Block 1455, lot 018
476 24th Ave
- City’s use
- Commercial Misc
- Built
- 1937
- Stories
- 2
- Rooms
- 9 bathrooms
- Building
- 18,177 sq ft
- Lot
- 26,771 sq ft
- Zoning
- RM1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 13, 2024 | In progress issued Jul 2024 | 476 24th Av | Eoin De Barra Plumbing | installation of 2 bioretention faclities & 1 subsurface infiltration trench. no change to site grading. work funded by sfpuc green infranstructure grant. only need plumbing review for changes to exterior downspouts & storm drain connectionDetails
installation of 2 bioretention faclities & 1 subsurface infiltration trench. no change to site grading. work funded by sfpuc green infranstructure grant. only need plumbing review for changes to exterior downspouts & storm drain connection | $720,000 |
| Dec 21, 2020 | Never finaled filed Dec 2020, never issued | 476 24th Av | Golden Gate Sign Company Inc. | install a non-electric single faced sign "santa monica shcool" sign a- 214" x 18"Details
install a non-electric single faced sign "santa monica shcool" sign a- 214" x 18" | $5,000 |
| Dec 21, 2020 | Never finaled filed Dec 2020, never issued | 476 24th Av | Golden Gate Sign Company Inc. | install a non-electric single faced sign "santa monica shcool" sign b- 119" x 10"Details
install a non-electric single faced sign "santa monica shcool" sign b- 119" x 10" | $3,000 |
| Jul 10, 2017 | Completed final sign-off Aug 2017 | 476 24th Av | Alliance Roofing Co Inc | reroofing.Details
reroofing. | $87,000 |
| Jun 12, 2017 | Never finaled issued Jun 2017, no final | 476 24th Av | street spaceDetails
street space | ||
| Mar 16, 2017 | Never finaled issued Jun 2017, no final | 476 24th Av | Bach Construction, Inc. | includes accommodating structural seismic strengthening to (e) building. project also includes providing fully complaint access into the main building as well as providing a fully compliant ada unixex bathroom in the basement level of the buildingDetails
includes accommodating structural seismic strengthening to (e) building. project also includes providing fully complaint access into the main building as well as providing a fully compliant ada unixex bathroom in the basement level of the building | $575,000 |
| Jan 28, 2009 | Completed final sign-off Feb 2009 | 476 24th Av | Precision Roofing Inc | reroofing.Details
reroofing. | $4,500 |