Peter Braun
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Restaurant Design Concepts
- Based in
- Oakland
- On San Francisco permits
- Jan 2005 to May 2023
71 permits since 2000 (architect on 64 permits, authorized agent-others on 4 permits, designer on 3 permits, engineer on 3 permits): 45 completed, 17 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 30, 2023 | Expired or cancelled cancelled Jan 2026 | 490 Post St | ste 1440: t.i. for ophthamology office: interior bearing partitions for offices, exam rms, treatment rms, casework, new finishes. relocate electrical, plumbing & mech work.Details
ste 1440: t.i. for ophthamology office: interior bearing partitions for offices, exam rms, treatment rms, casework, new finishes. relocate electrical, plumbing & mech work. | $903,000 | |
| Dec 28, 2022 | Expired or cancelled cancelled Jan 2026 | 1318 18th St | Westport Construction | install ada compliant electric door opener on 3/0 entry door abe 201901094125Details
install ada compliant electric door opener on 3/0 entry door abe 201901094125 | $4,800 |
| Nov 8, 2022 | Expired or cancelled cancelled Jan 2026 | 519 Clement St | demo (e) millwork, walls , finishes. new nostructural partitions, new low walls, millworkm new equipment, finsihes.Details
demo (e) millwork, walls , finishes. new nostructural partitions, new low walls, millworkm new equipment, finsihes. | $80,000 | |
| Oct 25, 2022 | Never finaled issued Nov 2022, no final | 490 Post St | Westport Construction | interior soft demo of interiorDetails
interior soft demo of interior | $64,320 |
| May 20, 2022 | Completed final sign-off Nov 2022 | 845 Market St | Pacific Wide Builders Inc. | unit #14/basement: to comply with nov 202035401. demo (e) millwork and finishes, construct new non structural partition, millwork, fixtures and finishes for food court tenant at sf centre mall.Details
unit #14/basement: to comply with nov 202035401. demo (e) millwork and finishes, construct new non structural partition, millwork, fixtures and finishes for food court tenant at sf centre mall. | $250,000 |
| Mar 14, 2022 | Completed final sign-off Aug 2022 | 1500 Ocean Av | Kinstan Construction Inc | new seafood market: demo (e) finishes, install (n) non-structural partitions, low-walls, new finishes, millwork, equipment.Details
new seafood market: demo (e) finishes, install (n) non-structural partitions, low-walls, new finishes, millwork, equipment. | $199,000 |
| Dec 10, 2021 | Never finaled issued Feb 2022, no final | 437 Hayes St | Choice Inc | commerical ti restaurant, no change of use: demo (e) millwork, walls, finishes, (n) non-structural partitions, (n) low walls, millwork, (n) equipment, finishes.Details
commerical ti restaurant, no change of use: demo (e) millwork, walls, finishes, (n) non-structural partitions, (n) low walls, millwork, (n) equipment, finishes. | $120,000 |
| Jul 29, 2021 | Expired or cancelled expired Sep 2024 | 1900 Hyde St | commercial t.i. cafe, demo finishes, non-accessible restroom, new nonstructural partitions, new walls, millwork, equipment, finishes, new accessible restroomDetails
commercial t.i. cafe, demo finishes, non-accessible restroom, new nonstructural partitions, new walls, millwork, equipment, finishes, new accessible restroom | $65,000 | |
| Jul 29, 2021 | Never finaled issued Nov 2021, no final | 800 Bay St | commercial t.i. new cafe: demo finishes and non accessible restroom, new non structural partitions, new low walls, mill work, equipment, finishes, new accessible restroom and entranceDetails
commercial t.i. new cafe: demo finishes and non accessible restroom, new non structural partitions, new low walls, mill work, equipment, finishes, new accessible restroom and entrance | $85,000 | |
| Jun 14, 2021 | Never finaled issued Sep 2021, no final | 655 Townsend St | Millennium Construction Group | 1/f: remove oven & gas equipment ((e) type 1 hood to remain). add new type 1 hood & gas equipment. fire alarm, sprinkler & ansul under sep permits.Details
1/f: remove oven & gas equipment ((e) type 1 hood to remain). add new type 1 hood & gas equipment. fire alarm, sprinkler & ansul under sep permits. | $35,000 |
| Jun 7, 2021 | Never finaled issued Mar 2022, no final | 6900 Geary Bl | demo existing wall, install new sinks, new elec outlet, new lighting & new wall.Details
demo existing wall, install new sinks, new elec outlet, new lighting & new wall. | $38,400 | |
| Sep 30, 2019 | Completed final sign-off Jun 2022 | 58 Leland Av | Mireles Construction Inc | commercial t.i. limited restaurant w/ accessory catering. demo (e) millwork, walls, finishes, grocery. (n) non-structural partition. (n) low wall, millwork, (n) equipment, finishes, commercial kitchenDetails
commercial t.i. limited restaurant w/ accessory catering. demo (e) millwork, walls, finishes, grocery. (n) non-structural partition. (n) low wall, millwork, (n) equipment, finishes, commercial kitchen | $110,000 |
| Jun 5, 2019 | Completed final sign-off May 2022 | 2481 Mission St | Best Forever Construction Company | demo (e) millwork, walls and finishes. remove (e) equip & fixtures. new non struct partitions, new low wall, millwork, new equip, finishesDetails
demo (e) millwork, walls and finishes. remove (e) equip & fixtures. new non struct partitions, new low wall, millwork, new equip, finishes | $80,000 |
| May 30, 2019 | Completed final sign-off Jan 2020 | 2761 Mission St | revision to pa 201608185374. revise sheet k9.1 to change the installation of 2 layers sheetrock from exterior wall of structure to inside wall at shedDetails
revision to pa 201608185374. revise sheet k9.1 to change the installation of 2 layers sheetrock from exterior wall of structure to inside wall at shed | ||
| Mar 4, 2019 | Completed final sign-off Sep 2019 | 250 Divisadero St | Richbay Construction | demo (e) non structural walls, finishes, wimdows mullons. new non structural partitions, low walls. millwork. new equipment and finishesDetails
demo (e) non structural walls, finishes, wimdows mullons. new non structural partitions, low walls. millwork. new equipment and finishes | $80,000 |
| Feb 12, 2019 | Completed final sign-off Mar 2019 | 474 03rd St | M R Christensen Construction Inc | commercial ti 201808066495 mechanical onlyDetails
commercial ti 201808066495 mechanical only | |
| Nov 7, 2018 | Completed final sign-off Sep 2019 | 3214 Folsom St | apply for conditional use permit to change from limited restaurant to restaurant. no construction to be done under this permit.**maher n/a**Details
apply for conditional use permit to change from limited restaurant to restaurant. no construction to be done under this permit.**maher n/a** | ||
| Nov 1, 2018 | Completed final sign-off Aug 2019 | 250 Divisadero St | Richbay Construction | change of use from retail to a nonformula, non-coding boba tea store (limited food use), no construction under this permit.Details
change of use from retail to a nonformula, non-coding boba tea store (limited food use), no construction under this permit. | |
| Nov 1, 2018 | Completed final sign-off Sep 2019 | 3214 Folsom St | Munoz Construction | demo (e) millwork, low wall, (n) non-structural partitions, (n) low walls millwork, (n) equipment finishes, rooftop equipment. n/a maherDetails
demo (e) millwork, low wall, (n) non-structural partitions, (n) low walls millwork, (n) equipment finishes, rooftop equipment. n/a maher | $40,000 |
| Oct 23, 2018 | Completed final sign-off Feb 2019 | 3251 20th Av | Best Forever Construction Company | suite 250 j. demo (e) millwork, new low wall and millwork, new equipment and finishesDetails
suite 250 j. demo (e) millwork, new low wall and millwork, new equipment and finishes | $70,000 |
| Aug 24, 2018 | Completed final sign-off Sep 2019 | 332 Clement St | Best Forever Construction Company | commercial t.i. "mokuku" no change of use. new dining finishes, new non-structural partitions, new millwork, remodeled bar area and 2nd floor wait station, accessible restroom upgrades. no change to 3rd floor.Details
commercial t.i. "mokuku" no change of use. new dining finishes, new non-structural partitions, new millwork, remodeled bar area and 2nd floor wait station, accessible restroom upgrades. no change to 3rd floor. | $120,000 |
| Jul 25, 2018 | Completed final sign-off Dec 2019 | 333 Bush St | M R Christensen Construction Inc | space 103: commercial ti dining rm. remodel. demo dining area finishe,s e millwork, entry, new millwork and finishes. upgrade entry door to full accessibility. maher n/a.Details
space 103: commercial ti dining rm. remodel. demo dining area finishe,s e millwork, entry, new millwork and finishes. upgrade entry door to full accessibility. maher n/a. | $75,000 |
| Jul 24, 2018 | Never finaled issued Jul 2018, no final | 332 Clement St | Best Forever Construction Company | demo existing millwork. non-structural partitionsDetails
demo existing millwork. non-structural partitions | $3,000 |
| Jun 26, 2018 | Expired or cancelled cancelled Jan 2026 | 22 Peace Pz | demo (e) retail interior non-structural partitions, new restroom fully accessible as barrier removal, no change of useDetails
demo (e) retail interior non-structural partitions, new restroom fully accessible as barrier removal, no change of use | $26,000 | |
| May 22, 2018 | Completed final sign-off Sep 2021 | 22 Peace Pz | David Jone | ste 511 - from retail to tea shop screen savors tea shop (change of use) demo existing retail,add restrom, new non-structural partitions, new low walls, millwork, new equipment, finishes, new mep for restaurantDetails
ste 511 - from retail to tea shop screen savors tea shop (change of use) demo existing retail,add restrom, new non-structural partitions, new low walls, millwork, new equipment, finishes, new mep for restaurant | $110,000 |
| Apr 27, 2018 | Completed final sign-off Mar 2019 | 490 Post St | Dooher Construction | suite 640: interior t.i. improvements to a 2506 sq ft vacant office. construct new interior partitions for offices, staff room handicap lav, file & it room, caswork, interior finishes, related electrical and plumbing. n/a for maherDetails
suite 640: interior t.i. improvements to a 2506 sq ft vacant office. construct new interior partitions for offices, staff room handicap lav, file & it room, caswork, interior finishes, related electrical and plumbing. n/a for maher | $200,000 |
| Jan 18, 2018 | Completed final sign-off Mar 2019 | 490 Post St | Dooher Construction | demo existing non bearin interior partitions, ceiling casework, light fixtures, interior finishes, plumbing fixtures 6th flDetails
demo existing non bearin interior partitions, ceiling casework, light fixtures, interior finishes, plumbing fixtures 6th fl | $14,500 |
| Sep 29, 2017 | Completed final sign-off Jan 2018 | 490 Post St | Dooher Construction | ste 1700 - install 1 34 linear ft of interior non bearing partitions, 2 doors, removestaff room cabinetsDetails
ste 1700 - install 1 34 linear ft of interior non bearing partitions, 2 doors, removestaff room cabinets | $15,800 |
| Feb 28, 2017 | Expired or cancelled cancelled Jan 2026 | 1402 California St | new juice shop - elixiria - commercial ti. new non structural partitions. new low wall, millwork. new equipment finishes maher naDetails
new juice shop - elixiria - commercial ti. new non structural partitions. new low wall, millwork. new equipment finishes maher na | $10,000 | |
| Dec 29, 2016 | Never finaled issued Jan 2017, no final | 390 Laurel St | R.E. Bradley Gen. Bld Cont | ste #301: t.i. for a 1,471 sf dental office, interior non bearing walls, t-bar ceiling, light fixtures,new supply/return ducts from existing hvac handicap lav, related plumbing and electrical; maher n/aDetails
ste #301: t.i. for a 1,471 sf dental office, interior non bearing walls, t-bar ceiling, light fixtures,new supply/return ducts from existing hvac handicap lav, related plumbing and electrical; maher n/a | $176,500 |
| Nov 22, 2016 | Expired or cancelled withdrawn May 2017 | 3801 17th St | M R Christensen Construction Inc | admin only: change of use from "limited restaurant" to "full service restaurant" ref pa #2016-0616-0136. applying for type 41 license.Details
admin only: change of use from "limited restaurant" to "full service restaurant" ref pa #2016-0616-0136. applying for type 41 license. | |
| Nov 7, 2016 | Completed final sign-off Aug 2017 | 220 Montgomery St | M R Christensen Construction Inc | suite 126 - the sandwich shop to restaurant, new equipments, new millwork, update dining finish. all interior work. no exterior work. n/a maher ordinanceDetails
suite 126 - the sandwich shop to restaurant, new equipments, new millwork, update dining finish. all interior work. no exterior work. n/a maher ordinance | $140,000 |
| Oct 11, 2016 | Never finaled issued Oct 2016, no final | 390 Laurel St | R.E. Bradley Gen. Bld Cont | suite 301 -demolition of non structural tenant improvement of a existing 1471 sq ft vacant medical office space. ab-007 applies.Details
suite 301 -demolition of non structural tenant improvement of a existing 1471 sq ft vacant medical office space. ab-007 applies. | $5,500 |
| Aug 9, 2016 | Completed final sign-off Dec 2016 | 1424 Lombard St | D M S Builders | construct new sushi bar, add additional hand wash sinks per health dept requirement. replace cooking equipments, upgrade exisitng restroom to meet ada requirement; maher n/aDetails
construct new sushi bar, add additional hand wash sinks per health dept requirement. replace cooking equipments, upgrade exisitng restroom to meet ada requirement; maher n/a | $35,000 |
| May 20, 2016 | Never finaled issued Jun 2016, no final | 2300 Sutter St | R.E. Bradley Gen. Bld Cont | suite 205: barrier removal of 30" doors. replace exam work stations, new handicap reception counter, replace fluorescent lights with led in exam rooms, related electrical and plumbing work.Details
suite 205: barrier removal of 30" doors. replace exam work stations, new handicap reception counter, replace fluorescent lights with led in exam rooms, related electrical and plumbing work. | $18,500 |
| Aug 18, 2015 | Never finaled issued Sep 2015, no final | 2300 Sutter St | R.E. Bradley Gen. Bld Cont | unit 204, 2nd floor: ti - add 462 sq of adjacent ofc space to (e) dental ofc. remodel partition creating staff rm, operatories, lab/steralization, construct new handicap staff/patient accessible business area.Details
unit 204, 2nd floor: ti - add 462 sq of adjacent ofc space to (e) dental ofc. remodel partition creating staff rm, operatories, lab/steralization, construct new handicap staff/patient accessible business area. | $50,000 |
| May 18, 2015 | Never finaled issued Jun 2015, no final | 25 Beale St | demo existing milolwork add new millwork, add new equipement. no change to existing hood, relocate non structural partitionDetails
demo existing milolwork add new millwork, add new equipement. no change to existing hood, relocate non structural partition | $70,000 | |
| Dec 29, 2014 | Completed final sign-off Aug 2015 | 490 Post St | B W H Builder Inc. | 10th floor suite 1004 interior tenant improvements: new prtitions, door & hardward, private lav, casework, service counter. n/a maher ordinanceDetails
10th floor suite 1004 interior tenant improvements: new prtitions, door & hardward, private lav, casework, service counter. n/a maher ordinance | $22,100 |
| Dec 17, 2014 | Completed final sign-off Aug 2015 | 50 Post St | Grand Electric & Construction Co. | change restaurant on 3rd floor to deli with kitchen - remove existing millwork, add new millwork, add new equipment.Details
change restaurant on 3rd floor to deli with kitchen - remove existing millwork, add new millwork, add new equipment. | $30,000 |
| Nov 17, 2014 | Completed final sign-off Jun 2015 | 490 Post St | Rivera Builders | suite 824: interior t.i. staff area, storage room, new office, new lighting, new interior finishes, related elec & plumbing; maher n/aDetails
suite 824: interior t.i. staff area, storage room, new office, new lighting, new interior finishes, related elec & plumbing; maher n/a | $45,000 |
| Nov 14, 2014 | Completed final sign-off Jul 2015 | 3303 Mission St | D M S Builders | demo of interior millwork to non structural partition wall per ab017Details
demo of interior millwork to non structural partition wall per ab017 | $3,000 |
| Oct 23, 2014 | Completed final sign-off Mar 2015 | 490 Post St | Wells Construction Inc | interior t.i. new t bar ceiling, lighting, casework and partition related plumbing and electrical, demo 2 walls.Details
interior t.i. new t bar ceiling, lighting, casework and partition related plumbing and electrical, demo 2 walls. | $57,000 |
| Sep 17, 2014 | Never finaled issued Sep 2014, no final | 490 Post St | Adam Lewis Construction Company | remove t bar ceiling and open walls to expose existing conditions. demo per ab-17. t.i. on seperate permit to follow. n/a ordinance #155-13.Details
remove t bar ceiling and open walls to expose existing conditions. demo per ab-17. t.i. on seperate permit to follow. n/a ordinance #155-13. | $10,000 |
| Aug 19, 2014 | Completed final sign-off Feb 2015 | 490 Post St | Mc Dermott Construction | suite #1415:14th flr, ste 1415: interior tenant improvements, new partitions and door, floor sink related electrical and plumbing, demo existing walls.Details
suite #1415:14th flr, ste 1415: interior tenant improvements, new partitions and door, floor sink related electrical and plumbing, demo existing walls. | $24,000 |
| Jun 16, 2014 | Completed final sign-off Oct 2014 | 490 Post St | Solstice Enterprises Inc. | interior t.i., demo existing improvements, construct 5 new offices, reception area, new lighting, electrical & low voltage system, remove 4 sinks. n/a ordinance #155-13.Details
interior t.i., demo existing improvements, construct 5 new offices, reception area, new lighting, electrical & low voltage system, remove 4 sinks. n/a ordinance #155-13. | $70,980 |
| Apr 21, 2014 | Completed final sign-off Jun 2014 | 490 Post St | Dooher Construction | 8th floor suite 830 - interior t.i. construct 3 offices, storage room & staff area, new ceiling & lighting, new inteiror finishes. compliance with ordinance #155-13 not requiredDetails
8th floor suite 830 - interior t.i. construct 3 offices, storage room & staff area, new ceiling & lighting, new inteiror finishes. compliance with ordinance #155-13 not required | $125,000 |
| Mar 27, 2014 | Never finaled issued Mar 2014, no final | 490 Post St | Dooher Construction | #830- demo staff room, 40' of wall & doors, install new entry door into suite. na ordinance #155-13Details
#830- demo staff room, 40' of wall & doors, install new entry door into suite. na ordinance #155-13 | $9,500 |
| Mar 12, 2014 | Never finaled issued Jun 2014, no final | 1446 Market St | revision of pa#201210182325, re-arrange equipment and cooking station in kitchen area, bar counter service with seating layout and dining area table and seating. new occupant load of 170. na ordiannce #155-13. n/a interim controlDetails
revision of pa#201210182325, re-arrange equipment and cooking station in kitchen area, bar counter service with seating layout and dining area table and seating. new occupant load of 170. na ordiannce #155-13. n/a interim control | ||
| Mar 5, 2014 | Completed final sign-off Jun 2014 | 1700 California St | Westridge Builders, Inc. | suite #205: t.i. to 924 sq ft for a dental office. construct interior partitions for business office , operatories dental support areas,and casework. related plmg and electrical work. n/a for the maher ordinance #155-13Details
suite #205: t.i. to 924 sq ft for a dental office. construct interior partitions for business office , operatories dental support areas,and casework. related plmg and electrical work. n/a for the maher ordinance #155-13 | $92,400 |
| Mar 5, 2014 | Completed final sign-off Sep 2014 | 490 Post St | Dooher Construction | t.i. to 723 sq ft. office, demo extg interior partitions. construct new reception/business,operatories, dental support areas, related electrical and plmg work new interior finishes. n/a for the maher ordinance #155-13Details
t.i. to 723 sq ft. office, demo extg interior partitions. construct new reception/business,operatories, dental support areas, related electrical and plmg work new interior finishes. n/a for the maher ordinance #155-13 | $80,000 |
| Aug 21, 2013 | Never finaled issued Aug 2013, no final | 490 Post St | Dooher Construction | interior ti: partitons, handicap lavatory, exam room, offices, casework. interior finishes. related plumbing, elec workDetails
interior ti: partitons, handicap lavatory, exam room, offices, casework. interior finishes. related plumbing, elec work | $120,500 |
| Jul 29, 2013 | Completed final sign-off Sep 2013 | 490 Post St | S F Bay Construction Inc | 10th floor-remove several sections of interior office walls, install 5 new doors with new glass enclosed conference toom. related electrical. remove 3 sinksDetails
10th floor-remove several sections of interior office walls, install 5 new doors with new glass enclosed conference toom. related electrical. remove 3 sinks | $23,000 |
| May 24, 2013 | Completed final sign-off Aug 2013 | 490 Post St | Dooher Construction | #644- interior tenant improvement for business office, interior walls, doors, casework, trim and finishes. t-bar ceiling & lights, new sinks.Details
#644- interior tenant improvement for business office, interior walls, doors, casework, trim and finishes. t-bar ceiling & lights, new sinks. | $51,000 |
| Apr 29, 2013 | Completed final sign-off Aug 2013 | 490 Post St | Dooher Construction | suite 356: remove 3 interior wall, non structural for 967 sf of vacant office space ab-017Details
suite 356: remove 3 interior wall, non structural for 967 sf of vacant office space ab-017 | $1,500 |
| Sep 5, 2012 | Never finaled issued Oct 2012, no final | 291 Geary St | Dooher Construction | 3rd floor suite 300 - non-structural tenant improvement. change from office to a dental office, inteior partitions, doors, casework, related electrical & plumbing, partial raised floor for plumbing vents & dental equipment. sprinklers and fire alarm separate permitDetails
3rd floor suite 300 - non-structural tenant improvement. change from office to a dental office, inteior partitions, doors, casework, related electrical & plumbing, partial raised floor for plumbing vents & dental equipment. sprinklers and fire alarm separate permit | $177,400 |
| Jul 26, 2012 | Completed final sign-off Jul 2013 | 490 Post St | Hendrickson Construction | remodel existing dental office, non structural walls, doors, ceiling, cabinets. related electrical and lighting. accessible lav, new finishesDetails
remodel existing dental office, non structural walls, doors, ceiling, cabinets. related electrical and lighting. accessible lav, new finishes | $102,000 |
| Jul 13, 2012 | Completed final sign-off Feb 2020 | 645 Larkin St | All Applied Construction Inc | change of use. tenant improvement of former tatoo parlor to restaurant on ground floor.Details
change of use. tenant improvement of former tatoo parlor to restaurant on ground floor. | $238,000 |
| Jun 26, 2012 | Completed final sign-off Dec 2012 | 291 Geary St | Dooher Construction | suite 610: interior t.i. remodel for a dental office, electrical, plumbing, casework and new finishes. hvac under separate permit.Details
suite 610: interior t.i. remodel for a dental office, electrical, plumbing, casework and new finishes. hvac under separate permit. | $82,875 |
| Jun 15, 2012 | Completed final sign-off Sep 2012 | 2029 Market St | D M S Builders | revision to pa# 201206041753: addition of light pendant above bar.Details
revision to pa# 201206041753: addition of light pendant above bar. | $4,000 |
| Feb 22, 2012 | Completed final sign-off Oct 2012 | 3208 Mission St | American Technologies Inc | interior t.i. partitions, doors, cabinets, related electrical, plumbing & mechanical. 2 new w/c, lavs, exterior work. new accessbile entry doors.Details
interior t.i. partitions, doors, cabinets, related electrical, plumbing & mechanical. 2 new w/c, lavs, exterior work. new accessbile entry doors. | $180,000 |
| Aug 17, 2011 | Never finaled issued Aug 2011, no final | 1055 Taraval St | All Applied Construction Inc | non structural interior demo, remove carpets, furnitures, some equipments & low walls. per ab-017.Details
non structural interior demo, remove carpets, furnitures, some equipments & low walls. per ab-017. | $5,000 |
| Dec 30, 2010 | Completed final sign-off Nov 2011 | 231 Franklin St | Yes Construction Group Inc | interior only. empty tenant space to restaurant, first time tenant improvement.Details
interior only. empty tenant space to restaurant, first time tenant improvement. | $140,000 |
| Jun 16, 2010 | Completed final sign-off Sep 2010 | 650 Florida St | Phollies Russ Murphy Inc. | revision to pa# 2010-0125-5241-change t-24 information & d.a. checklist. suite lDetails
revision to pa# 2010-0125-5241-change t-24 information & d.a. checklist. suite l | |
| Apr 27, 2010 | Completed final sign-off Jul 2010 | 3431 Scott St | J R W Construction Inc | termite repair work per report on items# 2a,3a,3b,3c,5a,5b. work to include replace two rear balconies/decks, repair mud sills in garage, front stair stringers and side stairsDetails
termite repair work per report on items# 2a,3a,3b,3c,5a,5b. work to include replace two rear balconies/decks, repair mud sills in garage, front stair stringers and side stairs | $40,000 |
| Jan 25, 2010 | Completed final sign-off Sep 2010 | 650 Florida St | Phollies Russ Murphy Inc. | suite "l" - handicapped lav, interior partitions, related mech., elec., & plumbing, metal guard & steps.Details
suite "l" - handicapped lav, interior partitions, related mech., elec., & plumbing, metal guard & steps. | $18,500 |
| Feb 26, 2009 | Completed final sign-off Oct 2009 | 490 Post St | R.E. Bradley Gen. Bld Cont | work @ suite# 1516 only. non-structural tenant improvement 310 sq.ft. office space. interior partition, millwork related electrical & plumbing, switches, outlets & lighting. new interior finishes.Details
work @ suite# 1516 only. non-structural tenant improvement 310 sq.ft. office space. interior partition, millwork related electrical & plumbing, switches, outlets & lighting. new interior finishes. | $35,000 |
| Dec 19, 2008 | Completed final sign-off Apr 2009 | 205 Oak St | Golden Seal General Construction | relocating existing equipment, new refrigeration /freezer, repalce main entrance door, new interior partition & millwork.Details
relocating existing equipment, new refrigeration /freezer, repalce main entrance door, new interior partition & millwork. | $45,000 |
| Oct 14, 2008 | Expired or cancelled expired Sep 2010 | 490 Post St | Dooher Construction | non structural tenant improvements, interior partitions, millwork, electrical, lighting outlet plmg, sinks, handicaptoilet. new finishesDetails
non structural tenant improvements, interior partitions, millwork, electrical, lighting outlet plmg, sinks, handicaptoilet. new finishes | $90,000 |
| Jun 6, 2008 | Completed final sign-off Jan 2009 | 260 Stockton St | Dooher Construction | 5th floor-non structural tenant improvements of interior partitions, millwork, electrical, plumbing. interior finishes, new hvac ductsDetails
5th floor-non structural tenant improvements of interior partitions, millwork, electrical, plumbing. interior finishes, new hvac ducts | $100,000 |
| Apr 27, 2007 | Completed final sign-off Oct 2007 | 77 Battery St | All Applied Construction Inc | remodel existing vacant drug store into a restaurant (full service) change of use.Details
remodel existing vacant drug store into a restaurant (full service) change of use. | $70,000 |
| Jan 13, 2005 | Expired or cancelled expired Mar 2006 | 998 Sutter St | Dooher Construction | rev. to appl#200410287953 revised storefront onlyDetails
rev. to appl#200410287953 revised storefront only | $4,000 |