Steve Connelly
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Oculus Architects
- Based in
- San Francisco
- On San Francisco permits
- Apr 2002 to Jun 2026
40 permits since 2000 (architect on 37 permits, engineer on 2 permits, authorized agent-others on 1 permit): 25 completed, 1 in progress, 7 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 15, 2026 | Completed final sign-off Jul 2026 | 2350 Turk Bl | Cahill Contractors Llc. | revision to pa # 202503041492: close-out permit to record approved as built condition approved by inspector request. drawing revise to document a approved complete work. for record purpose.Details
revision to pa # 202503041492: close-out permit to record approved as built condition approved by inspector request. drawing revise to document a approved complete work. for record purpose. | |
| Feb 6, 2026 | Completed final sign-off Aug 2026 | 476 Post St | T P Windows Inc/United Glass & Aluminum | remove 5-foot section of hollow, clay tile wall between two tenant spaces each with their own exits so as to create a common opening. refer to p/a 2026-0701-4457.Details
remove 5-foot section of hollow, clay tile wall between two tenant spaces each with their own exits so as to create a common opening. refer to p/a 2026-0701-4457. | $12,500 |
| May 14, 2025 | In progress issued Jun 2025 | 2340 Turk Bl | Lewis M Merlo Inc | new exterior paving and entry ramp.Details
new exterior paving and entry ramp. | $75,000 |
| Mar 20, 2025 | Completed final sign-off Aug 2025 | 280 Spear St | Black Mountain Development | new interior lighting with new dropped ceiling in areas to accomodate new led cans.Details
new interior lighting with new dropped ceiling in areas to accomodate new led cans. | $10,000 |
| Aug 23, 2024 | Completed final sign-off Aug 2025 | 1560 40th Av | Rudolph Commercial Interiors Inc, Rci | minor demolition to existing kitchen and servery including new case works and suspend ceilingDetails
minor demolition to existing kitchen and servery including new case works and suspend ceiling | $140,000 |
| Apr 24, 2023 | Completed final sign-off Apr 2024 | 2335 Golden Gate Av | Cahill Contractors Llc. | deferred submittal - shop drawings for acc glass inc window wall system - fixed window located high above the end of the basketball court (ref pa 2021-0521-0845)Details
deferred submittal - shop drawings for acc glass inc window wall system - fixed window located high above the end of the basketball court (ref pa 2021-0521-0845) | |
| Feb 19, 2021 | Never finaled issued Jul 2021, no final | 1330 14th Av | Arroyo Realty & Development Llc | interior partition barrier removal, new accessible restroom and new ada compliant ramp at entryway.Details
interior partition barrier removal, new accessible restroom and new ada compliant ramp at entryway. | $25,000 |
| May 7, 2019 | Never finaled issued Jun 2019, no final | 50 Thomas More Wy | Build Group Inc. | voluntary structural upgradeDetails
voluntary structural upgrade | $400,000 |
| Oct 23, 2018 | Completed final sign-off Jun 2021 | 1563 Fulton St | Ronan O'dea Inc Dba O'dea Ronan Inc | repair & remodel 4 fire damaged apartments. no building expansion, no new unitsDetails
repair & remodel 4 fire damaged apartments. no building expansion, no new units | $300,000 |
| Oct 15, 2018 | Completed final sign-off Dec 2022 | 330 Parker Av | erect 1-story, type 2-b, no basement, no dwelling unit, recycling & waste facility bldg.Details
erect 1-story, type 2-b, no basement, no dwelling unit, recycling & waste facility bldg. | $350,000 | |
| Dec 15, 2017 | Completed final sign-off Feb 2018 | 2350 Turk Bl | Mai Construction Inc. | removal of an (e) stud partition wall & renovation of (e) offices & classrooms maher naDetails
removal of an (e) stud partition wall & renovation of (e) offices & classrooms maher na | $100,000 |
| Nov 27, 2017 | Expired or cancelled expired Jan 2026 | 2800 Turk Bl | Cahill Const Service Inc | accessibility upgrades consisting of the removal of an (e) non-compliant ramp on the 1st fl along with corridor and adjacent office plan re-configurations to accomodate new ramp length, fire under separate permit(s)Details
accessibility upgrades consisting of the removal of an (e) non-compliant ramp on the 1st fl along with corridor and adjacent office plan re-configurations to accomodate new ramp length, fire under separate permit(s) | $400,000 |
| Mar 16, 2017 | Never finaled issued Jun 2017, no final | 3801 Balboa St | Bach Construction, Inc. | includes accommodating structural seismic strengthening to the existing building. project also includes providing a unisex ada restroomDetails
includes accommodating structural seismic strengthening to the existing building. project also includes providing a unisex ada restroom | $775,000 |
| Mar 16, 2017 | Never finaled issued Jun 2017, no final | 476 24th Av | Bach Construction, Inc. | includes accommodating structural seismic strengthening to (e) building. project also includes providing fully complaint access into the main building as well as providing a fully compliant ada unixex bathroom in the basement level of the buildingDetails
includes accommodating structural seismic strengthening to (e) building. project also includes providing fully complaint access into the main building as well as providing a fully compliant ada unixex bathroom in the basement level of the building | $575,000 |
| Jan 10, 2017 | Completed final sign-off Jan 2020 | 2350 Turk Bl | removal of (e) dilapidated greenhouse & installation of new pre-fabricated & pre-engineered , de-mountable greenhouse structure supplied by igc.Details
removal of (e) dilapidated greenhouse & installation of new pre-fabricated & pre-engineered , de-mountable greenhouse structure supplied by igc. | $5,000 | |
| Dec 5, 2016 | Never finaled issued Jan 2017, no final | 1330 14th Av | Ronan O'dea Inc Dba O'dea Ronan Inc | demo of existing bathrooms and new tenant improvements, including accessibility upgrades on 2nd and 3rd floor of existing st. annes' convent.Details
demo of existing bathrooms and new tenant improvements, including accessibility upgrades on 2nd and 3rd floor of existing st. annes' convent. | $1,100,000 |
| May 13, 2016 | Completed final sign-off Dec 2016 | 2445 Golden Gate Av | Mai Construction Inc. | interior renovations to an existing 'b' occupancy area within the 3/f of a 5-story bldg. renovations to include new offices and laboratory. n/a ordinance #155-13Details
interior renovations to an existing 'b' occupancy area within the 3/f of a 5-story bldg. renovations to include new offices and laboratory. n/a ordinance #155-13 | $750,000 |
| Oct 8, 2013 | Expired or cancelled cancelled Jan 2026 | 2130 Fulton St | 5/f- rev. to pa# 201307081302 restroom accessibility.Details
5/f- rev. to pa# 201307081302 restroom accessibility. | ||
| Sep 21, 2012 | Expired or cancelled withdrawn Dec 2015 | 284 Stanyan St | structurel seismic work & interior tenant improvement of existing offices.Details
structurel seismic work & interior tenant improvement of existing offices. | $200,000 | |
| Jul 3, 2012 | Completed final sign-off Feb 2015 | 2345 Golden Gate Av | Turner Construction Co | accessiblity entry upgrade with elevation & internal renovations. mep under separate permit. include new entry steps to (e) exterior & new curtain wall system & 1st floor north side. demo (e) office & restroom & install new replacement accessible restroom & relocated.Details
accessiblity entry upgrade with elevation & internal renovations. mep under separate permit. include new entry steps to (e) exterior & new curtain wall system & 1st floor north side. demo (e) office & restroom & install new replacement accessible restroom & relocated. | $2,000,000 |
| Jun 7, 2012 | Completed final sign-off Sep 2012 | 2375 Golden Gate Av | Turner Construction Co | new fireplace & new entry door along with new ceiling & interior finiahes. m.e.p under seperate permitDetails
new fireplace & new entry door along with new ceiling & interior finiahes. m.e.p under seperate permit | $200,000 |
| Jun 4, 2012 | Completed final sign-off Aug 2012 | 2101 Fulton St | Turner Construction Co | library renovations - first & second floor office reconfiguration.mep under separate permitDetails
library renovations - first & second floor office reconfiguration.mep under separate permit | $500,000 |
| Mar 6, 2012 | Completed final sign-off May 2012 | 101 Howard St | Bcci Construction Company | 4th floor-renovations & remodeling of a partial area of the (e) 4th floor converting 1 large classroom into 3 smaller classrooms along with other minor floor plan modifications. mep & fire protection under separate permit.Details
4th floor-renovations & remodeling of a partial area of the (e) 4th floor converting 1 large classroom into 3 smaller classrooms along with other minor floor plan modifications. mep & fire protection under separate permit. | $321,000 |
| Jan 27, 2012 | Completed final sign-off Aug 2014 | 2345 Golden Gate Av | Turner Construction Co | interior remodel of ground floor entry area and floors 2-6 dorm rooms and bathroomsDetails
interior remodel of ground floor entry area and floors 2-6 dorm rooms and bathrooms | $2,000,000 |
| Nov 29, 2011 | Completed final sign-off Jan 2013 | 2305 Golden Gate Av | demolition of (e) fence & installation of new 8' fence on property line & treesDetails
demolition of (e) fence & installation of new 8' fence on property line & trees | $20,000 | |
| Apr 7, 2011 | Completed final sign-off Feb 2012 | 22 Chabot Tr | Gelling & Judd Inc. | remodel kitchen and bath at 2nd floor. new interior stair between 1st and 2nd fl, change window to french door, convert storage at gr floor to bedroom, family room, and bath. elec, plumb, mech under sep permitDetails
remodel kitchen and bath at 2nd floor. new interior stair between 1st and 2nd fl, change window to french door, convert storage at gr floor to bedroom, family room, and bath. elec, plumb, mech under sep permit | $250,000 |
| Mar 2, 2011 | Completed final sign-off Aug 2014 | 2345 Golden Gate Av | Turner Construction Co | usf phelan hall. for limited voluntary seismic upgrade to existing basement thru the sixth floor of the 7-story bldg. local structural member strengthening. no change of occupancy (per general portion of asce-41 procedure with certain exceptions). see engineer's statement dated 4-18-11 attached.Details
usf phelan hall. for limited voluntary seismic upgrade to existing basement thru the sixth floor of the 7-story bldg. local structural member strengthening. no change of occupancy (per general portion of asce-41 procedure with certain exceptions). see engineer's statement dated 4-18-11 attached. | $890,000 |
| May 19, 2010 | Completed final sign-off Nov 2010 | 2375 Golden Gate Av | Schikore Construction | localized food strengthening of new security grille and new gyp bd along with minor non struct non rated demo workDetails
localized food strengthening of new security grille and new gyp bd along with minor non struct non rated demo work | $100,000 |
| Jul 10, 2009 | Completed final sign-off Aug 2009 | 2130 Fulton St | Schikore Construction | new storefront & entrances to (e) storefront. electrical permit under separate permit.Details
new storefront & entrances to (e) storefront. electrical permit under separate permit. | $100,000 |
| Jun 18, 2009 | Completed final sign-off Dec 2009 | 2497 Golden Gate Av | Schikore Construction | revision to pa# 2008/09/19/2126, revise previous building from concrete to pre engineered steel cladding (pre-engineered structure)Details
revision to pa# 2008/09/19/2126, revise previous building from concrete to pre engineered steel cladding (pre-engineered structure) | |
| Jul 9, 2008 | Completed final sign-off Apr 2009 | 2130 Fulton St | new stand alone canopy. including colums & beams supporting a translucent glazing system.Details
new stand alone canopy. including colums & beams supporting a translucent glazing system. | $100,000 | |
| Mar 27, 2007 | Expired or cancelled expired Mar 2010 | 2130 Fulton St | erect ground electric single faced replacement sign.Details
erect ground electric single faced replacement sign. | ||
| Jan 23, 2007 | Expired or cancelled withdrawn Jun 2017 | 4614 California St | to erect four story pre-school and administration new buildingDetails
to erect four story pre-school and administration new building | $3,000,000 | |
| Jan 23, 2007 | Expired or cancelled withdrawn Jun 2017 | 4614 California St | to demolish 4 story pre-school and administrationDetails
to demolish 4 story pre-school and administration | ||
| May 16, 2006 | Completed final sign-off Jan 2008 | 2800 Turk Bl | renovation of extg elevator lobby areas to floors 4 through 7. to correct extg lobby/elevator code infranctionDetails
renovation of extg elevator lobby areas to floors 4 through 7. to correct extg lobby/elevator code infranction | $350,000 | |
| Mar 8, 2006 | Expired or cancelled expired Feb 2009 | 2800 Turk Bl | remove (e) glass entry & construct new entry colamade. ref to previous pa# 2005/08/10/9898 for title 24 access complete dated: 09/21/05.Details
remove (e) glass entry & construct new entry colamade. ref to previous pa# 2005/08/10/9898 for title 24 access complete dated: 09/21/05. | $500,000 | |
| Sep 21, 2005 | Completed final sign-off Oct 2005 | 2800 Turk St | revision to permit#200508109898. ading new grand doors & screens & bean rated wall section. as builtDetails
revision to permit#200508109898. ading new grand doors & screens & bean rated wall section. as built | $20,000 | |
| Aug 12, 2005 | Never finaled issued Aug 2005, no final | 2130 Fulton St | renovation of (e) office area including removal of (e) partition & construction of new non-structuraDetails
renovation of (e) office area including removal of (e) partition & construction of new non-structura | $250,000 | |
| Jun 13, 2005 | Never finaled issued Jun 2005, no final | 2130 Fulton St | minor renoation to (e) locker room areas within (e) university gym, including creation of (n)Details
minor renoation to (e) locker room areas within (e) university gym, including creation of (n) | $400,000 | |
| Apr 4, 2002 | Completed final sign-off Aug 2002 | 2130 Fulton St | build new office & voctional training area within 1st fl area.incl modify garage door & north elevatDetails
build new office & voctional training area within 1st fl area.incl modify garage door & north elevat | $350,000 |