Block 0337, lot 020
350 Turk St
- City’s use
- Multi-Family Residential
- Built
- 1964
- Stories
- 15
- Units
- 362
- Rooms
- 362 bathrooms
- Building
- 247,100 sq ft
- Lot
- 37,812 sq ft
- Zoning
- RC4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
138 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 22, 2026 | Completed final sign-off May 2026 | 350 Turk St | Blu Sky Restoration Contractors Llc | fire damaged repair to studio unit t-704 only. scope of work includes interior & exterior finishes windows, doors, applliances, electrical, all like for likeDetails
fire damaged repair to studio unit t-704 only. scope of work includes interior & exterior finishes windows, doors, applliances, electrical, all like for like | $100,000 |
| Jan 30, 2023 | Completed final sign-off Apr 2024 | 455 Eddy St | Nomellini Construction * Ask For Id * | unit 807:1 kitchen & 1 bath remodel in kind. no structural/ exterior work required. no charge to wall layout. all work within unit. no fire alarm or sprinkler work required. unit 807 only.Details
unit 807:1 kitchen & 1 bath remodel in kind. no structural/ exterior work required. no charge to wall layout. all work within unit. no fire alarm or sprinkler work required. unit 807 only. | $30,000 |
| Aug 26, 2021 | Completed final sign-off Oct 2021 | 350 Turk St | unit 1406: kitchen & one bath remodel only. no structural/exterior work req, no change to wall layout. all work within unit. no fire alarm or sprinkler work req. unit 1406 only.Details
unit 1406: kitchen & one bath remodel only. no structural/exterior work req, no change to wall layout. all work within unit. no fire alarm or sprinkler work req. unit 1406 only. | $30,000 | |
| Jun 16, 2020 | Never finaled issued Aug 2020, no final | 455 Eddy St | Flow Masters Plumbing Inc | reconfigure fire sprinkler head to suit tenant improvement. install four new fire sprinkler heads; no other work to system.Details
reconfigure fire sprinkler head to suit tenant improvement. install four new fire sprinkler heads; no other work to system. | $2,000 |
| Jun 1, 2020 | Completed final sign-off Jul 2020 | 350 Turk St | Nomellini Construction * Ask For Id * | apt 201: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req.Details
apt 201: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req. | $32,000 |
| May 6, 2020 | Completed final sign-off Jul 2020 | 350 Turk St | Nomellini Construction * Ask For Id * | apt 1509: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req.Details
apt 1509: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req. | $18,000 |
| Feb 19, 2020 | Never finaled issued Sep 2020, no final | 350 Turk St | Wickman Development And Construction | exterior only improvement for (e) store front work to inclued in kind replacaement of lighting, store front system and finishes at street level entranceDetails
exterior only improvement for (e) store front work to inclued in kind replacaement of lighting, store front system and finishes at street level entrance | $90,000 |
| Jan 27, 2020 | Completed final sign-off Mar 2020 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 505: kitchen & bath remodel. no structural /exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req.Details
unit 505: kitchen & bath remodel. no structural /exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. | $25,000 |
| Nov 26, 2019 | Completed final sign-off Jan 2020 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 1607: kitchen & bath remodel, no structural/exterior work required, no change to wall layout. all work within unit, no fire alarm or sprinkler work required.Details
unit 1607: kitchen & bath remodel, no structural/exterior work required, no change to wall layout. all work within unit, no fire alarm or sprinkler work required. | $30,000 |
| Oct 11, 2019 | Completed final sign-off Dec 2019 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 701: kitchen (72 sq. ft.) & bath (40 sq. ft.) remodel. no structural/exterior/layout/wall change. all work within unit. no fire alarm/sprinkler work required.Details
unit 701: kitchen (72 sq. ft.) & bath (40 sq. ft.) remodel. no structural/exterior/layout/wall change. all work within unit. no fire alarm/sprinkler work required. | $30,000 |
| Oct 7, 2019 | Never finaled issued Oct 2019, no final | 350 Turk St | street spaceDetails
street space | ||
| Oct 3, 2019 | Completed final sign-off Dec 2019 | 455 Eddy St | unit 211: kitchen & bath remodel. no structural/exterior work. all work within unit. no change to wall layout. no fire alarm/sprinkler work req. kitchen 72 bath 40Details
unit 211: kitchen & bath remodel. no structural/exterior work. all work within unit. no change to wall layout. no fire alarm/sprinkler work req. kitchen 72 bath 40 | $30,000 | |
| Sep 20, 2019 | Expired or cancelled cancelled Jan 2026 | 350 Turk St | new exterior wall finish & paint @ entry level only. replace ext floor tile. replace in kind entry doors & windows within (e) at (e) unheated lobbies. replace ext lighting w/led retrofit lightsDetails
new exterior wall finish & paint @ entry level only. replace ext floor tile. replace in kind entry doors & windows within (e) at (e) unheated lobbies. replace ext lighting w/led retrofit lights | $197,000 | |
| Sep 20, 2019 | Expired or cancelled cancelled Jan 2026 | 350 Turk St | replace double faced wall sign "mosser towers parking"Details
replace double faced wall sign "mosser towers parking" | ||
| Sep 20, 2019 | Expired or cancelled cancelled Jan 2026 | 350 Turk St | install non electric single faced wall sign "mosser towers"Details
install non electric single faced wall sign "mosser towers" | ||
| Sep 11, 2019 | Completed final sign-off Nov 2019 | 350 Turk St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 1st fl retail. add 4 horn strobes, 2 strobes, 1 pull statoin ref 201904127862Details
fire alarm ti on 1st fl retail. add 4 horn strobes, 2 strobes, 1 pull statoin ref 201904127862 | $8,000 |
| Sep 6, 2019 | Completed final sign-off Oct 2019 | 455 Eddy St | Nomellini Construction * Ask For Id * | unit 406: kitchen & bathroom remodel: no structural/ no exterior work. all work within unit. no change to wall & opening layout. no fire alarm/ sprinklers work req.Details
unit 406: kitchen & bathroom remodel: no structural/ no exterior work. all work within unit. no change to wall & opening layout. no fire alarm/ sprinklers work req. | $30,000 |
| Aug 23, 2019 | Completed final sign-off Oct 2019 | 354 Turk St | Nassif A Ayyad | reconfigure floorplan, new 3 compartment pot sink. new hand sink. new quarry tile floor with quarry tile cove (work area)Details
reconfigure floorplan, new 3 compartment pot sink. new hand sink. new quarry tile floor with quarry tile cove (work area) | $10,000 |
| Aug 7, 2019 | Never finaled issued Aug 2019, no final | 350 Turk St | Nomellini Construction * Ask For Id * | #202: kitchen and bath remodel. no structural/no exterior work. no change to wall layout. all work within unit. no fire alarm or sprinkler work req.Details
#202: kitchen and bath remodel. no structural/no exterior work. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. | $30,000 |
| Jul 29, 2019 | Completed final sign-off Aug 2019 | 455 Eddy St | Nomellini Construction * Ask For Id * | unit #802: 1 kitchen, and one bath remodel, no exterior work. all work within unit. no change to wall layout, no fire alarm or sprinkler work required. kitchen 72 sq ft and bath 40 sq ft.Details
unit #802: 1 kitchen, and one bath remodel, no exterior work. all work within unit. no change to wall layout, no fire alarm or sprinkler work required. kitchen 72 sq ft and bath 40 sq ft. | $25,000 |
| Jul 24, 2019 | Never finaled issued Jul 2019, no final | 350 Turk St | Nomellini Construction * Ask For Id * | unit 205: kitchen and bathroom. no structural and no exterior work req. all work within unit. no changes to wall layout. no fire alarm/sprinkler work req. kitchen 72 sq bath 40 sq.Details
unit 205: kitchen and bathroom. no structural and no exterior work req. all work within unit. no changes to wall layout. no fire alarm/sprinkler work req. kitchen 72 sq bath 40 sq. | $25,000 |
| Jun 20, 2019 | Never finaled issued Jun 2019, no final | 350 Turk St | unit 1502. kitchen and bathroom remodel, in-kind. no structural. no exterior work. all work is within unit. no change to wall layout. no fire alarm / sprinkler work requiredDetails
unit 1502. kitchen and bathroom remodel, in-kind. no structural. no exterior work. all work is within unit. no change to wall layout. no fire alarm / sprinkler work required | $30,000 | |
| Jun 3, 2019 | Never finaled issued Jun 2019, no final | 455 Eddy St | Nomellini Construction * Ask For Id * | unit 505: kitchen and bathroom remodel. no exterior structural work req. all work within unit. no change to wall layout. no fire alarm/sprinkler work req. kichen 72 sqft and bath 40 sq ft. tile in bathroom. new cabinets/counter top. new appliances and electrical fixtures. flooring in unitDetails
unit 505: kitchen and bathroom remodel. no exterior structural work req. all work within unit. no change to wall layout. no fire alarm/sprinkler work req. kichen 72 sqft and bath 40 sq ft. tile in bathroom. new cabinets/counter top. new appliances and electrical fixtures. flooring in unit | $25,000 |
| May 21, 2019 | Completed final sign-off Jul 2019 | 455 Eddy St | Nomellini Construction * Ask For Id * | unit 1103: kitchen & bath remodel. no structural/ no exterior work required. no change in wall layout. all wiork within unit. no fire alarm/sprinkler work required.Details
unit 1103: kitchen & bath remodel. no structural/ no exterior work required. no change in wall layout. all wiork within unit. no fire alarm/sprinkler work required. | $25,000 |
| Apr 12, 2019 | Completed final sign-off Oct 2019 | 354 Turk St | Wickman Development And Construction | g/f -vacant space. barrier removal only for disabled access: new ada compliant entry door at existing entry door location. new ada compliant bathroom at existing bathroom location. new ada compliant ramp to access bathroom.Details
g/f -vacant space. barrier removal only for disabled access: new ada compliant entry door at existing entry door location. new ada compliant bathroom at existing bathroom location. new ada compliant ramp to access bathroom. | $90,000 |
| Mar 26, 2019 | Completed final sign-off Apr 2019 | 455 Eddy St | Nomellini Construction * Ask For Id * | unit 1604: kitchen and bathroom remodel no exterior no structural work. all work within unit no change to wall layout. no fire sprinkler work requiredDetails
unit 1604: kitchen and bathroom remodel no exterior no structural work. all work within unit no change to wall layout. no fire sprinkler work required | $25,000 |
| Mar 20, 2019 | Expired or cancelled cancelled Jan 2026 | 350 Turk St | Wickman Development And Construction | new ceiling tile, add electrical outlets, new ada accesible bathroom and new ada entrance and led lighting in the retail spaceDetails
new ceiling tile, add electrical outlets, new ada accesible bathroom and new ada entrance and led lighting in the retail space | $40,000 |
| Mar 18, 2019 | Never finaled issued Mar 2019, no final | 350 Turk St | street space and mtaDetails
street space and mta | ||
| Feb 21, 2019 | Completed final sign-off Apr 2019 | 455 Eddy St | Nomellini Construction * Ask For Id * | unit 902: kitchen & bathroom remodel, no structural/no exterior work, no change in wall layout. all work within unit. no fire alarm or sprinkler work required. kitchen 72 sf, bath 40 sf.Details
unit 902: kitchen & bathroom remodel, no structural/no exterior work, no change in wall layout. all work within unit. no fire alarm or sprinkler work required. kitchen 72 sf, bath 40 sf. | $25,000 |
| Jan 24, 2019 | Completed final sign-off Feb 2019 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 1008. kitchen and bathroom remodel. no exterior / no structural work. all work within unit. no change to wall layout. kitchen 72 sq ft, bath 40 sq ftDetails
unit 1008. kitchen and bathroom remodel. no exterior / no structural work. all work within unit. no change to wall layout. kitchen 72 sq ft, bath 40 sq ft | $25,000 |
| Jan 24, 2019 | Completed final sign-off Apr 2019 | 455 Eddy St | Nomellini Construction * Ask For Id * | unit 1009. kitchen and bathroom remodel. no exterior / no structural work. all work within unit. no change to wall layout. kitchen 72 sq ft, bath 40 sq ftDetails
unit 1009. kitchen and bathroom remodel. no exterior / no structural work. all work within unit. no change to wall layout. kitchen 72 sq ft, bath 40 sq ft | $25,000 |
| Jan 11, 2019 | Completed final sign-off Mar 2019 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 1505: kitchen and bathroom remodel. no exterior/no structural work. all work within unit. no change to wall layoutDetails
unit 1505: kitchen and bathroom remodel. no exterior/no structural work. all work within unit. no change to wall layout | $25,000 |
| Nov 5, 2018 | Completed final sign-off Jan 2019 | 455 Eddy St | Nomellini Construction * Ask For Id * | unit 1403 - kitchen and bath remodel no structural no exterior work., all work interior unit no work in any common area. no fire alarm or sprinklers worl reqd. no change in layoutDetails
unit 1403 - kitchen and bath remodel no structural no exterior work., all work interior unit no work in any common area. no fire alarm or sprinklers worl reqd. no change in layout | $25,000 |
| Oct 23, 2018 | Completed final sign-off Jan 2019 | 455 Eddy St | Nomellini Construction * Ask For Id * | unit # 311 -kitchen and bath remodel. no structural. no exterior work all work within unint. no work in any common areas. no fire alarm or sprinkler work req kitchen 72 sq ft bath 40 sq ft. all work in same location. no removal of wallsDetails
unit # 311 -kitchen and bath remodel. no structural. no exterior work all work within unint. no work in any common areas. no fire alarm or sprinkler work req kitchen 72 sq ft bath 40 sq ft. all work in same location. no removal of walls | $25,000 |
| Oct 23, 2018 | Completed final sign-off Dec 2018 | 455 Eddy St | Nomellini Construction * Ask For Id * | unit # 1206 -kitchen and bath remodel. no structural. no exterior work all work within unint. no work in any common areas. no fire alarm or sprinkler work req kitchen 72 sq ft bath 40 sq ft. all work in same location. no removal of wallsDetails
unit # 1206 -kitchen and bath remodel. no structural. no exterior work all work within unint. no work in any common areas. no fire alarm or sprinkler work req kitchen 72 sq ft bath 40 sq ft. all work in same location. no removal of walls | $25,000 |
| Oct 16, 2018 | Completed final sign-off Dec 2018 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 301: kitchen and bathroom remodel. no exterior/no structural work. all work within unit. no work in common areas.Details
unit 301: kitchen and bathroom remodel. no exterior/no structural work. all work within unit. no work in common areas. | $25,000 |
| Sep 27, 2018 | Completed final sign-off Dec 2018 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 312: kitchen & bath remodel, no exterior/structural work, all work w/in unit, no work in common areas, no fire alarm or sprinkler work required, kitchen approx 72 sq. ft., bathroom approx 40 sq. ft.Details
unit 312: kitchen & bath remodel, no exterior/structural work, all work w/in unit, no work in common areas, no fire alarm or sprinkler work required, kitchen approx 72 sq. ft., bathroom approx 40 sq. ft. | $25,000 |
| Sep 12, 2018 | Completed final sign-off Oct 2018 | 350 Turk St | Nomellini Construction * Ask For Id * | kitchen and bathroom remodel. no exterior / no structural work. all work within unit #1603. no work in any common area. no fire alarm or sprinkler work required. no modification-no re-framing.Details
kitchen and bathroom remodel. no exterior / no structural work. all work within unit #1603. no work in any common area. no fire alarm or sprinkler work required. no modification-no re-framing. | $30,000 |
| Aug 23, 2018 | Never finaled issued Aug 2018, no final | 455 Eddy St | Nomellini Construction * Ask For Id * | unit 1611: kitchen and bathroom remodel. no exterior / no structural work. all work within unit. no work in any common area. no fire alarm or sprinkler work req'd. maher n/aDetails
unit 1611: kitchen and bathroom remodel. no exterior / no structural work. all work within unit. no work in any common area. no fire alarm or sprinkler work req'd. maher n/a | $25,000 |
| Aug 23, 2018 | Completed final sign-off Oct 2018 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 708. kitchen and bathroom remodel. no exterior / no structural work. all work within unit. no work in any common area. no fire alarm or sprinkler work req'd. maher n/aDetails
unit 708. kitchen and bathroom remodel. no exterior / no structural work. all work within unit. no work in any common area. no fire alarm or sprinkler work req'd. maher n/a | $25,000 |
| Aug 17, 2018 | Completed final sign-off Sep 2018 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 206: kitchen and bathroom remodel. no structural and no exterior work. all work within unit. no work in any common areas. no fire alarm or sprinkler work required. kitchen: 40 sq ft. bathroom: 40 sq ft.Details
unit 206: kitchen and bathroom remodel. no structural and no exterior work. all work within unit. no work in any common areas. no fire alarm or sprinkler work required. kitchen: 40 sq ft. bathroom: 40 sq ft. | $25,000 |
| Aug 2, 2018 | Completed final sign-off Sep 2020 | 455 Eddy St | Red Hawk Fire & Security Ca Llc | fire alarm system upgrade for phase 3,4,5. 350 turk: add (7)power supply, (14)pull stations, (14) weatherproof pull station, (47)smoke detectors, (14) heat detector, (14)weatherproof heat detectors,(72)horn strobe, (236)low frequency horn. phase 5 add firefighter phone jackDetails
fire alarm system upgrade for phase 3,4,5. 350 turk: add (7)power supply, (14)pull stations, (14) weatherproof pull station, (47)smoke detectors, (14) heat detector, (14)weatherproof heat detectors,(72)horn strobe, (236)low frequency horn. phase 5 add firefighter phone jack | $447,600 |
| Jul 23, 2018 | Completed final sign-off Aug 2018 | 455 Eddy St | Nomellini Construction * Ask For Id * | #212: kitchen and bathroom remodel, no structural and no exterior work. maher naDetails
#212: kitchen and bathroom remodel, no structural and no exterior work. maher na | $25,000 |
| Jul 3, 2018 | Completed final sign-off Aug 2018 | 455 Eddy St | Nomellini Construction * Ask For Id * | unit 609: kitchen & bathroom remodel/no structural change/no exterior work, in-kind, same size/locationDetails
unit 609: kitchen & bathroom remodel/no structural change/no exterior work, in-kind, same size/location | $25,000 |
| Jul 3, 2018 | Completed final sign-off Aug 2018 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 807: kitchen & bathroom remodel/no structural change/no exterior work, in-kind, same size/locationDetails
unit 807: kitchen & bathroom remodel/no structural change/no exterior work, in-kind, same size/location | $25,000 |
| Jun 14, 2018 | Completed final sign-off Jun 2018 | 455 Eddy St | Rain Defense | to obtain a final inspectoin for work approevd under pa201507080925 & 201507302969. both roofing related.Details
to obtain a final inspectoin for work approevd under pa201507080925 & 201507302969. both roofing related. | |
| Jun 5, 2018 | Completed final sign-off Feb 2019 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 805: remodel kitchen & bathroom. no structural changes and no exterior worki.Details
unit 805: remodel kitchen & bathroom. no structural changes and no exterior worki. | $25,000 |
| May 10, 2018 | Completed final sign-off Jun 2018 | 350 Turk St | Nomellini Construction * Ask For Id * | unit #513: kitchen and bathroom remodel. no structural. no exterior. bathroom 40 sq ft. kitchen 72 s.f.Details
unit #513: kitchen and bathroom remodel. no structural. no exterior. bathroom 40 sq ft. kitchen 72 s.f. | $25,000 |
| Apr 27, 2018 | Completed final sign-off Oct 2019 | 350 Turk St | Red Hawk Fire & Security Ca Llc | to obtain final inspection for work approved under pa#201405024802. all work is complete.Details
to obtain final inspection for work approved under pa#201405024802. all work is complete. | |
| Apr 27, 2018 | Completed final sign-off Nov 2019 | 455 Eddy St | Red Hawk Fire & Security Ca Llc | to obtain final inspection for work approved under pa#201405024803. all work is complete.Details
to obtain final inspection for work approved under pa#201405024803. all work is complete. | |
| Mar 30, 2018 | Completed final sign-off May 2018 | 350 Turk St | Nomellini Construction * Ask For Id * | unit # 1110 - 11th floor: kitchen and bathroom remodel/ no structural work. n/a maherDetails
unit # 1110 - 11th floor: kitchen and bathroom remodel/ no structural work. n/a maher | $25,000 |
| Mar 19, 2018 | Completed final sign-off Jun 2018 | 455 Eddy St | Nomellini Construction * Ask For Id * | unit #1005: kitchen and bathroom remodel. no structural changes cmt # 204; n/a maherDetails
unit #1005: kitchen and bathroom remodel. no structural changes cmt # 204; n/a maher | $25,000 |
| Feb 6, 2018 | Completed final sign-off Mar 2018 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 1609: kitchen and bathroom remodel. no structural change. in-kind.Details
unit 1609: kitchen and bathroom remodel. no structural change. in-kind. | $25,000 |
| Feb 6, 2018 | Completed final sign-off Mar 2018 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 204: kitchen and bathroom remodel. no structural changes. in-kind.Details
unit 204: kitchen and bathroom remodel. no structural changes. in-kind. | $25,000 |
| Jan 10, 2018 | Completed final sign-off Feb 2018 | 350 Turk St | Nomellini Construction * Ask For Id * | unit #403: kitchen and bathroom remodel. no structural change of e layout. maher n/aDetails
unit #403: kitchen and bathroom remodel. no structural change of e layout. maher n/a | $25,000 |
| Jan 10, 2018 | Completed final sign-off Mar 2018 | 455 Eddy St | Nomellini Construction * Ask For Id * | unit #501: kitchen and bathroom remodel. no structural change of e layout. maher n/aDetails
unit #501: kitchen and bathroom remodel. no structural change of e layout. maher n/a | $25,000 |
| Dec 27, 2017 | Completed final sign-off Feb 2018 | 350 Turk St | Nomellini Construction * Ask For Id * | apt 808: kitchen & bathroom remodel, no structural, no exterior work.Details
apt 808: kitchen & bathroom remodel, no structural, no exterior work. | $25,000 |
| Nov 20, 2017 | Completed final sign-off Feb 2018 | 350 Turk St | Nomellini Construction * Ask For Id * | #1210 - kitchen & bathroom remodel. no structural changes, no change of (e) layout. n/a maher ordinanceDetails
#1210 - kitchen & bathroom remodel. no structural changes, no change of (e) layout. n/a maher ordinance | $20,000 |
| Nov 13, 2017 | Never finaled issued Nov 2017, no final | 455 Eddy St | Nomellini Construction * Ask For Id * | unit 1202 - to comply with nov 201798511 kitchen and bathroom remodel/no structural change.Details
unit 1202 - to comply with nov 201798511 kitchen and bathroom remodel/no structural change. | $25,000 |
| Nov 13, 2017 | Never finaled issued Nov 2017, no final | 455 Eddy St | Nomellini Construction * Ask For Id * | unit 1004 - kitchen and bathroom remodel / no structural changeDetails
unit 1004 - kitchen and bathroom remodel / no structural change | $25,000 |
| Aug 21, 2017 | Completed final sign-off Oct 2017 | 350 Turk St | Nomellini Construction * Ask For Id * | apt 908: kitchen & bathroom remodeling. no structural changes.Details
apt 908: kitchen & bathroom remodeling. no structural changes. | $20,000 |
| Aug 21, 2017 | Completed final sign-off Oct 2017 | 455 Eddy St | Nomellini Construction * Ask For Id * | apt 1108: remodel kitchen & bathroom. no structural changes.Details
apt 1108: remodel kitchen & bathroom. no structural changes. | $20,000 |
| Jun 29, 2017 | Never finaled issued Jun 2017, no final | 455 Eddy St | Nomellini Construction * Ask For Id * | #412 - kitchen & bathroom remodell, no structural change.Details
#412 - kitchen & bathroom remodell, no structural change. | $20,000 |
| Jun 29, 2017 | Completed final sign-off Oct 2017 | 350 Turk St | Nomellini Construction * Ask For Id * | #810 -kitchen & bathroom remodel, no structural changeDetails
#810 -kitchen & bathroom remodel, no structural change | $20,000 |
| Jun 29, 2017 | Never finaled issued Jun 2017, no final | 455 Eddy St | Nomellini Construction * Ask For Id * | #312 - kitchen & bathroom remodel ; no structural change.Details
#312 - kitchen & bathroom remodel ; no structural change. | $20,000 |
| Jun 29, 2017 | Never finaled issued Jun 2017, no final | 350 Turk St | Nomellini Construction * Ask For Id * | #407 -kitchen & bathroom remodel/ no structural change.Details
#407 -kitchen & bathroom remodel/ no structural change. | $20,000 |
| Jun 16, 2017 | Never finaled issued Jun 2017, no final | 350 Turk St | street spaceDetails
street space | ||
| Jun 14, 2017 | Never finaled issued Jun 2017, no final | 455 Eddy St | Nomellini Construction * Ask For Id * | #310 & #410 - for each unit - kitchen & bathroom remodel. no structural change, no chnage to walls & opening layout. n/a maher ordinanceDetails
#310 & #410 - for each unit - kitchen & bathroom remodel. no structural change, no chnage to walls & opening layout. n/a maher ordinance | $50,000 |
| Jun 8, 2017 | Expired or cancelled cancelled Jul 2017 | 455 Eddy St | Rain Defense | reroofingDetails
reroofing | $45,000 |
| Jun 6, 2017 | Completed final sign-off Jul 2017 | 455 Eddy St | Nomellini Construction * Ask For Id * | #705- kitchen & bathroom remodel, no structural change.Details
#705- kitchen & bathroom remodel, no structural change. | $25,000 |
| May 10, 2017 | Completed final sign-off Jun 2017 | 350 Turk St | Nomellini Construction * Ask For Id * | kitchen & bathroom renovation no structutral changes,unit # 1211Details
kitchen & bathroom renovation no structutral changes,unit # 1211 | $20,000 |
| Apr 11, 2017 | Completed final sign-off May 2017 | 350 Turk St | Nomellini Construction * Ask For Id * | unit#503. kitchen & bath remodel. no structural. no exterior work. like for like. n/a for maher.Details
unit#503. kitchen & bath remodel. no structural. no exterior work. like for like. n/a for maher. | $20,000 |
| Mar 1, 2017 | Completed final sign-off Apr 2017 | 455 Eddy St | Nomellini Construction * Ask For Id * | unit #1102: kitchen and bathroom remodel. no structural changes. using current layout.Details
unit #1102: kitchen and bathroom remodel. no structural changes. using current layout. | $25,000 |
| Feb 7, 2017 | Expired or cancelled cancelled Mar 2017 | 455 Eddy St | Nomellini Construction * Ask For Id * | 455 eddy, # 207: kitchen lighting per cec 150(k); kitchen and bathroom renovatgion (one of each) using current layout/no structural changes (same area)Details
455 eddy, # 207: kitchen lighting per cec 150(k); kitchen and bathroom renovatgion (one of each) using current layout/no structural changes (same area) | $25,000 |
| Feb 6, 2017 | Completed final sign-off Mar 2017 | 455 Eddy St | Nomellini Construction * Ask For Id * | kitchen & bathroom renovation. using current layout, no structural changes. 455 eddy unit #404Details
kitchen & bathroom renovation. using current layout, no structural changes. 455 eddy unit #404 | $25,000 |
| Dec 19, 2016 | Completed final sign-off Jan 2017 | 350 Turk St | Nomellini Construction * Ask For Id * | apt 1010: kitchen & bathroom renovation using current layout. no structural changes. no changes on walls.Details
apt 1010: kitchen & bathroom renovation using current layout. no structural changes. no changes on walls. | $25,000 |
| Dec 19, 2016 | Completed final sign-off Feb 2017 | 455 Eddy St | Nomellini Construction * Ask For Id * | apt 1105: kitchen & bathroom renovation using current layout. no structural changes, no change on walls.Details
apt 1105: kitchen & bathroom renovation using current layout. no structural changes, no change on walls. | $25,000 |
| Dec 15, 2016 | Expired or cancelled cancelled Jan 2026 | 455 Eddy St | exterior facade renovation, install (n) awning below concrete balcony & in exterior hardscaping at 455 eddy st & 350 turk st, ground floor lobby upgrade for 455 eddy & 350 turk st; maher n/aDetails
exterior facade renovation, install (n) awning below concrete balcony & in exterior hardscaping at 455 eddy st & 350 turk st, ground floor lobby upgrade for 455 eddy & 350 turk st; maher n/a | $50,000 | |
| Dec 9, 2016 | Completed final sign-off Feb 2017 | 455 Eddy St | Nomellini Construction * Ask For Id * | apt 1504: kitchen & bathroom renovation. no structural changes, using current layout.Details
apt 1504: kitchen & bathroom renovation. no structural changes, using current layout. | $25,000 |
| Dec 9, 2016 | Completed final sign-off Jan 2017 | 455 Eddy St | Nomellini Construction * Ask For Id * | apt 1205: kitchen & bathroom renovation. no structural changes, using current layout.Details
apt 1205: kitchen & bathroom renovation. no structural changes, using current layout. | $25,000 |
| Nov 2, 2016 | Completed final sign-off Dec 2016 | 350 Turk St | Nomellini Construction * Ask For Id * | apt 1513: kitchen and bathroom renovation. no structural changes, using current layout. no changes on walls.Details
apt 1513: kitchen and bathroom renovation. no structural changes, using current layout. no changes on walls. | $20,000 |
| Oct 13, 2016 | Completed final sign-off Dec 2016 | 350 Turk St | Nomellini Construction * Ask For Id * | apt 1512 :kitchen & bathroom renovation. no structural changes/using current layout.Details
apt 1512 :kitchen & bathroom renovation. no structural changes/using current layout. | $25,000 |
| Oct 13, 2016 | Completed final sign-off Dec 2016 | 455 Eddy St | Nomellini Construction * Ask For Id * | apt 1613 :kitchen & bathroom renovation. no structural changes/using current layout.Details
apt 1613 :kitchen & bathroom renovation. no structural changes/using current layout. | $25,000 |
| Oct 13, 2016 | Completed final sign-off Dec 2016 | 350 Turk St | Nomellini Construction * Ask For Id * | apt 903 :kitchen & bathroom renovation. no structural changes/using current layout.Details
apt 903 :kitchen & bathroom renovation. no structural changes/using current layout. | $25,000 |
| Sep 26, 2016 | Completed final sign-off Dec 2016 | 350 Turk St | Nomellini Construction * Ask For Id * | apt 410: kitchen & bathroom renovation using same layout. no structur work. no walls moved, removed, added or infilled. all (e) layouts to remain.Details
apt 410: kitchen & bathroom renovation using same layout. no structur work. no walls moved, removed, added or infilled. all (e) layouts to remain. | $25,000 |
| Sep 6, 2016 | Completed final sign-off Dec 2016 | 455 Eddy St | Nomellini Construction * Ask For Id * | apt 1513: renovate kitchen & bathroom with new fixtures using (e) layout.Details
apt 1513: renovate kitchen & bathroom with new fixtures using (e) layout. | $20,000 |
| Aug 24, 2016 | Completed final sign-off Jan 2017 | 350 Turk St | Super Home Builders Inc., Nomellini Construction * Ask For Id * | apt 1401: kitchen & bathroom renovation (new fixtures). no walls changed or removedl.Details
apt 1401: kitchen & bathroom renovation (new fixtures). no walls changed or removedl. | $20,000 |
| Aug 15, 2016 | Completed final sign-off Nov 2016 | 350 Turk St | Nomellini Construction * Ask For Id * | apt 907 : kitchen & bathroom renovation. replace (e) exh fans, lightings to be remain. no (n) windows.Details
apt 907 : kitchen & bathroom renovation. replace (e) exh fans, lightings to be remain. no (n) windows. | $20,000 |
| Aug 15, 2016 | Completed final sign-off Nov 2016 | 350 Turk St | Nomellini Construction * Ask For Id * | apt 1113 : kitchen & bathroom renovation. replace (e) exh fans, lightings to be remain. no (n) windows.Details
apt 1113 : kitchen & bathroom renovation. replace (e) exh fans, lightings to be remain. no (n) windows. | $20,000 |
| Aug 15, 2016 | Completed final sign-off Nov 2016 | 350 Turk St | Nomellini Construction * Ask For Id * | apt 203 : kitchen & bathroom renovation. replace (e) exh fans, lightings to be remain. no (n) windows.Details
apt 203 : kitchen & bathroom renovation. replace (e) exh fans, lightings to be remain. no (n) windows. | $20,000 |
| Aug 15, 2016 | Completed final sign-off Jan 2018 | 350 Turk St | Rain Defense | reroofingDetails
reroofing | $45,000 |
| Aug 15, 2016 | Completed final sign-off Nov 2016 | 350 Turk St | Nomellini Construction * Ask For Id * | apt 604: kitchen & bathroom renovation. replace (e) exh fans, lightings to be remain. no (n) windows.Details
apt 604: kitchen & bathroom renovation. replace (e) exh fans, lightings to be remain. no (n) windows. | $20,000 |
| Aug 15, 2016 | Completed final sign-off Nov 2016 | 455 Eddy St | Nomellini Construction * Ask For Id * | apt 1510 : kitchen & bathroom renovation. replace (e) exh fans, lightings to be remain. no (n) windows.Details
apt 1510 : kitchen & bathroom renovation. replace (e) exh fans, lightings to be remain. no (n) windows. | $20,000 |
| Jul 25, 2016 | Completed final sign-off Jan 2017 | 350 Turk St | Super Home Builders Inc., Nomellini Construction * Ask For Id * | apt 705: kitchen & bathroom remodel. as like, new fixtures.Details
apt 705: kitchen & bathroom remodel. as like, new fixtures. | $20,000 |
| Jul 25, 2016 | Expired or cancelled cancelled Aug 2016 | 455 Eddy St | Nomellini Construction * Ask For Id * | apt #:1113 kitchen & bathroom remodel. as like, new fixtures.Details
apt #:1113 kitchen & bathroom remodel. as like, new fixtures. | $20,000 |
| Jun 13, 2016 | Completed final sign-off Sep 2016 | 455 Eddy St | Nomellini Construction * Ask For Id * | apt 604: kitchen & bathroom remodel; like for like.Details
apt 604: kitchen & bathroom remodel; like for like. | $20,000 |
| May 20, 2016 | Completed final sign-off Aug 2016 | 455 Eddy St | Nomellini Construction * Ask For Id * | apt #1003. kitchen & bathroom remode. no walls moved, rmeoved, added or infilled. all (e) layouts to remain unchanged.Details
apt #1003. kitchen & bathroom remode. no walls moved, rmeoved, added or infilled. all (e) layouts to remain unchanged. | $20,000 |
| May 20, 2016 | Completed final sign-off Aug 2016 | 350 Turk St | Nomellini Construction * Ask For Id * | apt #413. kitchen & bathroom remode. no walls moved, rmeoved, added or infilled. all (e) layouts to remain unchanged.Details
apt #413. kitchen & bathroom remode. no walls moved, rmeoved, added or infilled. all (e) layouts to remain unchanged. | $20,000 |
| Mar 15, 2016 | Completed final sign-off May 2016 | 455 Eddy St | Nomellini Construction * Ask For Id * | apt 810: kitchen & bathroom remodel. no layout changes.Details
apt 810: kitchen & bathroom remodel. no layout changes. | $18,000 |
| Feb 3, 2016 | Completed final sign-off Mar 2016 | 350 Turk St | Nomellini Construction * Ask For Id * | apt 411 & 905: kitchen & bathroom remodel for 2 units. no walls relocated, new fixtures only.Details
apt 411 & 905: kitchen & bathroom remodel for 2 units. no walls relocated, new fixtures only. | $30,000 |
| Jan 25, 2016 | Completed final sign-off Mar 2016 | 350 Turk St | Nomellini Construction * Ask For Id * | apt 1510: kichen & bathroom remodel. no layout change.Details
apt 1510: kichen & bathroom remodel. no layout change. | $18,000 |
| Dec 8, 2015 | Completed final sign-off Mar 2016 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 711 & 713: each unit kitchen & bathroom remodel.Details
unit 711 & 713: each unit kitchen & bathroom remodel. | $18,000 |
| Nov 10, 2015 | Completed final sign-off Dec 2015 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 909: kitchen & bathroom remodel.no structural work.Details
unit 909: kitchen & bathroom remodel.no structural work. | $18,000 |
| Oct 23, 2015 | Completed final sign-off Dec 2015 | 455 Eddy St | Nomellini Construction * Ask For Id * | kitchen & bath remodel. no structural changes, no walls moved or altered maher naDetails
kitchen & bath remodel. no structural changes, no walls moved or altered maher na | $18,000 |
| Oct 13, 2015 | Never finaled issued Oct 2015, no final | 350 Turk St | street space permit - permit renewal # 201507080925 ( 1366065)Details
street space permit - permit renewal # 201507080925 ( 1366065) | ||
| Sep 23, 2015 | Completed final sign-off Nov 2015 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 1503: kitchen & bathroom remodel: no walls moved, rmeoved, added or infilled. all (e) layouts to remain unchanged.Details
unit 1503: kitchen & bathroom remodel: no walls moved, rmeoved, added or infilled. all (e) layouts to remain unchanged. | $18,000 |
| Sep 10, 2015 | Never finaled issued Sep 2015, no final | 455 Eddy St | Nomellini Construction * Ask For Id * | unit 1213: kitchen & bathroom remodel.Details
unit 1213: kitchen & bathroom remodel. | $18,000 |
| Aug 13, 2015 | Never finaled issued Aug 2015, no final | 350 Turk St | street space permit (pa #201507080925)Details
street space permit (pa #201507080925) | ||
| Aug 13, 2015 | Never finaled issued Aug 2015, no final | 455 Eddy St | street space permit and mta permitDetails
street space permit and mta permit | ||
| Aug 11, 2015 | Completed final sign-off Oct 2015 | 350 Turk St | unit 1606 - kitchen and bathroom remodel, 80 sq ft kitchen, 40 sq ft bath. no changes to wall or fixture locationsDetails
unit 1606 - kitchen and bathroom remodel, 80 sq ft kitchen, 40 sq ft bath. no changes to wall or fixture locations | $18,000 | |
| Aug 5, 2015 | Completed final sign-off Oct 2015 | 350 Turk St | Nomellini Construction * Ask For Id * | unit # 508 & 1005: kitchen & bathroom remodel. no structural walls to be moved, removed or altered. fixtures and finishes only, k:80sf, b:40sf.Details
unit # 508 & 1005: kitchen & bathroom remodel. no structural walls to be moved, removed or altered. fixtures and finishes only, k:80sf, b:40sf. | $36,000 |
| Aug 5, 2015 | Completed final sign-off Oct 2015 | 455 Eddy St | Nomellini Construction * Ask For Id * | unit #1507: kitchen & bathroom remodel.Details
unit #1507: kitchen & bathroom remodel. | $18,000 |
| Jul 30, 2015 | Never finaled issued Jul 2015, no final | 350 Turk St | Rain Defense | replace 5 each roof access doors with same type fire rated steel. 90 minutes.Details
replace 5 each roof access doors with same type fire rated steel. 90 minutes. | $11,000 |
| Jul 30, 2015 | Never finaled issued Jul 2015, no final | 455 Eddy St | Rain Defense | replace each roof access doors with same type fire rated stee, 90 min. min.Details
replace each roof access doors with same type fire rated stee, 90 min. min. | $11,000 |
| Jul 8, 2015 | Never finaled issued Jul 2015, no final | 455 Eddy St | Rain Defense | reroofing. remove and replace roof foam approx. 3800 sq. ft.Details
reroofing. remove and replace roof foam approx. 3800 sq. ft. | $45,000 |
| Jul 8, 2015 | Never finaled issued Jul 2015, no final | 350 Turk St | Rain Defense | reroofing.remove and replace roof foam, approx. 3,800 sq. ft.Details
reroofing.remove and replace roof foam, approx. 3,800 sq. ft. | $45,000 |
| Jul 7, 2015 | Expired or cancelled cancelled Jan 2026 | 455 Eddy St | g/f -renovation of 2 (e) lobby interiors of a residential apartment building, scope of work including: 1)2x(n) custom made reception desks,2) 2x(n) ceiling soffit with additional new lighting fixture 3)(n) finish throughout.Details
g/f -renovation of 2 (e) lobby interiors of a residential apartment building, scope of work including: 1)2x(n) custom made reception desks,2) 2x(n) ceiling soffit with additional new lighting fixture 3)(n) finish throughout. | $38,000 | |
| Jun 16, 2015 | Completed final sign-off Sep 2015 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 1511: remove extg bath and kitchen cabinets. install plmg and electrical to new and extg locations.provide counters, cabinets, fixtures. redo hardwood or provide vinyle flooring, paint apartment.Details
unit 1511: remove extg bath and kitchen cabinets. install plmg and electrical to new and extg locations.provide counters, cabinets, fixtures. redo hardwood or provide vinyle flooring, paint apartment. | $18,000 |
| Mar 18, 2015 | Completed final sign-off Sep 2015 | 350 Turk St | Nomellini Construction * Ask For Id * | unit 1207 - no walls to be removed, no structural, finishes/fixtures only. remove existing kitchen cabinets. install plumbing and electrical to new kitchen & bath remodels. paint apartment, supply laminate flooring. install or replace fixtures in bathroom. all fire rated assemblies to be retainedDetails
unit 1207 - no walls to be removed, no structural, finishes/fixtures only. remove existing kitchen cabinets. install plumbing and electrical to new kitchen & bath remodels. paint apartment, supply laminate flooring. install or replace fixtures in bathroom. all fire rated assemblies to be retained | $15,000 |
| Feb 17, 2015 | Completed final sign-off May 2015 | 455 Eddy St | Nomellini Construction * Ask For Id * | units 1012 & 1113 - remove existing kitchen & bath cabinets, replumb to accept new remodels, supply new cabinets. tilbe bathroom floor & shower walls, paint apartment, pergo floorsDetails
units 1012 & 1113 - remove existing kitchen & bath cabinets, replumb to accept new remodels, supply new cabinets. tilbe bathroom floor & shower walls, paint apartment, pergo floors | $36,000 |
| May 2, 2014 | Never finaled issued Aug 2014, no final | 350 Turk St | California Fire & Electric Inc | fire alarm system upgrade for whole building. per sffd approved p.o.a. phase i & ii. ** maher: compliance with ordinance no# 155-13.not required **Details
fire alarm system upgrade for whole building. per sffd approved p.o.a. phase i & ii. ** maher: compliance with ordinance no# 155-13.not required ** | $150,000 |
| May 2, 2014 | Never finaled issued Aug 2014, no final | 455 Eddy St | California Fire & Electric Inc | fire alarm system upgrade for whole building. ** maher: compliance with ordinance no# 155-13 not required **Details
fire alarm system upgrade for whole building. ** maher: compliance with ordinance no# 155-13 not required ** | $150,000 |
| Jan 8, 2014 | Completed final sign-off Apr 2014 | 350 Turk St | Nomellini Construction * Ask For Id * | remove exisitng kitche cabinets, install plumbing for kitchen & bath, intall granite tile flooring and shower tub combo in units 1004 & 1007Details
remove exisitng kitche cabinets, install plumbing for kitchen & bath, intall granite tile flooring and shower tub combo in units 1004 & 1007 | $20,000 |
| Oct 30, 2013 | Completed final sign-off Dec 2013 | 350 Turk St | Nomellini Construction * Ask For Id * | unit # 1613: remodel existing kitchen and bath. supply plumbing to new locations. paint apartment.Details
unit # 1613: remodel existing kitchen and bath. supply plumbing to new locations. paint apartment. | $15,000 |
| Sep 25, 2013 | Completed final sign-off Nov 2013 | 350 Turk St | Nomellini Construction * Ask For Id * | #507: demo (e) kitchen & bath. install plumbing shutoffs. new granite floors, new kitchen and bath cabinets, install countertops, paint apartment, add pergo floors, no electrical needed. no structural.Details
#507: demo (e) kitchen & bath. install plumbing shutoffs. new granite floors, new kitchen and bath cabinets, install countertops, paint apartment, add pergo floors, no electrical needed. no structural. | $15,000 |
| Sep 5, 2013 | Completed final sign-off Oct 2013 | 350 Turk St | Nomellini Construction * Ask For Id * | unit #1413: remodel kitchen & bath. install new cabinetse over new granite floor. install shut off valves in kitchen, control, minor frame built using 5/8" type x gypsum board for bathroom wall & kitchen stove wall. (non-bearing) no electrical. comply with complaint #201303781, 199602800, 9402979Details
unit #1413: remodel kitchen & bath. install new cabinetse over new granite floor. install shut off valves in kitchen, control, minor frame built using 5/8" type x gypsum board for bathroom wall & kitchen stove wall. (non-bearing) no electrical. comply with complaint #201303781, 199602800, 9402979 | $5,000 |
| Feb 8, 2011 | Never finaled issued Feb 2011, no final | 455 Eddy St | street space permitDetails
street space permit | ||
| Dec 20, 2010 | Never finaled issued Dec 2010, no final | 455 Eddy St | Weather Tight Waterproofing | reroofingDetails
reroofing | $42,250 |
| Nov 8, 2005 | Completed final sign-off Mar 2006 | 455 Eddy St | Property Mgmnt Merchandisea | remove & replace kitchen cabinets, shower, walls, toilet, sinks, plumbing & electrical to correct nov 200564460Details
remove & replace kitchen cabinets, shower, walls, toilet, sinks, plumbing & electrical to correct nov 200564460 | $12,000 |
| Sep 7, 2005 | Expired or cancelled expired Apr 2007 | 455 Eddy St | High Quality Roofing Co. | reroofingDetails
reroofing | $26,500 |
| May 10, 2005 | Never finaled issued May 2005, no final | 455 Eddy St | street space for scaffoldDetails
street space for scaffold | ||
| Mar 18, 2005 | Never finaled issued Mar 2005, no final | 455 Eddy St | street space permitDetails
street space permit | ||
| Jan 27, 2005 | Never finaled issued Jan 2005, no final | 350 Turk St | street spaceDetails
street space | ||
| Oct 7, 2004 | Never finaled issued Oct 2004, no final | 455 Eddy St | street space permit.Details
street space permit. | ||
| Sep 7, 2004 | Never finaled issued Sep 2004, no final | 455 Eddy St | streetspaceDetails
streetspace | ||
| May 7, 2002 | Expired or cancelled expired Sep 2002 | 350 Turk St | sidewalkDetails
sidewalk | ||
| Sep 22, 2000 | Expired or cancelled expired Nov 2001 | 455 Eddy St | sign permit - non-electric, wall &single faced.Details
sign permit - non-electric, wall &single faced. | $1,500 | |
| Jun 7, 2000 | Completed final sign-off Oct 2000 | 350 Turk St | Property Mgmnt Merchandisea | replace kitchen and bath cabinets, repalce sheetrock and tile, replce dishwasher and toilet unit1104Details
replace kitchen and bath cabinets, repalce sheetrock and tile, replce dishwasher and toilet unit1104 | $14,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Nomellini Construction * Ask For Id * (92), Rain Defense (7), Red Hawk Fire & Security Ca Llc (4), Wickman Development And Construction (3), California Fire & Electric Inc (2), Property Mgmnt Merchandisea (2), Super Home Builders Inc. (2), Blu Sky Restoration Contractors Llc, Flow Masters Plumbing Inc, High Quality Roofing Co., Nassif A Ayyad, Weather Tight Waterproofing
- Architects
- Mark Hogan, Romain Curtis
- Engineers
- Edward K S Wong (2), John Ehlert
- Designers
- Marc Dimalanta
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.