Bashland Inc. Dba Bashland Builders
- Based in
- Emeryville
- On San Francisco permits
- Mar 2000 to Apr 2024
- Last 24 months
- 0 permits filed
145 permits since 2000: 113 completed, 1 in progress, 11 never finaled, 20 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 145.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2024 | Completed final sign-off Mar 2025 | 345 Folsom St | unit# 301: interior remodel, no structural or architectural changes. 1) kitchen remodel: replace (e) cabinets, counters, appliances, lights. 2) main bath: replace (e) cabs, counters, fixtures, finishes and lights.Details
unit# 301: interior remodel, no structural or architectural changes. 1) kitchen remodel: replace (e) cabinets, counters, appliances, lights. 2) main bath: replace (e) cabs, counters, fixtures, finishes and lights. | $288,000 |
| Mar 18, 2024 | Completed final sign-off Aug 2024 | 3949 26th St | interior non-structural work. remodel/reconfigure bath #2 on the 2nd fl; all new interior finishes to replace existing finishes @ bed #2 & den; reconfigure bedroom #8 closetDetails
interior non-structural work. remodel/reconfigure bath #2 on the 2nd fl; all new interior finishes to replace existing finishes @ bed #2 & den; reconfigure bedroom #8 closet | $48,000 |
| Oct 17, 2023 | Completed final sign-off Jun 2024 | 38 Mountain Spring Av | repair leak over garage space. requires removal of tile, replacement of membrane, and replacement of tile in kind.Details
repair leak over garage space. requires removal of tile, replacement of membrane, and replacement of tile in kind. | $62,000 |
| Mar 31, 2023 | Completed final sign-off Jan 2024 | 1070 Green St | kitchen: new cabinets, counters, fixtures and finishes to replace (e) in same location bath 1&2: new cabinets counters, fixtures and finishes to replace (e) in same location, replace (e) window in kind at side elevation (not visible from street) w/(n) window to match building standard.Details
kitchen: new cabinets, counters, fixtures and finishes to replace (e) in same location bath 1&2: new cabinets counters, fixtures and finishes to replace (e) in same location, replace (e) window in kind at side elevation (not visible from street) w/(n) window to match building standard. | $78,000 |
| Aug 10, 2022 | Completed final sign-off Apr 2023 | 14 Santa Clara Av | exterior work: replace sash selected windows in kind. interior: replace main bath fixtures in kind. relocate attic ceiling access.Details
exterior work: replace sash selected windows in kind. interior: replace main bath fixtures in kind. relocate attic ceiling access. | $38,000 |
| Jul 13, 2022 | Completed final sign-off Aug 2022 | 180 Palo Alto Av | rev to pa202109309572 to eliminate new deck (on grade) at rear yard. maintain previously approved landing and stairs to (e) grade.Details
rev to pa202109309572 to eliminate new deck (on grade) at rear yard. maintain previously approved landing and stairs to (e) grade. | |
| Jul 7, 2022 | Completed final sign-off Oct 2023 | 999 Green St | unit 2901: non structural interior remodel. remove and relocate interior partitoin walls. remodel kitchen and baths. new finishes. enclose balcony to match existingDetails
unit 2901: non structural interior remodel. remove and relocate interior partitoin walls. remodel kitchen and baths. new finishes. enclose balcony to match existing | $138,000 |
| Feb 28, 2022 | In progress issued Sep 2024 | 1039 Green St | correct noe complaint 2021-010111enf: return bldg to become 2 unit in compliance with bpa 201901251242. legalize horizontal infill at 1/f bed #2 to enclose (e) rear deck approved under bpa 201901251242. legalize alterations to roofdeck approved under bpa 201903114863.Details
correct noe complaint 2021-010111enf: return bldg to become 2 unit in compliance with bpa 201901251242. legalize horizontal infill at 1/f bed #2 to enclose (e) rear deck approved under bpa 201901251242. legalize alterations to roofdeck approved under bpa 201903114863. | $250,000 |
| Sep 30, 2021 | Completed final sign-off Sep 2022 | 180 Palo Alto Av | interior remodel new office/den, bathrooms, reconfigured main bedroom. new finishes & associated electrical/plumbing. new deck (on grade) @ rear yard. new skylights. mechanical deferred submittal.Details
interior remodel new office/den, bathrooms, reconfigured main bedroom. new finishes & associated electrical/plumbing. new deck (on grade) @ rear yard. new skylights. mechanical deferred submittal. | $318,000 |
| Sep 24, 2021 | Completed final sign-off Feb 2023 | 1998 Broadway | unit 1504: interior remodeling of kitchen, 2 bathrooms, 2 bedrooms and living area.Details
unit 1504: interior remodeling of kitchen, 2 bathrooms, 2 bedrooms and living area. | $200,000 |
| Jun 17, 2021 | Completed final sign-off Apr 2022 | 233 Kensington Wy | 3rd fl: remodel (e) bathroom in-kind. new fixtures, surface all in existing locations. no structural work. no exterior work.Details
3rd fl: remodel (e) bathroom in-kind. new fixtures, surface all in existing locations. no structural work. no exterior work. | $40,000 |
| Jun 10, 2021 | Completed final sign-off Sep 2022 | 180 Palo Alto Av | non-structural interior remodeling with no change to fl. plan or walls, kitchen remodel: replace cabinets, fixtures and all finishes bathroom remodel: replace cabinets, fixtures and finishes, (2) bathrooms interior finishes: replace (e) finish material wit new finsh material at walls, ceilingsDetails
non-structural interior remodeling with no change to fl. plan or walls, kitchen remodel: replace cabinets, fixtures and all finishes bathroom remodel: replace cabinets, fixtures and finishes, (2) bathrooms interior finishes: replace (e) finish material wit new finsh material at walls, ceilings | $78,000 |
| Jun 7, 2021 | Completed final sign-off Sep 2021 | 2562 Green St | replace existing kitchen cabinetry- counters, and appliances in same layout as existing. no other changes, all work due to water damage. non structural.Details
replace existing kitchen cabinetry- counters, and appliances in same layout as existing. no other changes, all work due to water damage. non structural. | $90,000 |
| Apr 7, 2021 | Completed final sign-off May 2022 | 3025 Broderick St | roof deck alteration to existing roof and reroofing.Details
roof deck alteration to existing roof and reroofing. | $70,000 |
| Mar 22, 2021 | Never finaled issued May 2021, no final | 10 Presidio Av | revision to pa# 202012110866. reduce opening size at (e) closet & den. (e) wall to remain. opening to be created at (e) kitchen & den.Details
revision to pa# 202012110866. reduce opening size at (e) closet & den. (e) wall to remain. opening to be created at (e) kitchen & den. | |
| Dec 11, 2020 | Never finaled issued Jan 2021, no final | 10 Presidio Av | interior remodeling on the 2nd flr. remove interior wall between (e) kitchen & (e) den. remove interior wall between (e) closet & (e) den. remodel (e) kitchen.Details
interior remodeling on the 2nd flr. remove interior wall between (e) kitchen & (e) den. remove interior wall between (e) closet & (e) den. remodel (e) kitchen. | $38,000 |
| Jan 7, 2020 | Completed final sign-off Dec 2020 | 2200 Sacramento St | apt 1602 remodel; no structural. work includes demo, metal stud & dry wall partitions, finishes, plumbing & electrical work. conversion of portion of existing exterior balcony into finished interior space. fire alarm under sep permit to comply with sffc 1103.7.6.1Details
apt 1602 remodel; no structural. work includes demo, metal stud & dry wall partitions, finishes, plumbing & electrical work. conversion of portion of existing exterior balcony into finished interior space. fire alarm under sep permit to comply with sffc 1103.7.6.1 | $333,000 |
| Jan 7, 2020 | Completed final sign-off Dec 2020 | 2200 Sacramento St | bathroom & powder room remodel; no structural.Details
bathroom & powder room remodel; no structural. | $175,000 |
| Aug 9, 2019 | Never finaled issued Apr 2022, no final | 130 Russ St | renovate (e) 2nd flr into 1 bedrm apartment. no addt sf. no structural work. current 2nd flr storage area may have been a residential unit at some time in the past but no kitchen remains nowDetails
renovate (e) 2nd flr into 1 bedrm apartment. no addt sf. no structural work. current 2nd flr storage area may have been a residential unit at some time in the past but no kitchen remains now | $200,000 |
| Jul 2, 2019 | Never finaled issued Jul 2019, no final | 2127 Broadway | replacing cabinetry in kitchen, replacing gas cook top appliance and hood range.Details
replacing cabinetry in kitchen, replacing gas cook top appliance and hood range. | $35,000 |
| Mar 26, 2019 | Completed final sign-off Nov 2019 | 1301 Page St | unit #1: interior remodel - remodel kitchen, rmeove wall between kitchen & fmaily rm. provide (n) structural beam where wall removed. replace (e) window in like kind on south(non-street facing elevation). unit #2: new post/solid bearing from (n) beam at 2nd fl above to existing foundation.Details
unit #1: interior remodel - remodel kitchen, rmeove wall between kitchen & fmaily rm. provide (n) structural beam where wall removed. replace (e) window in like kind on south(non-street facing elevation). unit #2: new post/solid bearing from (n) beam at 2nd fl above to existing foundation. | $89,800 |
| Sep 26, 2018 | Completed final sign-off Nov 2018 | 233 Kensington Wy | replace 11 wood windows on west facade w/ clad, wooden marvin dual glazed units. windows & sizes to match (e). all works not facility to street or visible from street, no change of (e) window opening.Details
replace 11 wood windows on west facade w/ clad, wooden marvin dual glazed units. windows & sizes to match (e). all works not facility to street or visible from street, no change of (e) window opening. | $52,000 |
| Apr 26, 2018 | Completed final sign-off Oct 2018 | 2457 Scott St | replace windows in kind. wood windows to match exisitng openings and operation. reroofing in kind. 10 windows in total, curved wood sashDetails
replace windows in kind. wood windows to match exisitng openings and operation. reroofing in kind. 10 windows in total, curved wood sash | $20,000 |
| Dec 23, 2016 | Never finaled issued Feb 2017, no final | 999 Green St | unit #1005: interior remodeling, 1 bathroom, kitchen. remove/relocate non-bearing partition walls. enclose balcony & replace (e) sliding glass doors/windows to exactly match existing.Details
unit #1005: interior remodeling, 1 bathroom, kitchen. remove/relocate non-bearing partition walls. enclose balcony & replace (e) sliding glass doors/windows to exactly match existing. | $118,000 |
| Dec 21, 2016 | Completed final sign-off Jul 2017 | 2128 Vallejo St | #2- replace existing wood and glass solarium on facade with aluminium & glass solarium. no change in footprint.Details
#2- replace existing wood and glass solarium on facade with aluminium & glass solarium. no change in footprint. | $52,000 |
| Nov 20, 2015 | Completed final sign-off Oct 2016 | 1998 Broadway | interior remodel of 1 unit in a multi unit buildingDetails
interior remodel of 1 unit in a multi unit building | $20,000 |
| Jun 9, 2015 | Completed final sign-off Aug 2016 | 170 Pacific Av | #27: new kitchen and bath surfaces, new lighting, painting and flooring. new structural opening between kitchen and living room.Details
#27: new kitchen and bath surfaces, new lighting, painting and flooring. new structural opening between kitchen and living room. | $280,000 |
| Jun 3, 2015 | Completed final sign-off Feb 2016 | 1010 Lombard St | kitchen and breakfast room remodel. relocate laundry to utility room. make over laundry into exercise room. change entrance to house from garage. newl lighting in garageDetails
kitchen and breakfast room remodel. relocate laundry to utility room. make over laundry into exercise room. change entrance to house from garage. newl lighting in garage | $260,000 |
| Apr 21, 2015 | Completed final sign-off Dec 2015 | 65 Raycliff Tr | revision to pa # 2015 0323 1605. additional work to include: move one wall 18" on 2nd floor @ bathroomDetails
revision to pa # 2015 0323 1605. additional work to include: move one wall 18" on 2nd floor @ bathroom | $2,500 |
| Mar 23, 2015 | Completed final sign-off Dec 2015 | 65 Raycliff Tr | retile 3 bathrooms - n owalls tobe moved, all fire rated assemblies to be maintained, finishes & fixtures.Details
retile 3 bathrooms - n owalls tobe moved, all fire rated assemblies to be maintained, finishes & fixtures. | $22,500 |
| Mar 16, 2015 | Never finaled issued Mar 2015, no final | 1998 Broadway | unit #607: remodel kitchen & baths. add washer & dryerDetails
unit #607: remodel kitchen & baths. add washer & dryer | $182,000 |
| Jan 26, 2015 | Completed final sign-off Apr 2015 | 2074 Jefferson St | add shower to powder room at garage level. replace cabinetryDetails
add shower to powder room at garage level. replace cabinetry | $35,000 |
| Jan 23, 2015 | Completed final sign-off Nov 2019 | 3383 Washington St | addition of 225 sq ft to extend family room.Details
addition of 225 sq ft to extend family room. | $125,000 |
| Jan 16, 2015 | Completed final sign-off May 2015 | 2128 Vallejo St | #4 - kitchen remodel, new cabinets, enlarge window, new fixtures.Details
#4 - kitchen remodel, new cabinets, enlarge window, new fixtures. | $83,500 |
| Oct 1, 2014 | Completed final sign-off Jan 2015 | 1070 Green St | #202 - new fixtures, countertop, exhaust fan, tile floor. bathroom remodel, no walls to be removed.Details
#202 - new fixtures, countertop, exhaust fan, tile floor. bathroom remodel, no walls to be removed. | $32,000 |
| Nov 8, 2013 | Completed final sign-off May 2014 | 1760 Pacific Av | unit #8-renovation to (e) kitchen, master bathroom, guest bathroom & wet bar including replacement of (e) plumbing fixtures, finishes, cabinetry & light fixtures. carpet to be replaced & wood floors to be refinished to match newDetails
unit #8-renovation to (e) kitchen, master bathroom, guest bathroom & wet bar including replacement of (e) plumbing fixtures, finishes, cabinetry & light fixtures. carpet to be replaced & wood floors to be refinished to match new | $75,000 |
| Aug 14, 2013 | Never finaled issued Aug 2013, no final | 550 Davis St | #37 - replace kitchen & bath cabinetry, install drop ceiling in kitchen, recessed led lighting, retrim apartment, install new doors. drop ceiling to be under separate permit.Details
#37 - replace kitchen & bath cabinetry, install drop ceiling in kitchen, recessed led lighting, retrim apartment, install new doors. drop ceiling to be under separate permit. | $110,000 |
| Sep 11, 2012 | Completed final sign-off Jan 2013 | 550 Davis St | new lighting, replace water heater, new shower mixer, new flooring, cabinetry, drywall work, re-trim apt., full re-paint, no structural work. no wall changes. hvac under seperate permitDetails
new lighting, replace water heater, new shower mixer, new flooring, cabinetry, drywall work, re-trim apt., full re-paint, no structural work. no wall changes. hvac under seperate permit | $110,000 |
| Aug 14, 2012 | Expired or cancelled cancelled Oct 2012 | 550 Davis St | unit #35: new lighting, water heater, shower mixer, new flooring, cabinetry, drywall work, retrim apt, full repaint. no structural. hvac under seperate permit.Details
unit #35: new lighting, water heater, shower mixer, new flooring, cabinetry, drywall work, retrim apt, full repaint. no structural. hvac under seperate permit. | $110,000 |
| Jun 12, 2012 | Completed final sign-off Aug 2013 | 125 Commonwealth Av | basement, 1st & 2nd floor installation plywood panels.remove (e) interior posts @ basement to create open plan @ (e) storage room. remodel (e) seconfd floor bathroom. replace (e) wood siding in kind. replace all (e) windows & exterior doors in-kind. (n) lighting through out.Details
basement, 1st & 2nd floor installation plywood panels.remove (e) interior posts @ basement to create open plan @ (e) storage room. remodel (e) seconfd floor bathroom. replace (e) wood siding in kind. replace all (e) windows & exterior doors in-kind. (n) lighting through out. | $75,000 |
| Mar 6, 2012 | Completed final sign-off Aug 2013 | 125 Commonwealth Av | remodel (e) attic & roof at rear of (e) dwelling to create (n) 3rd floor containing (n) study, powder, storage space & roof deck. dwelling to be equipped with (n) automatic fire sprinkler system. work also includes replacing (e) siding w/(n) stucco& replacing (e) wood windows w/(n) wood windows.Details
remodel (e) attic & roof at rear of (e) dwelling to create (n) 3rd floor containing (n) study, powder, storage space & roof deck. dwelling to be equipped with (n) automatic fire sprinkler system. work also includes replacing (e) siding w/(n) stucco& replacing (e) wood windows w/(n) wood windows. | $210,000 |
| Mar 2, 2012 | Completed final sign-off Jul 2012 | 999 Green St | new aluminum windows to replace extg windows in like kind match building standards. revision to app#201001313270.Details
new aluminum windows to replace extg windows in like kind match building standards. revision to app#201001313270. | |
| Jan 31, 2012 | Completed final sign-off Jul 2012 | 999 Green St | interior remodel and window replacement in kind at 1-bedroom condominium unit on 23rd floor of a 32 story residential tower. work includes kitchen and bath remodel. new windows and sliding glass doors, new lighting finishes and decoration. no sprinklers in area of work.Details
interior remodel and window replacement in kind at 1-bedroom condominium unit on 23rd floor of a 32 story residential tower. work includes kitchen and bath remodel. new windows and sliding glass doors, new lighting finishes and decoration. no sprinklers in area of work. | $110,000 |
| Apr 19, 2011 | Expired or cancelled expired Jul 2012 | 2222 Hyde St | replace in like kind water damaged plaster and other finish surfaces, reinstall (e) plumbing fixtures and (e) electrical.Details
replace in like kind water damaged plaster and other finish surfaces, reinstall (e) plumbing fixtures and (e) electrical. | $60,000 |
| Mar 17, 2011 | Completed final sign-off Jun 2011 | 2222 Hyde St | replace in like kind water damaged plaster and drywall sections, mouldings, flooring, cabinetry work in study and bath @ southeast corner (all work in study and bath)Details
replace in like kind water damaged plaster and drywall sections, mouldings, flooring, cabinetry work in study and bath @ southeast corner (all work in study and bath) | $55,000 |
| Feb 15, 2011 | Completed final sign-off Mar 2011 | 2222 Hyde St | replace in like kind water damaged plaster & drywall 5/8" type x sections, moldings, carpet, work in study & bath @ southeast corner of unit.Details
replace in like kind water damaged plaster & drywall 5/8" type x sections, moldings, carpet, work in study & bath @ southeast corner of unit. | $18,000 |
| Feb 4, 2011 | Completed final sign-off Mar 2011 | 2222 Hyde St | replace in like kind water damaged plaster & drywall sections, moldings, flooring, cabinetry. work in study & bath @ south east corner.Details
replace in like kind water damaged plaster & drywall sections, moldings, flooring, cabinetry. work in study & bath @ south east corner. | $40,000 |
| Dec 7, 2010 | Completed final sign-off Jan 2011 | 1070 Green St | repair water damaged ceiling from broken pipe @ drywall replaced w/ in kind 250 sq. ft.Details
repair water damaged ceiling from broken pipe @ drywall replaced w/ in kind 250 sq. ft. | $45,000 |
| Aug 13, 2010 | Completed final sign-off Dec 2010 | 550 Davis St | kitchen and remodel of 3 baths, new plumbing &electrical fixtures, cabinets, flooring. no exterior work, no changes to structural elements.Details
kitchen and remodel of 3 baths, new plumbing &electrical fixtures, cabinets, flooring. no exterior work, no changes to structural elements. | $160,000 |
| Aug 4, 2010 | Completed final sign-off Dec 2010 | 1 Crestmont Dr | remove & replace in (e) openings windows, dryrot repair including windowwashing platform, replace (e) window w/sliding door, add new deck @ grade.Details
remove & replace in (e) openings windows, dryrot repair including windowwashing platform, replace (e) window w/sliding door, add new deck @ grade. | $48,000 |
| Jun 29, 2010 | Completed final sign-off Sep 2010 | 279 Dalewood Wy | remodel kitchen-new cabinets, appliances, lighting. replace window in (e) opening. add kitchen island.Details
remodel kitchen-new cabinets, appliances, lighting. replace window in (e) opening. add kitchen island. | $80,000 |
| Nov 12, 2009 | Completed final sign-off Mar 2010 | 550 Davis St | unit #15 @ 2nd fl. kitchen remodel, remodel downstairs bath. new cabinets, counters , appliances, lighting fixtures, plumbing fixtures. no interior wall removal. no exterior work under this permit.Details
unit #15 @ 2nd fl. kitchen remodel, remodel downstairs bath. new cabinets, counters , appliances, lighting fixtures, plumbing fixtures. no interior wall removal. no exterior work under this permit. | $85,000 |
| Sep 3, 2009 | Completed final sign-off Dec 2009 | 233 Kensington Wy | kitchen remodel - no ext. changes, remove & replace cabinetry, remove non-bearing walls.Details
kitchen remodel - no ext. changes, remove & replace cabinetry, remove non-bearing walls. | $115,000 |
| Aug 11, 2009 | Completed final sign-off Dec 2009 | 737 Kansas St | replace dryrotted shower in 2 bathrooms on unit 732. in kind.Details
replace dryrotted shower in 2 bathrooms on unit 732. in kind. | $24,000 |
| Jul 22, 2009 | Completed final sign-off Dec 2009 | 737 Kansas St | replace dryrotted deck boards and framing @ rear deck. in kind less than 50%.Details
replace dryrotted deck boards and framing @ rear deck. in kind less than 50%. | $50,000 |
| Jul 15, 2009 | Completed final sign-off Sep 2009 | 2562 Green St | interior non stuctural remodeling at 1st fl. remodel (e) bedrm to become a clothes storage, remodel 2 (e) storage rms to become one large room for wine. install premade wine racks.Details
interior non stuctural remodeling at 1st fl. remodel (e) bedrm to become a clothes storage, remodel 2 (e) storage rms to become one large room for wine. install premade wine racks. | $28,100 |
| Jun 24, 2009 | Completed final sign-off Jul 2009 | 737 Kansas St | replace leaking sliding door in same opening. no structural work.Details
replace leaking sliding door in same opening. no structural work. | $38,000 |
| Apr 2, 2009 | Expired or cancelled expired Nov 2013 | 757 Market St | work @ unit# 26f only. fabricate & install new cabinetry, cahnge out existing doors & oterh misc. work. replacing in kind. no structural work being completed. work to be complete @ 2 existing bathrooms & 2 existing closets. no windows & no door work on this permit. no lighting involved.Details
work @ unit# 26f only. fabricate & install new cabinetry, cahnge out existing doors & oterh misc. work. replacing in kind. no structural work being completed. work to be complete @ 2 existing bathrooms & 2 existing closets. no windows & no door work on this permit. no lighting involved. | $75,000 |
| Feb 12, 2009 | Completed final sign-off May 2009 | 850 Powell St | replace two interior litewell windows in kind. reglaze exterior front windows in kind. replace single glazing with dual glazed low e' insulated lights. no changes to frames or mullions.Details
replace two interior litewell windows in kind. reglaze exterior front windows in kind. replace single glazing with dual glazed low e' insulated lights. no changes to frames or mullions. | $7,800 |
| Nov 14, 2008 | Completed final sign-off Mar 2009 | 2 06th Av | revision to pa# 2008-0904-0819-replace toilet and sink in (e) half bathroom. move water supply stubs as needed for new fixtures. replace tile floor. move electrical junction box, replace exhaust fan. 2nd floor master toilet roomDetails
revision to pa# 2008-0904-0819-replace toilet and sink in (e) half bathroom. move water supply stubs as needed for new fixtures. replace tile floor. move electrical junction box, replace exhaust fan. 2nd floor master toilet room | $12,000 |
| Sep 30, 2008 | Completed final sign-off Mar 2009 | 2 06th Av | revision to pa #200809040819, replace two double hung windows w/ new round windows @ master beath, replace dbl hung window w/ new french door & transom, new exterior metal guard.Details
revision to pa #200809040819, replace two double hung windows w/ new round windows @ master beath, replace dbl hung window w/ new french door & transom, new exterior metal guard. | $30,000 |
| Sep 4, 2008 | Completed final sign-off Mar 2009 | 2 06th Av | remodel master bedroom and bath, remove and replace plmbg, electrical, tiling, etc. add level ceiling at master bedroom. add sink to laundry room, add non bearing walls and cabinetry to dressing room, structural upgrade to one ext'g walls.Details
remodel master bedroom and bath, remove and replace plmbg, electrical, tiling, etc. add level ceiling at master bedroom. add sink to laundry room, add non bearing walls and cabinetry to dressing room, structural upgrade to one ext'g walls. | $700,000 |
| Sep 4, 2008 | Completed final sign-off Oct 2008 | 1090 Chestnut St | revision to concrete patch detail as shown on 1/a0. reference per app #200710105034Details
revision to concrete patch detail as shown on 1/a0. reference per app #200710105034 | $1,000 |
| Jul 23, 2008 | Completed final sign-off Aug 2008 | 1070 Green St | enclose (e) deck terrace w/ new windows to match (e). re-route (e) deck drain in partition wall. add to (e) track lighting. no structural work.Details
enclose (e) deck terrace w/ new windows to match (e). re-route (e) deck drain in partition wall. add to (e) track lighting. no structural work. | $100,000 |
| Apr 23, 2008 | Completed final sign-off Oct 2008 | 2222 Hyde St | clarification of structural slab repair per field inspector request for pa# 2007-1217-0662. scope of work same as original permit.Details
clarification of structural slab repair per field inspector request for pa# 2007-1217-0662. scope of work same as original permit. | $2,000 |
| Mar 21, 2008 | Completed final sign-off Sep 2008 | 1070 Green St | replace all floor coverings w/stone tile, replace all 1 bathroom plumbing fixtures and tile, new eight fixtures same locations, reface 1 kitchen cabinets, replace glass in (e) windows w/new laminated glass. no structural work, no moving of (e) plumbing locations, paint entire unit. no change inDetails
replace all floor coverings w/stone tile, replace all 1 bathroom plumbing fixtures and tile, new eight fixtures same locations, reface 1 kitchen cabinets, replace glass in (e) windows w/new laminated glass. no structural work, no moving of (e) plumbing locations, paint entire unit. no change in | $165,000 |
| Mar 14, 2008 | Never finaled issued Mar 2008, no final | 2222 Hyde St | unite#4. revision to pa# 2007/12/17/0662. repalce double hung and casement windows in same openings, upgrade alarm to meet u factor min.Details
unite#4. revision to pa# 2007/12/17/0662. repalce double hung and casement windows in same openings, upgrade alarm to meet u factor min. | $20,000 |
| Dec 17, 2007 | Completed final sign-off Oct 2008 | 2222 Hyde St | 5th floor apt#4. interior remodel of apartment/condo. move non bearing partition walls, new cabinetry , tile, plumbing + electrical fixtures, replace doors + windows to balcony + fire eascape.Details
5th floor apt#4. interior remodel of apartment/condo. move non bearing partition walls, new cabinetry , tile, plumbing + electrical fixtures, replace doors + windows to balcony + fire eascape. | $700,000 |
| Oct 29, 2007 | Completed final sign-off Feb 2008 | 2511 Steiner St | upgrade lighting, sub panel upgrad, remodel guest barhroom new fixtures & tile. all fixtures stay in same position paint througout. no exterior work.Details
upgrade lighting, sub panel upgrad, remodel guest barhroom new fixtures & tile. all fixtures stay in same position paint througout. no exterior work. | $50,000 |
| Oct 10, 2007 | Completed final sign-off Dec 2007 | 1245 Stanyan St | add steel bracket and aluminium and glass awning to rearwall. remove and replace garage roof ( shingle) with copper shingles.work related to pa# 200705151292Details
add steel bracket and aluminium and glass awning to rearwall. remove and replace garage roof ( shingle) with copper shingles.work related to pa# 200705151292 | $9,000 |
| Oct 9, 2007 | Completed final sign-off Dec 2007 | 1245 Stanyan St | rev. pa.#200705151292 to add reinforcement to ceiling framing.Details
rev. pa.#200705151292 to add reinforcement to ceiling framing. | $3,000 |
| Aug 29, 2007 | Completed final sign-off Oct 2007 | 455 Frederick St | replace 6 double hung windows at rear of property with pella double hung replacement kits. no change to outside trim or apperance of house or windows. replace with in kind windos. u=>or = to .67Details
replace 6 double hung windows at rear of property with pella double hung replacement kits. no change to outside trim or apperance of house or windows. replace with in kind windos. u=>or = to .67 | $10,000 |
| Jul 20, 2007 | Completed final sign-off Aug 2008 | 1070 Green St | horizontal addition: total remodel of unit #403. no structural woork.exterior windows changed, deck area enclosed. windows changed in kind with previous work on building. all new fixtures. surfaces. unit located on 4th floor of bldng.Details
horizontal addition: total remodel of unit #403. no structural woork.exterior windows changed, deck area enclosed. windows changed in kind with previous work on building. all new fixtures. surfaces. unit located on 4th floor of bldng. | $400,000 |
| Jul 12, 2007 | Completed final sign-off Sep 2007 | 2511 Steiner St | removal of stucco at bottom of 2 bay window at front of house. repair stucco replacement with same as extg. drive slope inside prop line re-slopedDetails
removal of stucco at bottom of 2 bay window at front of house. repair stucco replacement with same as extg. drive slope inside prop line re-sloped | $10,000 |
| May 15, 2007 | Completed final sign-off Dec 2007 | 1245 Stanyan St | remodel 1 kitchen, rebuild e greenhouse window with new double glazed unit. replace door at exterior, extend floor in breakfast nook under e cantilevered bedroom above. replace stair railings, fur up sunken living room floorDetails
remodel 1 kitchen, rebuild e greenhouse window with new double glazed unit. replace door at exterior, extend floor in breakfast nook under e cantilevered bedroom above. replace stair railings, fur up sunken living room floor | $175,000 |
| Mar 21, 2007 | Completed final sign-off Sep 2007 | 999 Green St | work @ unit# 2504 (lot# 107) only. kitchen cabinet swap out, appliances to remain in current positions. 1 new electrical circuit from ex panel.Details
work @ unit# 2504 (lot# 107) only. kitchen cabinet swap out, appliances to remain in current positions. 1 new electrical circuit from ex panel. | $40,000 |
| Nov 22, 2006 | Completed final sign-off Jan 2007 | 49 Jersey St | remove metal fireplace, chimney & enclosure from bedroom, fill in door opening between two bedrooms. replace 5 doors in (e) ovenings. install electrical for wall mount tv.Details
remove metal fireplace, chimney & enclosure from bedroom, fill in door opening between two bedrooms. replace 5 doors in (e) ovenings. install electrical for wall mount tv. | $15,000 |
| Oct 30, 2006 | Completed final sign-off Feb 2007 | 2074 Jefferson St | revision to railing around existing skylights in deck area. change from cable railing to redwood railing supporting 1/2 " tepered glass tops. revison to 200608159570Details
revision to railing around existing skylights in deck area. change from cable railing to redwood railing supporting 1/2 " tepered glass tops. revison to 200608159570 | $1,500 |
| Sep 12, 2006 | Completed final sign-off May 2007 | 2100 Green St | renewal for final inspection app#200003164571.Details
renewal for final inspection app#200003164571. | |
| Sep 6, 2006 | Completed final sign-off Dec 2006 | 16 Woodland Av | for permit# 200608048651-revision to deck size (smaller) and structural details as shown on plans 8/29/06.Details
for permit# 200608048651-revision to deck size (smaller) and structural details as shown on plans 8/29/06. | |
| Aug 15, 2006 | Completed final sign-off Feb 2007 | 2074 Jefferson St | replace ex. palette deck with new, decrease size of deck to fit within 36" from prop lines. install cable rail system. to comply with n.o.v 200670804.Details
replace ex. palette deck with new, decrease size of deck to fit within 36" from prop lines. install cable rail system. to comply with n.o.v 200670804. | $9,500 |
| Aug 8, 2006 | Completed final sign-off Feb 2007 | 179 San Felipe Av | leak remediation, remove/replace stucco on rear of house & 20' up eat side of house. reflash all doors/windows replace rotted doors @ solarium. replace all dryrotted framing change (4) aluminum window to match wooden windows in rest of house.Details
leak remediation, remove/replace stucco on rear of house & 20' up eat side of house. reflash all doors/windows replace rotted doors @ solarium. replace all dryrotted framing change (4) aluminum window to match wooden windows in rest of house. | $97,500 |
| Aug 7, 2006 | Completed final sign-off Jan 2007 | 1245 Stanyan St | modify exist permit #1085498 to add skylight, parapet, re-locate water heater, modify chimney, add typex rock. re-roofing.Details
modify exist permit #1085498 to add skylight, parapet, re-locate water heater, modify chimney, add typex rock. re-roofing. | $15,000 |
| Aug 4, 2006 | Completed final sign-off Dec 2006 | 16 Woodland Av | replace dryrotted deck with new that is 3' set back. investigate for dryrot at sill plate of storage room floorDetails
replace dryrotted deck with new that is 3' set back. investigate for dryrot at sill plate of storage room floor | $15,000 |
| Jul 7, 2006 | Completed final sign-off Dec 2006 | 1852 Laguna St | comply w/ nov 200670769. replace decking and dryrotted under carriage of existing deck completed under 8410860. extend existing deck to back property line w/1 hr separation. extension is 69 sf. 3ft extension x 22.5 ftDetails
comply w/ nov 200670769. replace decking and dryrotted under carriage of existing deck completed under 8410860. extend existing deck to back property line w/1 hr separation. extension is 69 sf. 3ft extension x 22.5 ft | $16,500 |
| Mar 28, 2006 | Completed final sign-off Jan 2007 | 1245 Stanyan St | master bath & 3rd floor bath remodel - new cabinetry, tile, fixtures. new on-demand water heater, replace skylight, minor interior wall modification, builtin cabinetry, new lighting, replace 12 (e) window, add 6 new 45 min fire rated windows in north wall @ property line.Details
master bath & 3rd floor bath remodel - new cabinetry, tile, fixtures. new on-demand water heater, replace skylight, minor interior wall modification, builtin cabinetry, new lighting, replace 12 (e) window, add 6 new 45 min fire rated windows in north wall @ property line. | $175,000 |
| Oct 19, 2005 | Completed final sign-off Dec 2005 | 2875 Green St | repair exterior siding where dirt wood contact extgs lower grade 6" at west wall of residenceDetails
repair exterior siding where dirt wood contact extgs lower grade 6" at west wall of residence | $2,750 |
| Sep 12, 2005 | Completed final sign-off Jan 2006 | 66 Saint Germain Av | removal all cabs, appliances, floor covering in kitchen new lighting & plugs new insulation & sheetrDetails
removal all cabs, appliances, floor covering in kitchen new lighting & plugs new insulation & sheetr | $105,000 |
| Mar 15, 2005 | Completed final sign-off Oct 2005 | 1245 Stanyan St | remodel guest bath, replace tub w/ shower, create desk area,Details
remodel guest bath, replace tub w/ shower, create desk area, | $85,000 |
| Feb 9, 2005 | Completed final sign-off Jun 2005 | 550 Davis St | #29 - add built in cabinetry in study,master bedroom,media room,bath rooms,Details
#29 - add built in cabinetry in study,master bedroom,media room,bath rooms, | $41,000 |
| Oct 22, 2004 | Completed final sign-off May 2005 | 46 06th Av | replace (e) rotted rear yard deck w/n deck. no changes to deck-reuse (e) foundations -replace (e) daDetails
replace (e) rotted rear yard deck w/n deck. no changes to deck-reuse (e) foundations -replace (e) da | $25,000 |
| Sep 20, 2004 | Completed final sign-off Dec 2004 | 2332 Vallejo St | all works are being done in unit 1 only. replace tub w/shower; reframe doorway-same size opening inDetails
all works are being done in unit 1 only. replace tub w/shower; reframe doorway-same size opening in | $25,000 |
| Sep 14, 2004 | Completed final sign-off Jun 2005 | 46 06th Av | remodel kchn/dining room/master bdrm bth/new wall sufaces fixtures and applDetails
remodel kchn/dining room/master bdrm bth/new wall sufaces fixtures and appl | $175,000 |
| Sep 10, 2004 | Completed final sign-off Mar 2005 | 1070 Green St | add new cabinets, appliances, plumbing fixt, lights, flr coverings, tile, mirrors,paint all areas,Details
add new cabinets, appliances, plumbing fixt, lights, flr coverings, tile, mirrors,paint all areas, | $125,000 |
| Aug 10, 2004 | Expired or cancelled expired Jan 2006 | 2352 Pine St | revision for structural boldt change from 7/8" to 3/4" for app#200205247465. structural drawings onlDetails
revision for structural boldt change from 7/8" to 3/4" for app#200205247465. structural drawings onl | |
| Aug 6, 2004 | Never finaled issued Aug 2004, no final | 2115 Broderick St | renew expired permit app 200308041174-200302147525Details
renew expired permit app 200308041174-200302147525 | |
| Aug 6, 2004 | Completed final sign-off Sep 2004 | 2115 Broderick St | renew expired permit app 200304152293-200308081567Details
renew expired permit app 200304152293-200308081567 | |
| Aug 3, 2004 | Completed final sign-off Dec 2004 | 1070 Green St | add tub to existing shower location (no structural)Details
add tub to existing shower location (no structural) | $4,200 |
| Jun 11, 2004 | Completed final sign-off Jul 2004 | 2356 Pine St | renew#200308142133 for final inspectionDetails
renew#200308142133 for final inspection | |
| May 12, 2004 | Completed final sign-off Sep 2004 | 2115 Broderick St | install 2 new skylights within existing roof framingDetails
install 2 new skylights within existing roof framing | $5,000 |