Block 0219, lot 011
1474 Sacramento St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 4
- Units
- 42
- Rooms
- 41 bathrooms
- Building
- 34,148 sq ft
- Lot
- 10,141 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
46 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 29, 2024 | Completed final sign-off Jan 2025 | 1474 Sacramento St | Rain Defense | re-roof. power wash (e) roof mem to remove all loose dirt/aluminum coating. instl (n) roof scuppers at all (e) scuppers locs. caulk the ext nipple of the scupper with np-1 urethane caulkins. repl all pene flashing with new apply asphalt is primer to the en. torch-down.Details
re-roof. power wash (e) roof mem to remove all loose dirt/aluminum coating. instl (n) roof scuppers at all (e) scuppers locs. caulk the ext nipple of the scupper with np-1 urethane caulkins. repl all pene flashing with new apply asphalt is primer to the en. torch-down. | $39,478 |
| Aug 22, 2022 | Expired or cancelled cancelled Jan 2026 | 1474 Sacramento St | #307. install one (n) clthes washer and drye & pantry. no wall demo.Details
#307. install one (n) clthes washer and drye & pantry. no wall demo. | $4,500 | |
| Jun 22, 2022 | Completed final sign-off Sep 2023 | 1474 Sacramento St | Au Electric Corporation/Aec Alarms | upgrade the (e) fa system with a new fire alarm system to comply with sffc 1103.7.6.1. by installing new wireless low frequency sounders in all sleeping areas and replace (like for like) devices where are (e) smoke, pull stations and hor/strobes in common areasDetails
upgrade the (e) fa system with a new fire alarm system to comply with sffc 1103.7.6.1. by installing new wireless low frequency sounders in all sleeping areas and replace (like for like) devices where are (e) smoke, pull stations and hor/strobes in common areas | $75,000 |
| Mar 24, 2022 | Completed final sign-off Jun 2022 | 1474 Sacramento St | Markoff Structural Pest Control | markoff structural pest control termite report #19643 items #1-13Details
markoff structural pest control termite report #19643 items #1-13 | $69,000 |
| Nov 23, 2021 | Never finaled issued Dec 2021, no final | 1474 Sacramento St | B-Side Inc. | unit 410 - rehabilitate existing kitchen & bathroom; install washer/dryerDetails
unit 410 - rehabilitate existing kitchen & bathroom; install washer/dryer | $36,000 |
| Aug 18, 2021 | Completed final sign-off Mar 2022 | 1474 Sacramento St | B-Side Inc. | #410. remodeling one kitchen and one bathroom. non structural.Details
#410. remodeling one kitchen and one bathroom. non structural. | $30,000 |
| May 26, 2021 | Expired or cancelled cancelled Jan 2026 | 1474 Sacramento St | unit 402: rehab (e) kitchen & bathroom. install washer/dryerDetails
unit 402: rehab (e) kitchen & bathroom. install washer/dryer | $35,000 | |
| Feb 19, 2021 | Completed final sign-off Jul 2021 | 1474 Sacramento St | B-Side Inc. | unit 409: remodel bathroom. remodel kitchen. replace washer/dryer. no structural work. all walls to remain. no walls to be relocatedDetails
unit 409: remodel bathroom. remodel kitchen. replace washer/dryer. no structural work. all walls to remain. no walls to be relocated | $25,000 |
| Jan 21, 2021 | Completed final sign-off Apr 2021 | 1474 Sacramento St | B-Side Inc. | unit 402: remodel bathroom and kitchen. no structural work. no moving walls.Details
unit 402: remodel bathroom and kitchen. no structural work. no moving walls. | $25,000 |
| Jan 13, 2021 | Completed final sign-off May 2021 | 1474 Sacramento St | B-Side Inc. | unit 207. rehab kitchen & bathroom. no structural work, no wall alterationsDetails
unit 207. rehab kitchen & bathroom. no structural work, no wall alterations | $25,000 |
| Jan 13, 2021 | Completed final sign-off May 2021 | 1474 Sacramento St | B-Side Inc. | unit 404. rehab kitchen & bathroom. no structural work, no wall alterationsDetails
unit 404. rehab kitchen & bathroom. no structural work, no wall alterations | $25,000 |
| Dec 15, 2020 | Completed final sign-off Mar 2021 | 1474 Sacramento St | B-Side Inc. | apt 405: remodel bathroom, remodel kitchen, no moving walls, no structural work.Details
apt 405: remodel bathroom, remodel kitchen, no moving walls, no structural work. | $20,000 |
| Dec 14, 2020 | Completed final sign-off Mar 2021 | 1474 Sacramento St | B-Side Inc. | #109:remodel bathroom, remodel kitchen. no structural work and no moving walls.Details
#109:remodel bathroom, remodel kitchen. no structural work and no moving walls. | $34,000 |
| Oct 13, 2020 | Never finaled issued Oct 2020, no final | 1474 Sacramento St | B-Side Inc. | unit 105: rehab bathroom. rehab kitchenDetails
unit 105: rehab bathroom. rehab kitchen | $20,000 |
| Sep 4, 2020 | Never finaled issued Sep 2020, no final | 1474 Sacramento St | B-Side Inc. | apt 309: replace washer/dryer. upgrade line.Details
apt 309: replace washer/dryer. upgrade line. | $4,000 |
| Aug 12, 2020 | Never finaled issued Aug 2020, no final | 1474 Sacramento St | B-Side Inc. | unit 210 - remodel 1 kitchen and 1 bath in kind. no walls moving. plumbing and electrical remain same area. new lighting shall comply w/ cec 150.0 (k) 3 & (k)s.Details
unit 210 - remodel 1 kitchen and 1 bath in kind. no walls moving. plumbing and electrical remain same area. new lighting shall comply w/ cec 150.0 (k) 3 & (k)s. | $20,000 |
| Aug 12, 2020 | Completed final sign-off Feb 2021 | 1474 Sacramento St | B-Side Inc. | unit # 310: rehab kitchen and bathroom. no structural work no moving of any walls.Details
unit # 310: rehab kitchen and bathroom. no structural work no moving of any walls. | $20,000 |
| Aug 12, 2020 | Completed final sign-off Jul 2021 | 1474 Sacramento St | B-Side Inc. | unit # 209: rehab kitchen and bathroom. no structural work no moving of any walls.Details
unit # 209: rehab kitchen and bathroom. no structural work no moving of any walls. | $20,000 |
| Aug 12, 2020 | Never finaled issued Aug 2020, no final | 1474 Sacramento St | B-Side Inc. | unit 208 - remodel 1 kitchen and 1 bath in kind. no walls moving. plumbing and electrical remain same area. new lighting shall comply w/ cec 150.0 (k) 3 & (k)s.Details
unit 208 - remodel 1 kitchen and 1 bath in kind. no walls moving. plumbing and electrical remain same area. new lighting shall comply w/ cec 150.0 (k) 3 & (k)s. | $20,000 |
| Aug 11, 2020 | Never finaled issued Aug 2020, no final | 1474 Sacramento St | B-Side Inc. | unit# 306: rehab bathroom and kitchen. no structural work no moving of walls.Details
unit# 306: rehab bathroom and kitchen. no structural work no moving of walls. | $20,000 |
| Jul 15, 2020 | Completed final sign-off Jul 2021 | 1474 Sacramento St | 403: 1 bath 1 kitchen remodel. new lighting shall comply w cec 105k 3 and 105 k5 respectivelyDetails
403: 1 bath 1 kitchen remodel. new lighting shall comply w cec 105k 3 and 105 k5 respectively | $20,000 | |
| Jul 15, 2020 | Never finaled issued Jul 2020, no final | 1474 Sacramento St | B-Side Inc. | unit 301 : 1 kitchen and one bath remodel, new lighting shall comply w cec 150.0443 and 150.0 k 5Details
unit 301 : 1 kitchen and one bath remodel, new lighting shall comply w cec 150.0443 and 150.0 k 5 | $20,000 |
| Jul 15, 2020 | Completed final sign-off Jul 2021 | 1474 Sacramento St | B-Side Inc. | 400: 1 kitchen, 1 bath remodel, new lighting shall comply w cec 1509 k 3 and 150 k 5Details
400: 1 kitchen, 1 bath remodel, new lighting shall comply w cec 1509 k 3 and 150 k 5 | $20,000 |
| Jul 13, 2020 | Completed final sign-off Jul 2021 | 1474 Sacramento St | B-Side Inc. | unit 408: remodel bathroom, kitchen, no structural work, no moving wallsDetails
unit 408: remodel bathroom, kitchen, no structural work, no moving walls | $20,000 |
| Jul 13, 2020 | Completed final sign-off Jul 2021 | 1474 Sacramento St | B-Side Inc. | unit 401: remodel bathroom, kitchen, no structural work, no moving wallsDetails
unit 401: remodel bathroom, kitchen, no structural work, no moving walls | $20,000 |
| Jul 13, 2020 | Completed final sign-off Jul 2021 | 1474 Sacramento St | B-Side Inc. | unit 406: remodel bathroom, kitchen, no structural work, no moving wallsDetails
unit 406: remodel bathroom, kitchen, no structural work, no moving walls | $20,000 |
| Jul 10, 2020 | Completed final sign-off Jul 2021 | 1474 Sacramento St | B-Side Inc. | unit# 205: rehab bathroom and kitchen. no structural work.Details
unit# 205: rehab bathroom and kitchen. no structural work. | $20,000 |
| Jul 10, 2020 | Completed final sign-off Jul 2021 | 1474 Sacramento St | B-Side Inc. | unit# 206: rehab bathroom and kitchen. no structural work.Details
unit# 206: rehab bathroom and kitchen. no structural work. | $20,000 |
| Jul 10, 2020 | Never finaled issued Jul 2020, no final | 1474 Sacramento St | B-Side Inc. | unit# 204: rehab bathroom and kitchen. no structural work.Details
unit# 204: rehab bathroom and kitchen. no structural work. | $20,000 |
| Jul 1, 2020 | Completed final sign-off Dec 2020 | 1474 Sacramento St | B-Side Inc. | kitchen & bath remodel inkindDetails
kitchen & bath remodel inkind | $20,000 |
| Jul 1, 2020 | Never finaled issued Jul 2020, no final | 1474 Sacramento St | B-Side Inc. | kitchen & bath remodel inkindDetails
kitchen & bath remodel inkind | $20,000 |
| Jun 11, 2018 | Never finaled issued Jun 2018, no final | 1474 Sacramento St | street spaceDetails
street space | ||
| Nov 6, 2015 | Completed final sign-off Nov 2015 | 1474 Sacramento St | Make Ready Maintenance Inc | unit #200: install new kitchen cabiners only. no structural or windows.Details
unit #200: install new kitchen cabiners only. no structural or windows. | $12,000 |
| Jul 14, 2015 | Completed final sign-off Nov 2015 | 1474 Sacramento St | Make Ready Maintenance Inc | unit 106: kitchen and bathroom remodel. no alteration to walls, window and door.Details
unit 106: kitchen and bathroom remodel. no alteration to walls, window and door. | $35,000 |
| Jul 28, 2014 | Completed final sign-off Sep 2014 | 1474 Sacramento St | Make Ready Maintenance Inc | unit#104 kitchen & bathroom remodel.Details
unit#104 kitchen & bathroom remodel. | $28,741 |
| May 5, 2014 | Completed final sign-off Jun 2014 | 1474 Sacramento St | Make Ready Maintenance Inc | kitchen & bathroom remodel, unit # 202, no windows, no walls to be removed.Details
kitchen & bathroom remodel, unit # 202, no windows, no walls to be removed. | $22,000 |
| Feb 14, 2014 | Completed final sign-off Feb 2014 | 1474 Sacramento St | Make Ready Maintenance Inc | replace for like extg wall heaters including t-24 to comply with correction on job card app#201309237504; compliance with ord. no 155-13 not required.Details
replace for like extg wall heaters including t-24 to comply with correction on job card app#201309237504; compliance with ord. no 155-13 not required. | $500 |
| Sep 23, 2013 | Completed final sign-off Feb 2014 | 1474 Sacramento St | Make Ready Maintenance Inc | kitchen and bathroom rmeodel -unit 210Details
kitchen and bathroom rmeodel -unit 210 | $15,000 |
| Oct 26, 2012 | Completed final sign-off Nov 2012 | 1474 Sacramento St | Make Ready Maintenance Inc | comply w/nov 201104561 - cap ceiling in boiler room (1-hr ceiling w/5/8" gyp) & repair stairs -minor dryrot.Details
comply w/nov 201104561 - cap ceiling in boiler room (1-hr ceiling w/5/8" gyp) & repair stairs -minor dryrot. | $2,500 |
| Feb 2, 2007 | Completed final sign-off Jun 2007 | 1474 Sacramento St | On-Site Maintenance | revision to appl#200612260520 to include cabinet change out in kitchen/bath. no structural changes. no window/door & lighting work. flourescent lighting.Details
revision to appl#200612260520 to include cabinet change out in kitchen/bath. no structural changes. no window/door & lighting work. flourescent lighting. | $5,000 |
| Dec 26, 2006 | Never finaled issued Dec 2006, no final | 1474 Sacramento St | On-Site Maintenance | kitchen remodel in kind no strutural changes. sinks faucets dishwasher bathtub toilets shower value vanity no window or door work.Details
kitchen remodel in kind no strutural changes. sinks faucets dishwasher bathtub toilets shower value vanity no window or door work. | $10,500 |
| Nov 18, 2005 | Completed final sign-off Feb 2006 | 1474 Sacramento St | On-Site Maintenance | kitchen and bath remodel. new tub on closure, new cabinets, tile kitchen floor, no struct work, provide fluorescent light fixturesDetails
kitchen and bath remodel. new tub on closure, new cabinets, tile kitchen floor, no struct work, provide fluorescent light fixtures | $18,000 |
| Sep 12, 2005 | Completed final sign-off Dec 2005 | 1474 Sacramento St | On-Site Maintenance | remove partation wall. between living room hall and clset. revision to pa#200507056770.Details
remove partation wall. between living room hall and clset. revision to pa#200507056770. | $2,000 |
| Aug 31, 2005 | Never finaled issued Aug 2005, no final | 1474 Sacramento St | street spaceDetails
street space | ||
| Jul 5, 2005 | Completed final sign-off Dec 2005 | 1474 Sacramento St | On-Site Maintenance | kitchen and bathroom remodel - no structural workDetails
kitchen and bathroom remodel - no structural work | $10,500 |
| Jul 5, 2005 | Completed final sign-off Dec 2005 | 1474 Sacramento St | On-Site Maintenance | remodel kitchen & bath.no structural workDetails
remodel kitchen & bath.no structural work | $12,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.