R.E. Bradley Gen. Bld Cont
- Based in
- Napa
- On San Francisco permits
- Mar 2002 to Dec 2016
- Last 24 months
- 0 permits filed
21 permits since 2000: 14 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 29, 2016 | Never finaled issued Jan 2017, no final | 390 Laurel St | ste #301: t.i. for a 1,471 sf dental office, interior non bearing walls, t-bar ceiling, light fixtures,new supply/return ducts from existing hvac handicap lav, related plumbing and electrical; maher n/aDetails
ste #301: t.i. for a 1,471 sf dental office, interior non bearing walls, t-bar ceiling, light fixtures,new supply/return ducts from existing hvac handicap lav, related plumbing and electrical; maher n/a | $176,500 |
| Oct 11, 2016 | Never finaled issued Oct 2016, no final | 390 Laurel St | suite 301 -demolition of non structural tenant improvement of a existing 1471 sq ft vacant medical office space. ab-007 applies.Details
suite 301 -demolition of non structural tenant improvement of a existing 1471 sq ft vacant medical office space. ab-007 applies. | $5,500 |
| May 20, 2016 | Never finaled issued Jun 2016, no final | 2300 Sutter St | suite 205: barrier removal of 30" doors. replace exam work stations, new handicap reception counter, replace fluorescent lights with led in exam rooms, related electrical and plumbing work.Details
suite 205: barrier removal of 30" doors. replace exam work stations, new handicap reception counter, replace fluorescent lights with led in exam rooms, related electrical and plumbing work. | $18,500 |
| Feb 19, 2016 | Completed final sign-off Mar 2016 | 2172 Mission St | interior demo; maher n/aDetails
interior demo; maher n/a | $8,000 |
| Aug 18, 2015 | Never finaled issued Sep 2015, no final | 2300 Sutter St | unit 204, 2nd floor: ti - add 462 sq of adjacent ofc space to (e) dental ofc. remodel partition creating staff rm, operatories, lab/steralization, construct new handicap staff/patient accessible business area.Details
unit 204, 2nd floor: ti - add 462 sq of adjacent ofc space to (e) dental ofc. remodel partition creating staff rm, operatories, lab/steralization, construct new handicap staff/patient accessible business area. | $50,000 |
| Sep 10, 2010 | Expired or cancelled expired Mar 2013 | 2301 Ocean Av | revision to 200911161318: to show sidewalk encroachment on necessary, removed from scope. railing at step and ram not necessaryDetails
revision to 200911161318: to show sidewalk encroachment on necessary, removed from scope. railing at step and ram not necessary | |
| Jun 15, 2010 | Completed final sign-off Jan 2011 | 212 Clement St | proposed a clothes retail store to (e) retail store @ ground flr.Details
proposed a clothes retail store to (e) retail store @ ground flr. | $30,000 |
| May 11, 2010 | Completed final sign-off Dec 2010 | 1420 Clement St | converting a vacant retail store in a dental office with no change to storefront. replace 4 e windows with 3 at rear, 1 at side lightwell. install 2 ada complying restrooms. e hvac stystem to be modified under separate per permitDetails
converting a vacant retail store in a dental office with no change to storefront. replace 4 e windows with 3 at rear, 1 at side lightwell. install 2 ada complying restrooms. e hvac stystem to be modified under separate per permit | $130,000 |
| Dec 2, 2009 | Completed final sign-off Jan 2010 | 2480 Mission St | suite 219 ti. revision to pa# 2009.11.02.0358. new ceiling, t-bar grid, light fixtures, cylinder closet, handicap reception counter.Details
suite 219 ti. revision to pa# 2009.11.02.0358. new ceiling, t-bar grid, light fixtures, cylinder closet, handicap reception counter. | $20,000 |
| Nov 16, 2009 | Completed final sign-off Sep 2010 | 2301 Ocean Av | (e) two office tenant spaces. work includes base bldg improvements (n)ext. ramp, windowenlargements, ada restroom with a ti improvement project that develops one of the spaces into new dental office, and the 2nd space as vacant. work to include (n) walls, millwork,finihes.mep under separate permitDetails
(e) two office tenant spaces. work includes base bldg improvements (n)ext. ramp, windowenlargements, ada restroom with a ti improvement project that develops one of the spaces into new dental office, and the 2nd space as vacant. work to include (n) walls, millwork,finihes.mep under separate permit | $220,000 |
| Mar 17, 2009 | Completed final sign-off Aug 2009 | 2445 Clement St | dental t.i. demo, new walls, electrical,plumg, finishes. hvac under seperate permit.Details
dental t.i. demo, new walls, electrical,plumg, finishes. hvac under seperate permit. | $150,000 |
| Feb 26, 2009 | Completed final sign-off Oct 2009 | 490 Post St | work @ suite# 1516 only. non-structural tenant improvement 310 sq.ft. office space. interior partition, millwork related electrical & plumbing, switches, outlets & lighting. new interior finishes.Details
work @ suite# 1516 only. non-structural tenant improvement 310 sq.ft. office space. interior partition, millwork related electrical & plumbing, switches, outlets & lighting. new interior finishes. | $35,000 |
| Jun 17, 2008 | Never finaled issued Jul 2008, no final | 219 Clement St | remodel existing 2nd floor office space to accomodate new dental office, including relocating bathroom, new kitchenette and new stairs. planing has approved conditional use. replace 5 windows at front, add 1 window to lightwell, new door to existing rear deck.Details
remodel existing 2nd floor office space to accomodate new dental office, including relocating bathroom, new kitchenette and new stairs. planing has approved conditional use. replace 5 windows at front, add 1 window to lightwell, new door to existing rear deck. | $62,000 |
| Jun 10, 2008 | Completed final sign-off Dec 2008 | 2480 Mission St | dental office tenant improvement, new walls, doors,ceiling, lighting, electrical, plumbing, hvac improvements.Details
dental office tenant improvement, new walls, doors,ceiling, lighting, electrical, plumbing, hvac improvements. | $125,000 |
| Apr 4, 2008 | Never finaled issued Apr 2008, no final | 217 Clement St | remodel existing ground floor office for new dental office, 1st floor only, new awningDetails
remodel existing ground floor office for new dental office, 1st floor only, new awning | $165,000 |
| Feb 8, 2008 | Completed final sign-off Jul 2008 | 114 Sansome St | suite 715:interior non structural tenant improvements to include building new partitions, new cabinetry, finishes, dental equipementDetails
suite 715:interior non structural tenant improvements to include building new partitions, new cabinetry, finishes, dental equipement | $275,000 |
| Nov 26, 2007 | Completed final sign-off Feb 2008 | 1151 Washington St | @ garage furr down ceiling apox 4" using 20 gauge metal studs. insulate (e) floor joist w/r-30 insulation. install 5/8 type wall to walls & ceiling (finish smooth).Details
@ garage furr down ceiling apox 4" using 20 gauge metal studs. insulate (e) floor joist w/r-30 insulation. install 5/8 type wall to walls & ceiling (finish smooth). | $3,500 |
| Oct 24, 2007 | Completed final sign-off Feb 2008 | 1151 Washington St | dryort repai of approx 78"x20' cantileavard plant pourch. in kind repair.Details
dryort repai of approx 78"x20' cantileavard plant pourch. in kind repair. | $4,500 |
| Sep 28, 2006 | Completed final sign-off Feb 2008 | 801 Taraval St | interior remodel for a dental office. seismic upgrade at first floor & basement.Details
interior remodel for a dental office. seismic upgrade at first floor & basement. | $150,000 |
| Nov 24, 2004 | Completed final sign-off Feb 2005 | 330 Townsend St | structural infornation for apprvv plan3200407158880, for slab depression at entry way.Details
structural infornation for apprvv plan3200407158880, for slab depression at entry way. | $3,000 |
| Mar 8, 2002 | Completed final sign-off Jul 2002 | 4851 Mission St | non bearing walls,plumbing,electrical work.suspended ceiling,lighting.sprinklers separate permit.Details
non bearing walls,plumbing,electrical work.suspended ceiling,lighting.sprinklers separate permit. | $25,000 |