John Goldman
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Goldman Architects
- Based in
- San Francisco
- On San Francisco permits
- Nov 2001 to Jun 2026
60 permits since 2000 (architect on 58 permits, authorized agent-others on 2 permits, engineer on 1 permit): 15 completed, 4 in progress, 26 never finaled, 15 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 24, 2026 | In progress issued Jun 2026 | 950 Jamestown Av | administrative permit to document change of address for pa 201708316553 from 938 jamestown to 950 jamestown ave (4970/041).Details
administrative permit to document change of address for pa 201708316553 from 938 jamestown to 950 jamestown ave (4970/041). | ||
| Jun 24, 2026 | In progress issued Jun 2026 | 952 Jamestown Av | administrative permit to document change of address for pa 201708316563 from 950 jamestown to 952 jamestown ave (4970/040).Details
administrative permit to document change of address for pa 201708316563 from 950 jamestown to 952 jamestown ave (4970/040). | ||
| Sep 15, 2025 | In progress issued Sep 2025 | 2000 Washington St | C A Mc Kee Construction | install new counter balance at existing fire escape balcony.Details
install new counter balance at existing fire escape balcony. | $4,000 |
| May 30, 2025 | Completed final sign-off Nov 2025 | 855 Folsom St | unit 511- 1st and 2nd floor bathroom's remodel to include removal of walls.Details
unit 511- 1st and 2nd floor bathroom's remodel to include removal of walls. | $10,000 | |
| Apr 2, 2025 | Expired or cancelled withdrawn Jan 2026 | 1970 Ocean Av | Kmk Construction And Design | east wing: upgrade (2) bathrooms on the 1st floor.Details
east wing: upgrade (2) bathrooms on the 1st floor. | $35,000 |
| Mar 14, 2025 | Completed final sign-off Oct 2025 | 1970 Ocean Av | existing metal fire escape exterior exit stairs and landings to be replaced with new in-kind ones. to abate comp. #201600492Details
existing metal fire escape exterior exit stairs and landings to be replaced with new in-kind ones. to abate comp. #201600492 | $70,000 | |
| Nov 5, 2024 | Completed final sign-off May 2025 | 1208 Stanyan St | revison to permit 201811075321. as-built floor plans per inspector (michael chan)'s request.Details
revison to permit 201811075321. as-built floor plans per inspector (michael chan)'s request. | ||
| Jul 10, 2023 | Never finaled filed Jul 2023, never issued | 2725 Broadway | renovation of the (e) house & garage. addition of the underground areas in the basement, level 2 and 3. revised facades of the building while staying within existing envelope of the building. adding adu unit (2725a broadway) at level two under state gov't code section 66314.Details
renovation of the (e) house & garage. addition of the underground areas in the basement, level 2 and 3. revised facades of the building while staying within existing envelope of the building. adding adu unit (2725a broadway) at level two under state gov't code section 66314. | $1,800,000 | |
| May 19, 2023 | Completed final sign-off Jun 2024 | 3810 24th St | remodel of the existing ground floor and mezzanine level. ground floor front & rear elevations are being remodeled. on front facade we are replacing 8'x9' aluminum window and storefront door; on rear facade we are replacing wood door. no work is proposed at the residential units on floors 2 & 3Details
remodel of the existing ground floor and mezzanine level. ground floor front & rear elevations are being remodeled. on front facade we are replacing 8'x9' aluminum window and storefront door; on rear facade we are replacing wood door. no work is proposed at the residential units on floors 2 & 3 | $80,000 | |
| Nov 23, 2022 | In progress issued Sep 2025 | 2725 Broadway | Ren Lei Construction Co, Green City Construction Inc | basement excavation to enlarge (e) garage and new foundations. max 3 parking spaces.Details
basement excavation to enlarge (e) garage and new foundations. max 3 parking spaces. | $175,000 |
| Oct 17, 2020 | Never finaled filed Oct 2020, never issued | 960 Jamestown Av | accessory dwelling unit at the basement level, below the single family 3-story residence, which is under permit # 201708316559Details
accessory dwelling unit at the basement level, below the single family 3-story residence, which is under permit # 201708316559 | $105,000 | |
| Oct 17, 2020 | Never finaled filed Oct 2020, never issued | 952 Jamestown Av | accessory dwelling unit at the basement level, below the single family 3-story residence , which is under permit # 201708316563Details
accessory dwelling unit at the basement level, below the single family 3-story residence , which is under permit # 201708316563 | $105,000 | |
| Oct 17, 2020 | Never finaled filed Oct 2020, never issued | 950 Jamestown Av | accessory dwelling unit per ordinance #162-17, at the basement level, below the single family 3 story residence, which is under new construction permit #201708316553Details
accessory dwelling unit per ordinance #162-17, at the basement level, below the single family 3 story residence, which is under new construction permit #201708316553 | $105,000 | |
| Nov 13, 2019 | Completed final sign-off Dec 2019 | 1121 Howard St | change of use and occupancy only from b to b, s-1. no physical work to be done - cannibis distribution and delivery. no consumption or in-person retail sales.Details
change of use and occupancy only from b to b, s-1. no physical work to be done - cannibis distribution and delivery. no consumption or in-person retail sales. | ||
| Aug 9, 2019 | Never finaled issued Apr 2022, no final | 130 Russ St | Bashland Inc. Dba Bashland Builders | renovate (e) 2nd flr into 1 bedrm apartment. no addt sf. no structural work. current 2nd flr storage area may have been a residential unit at some time in the past but no kitchen remains nowDetails
renovate (e) 2nd flr into 1 bedrm apartment. no addt sf. no structural work. current 2nd flr storage area may have been a residential unit at some time in the past but no kitchen remains now | $200,000 |
| Aug 6, 2019 | Never finaled issued Jul 2020, no final | 4128 03rd St | Bryan J. Valverde Co | demolish 2-story, type 5, 2 residential units & 1 commercial building.Details
demolish 2-story, type 5, 2 residential units & 1 commercial building. | $50,000 |
| Mar 1, 2019 | Never finaled issued Feb 2021, no final | 245 Valencia St | Mc Nely Construction Company | documentation only. establishing commercial parking garage at 275 valencia st.Details
documentation only. establishing commercial parking garage at 275 valencia st. | |
| Mar 1, 2019 | Expired or cancelled cancelled Jul 2024 | 968 Jamestown Av | remodel the existing house basement. extend existing basement and existing floor into the rear yard. add new levels 2 and 3. add 3 bedrroms and 3 baths and laundry room.Details
remodel the existing house basement. extend existing basement and existing floor into the rear yard. add new levels 2 and 3. add 3 bedrroms and 3 baths and laundry room. | $550,000 | |
| Nov 7, 2018 | Completed final sign-off May 2025 | 1208 Stanyan St | addition of a dwelling unit within existing envelope of 1 single family house. reconfigure space layout, outside paint and landscaping of back yardDetails
addition of a dwelling unit within existing envelope of 1 single family house. reconfigure space layout, outside paint and landscaping of back yard | $200,000 | |
| Jul 30, 2018 | Never finaled issued Oct 2019, no final | 561 Ellington Av | to erect 4 stories, no basement, type v-a, 3 units residential & commercial building. (r-2, m, u-1) ** maher: n/a **Details
to erect 4 stories, no basement, type v-a, 3 units residential & commercial building. (r-2, m, u-1) ** maher: n/a ** | $477,000 | |
| Jul 30, 2018 | Never finaled issued Oct 2022, no final | 219 Missouri St | comply with nov #200683337. renovation of (e) level 1 and units 1 & 2. (n) 2-car garage & (n) 4-spaces bicycle storage @ (e) level 1. (n) addition @ levels 2-4 for remaining units 3 & 4.Details
comply with nov #200683337. renovation of (e) level 1 and units 1 & 2. (n) 2-car garage & (n) 4-spaces bicycle storage @ (e) level 1. (n) addition @ levels 2-4 for remaining units 3 & 4. | $950,000 | |
| Mar 6, 2018 | Never finaled filed Mar 2018, never issued | 3601 Lawton St | 201803062986to erect 5 stories, 1 basement, type 1-a / v-a, 41 dwelling units mixed use/multi family,parking and community room & roof deck. (r-2,s-2) ** maher: disturbance of at least 50 cu. yd of soil. route to dph **Details
201803062986to erect 5 stories, 1 basement, type 1-a / v-a, 41 dwelling units mixed use/multi family,parking and community room & roof deck. (r-2,s-2) ** maher: disturbance of at least 50 cu. yd of soil. route to dph ** | $7,000,000 | |
| Mar 6, 2018 | Never finaled filed Mar 2018, never issued | 3601 Lawton St | to demolish 1 story canopy building. ** maher: disturbance of at least 50 cu. yd of soil. route to dph **Details
to demolish 1 story canopy building. ** maher: disturbance of at least 50 cu. yd of soil. route to dph ** | $25,000 | |
| Mar 6, 2018 | Never finaled filed Mar 2018, never issued | 3601 Lawton St | to demolish 1 story foodmart/gas station building. ** maher: disturbance of at least 50 cu. yd of soil. route to dph **Details
to demolish 1 story foodmart/gas station building. ** maher: disturbance of at least 50 cu. yd of soil. route to dph ** | $25,000 | |
| Dec 29, 2017 | Expired or cancelled cancelled Sep 2020 | 930 Grove St | (n) 3-car underground parking garage, (n) curb cut, driveway, front fence & gate. this application along with app #2017-1018-1620 will address the following nov's: #201079911, #201766071, #201758081, #201763891 & #201757202. this app supercedes #2007-0109-1347.Details
(n) 3-car underground parking garage, (n) curb cut, driveway, front fence & gate. this application along with app #2017-1018-1620 will address the following nov's: #201079911, #201766071, #201758081, #201763891 & #201757202. this app supercedes #2007-0109-1347. | $450,000 | |
| Dec 22, 2017 | Completed final sign-off Jul 2023 | 29 Hattie St | Ccsf Design Build | construct 2 (n) wood framed units on top of the (e) foundations. the former home was demolished under emergency pa #2017-0120-7561. also see former site pa #2014-0616-8502. (**form 3 submittal for new bldg- approved by ron tom for dan lowrey**)Details
construct 2 (n) wood framed units on top of the (e) foundations. the former home was demolished under emergency pa #2017-0120-7561. also see former site pa #2014-0616-8502. (**form 3 submittal for new bldg- approved by ron tom for dan lowrey**) | $1,000,000 |
| Oct 18, 2017 | Expired or cancelled suspend Aug 2019 | 930 Grove St | Barker-O'donoghue Master Bldrs | repair & rehabilitate exterior bldg facades. repair (e) wood windows & doors. repair & rehabilitate interiors on floors 1,2 & 3. remodel interiors to include (n) kitchen & bathrooms. no structural work. mep under separate permits. drawings address nov's.Details
repair & rehabilitate exterior bldg facades. repair (e) wood windows & doors. repair & rehabilitate interiors on floors 1,2 & 3. remodel interiors to include (n) kitchen & bathrooms. no structural work. mep under separate permits. drawings address nov's. | $350,000 |
| Oct 4, 2017 | Never finaled issued Oct 2017, no final | 131 South Van Ness Av | interior renovation non-structural remodel of existing retail store scope includes, new/replaced interior lighting, new framed storage area. new store fixtures, changing rooms, hanging racks furniture.Details
interior renovation non-structural remodel of existing retail store scope includes, new/replaced interior lighting, new framed storage area. new store fixtures, changing rooms, hanging racks furniture. | $75,000 | |
| Sep 21, 2017 | Never finaled issued Oct 2017, no final | 2985 San Bruno Av | cosmetic external work for remodeling an existing 1 story building (f00d mart) no change of use, time of service, height, occupancy or envelope size building to be cladded with wooden material to have more contemporary lookDetails
cosmetic external work for remodeling an existing 1 story building (f00d mart) no change of use, time of service, height, occupancy or envelope size building to be cladded with wooden material to have more contemporary look | $50,000 | |
| Aug 31, 2017 | Never finaled issued Jun 2023, no final | 950 Jamestown Av | to erect 3 stories, 1 basement, type v-b, single family residence.Details
to erect 3 stories, 1 basement, type v-b, single family residence. | $350,000 | |
| Aug 31, 2017 | Never finaled issued Jun 2023, no final | 938 Jamestown Av | to erect 3 stories, 1 basement, type v-b, single family residence.Details
to erect 3 stories, 1 basement, type v-b, single family residence. | $350,000 | |
| Aug 31, 2017 | Never finaled issued Jun 2023, no final | 960 Jamestown Av | to erect 3 stories, 1 basement, type v-b, single family residence.Details
to erect 3 stories, 1 basement, type v-b, single family residence. | $350,000 | |
| Aug 4, 2017 | Completed final sign-off Mar 2018 | 529 Wildwood Wy | reconfiguring & addition of (e) space within (e) envelope of bldg. at 1/f to include a bedroom, bathroom and walk in closet. add one bathroom on 2/f.Details
reconfiguring & addition of (e) space within (e) envelope of bldg. at 1/f to include a bedroom, bathroom and walk in closet. add one bathroom on 2/f. | $20,000 | |
| Jul 20, 2017 | Never finaled issued Sep 2019, no final | 1633 Cabrillo St | Bay C T Construction Inc. | erect 4-story (2)(n) family residentialDetails
erect 4-story (2)(n) family residential | $950,000 |
| Jul 10, 2017 | Completed final sign-off Nov 2020 | 955 Page St | Barrera & Associates Construction Inc | addition of (2) dwelling units at the 1st flor per ordinance 162-16.Details
addition of (2) dwelling units at the 1st flor per ordinance 162-16. | $60,000 |
| Feb 17, 2016 | Expired or cancelled cancelled Apr 2021 | 1060 Folsom St | change of use from industrial/wearhouse to asseembly and social service use (dba alchemy) and remove the notice of violation complaint number 13538_enf.Details
change of use from industrial/wearhouse to asseembly and social service use (dba alchemy) and remove the notice of violation complaint number 13538_enf. | ||
| Jan 26, 2016 | Expired or cancelled expired Jan 2017 | 930 Grove St | Shek's Construction Co | remodel existing floor 1, 2, and 3. remove doors, non bearing partition walls, bath and kitchen fixtures, furnishings, equipment. construct new doors, partiton walls, bath, kitchen fixtures, furnishings, equipment. all bah and kitchens new no change to egress, occupancy, increase to area. mep sep.Details
remodel existing floor 1, 2, and 3. remove doors, non bearing partition walls, bath and kitchen fixtures, furnishings, equipment. construct new doors, partiton walls, bath, kitchen fixtures, furnishings, equipment. all bah and kitchens new no change to egress, occupancy, increase to area. mep sep. | $200,000 |
| Jan 6, 2016 | Never finaled issued Jan 2016, no final | 245 Valencia St | Barker-O'donoghue Master Bldrs | calculate the occupancy for determining what occupancy signs need to be posted in the existing multi purpose/assembly room. assembly meeting room, chapel and new cathedral and to get a fire dept assembly permit per mark o'hara.Details
calculate the occupancy for determining what occupancy signs need to be posted in the existing multi purpose/assembly room. assembly meeting room, chapel and new cathedral and to get a fire dept assembly permit per mark o'hara. | |
| Dec 31, 2015 | Never finaled filed Dec 2015, never issued | 612 Natoma St | enlarge (e) basement @ rear by lowering grades in crawl space. remodel(e) ppr 2-story space. remove portion of (e) pdr space @ rear ground level to create an outdoor courtyard. add (n) single car garage @ front. add (2)(n) fl above(e)bldg, for (n) single family townhouse unit. the unit includesDetails
enlarge (e) basement @ rear by lowering grades in crawl space. remodel(e) ppr 2-story space. remove portion of (e) pdr space @ rear ground level to create an outdoor courtyard. add (n) single car garage @ front. add (2)(n) fl above(e)bldg, for (n) single family townhouse unit. the unit includes | $1,200,000 | |
| Sep 28, 2015 | Expired or cancelled expired Jun 2024 | 1267 Rhode Island St | Ampex Engineering & Co | restore existing front facade. add new wood front stairs. remodel the existing home. construct a new rear yard extension and 2 additional floors on top. additional bathrooms. fire sprinkler under separate permit.Details
restore existing front facade. add new wood front stairs. remodel the existing home. construct a new rear yard extension and 2 additional floors on top. additional bathrooms. fire sprinkler under separate permit. | $1,010,000 |
| Dec 29, 2014 | Never finaled issued Feb 2019, no final | 483 Clementina St | demolish 1-story with mezz, autobody repair and paint shop building. maher n/aDetails
demolish 1-story with mezz, autobody repair and paint shop building. maher n/a | $70,000 | |
| Dec 29, 2014 | Never finaled issued Feb 2019, no final | 483 Clementina St | erect 8-story, 32 condo units above parking & commercial retail building. maher n/a.Details
erect 8-story, 32 condo units above parking & commercial retail building. maher n/a. | $8,500,000 | |
| Jan 22, 2014 | Never finaled issued Sep 2015, no final | 86 Stanton St | to erect 4 stories, no basement, single family residence. (front building)Details
to erect 4 stories, no basement, single family residence. (front building) | $525,000 | |
| Apr 1, 2013 | Completed final sign-off Jun 2013 | 1270 Sanchez St | change of occupancy to e occupancy requested. first floor only. all construction is completed. conditional use permit has been applied for and granted 3/14/14 for preschool. fire alarm under separate permit.Details
change of occupancy to e occupancy requested. first floor only. all construction is completed. conditional use permit has been applied for and granted 3/14/14 for preschool. fire alarm under separate permit. | ||
| May 10, 2012 | Completed final sign-off Mar 2016 | 134 Lunado Wy | renovate & rear addition. extend north wall to align with existing bay, add space in garage for a 2nd parking space. new roof. full seismic upgrade including earthquake foundaton improvement.Details
renovate & rear addition. extend north wall to align with existing bay, add space in garage for a 2nd parking space. new roof. full seismic upgrade including earthquake foundaton improvement. | $400,000 | |
| Aug 5, 2010 | Completed final sign-off Apr 2015 | 1021 Sanchez St | Barker-O'donoghue Master Bldrs | remodel(e)church compllex. exterior work to incl(1)story additn on (e)1 story additn (northside). remove(e)additn on eastside & constr (n) bay @ 2nd story. interior work to consist of & complete remodel incl accessibility, restrms, elevator, fire sprinkler system & seismic upgrade.Details
remodel(e)church compllex. exterior work to incl(1)story additn on (e)1 story additn (northside). remove(e)additn on eastside & constr (n) bay @ 2nd story. interior work to consist of & complete remodel incl accessibility, restrms, elevator, fire sprinkler system & seismic upgrade. | $1,100,000 |
| Aug 3, 2010 | Never finaled issued Oct 2013, no final | 275 Valencia St | Mc Nely Construction Company | to erect 2 stories, religious worship building.Details
to erect 2 stories, religious worship building. | $6,000,000 |
| Jan 19, 2010 | Never finaled issued Apr 2011, no final | 174 Fairmount St | selective demolition at rear, construct addition at rear of 1st floor, remodel remaining 1st floor, partial 2nd floor addition. first floor rear deck extension & second floor deck over 1st floor addition.Details
selective demolition at rear, construct addition at rear of 1st floor, remodel remaining 1st floor, partial 2nd floor addition. first floor rear deck extension & second floor deck over 1st floor addition. | $155,000 | |
| Dec 9, 2008 | Completed final sign-off Aug 2012 | 1270 Sanchez St | partial demolition & re-build and renovation of (e) structure. remove part of bldg to create outdoor court area. remove & rebuild partitions in accessory spaces.Details
partial demolition & re-build and renovation of (e) structure. remove part of bldg to create outdoor court area. remove & rebuild partitions in accessory spaces. | $1,700,000 | |
| Apr 30, 2008 | Expired or cancelled expired Mar 2009 | 1751 Leavenworth St | Clipper Construction Inc. | revision to 200412232085 ( horizontal addition and deck at rear) revision to include: adjustment of deck material and detailing, omission of hardscaping at rear yard, adjustment of interior partition walls, redesign retaining walls and garden privacy fence.Details
revision to 200412232085 ( horizontal addition and deck at rear) revision to include: adjustment of deck material and detailing, omission of hardscaping at rear yard, adjustment of interior partition walls, redesign retaining walls and garden privacy fence. | |
| Mar 16, 2007 | Expired or cancelled expired Oct 2008 | 3059 Franklin St | bathroom remodel, bedroom and living room modifications (non structural) for installation of in wall speaker.Details
bathroom remodel, bedroom and living room modifications (non structural) for installation of in wall speaker. | $11,000 | |
| Jan 9, 2007 | Expired or cancelled expired Jan 2017 | 930 Grove St | Ezra Construction | comply with nov #200671344, issued on 7/14/06. provide (n) driveway access to (n) underground parking garage, provide (n) elevator-residential, provide (n) stair & modify (e) to (n) garage. mep under separate permit.Details
comply with nov #200671344, issued on 7/14/06. provide (n) driveway access to (n) underground parking garage, provide (n) elevator-residential, provide (n) stair & modify (e) to (n) garage. mep under separate permit. | $300,000 |
| Dec 12, 2006 | Never finaled issued Jun 2009, no final | 503 Andover St | remodel of existing ground lfoor and second floor. addition horizontal at ground floor.Details
remodel of existing ground lfoor and second floor. addition horizontal at ground floor. | $60,000 | |
| Oct 27, 2006 | Completed final sign-off Mar 2007 | 510 48th Av | Level 8 Construction Inc | alter existing bathroom & closet area to create 2 bathrooms and 1 closet. remodel kitchen.Details
alter existing bathroom & closet area to create 2 bathrooms and 1 closet. remodel kitchen. | $30,000 |
| Sep 22, 2006 | Expired or cancelled expired Jul 2008 | 450 Broadway | submit calculations for occupant load for s.f.f.d. ref. to appl#200505021388 & 8510700/r5. no construction work under this permit or change of use.Details
submit calculations for occupant load for s.f.f.d. ref. to appl#200505021388 & 8510700/r5. no construction work under this permit or change of use. | ||
| Jan 12, 2006 | Expired or cancelled disapproved Jan 2019 | 655 Dolores St | construct a 4 story, eight unit mixed use dwellingDetails
construct a 4 story, eight unit mixed use dwelling | $3,500,000 | |
| Apr 11, 2005 | Expired or cancelled cancelled May 2016 | 340 11th St | demolish 2 stories garageDetails
demolish 2 stories garage | ||
| Apr 11, 2005 | Expired or cancelled withdrawn Jun 2014 | 340 11th St | erect 4 stories 20 units res. & mixed use bldg.Details
erect 4 stories 20 units res. & mixed use bldg. | $3,000,000 | |
| Dec 16, 2004 | Expired or cancelled cancelled May 2013 | 1675 48th Av | erect 3 story 2 dwelling buildingDetails
erect 3 story 2 dwelling building | $600,000 | |
| Nov 14, 2001 | Completed final sign-off Mar 2004 | 536 Presidio Av | erect a four story two unit residential bldgDetails
erect a four story two unit residential bldg | $500,000 |