Permit GraphShortlistSan Francisco building permits since 2000

Block 5583, lot 005

200 Industrial St

City’s use
Industrial
Built
2007
Stories
2
Rooms
1 bathroom
Building
7,660 sq ft
Lot
11,789 sq ft
Zoning
M1
Construction type
A

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

21 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 15, 2023Never finaled
issued Jun 2023, no final
200 Industrial StSentry Alarm Systemssentry alrm to install (1) fire cellular transmitter, to an (e) fire panel, cell to be used in lieu of analog phone lines no other changes to system
Details
Permit
202306150125
Status
issued
Filed
Jun 15, 2023
Permit issued
Jun 15, 2023
Declared cost
$4,978
Address
200 Industrial St

sentry alrm to install (1) fire cellular transmitter, to an (e) fire panel, cell to be used in lieu of analog phone lines no other changes to system

Open the permit page

$4,978
Jul 15, 2022Completed
final sign-off Aug 2022
200 Industrial StRain Defenserefoofing. tear off (e) roof, install base sheet, mod bit & class a fire-rated cap sheet, emittance > 0.75, aged reflectance > 0.63, sp1275
Details
Permit
202207158630
Status
complete
Filed
Jul 15, 2022
Permit issued
Jul 15, 2022
Final sign-off
Aug 9, 2022
Declared cost
$70,000
Address
200 Industrial St

refoofing. tear off (e) roof, install base sheet, mod bit & class a fire-rated cap sheet, emittance > 0.75, aged reflectance > 0.63, sp1275

Open the permit page

$70,000
Nov 8, 2016Never finaled
issued Nov 2016, no final
200 Industrial Ststreet space
Details
Permit
M737468
Status
issued
Filed
Nov 8, 2016
Permit issued
Nov 8, 2016
Address
200 Industrial St

street space

Open the permit page

Oct 18, 2013Completed
final sign-off Nov 2013
200 Industrial StCosco Fire Protection Inc.as built 201309267860 fire sprinkler change to 4 uprights at roof per new fhw. t.i. 2013-08-08-3857
Details
Permit
201310189696
Status
complete
Filed
Oct 18, 2013
Permit issued
Oct 18, 2013
Final sign-off
Nov 25, 2013
Declared cost
$10,890
Address
200 Industrial St

as built 201309267860 fire sprinkler change to 4 uprights at roof per new fhw. t.i. 2013-08-08-3857

Open the permit page

$10,890
Sep 26, 2013Completed
final sign-off Nov 2013
200 Industrial StCosco Fire Protection Inc.add (5) uprights per new wall layout in office area & (11) pendent per new office space. add (11) uprights at roof area per fhw. t.i ref pa# 201308083857
Details
Permit
201309267860
Status
complete
Filed
Sep 26, 2013
Permit issued
Sep 26, 2013
Final sign-off
Nov 25, 2013
Declared cost
$10,890
Address
200 Industrial St

add (5) uprights per new wall layout in office area & (11) pendent per new office space. add (11) uprights at roof area per fhw. t.i ref pa# 201308083857

Open the permit page

$10,890
Aug 8, 2013Completed
final sign-off Nov 2013
200 Industrial StDpr Constructionbuild out of office and warehouse space indluding mechanical, electrical, non structural partitons, accoustical partitons and finishes.
Details
Permit
201308083857
Status
complete
Filed
Aug 8, 2013
Permit issued
Sep 9, 2013
Final sign-off
Nov 6, 2013
Declared cost
$313,375
Address
200 Industrial St

build out of office and warehouse space indluding mechanical, electrical, non structural partitons, accoustical partitons and finishes.

Open the permit page

$313,375
Dec 7, 2009Never finaled
issued Dec 2009, no final
200 Industrial Stsidewalk
Details
Permit
M185727
Status
issued
Filed
Dec 7, 2009
Permit issued
Dec 7, 2009
Address
200 Industrial St

sidewalk

Open the permit page

Apr 7, 2009Completed
final sign-off Aug 2010
200 Industrial StBay Area Signsto obtain final inspection for work approved under pa #200803056411. all work has been completed.
Details
Permit
200904075796
Status
complete
Filed
Apr 7, 2009
Permit issued
Apr 7, 2009
Final sign-off
Aug 26, 2010
Address
200 Industrial St

to obtain final inspection for work approved under pa #200803056411. all work has been completed.

Open the permit page

Mar 17, 2009Completed
final sign-off Nov 2009
200 Industrial StBay Area Signsto erect electrical sign
Details
Permit
200903174291
Status
complete
Filed
Mar 17, 2009
Permit issued
Mar 17, 2009
Final sign-off
Nov 20, 2009
Address
200 Industrial St

to erect electrical sign

Open the permit page

Oct 29, 2008Expired or cancelled
expired Jun 2010
200 Industrial Strevision to application 2008-0716-6791, infill ceiling joists & add handicap counter space. infill ceiling joist mezzanine floor plan plus ceiling addition framing less than 1/3 of floor area of 5496 s.f.. 12'0"x12'0" + 12'6"x8'6" over restroom.
Details
Permit
200810295445
Status
expired
Filed
Oct 29, 2008
Permit issued
Oct 30, 2008
Declared cost
$1,000
Address
200 Industrial St

revision to application 2008-0716-6791, infill ceiling joists & add handicap counter space. infill ceiling joist mezzanine floor plan plus ceiling addition framing less than 1/3 of floor area of 5496 s.f.. 12'0"x12'0" + 12'6"x8'6" over restroom.

Open the permit page

$1,000
Jul 16, 2008Expired or cancelled
expired Jun 2010
200 Industrial StE - 5 Construction Inctenant improvement for warehouse, interior remodel, new partition walls, new boll down door, new sales counter.
Details
Permit
200807166791
Status
expired
Filed
Jul 16, 2008
Permit issued
Jul 16, 2008
Declared cost
$20,000
Address
200 Industrial St

tenant improvement for warehouse, interior remodel, new partition walls, new boll down door, new sales counter.

Open the permit page

$20,000
Jul 9, 2008Completed
final sign-off Nov 2008
200 Industrial StDan Howards Consultinginstallation of pallet rack & moulding rack 22 bays 192"tx84"wx36"d. 6 bays 168"tx96"wx42d moulding rack. no existing wall removal.expansion anchors into slab.
Details
Permit
200807096333
Status
complete
Filed
Jul 9, 2008
Permit issued
Oct 6, 2008
Final sign-off
Nov 19, 2008
Declared cost
$3,925
Address
200 Industrial St

installation of pallet rack & moulding rack 22 bays 192"tx84"wx36"d. 6 bays 168"tx96"wx42d moulding rack. no existing wall removal.expansion anchors into slab.

Open the permit page

$3,925
Jun 19, 2008Completed
final sign-off Oct 2008
200 Industrial StE.A.Davidovits &Co.,Inc.new bldg - no occupancy as of yet (vacant)warehouse with second floor mezzaninne shell only/sprinkler monitorying system/fire alarm system. new bldg app #200603287715.
Details
Permit
200806194856
Status
complete
Filed
Jun 19, 2008
Permit issued
Jun 19, 2008
Final sign-off
Oct 22, 2008
Declared cost
$7,000
Address
200 Industrial St

new bldg - no occupancy as of yet (vacant)warehouse with second floor mezzaninne shell only/sprinkler monitorying system/fire alarm system. new bldg app #200603287715.

Open the permit page

$7,000
Apr 17, 2008Completed
final sign-off Oct 2008
200 Industrial StBayside Mechanical Incinstall two 200,000 btu unit heaters and two bathroom exhaust fans
Details
Permit
200804179995
Status
complete
Filed
Apr 17, 2008
Permit issued
Apr 17, 2008
Final sign-off
Oct 21, 2008
Declared cost
$9,800
Address
200 Industrial St

install two 200,000 btu unit heaters and two bathroom exhaust fans

Open the permit page

$9,800
Apr 9, 2008Completed
final sign-off Oct 2008
200 Industrial StCintas Fire Protectioninstallation of new automatic wet-type overhead fire protection system. (approx. 100 heads). new fire sprinkler system.in conjunction w/ underground permit appl#200804099252.
Details
Permit
200804099250
Status
complete
Filed
Apr 9, 2008
Permit issued
May 1, 2008
Final sign-off
Oct 21, 2008
Declared cost
$29,500
Address
200 Industrial St

installation of new automatic wet-type overhead fire protection system. (approx. 100 heads). new fire sprinkler system.in conjunction w/ underground permit appl#200804099252.

Open the permit page

$29,500
Apr 9, 2008Completed
final sign-off Oct 2008
200 Industrial StCintas Fire Protectioninstall a new 8" under ground supply per new building. underground includes new 8"backflow preventor.
Details
Permit
200804099252
Status
complete
Filed
Apr 9, 2008
Permit issued
Apr 15, 2008
Final sign-off
Oct 21, 2008
Declared cost
$18,500
Address
200 Industrial St

install a new 8" under ground supply per new building. underground includes new 8"backflow preventor.

Open the permit page

$18,500
Mar 5, 2008Expired or cancelled
cancelled Jan 2026
200 Industrial Stinstall electric/wall sign single faced.
Details
Permit
200803056407
Status
cancelled
Filed
Mar 5, 2008
Declared cost
$4,500
Address
200 Industrial St

install electric/wall sign single faced.

Open the permit page

$4,500
Mar 5, 2008Expired or cancelled
expired Sep 2010
200 Industrial StBay Area Signsinstall electric doubled faced sign.
Details
Permit
200803056411
Status
expired
Filed
Mar 5, 2008
Permit issued
Apr 8, 2008
Declared cost
$20,000
Address
200 Industrial St

install electric doubled faced sign.

Open the permit page

$20,000
Jan 29, 2008Completed
final sign-off Oct 2008
200 Industrial StE.A.Davidovits &Co.,Inc.revision to pa# 2006.03.28.7715 and 2007.02.26.4851. add 1 bath room.
Details
Permit
200801293474
Status
complete
Filed
Jan 29, 2008
Permit issued
Feb 21, 2008
Final sign-off
Oct 24, 2008
Declared cost
$8,000
Address
200 Industrial St

revision to pa# 2006.03.28.7715 and 2007.02.26.4851. add 1 bath room.

Open the permit page

$8,000
Feb 26, 2007Completed
final sign-off Oct 2008
200 Industrial StE.A.Davidovits &Co.,Inc.revision to app #200603287715 s1. clarifications and additonal bidders notes. all changes have been clouded with delta 2. change of slope of roof and framing system.
Details
Permit
200702264851
Status
complete
Filed
Feb 26, 2007
Permit issued
May 21, 2007
Final sign-off
Oct 21, 2008
Address
200 Industrial St

revision to app #200603287715 s1. clarifications and additonal bidders notes. all changes have been clouded with delta 2. change of slope of roof and framing system.

Open the permit page

Mar 28, 2006Completed
final sign-off Oct 2008
200 Industrial StE.A.Davidovits &Co.,Inc.erect type 5, 1 story and mezz, wholesale/warehouse building.
Details
Permit
200603287715
Status
complete
Filed
Mar 28, 2006
Permit issued
Feb 14, 2007
Final sign-off
Oct 27, 2008
Declared cost
$650,000
Address
200 Industrial St

erect type 5, 1 story and mezz, wholesale/warehouse building.

Open the permit page

$650,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
E.A.Davidovits &Co.,Inc. (4), Bay Area Signs (3), Cintas Fire Protection (2), Cosco Fire Protection Inc. (2), Bayside Mechanical Inc, Dan Howards Consulting, Dpr Construction, E - 5 Construction Inc, Rain Defense, Sentry Alarm Systems
Architects
Peter Shatara (2), Sy-Cheng Tsai

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.