114 permits since 2000 (engineer on 102 permits, architect on 8 permits, authorized agent-others on 2 permits, designer on 2 permits): 72 completed, 17 in progress, 18 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 114.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 6, 2026 | In progress filed Jul 2026, not yet issued | 1731 34th Av | convert 1/f garage and storage area to adu. ad wood shearwalls in transverst and longitudinal directions. voluntary partial lateral strengthening. replace rear yard sog patio with raised wood framed deck. reframe deteriorating 2/f balcony.Details
convert 1/f garage and storage area to adu. ad wood shearwalls in transverst and longitudinal directions. voluntary partial lateral strengthening. replace rear yard sog patio with raised wood framed deck. reframe deteriorating 2/f balcony. | $45,000 | |
| Apr 27, 2026 | In progress filed Apr 2026, not yet issued | 3621 Clay St | The Toboni Group | revision 202211287189 to include repalcement at gridlines 1-2/c-f1 and adjustment to moment frame along gle and removal of posts at rear deck. cantivlevered deck joists.Details
revision 202211287189 to include repalcement at gridlines 1-2/c-f1 and adjustment to moment frame along gle and removal of posts at rear deck. cantivlevered deck joists. | $15,000 |
| Jan 28, 2026 | Expired or cancelled cancelled Feb 2026 | 1731 34th Av | convert 1/f garage and storage area to an adu. add wood shearwalls in the transverse and longitudinal directions in areas where construction wil be performed. voluntary partial lateral strengthening.Details
convert 1/f garage and storage area to an adu. add wood shearwalls in the transverse and longitudinal directions in areas where construction wil be performed. voluntary partial lateral strengthening. | $45,000 | |
| Oct 24, 2025 | In progress issued Oct 2025 | 3621 Clay St | The Toboni Group | revision to pa # 202510036747 sideyard finishes.Details
revision to pa # 202510036747 sideyard finishes. | $2 |
| Oct 17, 2025 | Completed final sign-off May 2026 | 4135 California St | Seamus Collins Construction, Inc. | 2 set of metal stairs to be installed at the 4135 california st stair#1 along cornwall st and stair #2 along california st.Details
2 set of metal stairs to be installed at the 4135 california st stair#1 along cornwall st and stair #2 along california st. | $150,000 |
| Oct 3, 2025 | In progress issued Oct 2025 | 3621 Clay St | The Toboni Group | sideyard concrete slab replacementDetails
sideyard concrete slab replacement | $6,000 |
| Sep 9, 2025 | In progress issued Feb 2026 | 351 Hill St | Maguire Construction | single family residence remodel + addition of adu unit at ground level. vertical addition to add 3rd level. (n) roof, improvements: floor reconfiguration, (n) windows, (n) facade, (n) rear decksDetails
single family residence remodel + addition of adu unit at ground level. vertical addition to add 3rd level. (n) roof, improvements: floor reconfiguration, (n) windows, (n) facade, (n) rear decks | $900,000 |
| Jun 2, 2025 | In progress issued Aug 2025 | 3575 Clay St | The Toboni Group | rev 202411265790: revise framing at new dormer, rmove framing for previously proposed chimney and beam & retianing wall revisions.Details
rev 202411265790: revise framing at new dormer, rmove framing for previously proposed chimney and beam & retianing wall revisions. | |
| Mar 14, 2025 | Completed final sign-off May 2026 | 16 West Clay St | Urbnbuild Inc | minor horizontal addition at 3rd level only. (180 sq ft). at front of home: new closet & exercise space. addition is setback from facade by 5'-3". remove non-historic balaustrades at front, side & rear facades reconstructing closer to original design. reconstruct clay tile rooflets over two frontDetails
minor horizontal addition at 3rd level only. (180 sq ft). at front of home: new closet & exercise space. addition is setback from facade by 5'-3". remove non-historic balaustrades at front, side & rear facades reconstructing closer to original design. reconstruct clay tile rooflets over two front | $50,000 |
| Mar 4, 2025 | In progress issued Mar 2025 | 1650 Broadway | Murphymckenna Construction | rev to pa# 2021-1108-2028: scope reduction interior remodel of 7th fl. penthouse, to increase the size of ph.1 (701) conditional use requiredDetails
rev to pa# 2021-1108-2028: scope reduction interior remodel of 7th fl. penthouse, to increase the size of ph.1 (701) conditional use required | |
| Mar 4, 2025 | In progress issued Mar 2025 | 1650 Broadway | Murphymckenna Construction | rev to pa# 2024-0308-7483: scope reduction interior remodel of 7th fl. penthouse to reduce the size of unit #702 (ph2) conditional use required.Details
rev to pa# 2024-0308-7483: scope reduction interior remodel of 7th fl. penthouse to reduce the size of unit #702 (ph2) conditional use required. | |
| Dec 24, 2024 | In progress issued May 2025 | 3575 Clay St | The Toboni Group | new dormer. fill in 56 sq ft on level 1. demo e construct new partitons, structural and non structural . excavate basement and add new rooms. removel and add new baths and kitchen. new lighting and electrical.Details
new dormer. fill in 56 sq ft on level 1. demo e construct new partitons, structural and non structural . excavate basement and add new rooms. removel and add new baths and kitchen. new lighting and electrical. | $850,000 |
| Dec 17, 2024 | In progress filed Dec 2024, not yet issued | 5400 Geary Bl | planning enforcement case # 2022-012075enf. includes but not limited to: interior cleaning/ removal of debris. provide protection of (e) interior features & murals. reconstruct blade sign & support tower. repair marquee & stabilize finish consition. repair vitrines. reinstall marquee soffit.Details
planning enforcement case # 2022-012075enf. includes but not limited to: interior cleaning/ removal of debris. provide protection of (e) interior features & murals. reconstruct blade sign & support tower. repair marquee & stabilize finish consition. repair vitrines. reinstall marquee soffit. | $250,000 | |
| Dec 17, 2024 | In progress filed Dec 2024, not yet issued | 5400 Geary Bl | reconstruct blade sign - electric, roof, double faced wall sign.Details
reconstruct blade sign - electric, roof, double faced wall sign. | $159,234 | |
| Nov 1, 2024 | In progress issued Nov 2024 | 1205 Van Dyke Av | remove and replace existing concrete retaining wall and sheet metal fence, all work to be performed along hawes street and van dyke avenue.Details
remove and replace existing concrete retaining wall and sheet metal fence, all work to be performed along hawes street and van dyke avenue. | $15,000 | |
| Aug 19, 2024 | Completed final sign-off Mar 2025 | 19 Delano Av | A-1 Dynamic Builders Inc. | revision to 202401244520 partial voluntary rebuild of existing foundation. no work visible from street. strengthening of ground floor.Details
revision to 202401244520 partial voluntary rebuild of existing foundation. no work visible from street. strengthening of ground floor. | $30,000 |
| Aug 7, 2024 | Completed final sign-off Aug 2025 | 18 Palm Av | Blue Bend Construction Inc | voluntary structural strengthening - adding one steel moment frame and one shearwall.Details
voluntary structural strengthening - adding one steel moment frame and one shearwall. | $100,000 |
| Jun 11, 2024 | Completed final sign-off Nov 2024 | 3400 Mission St | New World Construction Inc | partial abate 20244418-remove and replace non structrual elements damaged by smoke and fire (work on south wall)Details
partial abate 20244418-remove and replace non structrual elements damaged by smoke and fire (work on south wall) | $2,000 |
| Apr 23, 2024 | Completed final sign-off Aug 2025 | 1146 Taylor St | Cal Am Construction Inc. | to abate nov 202422441 (items 2 & 3) and 202303442- repair facade in stucco facing front of building and waterproof exterior.Details
to abate nov 202422441 (items 2 & 3) and 202303442- repair facade in stucco facing front of building and waterproof exterior. | $30,000 |
| Apr 5, 2024 | In progress issued Apr 2024 | 3621 Clay St | The Toboni Group | perimeter site retaining walls. (at rear)Details
perimeter site retaining walls. (at rear) | $15,000 |
| Mar 8, 2024 | In progress issued Mar 2024 | 1650 Broadway | Murphymckenna Construction | ph2: interior remodel to reduce the size of unit 702 (ph2). conditional use required. ref pa 202111082028.Details
ph2: interior remodel to reduce the size of unit 702 (ph2). conditional use required. ref pa 202111082028. | $150,000 |
| Dec 19, 2023 | Completed final sign-off Jul 2024 | 3731 23rd St | M F Construction, Reliable Construction Inc | install beam at garage. replace rear windows in kind. install sheetrock in garage under stair and wall. legalize storage rooms at g/f.Details
install beam at garage. replace rear windows in kind. install sheetrock in garage under stair and wall. legalize storage rooms at g/f. | $35,000 |
| Oct 18, 2023 | Completed final sign-off Dec 2023 | 855 Fell St | remove (e) double french doors and replace with single door.Details
remove (e) double french doors and replace with single door. | $6,000 | |
| Sep 1, 2023 | In progress issued Aug 2026 | 538 44th Av | partial conversion of existing ground floor storage/garage to conditioned space. horizontal addition into rear yard. horizontal addition on level 2 and level 3.Details
partial conversion of existing ground floor storage/garage to conditioned space. horizontal addition into rear yard. horizontal addition on level 2 and level 3. | $600,000 | |
| Aug 7, 2023 | Completed final sign-off Aug 2024 | 20 Walnut St | Cairn Construction | 1st fl: remove (e) gas fireplace, add new gas fireplace. raise head height at (e) window. 2nd fl: add flue for new 1st fl gas fireplace. new office doors. 3rd fl: cut out opening in roof for new recessed family room window. add new folding door system. add new chimney, add new coffee bar. removeDetails
1st fl: remove (e) gas fireplace, add new gas fireplace. raise head height at (e) window. 2nd fl: add flue for new 1st fl gas fireplace. new office doors. 3rd fl: cut out opening in roof for new recessed family room window. add new folding door system. add new chimney, add new coffee bar. remove | $285,000 |
| Apr 25, 2023 | Completed final sign-off Dec 2023 | 766 33rd Av | Maguire Construction | revision to pa# 202211156505, minor shearwall revisionsDetails
revision to pa# 202211156505, minor shearwall revisions | |
| Mar 17, 2023 | Completed final sign-off Mar 2023 | 101 Teresita Bl | Maguire Construction | cover (e) slab on grade w/ wood decking, add wood stairs and cover (e) rubble wall with wood screen wallDetails
cover (e) slab on grade w/ wood decking, add wood stairs and cover (e) rubble wall with wood screen wall | $800 |
| Dec 20, 2022 | Completed final sign-off Jul 2023 | 2150 Green St | Mountain Bay Construction | revision to permit 202111031702. minor underpinning of rear wall.Details
revision to permit 202111031702. minor underpinning of rear wall. | |
| Nov 30, 2022 | Completed final sign-off Nov 2023 | 755 Burnett Av | Thomas Doherty Construction Dba Doherty | supplemental deck supportDetails
supplemental deck support | $10,000 |
| Nov 30, 2022 | Never finaled issued May 2023, no final | 795 Burnett Av | Thomas Doherty Construction Dba Doherty | supplemental deck supportDetails
supplemental deck support | $10,000 |
| Nov 30, 2022 | Completed final sign-off Nov 2023 | 765 Burnett Av | Thomas Doherty Construction Dba Doherty | supplemental deck supportDetails
supplemental deck support | $10,000 |
| Nov 28, 2022 | Never finaled issued Sep 2023, no final | 3621 Clay St | The Toboni Group | main sfr building - interior: excavation at level 1 to 9'6", wall reconfigurations, (n) kitchen, baths, electrical, lighting and radiant heating system. exterior: add 12' wide garage door. (n) dormer. gable roof, deck at level 2 & 4. (n) siding, wood clad windows, doors.(n) roof, colums & entry doorDetails
main sfr building - interior: excavation at level 1 to 9'6", wall reconfigurations, (n) kitchen, baths, electrical, lighting and radiant heating system. exterior: add 12' wide garage door. (n) dormer. gable roof, deck at level 2 & 4. (n) siding, wood clad windows, doors.(n) roof, colums & entry door | $2,400,000 |
| Nov 28, 2022 | Never finaled issued Sep 2023, no final | 3621 Clay St | The Toboni Group | existing detached carport to be converted to new adu under state program government code 65852.2. enclose shed, (n) siding, windows, doors, kitchen, bath, skylight, finishes and fixtures.Details
existing detached carport to be converted to new adu under state program government code 65852.2. enclose shed, (n) siding, windows, doors, kitchen, bath, skylight, finishes and fixtures. | $200,000 |
| Nov 15, 2022 | Completed final sign-off Dec 2023 | 766 33rd Av | new habitable space (596sf) in garage. to include 2 bedrooms and new bath. remodel e kitchen and master bedroom suite.Details
new habitable space (596sf) in garage. to include 2 bedrooms and new bath. remodel e kitchen and master bedroom suite. | $386,000 | |
| Nov 15, 2022 | Completed final sign-off Jul 2023 | 1901 Pacific Av | Nextech Security Solutions | replace damaged wood bearing wall. ref #202205043561Details
replace damaged wood bearing wall. ref #202205043561 | $2,000 |
| May 31, 2022 | Completed final sign-off Apr 2023 | 1083 Portola Dr | Federico Cusigch | revision to pa# 202107154462. structural revision.Details
revision to pa# 202107154462. structural revision. | |
| Apr 20, 2022 | Completed final sign-off Mar 2023 | 101 Teresita Bl | Maguire Construction | add 1 bed, 2 bath to (e) garage w/2 closets, family, powder, laundry, & storage rm. infill lightwell on northeast. relocate int stairs. add powder rm. infill courtyard. (n) outdoor kitchen. enlarge (e) closet on 2nd fl. remodel bath #1. infill (e) skylights above kitchen. (n) skylight.Details
add 1 bed, 2 bath to (e) garage w/2 closets, family, powder, laundry, & storage rm. infill lightwell on northeast. relocate int stairs. add powder rm. infill courtyard. (n) outdoor kitchen. enlarge (e) closet on 2nd fl. remodel bath #1. infill (e) skylights above kitchen. (n) skylight. | $100,000 |
| Mar 10, 2022 | In progress issued Mar 2025 | 360 Claremont Bl | Embarcadero Enterprises Corporation | one proposed detached 1-story type-v, adu in rear yard. aul will be added per ca govt code 65852.2.Details
one proposed detached 1-story type-v, adu in rear yard. aul will be added per ca govt code 65852.2. | $30,000 |
| Mar 9, 2022 | Never finaled issued Aug 2022, no final | 554 Capp St | Oliver & Company Inc. | existing vacant cottage to be remodeled for use as music instruction space and restrooms. exterior improvements include a new roof, windows, doors, and paint.Details
existing vacant cottage to be remodeled for use as music instruction space and restrooms. exterior improvements include a new roof, windows, doors, and paint. | $350,000 |
| Jan 31, 2022 | Completed final sign-off Apr 2022 | 1527 Mcallister St | board of appeal no. 21-096. revision to bpa 202108277316. to comply with boa decision. infill hole in rear yard.Details
board of appeal no. 21-096. revision to bpa 202108277316. to comply with boa decision. infill hole in rear yard. | $20,000 | |
| Nov 22, 2021 | Completed final sign-off Oct 2022 | 284 Mallorca Wy | Maguire Construction | voluntary lateral strengthening. partial. add wood shear walls and foundations in 1st fl garage.Details
voluntary lateral strengthening. partial. add wood shear walls and foundations in 1st fl garage. | $14,000 |
| Aug 27, 2021 | Expired or cancelled cancelled Mar 2022 | 1527 Mcallister St | Maguire Construction | addition of wood deck in rear yard to cover excvated area from previous abandoned permit. to address nov 202178287Details
addition of wood deck in rear yard to cover excvated area from previous abandoned permit. to address nov 202178287 | $18,000 |
| Jul 23, 2021 | In progress issued Mar 2025 | 300 De Haro St | Thompson Builders Corp | 100% affordable housing mayor ed 13-01: erect a new 11 story, mixed use public housing facility with 425 sleeping units and common use facilities, and two commercial restaurant tenant spaces at ground floorDetails
100% affordable housing mayor ed 13-01: erect a new 11 story, mixed use public housing facility with 425 sleeping units and common use facilities, and two commercial restaurant tenant spaces at ground floor | $72,000,000 |
| Jul 15, 2021 | Completed final sign-off Jun 2022 | 275 Vernon St | Sean Michael Mchugh Construction | rebuild central stairs for improved access to all floors, replace 3 rer windows, create 1 (n) bathroom, add radiant floor heat @ lower 2 floors. new floor area. all work done within existing envelope.Details
rebuild central stairs for improved access to all floors, replace 3 rer windows, create 1 (n) bathroom, add radiant floor heat @ lower 2 floors. new floor area. all work done within existing envelope. | $20,000 |
| Jun 22, 2021 | Completed final sign-off Sep 2022 | 2353 Pacific Av | 4/f: new elevator, bathroom remodel. new electrical and plumbing work. new hatch skylight.Details
4/f: new elevator, bathroom remodel. new electrical and plumbing work. new hatch skylight. | $400,000 | |
| Apr 23, 2021 | Never finaled issued May 2021, no final | 1239 Union St | Prospect Construction Inc | voluntary seismic retrofitting of garage level and basement level.Details
voluntary seismic retrofitting of garage level and basement level. | $150,000 |
| Apr 16, 2021 | Completed final sign-off Jan 2023 | 65 Forest Side Av | to comply with nov# 202172479. repair all fire damage throughout the entirety of the home. work to be done on the 1st fl, 2nd fl and exterior of home including roof.Details
to comply with nov# 202172479. repair all fire damage throughout the entirety of the home. work to be done on the 1st fl, 2nd fl and exterior of home including roof. | $80,000 | |
| Mar 1, 2021 | Never finaled issued Jul 2021, no final | 1150 Monterey Bl | Lordan Construction | moving one wall in garage.Details
moving one wall in garage. | $50,000 |
| Jan 30, 2021 | Never finaled issued Sep 2022, no final | 2285 Jerrold Av | erect 6 stories commerical and self storage buildingDetails
erect 6 stories commerical and self storage building | $3,000,000 | |
| Jan 29, 2021 | Completed final sign-off Nov 2022 | 3103 Clay St | Cairn Construction | remove (e) deteriorated siding & trim on sides & rear of home & replace inkind.r/r in-kind deteriorating windows.front windows will be wood, side & rear wood w/ metal cladding.1/2in sheer plywood & waterproof membrane.fitness room added to lower level.skylights to foyer & pantry. no facade,prow.Details
remove (e) deteriorated siding & trim on sides & rear of home & replace inkind.r/r in-kind deteriorating windows.front windows will be wood, side & rear wood w/ metal cladding.1/2in sheer plywood & waterproof membrane.fitness room added to lower level.skylights to foyer & pantry. no facade,prow. | $120,000 |
| Jan 4, 2021 | Never finaled issued Oct 2023, no final | 2205 Mission St | Guzman Construction Group Inc. | priority mayor ed 13-01. to erect a type 1b, 9-story, 62 residential unit bldg with commercial space.Details
priority mayor ed 13-01. to erect a type 1b, 9-story, 62 residential unit bldg with commercial space. | $28,000,000 |
| Nov 24, 2020 | Completed final sign-off Jul 2021 | 880 25th Av | A M Rocca Inc. | voluntary seismic upgrade for residential apartments. structural only. no mep, no change to fixtures, no facade work, no work in public right of way.Details
voluntary seismic upgrade for residential apartments. structural only. no mep, no change to fixtures, no facade work, no work in public right of way. | $40,000 |
| Jul 10, 2020 | Completed final sign-off Oct 2022 | 311 Grove St | Noa Construction Llc, Granite Excavation & Demolition Inc | revision to issued addendum for pa# 201502269406-s1 & s3. due to added floor load. changes limited to added rebar. there are no geometry changes as a result of these increased loads.Details
revision to issued addendum for pa# 201502269406-s1 & s3. due to added floor load. changes limited to added rebar. there are no geometry changes as a result of these increased loads. | $1,000 |
| Apr 10, 2019 | Never finaled issued Mar 2022, no final | 166 Parker Av | erect (n) 4-story 2-unit residentialDetails
erect (n) 4-story 2-unit residential | $1,350,000 | |
| Feb 14, 2019 | Completed final sign-off Feb 2020 | 3415 Pacific Av | Cairn Construction | new roof deck. level 2, new stair from level 2 to roof with retractable skylight. roof new walkway from stair to new roof deckDetails
new roof deck. level 2, new stair from level 2 to roof with retractable skylight. roof new walkway from stair to new roof deck | $150,000 |
| Feb 12, 2019 | Completed final sign-off Sep 2020 | 490 South Van Ness Av | Nibbi Bros Assoc Inc. | tower crane. ref #2010/1005/2342Details
tower crane. ref #2010/1005/2342 | $200,000 |
| Feb 11, 2019 | Completed final sign-off Sep 2019 | 833 Corbett Av | mandatory soft-story retrofit in accordance w/ 2016 cebc appendix a-4Details
mandatory soft-story retrofit in accordance w/ 2016 cebc appendix a-4 | $50,000 | |
| Jan 30, 2019 | Never finaled issued Oct 2020, no final | 1964 Union St | Cal Am Construction Inc. | to erect a type 3-a, 2-story, 2-dwelling unit building- no basements.Details
to erect a type 3-a, 2-story, 2-dwelling unit building- no basements. | $525,000 |
| Oct 10, 2018 | Completed final sign-off Apr 2021 | 2146 Union St | Stronghold Builders Inc, Dliu Construction | revision to issued addendum 1 (superstructure) for pa #2016-10-25-1069 s.Details
revision to issued addendum 1 (superstructure) for pa #2016-10-25-1069 s. | |
| Oct 3, 2018 | Never finaled issued Oct 2018, no final | 18 Belvedere St | Narrowback Construction Co. | strengthen beam on 1st elevated floor under laundry roomDetails
strengthen beam on 1st elevated floor under laundry room | $10,000 |
| Jun 20, 2018 | Completed final sign-off Apr 2021 | 2888 Bush St | Sean Michael Mchugh Construction | vertical & horizontal addition. re-frame roof to create gable at rear wall. add (2) shed dormers. finish out attic floor level for bedroom, closets & master bath.Details
vertical & horizontal addition. re-frame roof to create gable at rear wall. add (2) shed dormers. finish out attic floor level for bedroom, closets & master bath. | $95,000 |
| May 23, 2018 | Completed final sign-off Apr 2021 | 2888 Bush St | Sean Michael Mchugh Construction | (n) concrete slab & foundation. finish out lower (garage) level. shift location of (e) garage door & driveway. renovate kitchen & bathrooms. build stair to attic level for future work, phase 2.Details
(n) concrete slab & foundation. finish out lower (garage) level. shift location of (e) garage door & driveway. renovate kitchen & bathrooms. build stair to attic level for future work, phase 2. | $400,000 |
| Apr 20, 2018 | Never finaled issued Apr 2018, no final | 530 08th Av | street spaceDetails
street space | ||
| Oct 20, 2017 | Expired or cancelled withdrawn Jan 2019 | 600 Alabama St | Principal Builders Inc. | core & shell upgrades to demo & reconstruct stairs, offices & restrooms in (e) tenant space & create communicating opening to 612-614 alabama street for expansion of tenant space. upgrade ada van parking. ** maher: n/a **Details
core & shell upgrades to demo & reconstruct stairs, offices & restrooms in (e) tenant space & create communicating opening to 612-614 alabama street for expansion of tenant space. upgrade ada van parking. ** maher: n/a ** | $154,000 |
| Oct 20, 2017 | Expired or cancelled withdrawn Jan 2019 | 612 Alabama St | Principal Builders Inc. | core & shell improvement to demo partitions & doors. install new ada hydranlic elevator to accomodate gurney. add fire rated doors, skylights, mechanical & plumbing system improvement. upgrade restrooms & create communicating openning to 600 alabama st to expand t.i. ** maher: n/a **Details
core & shell improvement to demo partitions & doors. install new ada hydranlic elevator to accomodate gurney. add fire rated doors, skylights, mechanical & plumbing system improvement. upgrade restrooms & create communicating openning to 600 alabama st to expand t.i. ** maher: n/a ** | $306,000 |
| Sep 14, 2017 | Completed final sign-off Aug 2019 | 607 Corbett Av | mandatory soft story retrofit per sfebc chapter 4d, 2016 cebc app a4.Details
mandatory soft story retrofit per sfebc chapter 4d, 2016 cebc app a4. | $40,000 | |
| Sep 5, 2017 | Completed final sign-off May 2018 | 211 27th Av | John P Brennan Co Inc. | soft story retrofitt per 2016 cebc appendix a-4Details
soft story retrofitt per 2016 cebc appendix a-4 | $24,000 |
| Sep 5, 2017 | Completed final sign-off Dec 2018 | 1126 Stanyan St | Kong's Plumbing & Construction Co. | soft story retrofitt per 2016 cebc appendix a-4Details
soft story retrofitt per 2016 cebc appendix a-4 | $15,000 |
| Sep 5, 2017 | Expired or cancelled withdrawn Jan 2020 | 755 Green St | soft story retrofitt per 2016 cebc appendix a-4Details
soft story retrofitt per 2016 cebc appendix a-4 | $30,000 | |
| Sep 5, 2017 | Completed final sign-off Sep 2022 | 1345 20th Av | Maguire Construction | soft story retrofitt per 2016 cebc appendix a-4Details
soft story retrofitt per 2016 cebc appendix a-4 | $40,000 |
| Jul 17, 2017 | Completed final sign-off Mar 2018 | 1801 Ellis St | Old Sod Construction Inc | seismic retofitting in accordance with sf soft story ordinance. to comply with novDetails
seismic retofitting in accordance with sf soft story ordinance. to comply with nov | $50,000 |
| Jun 28, 2017 | Completed final sign-off Sep 2017 | 1249 Willard St | Fastnet Engineering & Const Inc | foundation replacement @ rear pop outDetails
foundation replacement @ rear pop out | $10,000 |
| Jun 27, 2017 | Completed final sign-off Apr 2019 | 530 08th Av | Old Sod Construction Inc | soft story retrofit per asce 43-13.Details
soft story retrofit per asce 43-13. | $60,000 |
| May 26, 2017 | Completed final sign-off May 2018 | 3666 Mission St | soft story retrofit per sfebc chapter 4d, 2016 cebc appedix a-4.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appedix a-4. | $25,000 | |
| Feb 3, 2017 | Completed final sign-off Sep 2017 | 1463 Haight St | John P Brennan Co Inc. | gain access to rear yard; terrace for landscapingDetails
gain access to rear yard; terrace for landscaping | $5,000 |
| Jan 19, 2017 | Completed final sign-off Jun 2017 | 450 Hayes St | K Bali Construction | revision to app#201601207535 - structural as built/field revision, framing conditions. n/a for maherDetails
revision to app#201601207535 - structural as built/field revision, framing conditions. n/a for maher | |
| Oct 28, 2016 | Never finaled issued Feb 2020, no final | 556 27th St | Linea Built Inc. | construct a new 4 story bldg over 3-story basement of type 1b, for 7 dwelling units and parking garageDetails
construct a new 4 story bldg over 3-story basement of type 1b, for 7 dwelling units and parking garage | $3,500,000 |
| Sep 15, 2016 | Completed final sign-off Nov 2017 | 1085 South Van Ness Av | Sincere Construction Company Inc | mandatory soft story seismic upgrades per sfebc chapter 4d, 2016 cebc appendix a-4.Details
mandatory soft story seismic upgrades per sfebc chapter 4d, 2016 cebc appendix a-4. | $110,000 |
| Aug 29, 2016 | Completed final sign-off Mar 2017 | 335 Euclid Av | John P Brennan Co Inc. | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $25,000 |
| Jul 18, 2016 | Never finaled issued Jul 2016, no final | 32 Church St | Blue Bend Construction Inc | revision to pa 2016-0526-8422, (n) skylight in bathroom on 2nd floor. (n) beam @ 1st floor-wall removalDetails
revision to pa 2016-0526-8422, (n) skylight in bathroom on 2nd floor. (n) beam @ 1st floor-wall removal | $2,500 |
| Feb 26, 2016 | Never finaled issued Jul 2016, no final | 146 Irving St | Shamrock Engineering Concrete, Michael Heavey Construction | new retaining wall at north property line to improve drainage. comply with violation 201407831Details
new retaining wall at north property line to improve drainage. comply with violation 201407831 | $5,000 |
| Dec 21, 2015 | Completed final sign-off Oct 2016 | 3520 23rd St | Blue Bend Construction Inc | soft story retrofit per sfbc chapter 34b engineering critaria per asce 41-13Details
soft story retrofit per sfbc chapter 34b engineering critaria per asce 41-13 | $45,000 |
| Oct 14, 2015 | Completed final sign-off Feb 2016 | 32 Church St | Blue Bend Construction Inc | interior garage remodel, new electrical sliding doors,4 skylights, structural. restrengthen roof with new framingDetails
interior garage remodel, new electrical sliding doors,4 skylights, structural. restrengthen roof with new framing | $20,000 |
| Sep 23, 2015 | Completed final sign-off Oct 2016 | 135 Cerritos Av | S C K Builders Inc. | foundation stabilizationDetails
foundation stabilization | $5,000 |
| Aug 26, 2015 | Completed final sign-off Oct 2016 | 1 Seymour St | interior remodel, converting crawl space to habitable space, kitchen remodel.Details
interior remodel, converting crawl space to habitable space, kitchen remodel. | $120,000 | |
| Aug 21, 2015 | Completed final sign-off Mar 2019 | 2833 Vallejo St | Linea Built Inc. | convert (e) lightwell into interior space and extend roof deck as shown on plan. ref pa 201412194134Details
convert (e) lightwell into interior space and extend roof deck as shown on plan. ref pa 201412194134 | $10,000 |
| Aug 4, 2015 | Completed final sign-off Oct 2016 | 892 Lombard St | John P Brennan Co Inc. | mandatory soft story seismic. ordinance #66-13. 2012 iebc appendix a-4Details
mandatory soft story seismic. ordinance #66-13. 2012 iebc appendix a-4 | $20,000 |
| Jul 16, 2015 | Expired or cancelled cancelled Jan 2026 | 1926 16th Av | deck replacement at front elevationDetails
deck replacement at front elevation | $8,000 | |
| May 28, 2015 | Completed final sign-off Feb 2016 | 2427 Vallejo St | Cairn Construction | move posts in garage. n/a for maher.Details
move posts in garage. n/a for maher. | $15,000 |
| Aug 27, 2014 | Completed final sign-off May 2015 | 41 Dearborn St | Mac Construction | alteration of basement to habitable space, alter partition wall locations on main floor, hydronic radiant heat for 1/f flat, extend bay window on the ground floor.Details
alteration of basement to habitable space, alter partition wall locations on main floor, hydronic radiant heat for 1/f flat, extend bay window on the ground floor. | $120,000 |
| Jul 24, 2014 | Completed final sign-off May 2016 | 1650 Broadway | Centrix Builders Inc. | erect temporary crane for new construction at 1650 broadway (ref. #201203055396), no change to foundation approved under addenda #1.Details
erect temporary crane for new construction at 1650 broadway (ref. #201203055396), no change to foundation approved under addenda #1. | $20,000 |
| Apr 15, 2014 | Never finaled issued Apr 2014, no final | 555 23rd St | new inertia pads for bifuel generators. n/a for maher ordinance #155-13Details
new inertia pads for bifuel generators. n/a for maher ordinance #155-13 | $50,000 | |
| Jan 22, 2014 | Completed final sign-off Feb 2017 | 2177 09th Av | Kelly Brother's Construction | remodel of kitchen on main level, addition of 2 bathroom & 2 bedrooms on lower level.Details
remodel of kitchen on main level, addition of 2 bathroom & 2 bedrooms on lower level. | $120,000 |
| Dec 30, 2013 | Completed final sign-off Jun 2014 | 400 South Van Ness Av | Js Sullivan Construction Inc | revision to pa#201111038205 s1 shotcrete wall along south van ness neighbor side approx 124 ft and 15th st side approx 35 ft in lieu of wood frame wall. revise planter per plan, revise bathroom doors per plan.Details
revision to pa#201111038205 s1 shotcrete wall along south van ness neighbor side approx 124 ft and 15th st side approx 35 ft in lieu of wood frame wall. revise planter per plan, revise bathroom doors per plan. | $3,000 |
| Aug 15, 2012 | Completed final sign-off Feb 2014 | 1998 Market St | Cahill Contractors Inc | tower crane foundationDetails
tower crane foundation | $7,500 |
| May 31, 2012 | Never finaled issued Jul 2012, no final | 1996 Great Hy | raising ceiling liv room/din room/kitchen, eliminate kitchen wall, replace kitchen cabinets, replace bathroom fixtures, upgrade electrical, relocate registers at upstairs unit #1996 only, strengthen 2nd floor & foundation for entire bldg.Details
raising ceiling liv room/din room/kitchen, eliminate kitchen wall, replace kitchen cabinets, replace bathroom fixtures, upgrade electrical, relocate registers at upstairs unit #1996 only, strengthen 2nd floor & foundation for entire bldg. | $30,000 | |
| Nov 23, 2010 | Completed final sign-off Feb 2011 | 174 Stanyan St | A Mc Carthy Engineering Inc | two foot high retaining wall to be constructed in the rear yard.Details
two foot high retaining wall to be constructed in the rear yard. | $18,000 |
| Aug 3, 2010 | Never finaled issued Oct 2013, no final | 275 Valencia St | Mc Nely Construction Company | to erect 2 stories, religious worship building.Details
to erect 2 stories, religious worship building. | $6,000,000 |
| Jun 10, 2010 | Completed final sign-off Sep 2018 | 5050 Mission St | James E Roberts-Obayashi Corporation | to erect 6 stories, no basement, 61 units of commerical & residential mix used building. includes mep and structural. f/a and sprinklers on separate permit.Details
to erect 6 stories, no basement, 61 units of commerical & residential mix used building. includes mep and structural. f/a and sprinklers on separate permit. | $11,500,000 |
| May 20, 2010 | Completed final sign-off Aug 2010 | 4170 17th St | A M Rocca Inc. | foundation repairs per plans.Details