, add laundry outlets, remove non bearing walls, relocate kitchen fixtures and cabinets, remodel bathroom, new tile, toilet and vanity. upgrade electrical & plumbing fixtures, reroute elec wires and plumbing as needed.Details
remodel units #3675, 3675a: add new closets, add laundry outlets, remove non bearing walls, relocate kitchen fixtures and cabinets, remodel bathroom, new tile, toilet and vanity. upgrade electrical & plumbing fixtures, reroute elec wires and plumbing as needed. | $50,000 |
| Jan 4, 2013 | Completed final sign-off Apr 2013 | 3659 20th St | Markoff Structural Pest Control | termite report #2011 repair dry rot at rear stair & decks less than 50%; repair frame base with cap over concrete 12" max #4 rear in 12", bolts at 4' at several areas indicated on termite report #12011Details
termite report #2011 repair dry rot at rear stair & decks less than 50%; repair frame base with cap over concrete 12" max #4 rear in 12", bolts at 4' at several areas indicated on termite report #12011 | $54,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Axel8 Construction (4), Community First Construction Corp (3), Apex Construction & Maintenance Inc. (2), Byington Electric Corp (2), D F K Y Construction Inc (2), Markoff Structural Pest Control (2), B-Side Inc., Boss Construction Inc., Rain Defense, Sandbank Construction, Inc, Stone And Stryder Llc, Synergy Enterprises Inc.
- Architects
- Daniel Paris, John Hood
- Engineers
- Jefferson Chen (6), Jefferson Jie Chen (2), Daniel Barringer, Huzma Shahid Chowdhry
- Authorized agent-otherss
- Edward Elms, Jahaziel Delgado
- Designers
- Byington Electric (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.