Block 0256, lot 003
621 Stockton St
- City’s use
- Multi-Family Residential
- Built
- 1917
- Stories
- 3
- Units
- 23
- Rooms
- 23 bathrooms
- Building
- 16,047 sq ft
- Lot
- 10,158 sq ft
- Zoning
- RM4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
52 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 11, 2026 | In progress issued Aug 2026 | 621 Stockton St | Halyard Inc | fire alarm system upgrade to comply with sffc 1103.7.6.1.Details
fire alarm system upgrade to comply with sffc 1103.7.6.1. | $5,000 |
| Aug 24, 2021 | Completed final sign-off Mar 2022 | 621 Stockton St | Axel8 Construction | #402: 1) rehabilitate extg kitchen 2)rehabilitate extg bathroom. 3) 5)install washer and dryerDetails
#402: 1) rehabilitate extg kitchen 2)rehabilitate extg bathroom. 3) 5)install washer and dryer | $32,000 |
| Feb 22, 2021 | Completed final sign-off Jul 2021 | 621 Stockton St | Axel8 Construction | #306: rehabilitate existing kitchen & bathroom. install washer & dryer in existing closet.Details
#306: rehabilitate existing kitchen & bathroom. install washer & dryer in existing closet. | $35,000 |
| Jan 21, 2021 | Completed final sign-off Jun 2021 | 621 Stockton St | Rain Defense | 12 windows replacement (wood frame, fiberglass clad/pella) and replace siding in kind (1x6 ship lad redwood or ceder)Details
12 windows replacement (wood frame, fiberglass clad/pella) and replace siding in kind (1x6 ship lad redwood or ceder) | $70,000 |
| Aug 20, 2019 | Completed final sign-off Feb 2020 | 621 Stockton St | Axel8 Construction | unit 201 rehabilitate existing kitchen 10x10, rehabilitate existing bathroom, 7x7. install washer and dryer(ventless type, near kitchen areaDetails
unit 201 rehabilitate existing kitchen 10x10, rehabilitate existing bathroom, 7x7. install washer and dryer(ventless type, near kitchen area | $18,000 |
| Jul 29, 2019 | Never finaled issued Aug 2019, no final | 621 Stockton St | B-Side Inc. | unit # 202: install ventless combo washer/dryer in kitchen. no alteration to walls. all plumbinhg work within the unit.Details
unit # 202: install ventless combo washer/dryer in kitchen. no alteration to walls. all plumbinhg work within the unit. | $5,000 |
| Jun 14, 2019 | Never finaled issued Jul 2019, no final | 621 Stockton St | B-Side Inc. | #3: rehabilitate (e) kitchen & bathroom, install washer & dryer.Details
#3: rehabilitate (e) kitchen & bathroom, install washer & dryer. | $29,000 |
| May 9, 2018 | Never finaled issued May 2018, no final | 621 Stockton St | street spaceDetails
street space | ||
| May 9, 2018 | Completed final sign-off May 2018 | 621 Stockton St | Hue & Cry Security System | relocation of smoke on 1st fl floor and new devices by to improve coverage. as built for existing permit #201803163900. maher naDetails
relocation of smoke on 1st fl floor and new devices by to improve coverage. as built for existing permit #201803163900. maher na | |
| Mar 16, 2018 | Completed final sign-off May 2018 | 621 Stockton St | Hue & Cry Security System | installatin of new low voltage addressable, wireless, monitored fire alarm system, with full interior notification, pulls and smokes monitored by cell. n/a for maherDetails
installatin of new low voltage addressable, wireless, monitored fire alarm system, with full interior notification, pulls and smokes monitored by cell. n/a for maher | $47,000 |
| Mar 5, 2018 | Never finaled issued Mar 2018, no final | 621 Stockton St | Kong's Plumbing & Construction Co. | street spaceDetails
street space | |
| Jan 18, 2018 | Completed final sign-off Jul 2018 | 621 Stockton St | Kong's Plumbing & Construction Co. | unit #203 - rehabilitate (e) kitchen & bathroom. install w/d maher naDetails
unit #203 - rehabilitate (e) kitchen & bathroom. install w/d maher na | $34,000 |
| Jan 4, 2018 | Never finaled issued Jan 2018, no final | 621 Stockton St | Markoff Structural Pest Control | markoff structural pest control termite report #17603, item #1. maher n/aDetails
markoff structural pest control termite report #17603, item #1. maher n/a | $19,650 |
| Dec 26, 2017 | Never finaled issued Dec 2017, no final | 621 Stockton St | street spaceDetails
street space | ||
| Nov 3, 2017 | Completed final sign-off Apr 2018 | 621 Stockton St | Kong's Plumbing & Construction Co. | unit 403 rehabilitate existing kitchen, existing bath,install washer dryerDetails
unit 403 rehabilitate existing kitchen, existing bath,install washer dryer | $20,000 |
| Oct 23, 2017 | Never finaled issued Oct 2017, no final | 621 Stockton St | street spaceDetails
street space | ||
| Sep 5, 2017 | Completed final sign-off May 2018 | 621 Stockton St | Kong's Plumbing & Construction Co. | add new window located on the 4th floor unit 301 at building front @ penthouse frontDetails
add new window located on the 4th floor unit 301 at building front @ penthouse front | $1,000 |
| Jul 6, 2017 | Never finaled issued Jul 2017, no final | 621 Stockton St | street spaceDetails
street space | ||
| Mar 28, 2017 | Completed final sign-off Apr 2018 | 621 Stockton St | Kong's Plumbing & Construction Co. | revision to 201505085823 unit #301 - penthouse: rehabilitate and relocate (e) bathrooms. rehabilitate (e) bedrooms. relocate (e) kitchen. install washer and dryer. maher naDetails
revision to 201505085823 unit #301 - penthouse: rehabilitate and relocate (e) bathrooms. rehabilitate (e) bedrooms. relocate (e) kitchen. install washer and dryer. maher na | |
| Jan 27, 2017 | Completed final sign-off Jun 2017 | 621 Stockton St | West Coast Premier Construction Inc | soft story retrofit per sfbc chapter 34b engineering criteria: 2012 iebc appendix a-4. n/a for maherDetails
soft story retrofit per sfbc chapter 34b engineering criteria: 2012 iebc appendix a-4. n/a for maher | $200,000 |
| Dec 6, 2016 | Expired or cancelled cancelled Jan 2026 | 621 Stockton St | repair of existing roof deck including reroofing. repair in kind.Details
repair of existing roof deck including reroofing. repair in kind. | $6,000 | |
| Dec 6, 2016 | Never finaled issued Dec 2016, no final | 621 Stockton St | One Inch To The Left, Inc. Dba Rarefield | reconfigure existing walls/stucco over non-historical stone face, demo (e)no-historical balusters & railing,add railing, new site features to include trellis,arbor & seating ara,new planting,irrigation & lighting; maher n/aDetails
reconfigure existing walls/stucco over non-historical stone face, demo (e)no-historical balusters & railing,add railing, new site features to include trellis,arbor & seating ara,new planting,irrigation & lighting; maher n/a | $50,000 |
| Aug 12, 2016 | Completed final sign-off May 2017 | 621 Stockton St | 10 evacuation maps. n/a ordinance #155-13Details
10 evacuation maps. n/a ordinance #155-13 | $2,750 | |
| Aug 12, 2016 | Never finaled issued Aug 2016, no final | 621 Stockton St | P C Buildiers, Inc. | unit #301 - voluntary roof deck strengthening. partial floor stiffining in master bedroom, partial living room and partial bedroom. n/a maher ordinanceDetails
unit #301 - voluntary roof deck strengthening. partial floor stiffining in master bedroom, partial living room and partial bedroom. n/a maher ordinance | $20,000 |
| Jul 25, 2016 | Never finaled issued Jul 2016, no final | 621 Stockton St | street spaceDetails
street space | ||
| Mar 24, 2016 | Expired or cancelled cancelled Aug 2022 | 621 Stockton St | soft story seismic retrofit of (e) crawl spaces per sfbc chapter 34b, 2012 iebc appendix a-4. n/a maher ordinanceDetails
soft story seismic retrofit of (e) crawl spaces per sfbc chapter 34b, 2012 iebc appendix a-4. n/a maher ordinance | $200,000 | |
| Dec 10, 2015 | Completed final sign-off Jun 2016 | 621 Stockton St | unit #501 remodel at 5th floor : remodel exisitng bathroom & kitchen. add washer & dryer. n/a maher ordinanceDetails
unit #501 remodel at 5th floor : remodel exisitng bathroom & kitchen. add washer & dryer. n/a maher ordinance | $20,000 | |
| Dec 2, 2015 | Never finaled issued Dec 2015, no final | 621 Stockton St | street spaceDetails
street space | ||
| May 8, 2015 | Never finaled issued Oct 2015, no final | 621 Stockton St | K G Builder | penthouse, unit #301 - project to include interior renovation of existing penthouse unit within existing building, remodel and relocation of kitchen, laundry and master bedroom. remodel of bathroom & bedrooms. no change in occupancy or use. n/a ordinance #155-13Details
penthouse, unit #301 - project to include interior renovation of existing penthouse unit within existing building, remodel and relocation of kitchen, laundry and master bedroom. remodel of bathroom & bedrooms. no change in occupancy or use. n/a ordinance #155-13 | $90,000 |
| Apr 7, 2015 | Expired or cancelled cancelled Jan 2026 | 621 Stockton St | unit #4 - revision to appl #2015.0129.6989 - revise the proposed layout for kitchen. n/a maher ordinanceDetails
unit #4 - revision to appl #2015.0129.6989 - revise the proposed layout for kitchen. n/a maher ordinance | ||
| Jan 29, 2015 | Never finaled issued Mar 2015, no final | 621 Stockton St | Abg Group | unit #4: relocating of kitchen fixture and cabinets. remodeling of kitchen and add stud walls. n/a for the maherDetails
unit #4: relocating of kitchen fixture and cabinets. remodeling of kitchen and add stud walls. n/a for the maher | $12,000 |
| Jul 21, 2014 | Never finaled issued Jul 2014, no final | 621 Stockton St | Construction Depot Inc | #304- remodel kitchen and bathroom ;l; to comply with cec150(k) 8 & 10. compliance with ord 155-13 not requiredDetails
#304- remodel kitchen and bathroom ;l; to comply with cec150(k) 8 & 10. compliance with ord 155-13 not required | $20,000 |
| Sep 6, 2013 | Completed final sign-off Dec 2013 | 621 Stockton St | Lindsay & Wilson Construction Services I | to obtain final inspection for work approved under pa#9925342. all work is complete.Details
to obtain final inspection for work approved under pa#9925342. all work is complete. | |
| Jun 28, 2013 | Never finaled issued Jun 2013, no final | 621 Stockton St | Markoff Structural Pest Control | to comply nov # 200344902. remove shed unit at rear of structural backyard.Details
to comply nov # 200344902. remove shed unit at rear of structural backyard. | $12,000 |
| Jan 28, 2013 | Completed final sign-off Jun 2013 | 621 Stockton St | Lindsay & Wilson Construction Services I | recommencement and completion of work approved under application #201104285009Details
recommencement and completion of work approved under application #201104285009 | $5,000 |
| Apr 23, 2012 | Never finaled filed Apr 2012, never issued | 621 Stockton St | to comply w/ nov 200344902, legalize rear cottage from existing shad, structure already constructed.Details
to comply w/ nov 200344902, legalize rear cottage from existing shad, structure already constructed. | ||
| Oct 27, 2011 | Completed final sign-off Nov 2011 | 621 Stockton St | C Green Consulting Dba Anchway Property | to comply with nov 200345284. relocation of mailboxes and window to be infilled.Details
to comply with nov 200345284. relocation of mailboxes and window to be infilled. | $5,000 |
| Apr 28, 2011 | Never finaled issued Apr 2011, no final | 621 Stockton St | C Green Consulting Dba Anchway Property | voluntary structural upgrade as per submittal of plans.Details
voluntary structural upgrade as per submittal of plans. | $15,000 |
| Apr 26, 2011 | Completed final sign-off Apr 2011 | 621 Stockton St | C Green Consulting Dba Anchway Property | repair (e) decks in kind 4, not visible from streetDetails
repair (e) decks in kind 4, not visible from street | $6,000 |
| Mar 21, 2011 | Never finaled issued Mar 2011, no final | 621 Stockton St | street spaceDetails
street space | ||
| Mar 7, 2011 | Completed final sign-off Aug 2011 | 621 Stockton St | C Green Consulting Dba Anchway Property | to comply with n.o.v. #201057077 & 200852135. repair cracks and undermining in foundation. replace siding.Details
to comply with n.o.v. #201057077 & 200852135. repair cracks and undermining in foundation. replace siding. | $12,000 |
| Mar 3, 2011 | Completed final sign-off Aug 2011 | 621 Stockton St | C Green Consulting Dba Anchway Property | repair (3) existing decks at side of bldg less than 50% in-kind, not visible from street. decks are only accessed from within house. there are no stairs on decks. to comply with items #2 & 3 only on his nov no. 201064251: to provide ventilation opening at garage door and ventilation at penthouse.Details
repair (3) existing decks at side of bldg less than 50% in-kind, not visible from street. decks are only accessed from within house. there are no stairs on decks. to comply with items #2 & 3 only on his nov no. 201064251: to provide ventilation opening at garage door and ventilation at penthouse. | $3,500 |
| Mar 26, 2009 | Completed final sign-off May 2009 | 621 Stockton St | Frankie English Dba Doe Mabuhay Builders | apt#305. repair dryrotted deck 4x8 ft. no structural work. no lighting work-repair stucco . repairing in kind under 50%.Details
apt#305. repair dryrotted deck 4x8 ft. no structural work. no lighting work-repair stucco . repairing in kind under 50%. | $8,000 |
| Mar 11, 2009 | Completed final sign-off May 2009 | 621 Stockton St | F B E And Sons General Const | work @ apt# 405 only. dry rot repair. deck (4' x 8'). remove & replace all dryrot wood. repair stucco. no structural work. no lighting work. rear deck. not visible from the front.Details
work @ apt# 405 only. dry rot repair. deck (4' x 8'). remove & replace all dryrot wood. repair stucco. no structural work. no lighting work. rear deck. not visible from the front. | $10,000 |
| Feb 15, 2007 | Completed final sign-off Jun 2007 | 621 Stockton St | In-House Development | 50% reconsturuction of existing deck of stairs bring up to current standard of stairs landings provide hand rail remved all damaged lumbarsDetails
50% reconsturuction of existing deck of stairs bring up to current standard of stairs landings provide hand rail remved all damaged lumbars | $8,000 |
| Oct 13, 2006 | Never finaled issued Oct 2006, no final | 621 Stockton St | In-House Development | unit # 306-repair lath & plaster (living room area), remodel kitchen-cabinets, appliances, floor. remodel bath-fixtures & floor, replace door in bedroom (in kind).Details
unit # 306-repair lath & plaster (living room area), remodel kitchen-cabinets, appliances, floor. remodel bath-fixtures & floor, replace door in bedroom (in kind). | $10,000 |
| Feb 5, 2004 | Completed final sign-off Mar 2004 | 621 Stockton St | On-Site Maintenance | per ivan sarkany: to comply w/nov#200343340 open wall to access steam pipe, insulate and close up waDetails
per ivan sarkany: to comply w/nov#200343340 open wall to access steam pipe, insulate and close up wa | $550 |
| Nov 17, 2003 | Never finaled issued Nov 2003, no final | 621 Stockton St | moved mailbox to bldg interior. install granite top, mirror, crown molding in elevator.Details
moved mailbox to bldg interior. install granite top, mirror, crown molding in elevator. | $1,800 | |
| Oct 1, 2003 | Completed final sign-off Mar 2004 | 621 Stockton St | On-Site Maintenance | install new sheetrock walls, ceiling in bathrmDetails
install new sheetrock walls, ceiling in bathrm | $500 |
| Feb 7, 2002 | Expired or cancelled expired Aug 2002 | 621 Stockton St | to renew app#9925342 for remaining work.at front elevation/garage walls,remove wall sections to instDetails
to renew app#9925342 for remaining work.at front elevation/garage walls,remove wall sections to inst | $18,000 | |
| May 16, 2001 | Completed final sign-off May 2001 | 621 Stockton St | On-Site Maintenance | sister in new joist/replace w/pt pressure treated removed existing rotted railing & handrail, replacDetails
sister in new joist/replace w/pt pressure treated removed existing rotted railing & handrail, replac | $600 |
| Aug 14, 2000 | Expired or cancelled expired Feb 2001 | 621 Stockton St | replace kitchen cabinets, remove and replace plaster and sheetrock, upgrade plbgDetails
replace kitchen cabinets, remove and replace plaster and sheetrock, upgrade plbg | $10,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.