Permit GraphShortlistSan Francisco building permits since 2000

Steve Connelly

License
C27007
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C27007 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, engineer
Firm
Oculus Architects
Based in
San Francisco
On San Francisco permits
Apr 2002 to Jun 2026

40 permits since 2000 (architect on 37 permits, engineer on 2 permits, authorized agent-others on 1 permit): 25 completed, 1 in progress, 7 never finaled, 7 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Turner Construction Co (5), Schikore Construction (3), Bach Construction, Inc. (2), Cahill Contractors Llc. (2), Mai Construction Inc. (2), Ronan O'dea Inc Dba O'dea Ronan Inc (2), Arroyo Realty & Development Llc, Bcci Construction Company, Black Mountain Development, Build Group Inc., Cahill Const Service Inc, Gelling & Judd Inc., Lewis M Merlo Inc, Rudolph Commercial Interiors Inc, Rci, T P Windows Inc/United Glass & Aluminum
Engineers
Mark Moore (3), Ed Najjarine, Kirk Johnston, Loring Wyllie, Paul O'neill, Rizik J Michael

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 15, 2026Completed
final sign-off Jul 2026
2350 Turk BlCahill Contractors Llc.revision to pa # 202503041492: close-out permit to record approved as built condition approved by inspector request. drawing revise to document a approved complete work. for record purpose.
Details
Permit
202606153198
Permit issued
Jun 29, 2026
Final sign-off
Jul 28, 2026

revision to pa # 202503041492: close-out permit to record approved as built condition approved by inspector request. drawing revise to document a approved complete work. for record purpose.

Open the permit page

Feb 6, 2026Completed
final sign-off Aug 2026
476 Post StT P Windows Inc/United Glass & Aluminumremove 5-foot section of hollow, clay tile wall between two tenant spaces each with their own exits so as to create a common opening. refer to p/a 2026-0701-4457.
Details
Permit
202602065495
Permit issued
Jul 7, 2026
Final sign-off
Aug 18, 2026

remove 5-foot section of hollow, clay tile wall between two tenant spaces each with their own exits so as to create a common opening. refer to p/a 2026-0701-4457.

Open the permit page

$12,500
May 14, 2025In progress
issued Jun 2025
2340 Turk BlLewis M Merlo Incnew exterior paving and entry ramp.
Details
Permit
202505146462
Permit issued
Jun 11, 2025

new exterior paving and entry ramp.

Open the permit page

$75,000
Mar 20, 2025Completed
final sign-off Aug 2025
280 Spear StBlack Mountain Developmentnew interior lighting with new dropped ceiling in areas to accomodate new led cans.
Details
Permit
202503202682
Permit issued
Mar 21, 2025
Final sign-off
Aug 25, 2025

new interior lighting with new dropped ceiling in areas to accomodate new led cans.

Open the permit page

$10,000
Aug 23, 2024Completed
final sign-off Aug 2025
1560 40th AvRudolph Commercial Interiors Inc, Rciminor demolition to existing kitchen and servery including new case works and suspend ceiling
Details
Permit
202408239377
Permit issued
Jan 7, 2025
Final sign-off
Aug 8, 2025

minor demolition to existing kitchen and servery including new case works and suspend ceiling

Open the permit page

$140,000
Apr 24, 2023Completed
final sign-off Apr 2024
2335 Golden Gate AvCahill Contractors Llc.deferred submittal - shop drawings for acc glass inc window wall system - fixed window located high above the end of the basketball court (ref pa 2021-0521-0845)
Details
Permit
202304246303
Permit issued
May 24, 2023
Final sign-off
Apr 3, 2024

deferred submittal - shop drawings for acc glass inc window wall system - fixed window located high above the end of the basketball court (ref pa 2021-0521-0845)

Open the permit page

Feb 19, 2021Never finaled
issued Jul 2021, no final
1330 14th AvArroyo Realty & Development Llcinterior partition barrier removal, new accessible restroom and new ada compliant ramp at entryway.
Details
Permit
202102195001
Permit issued
Jul 2, 2021

interior partition barrier removal, new accessible restroom and new ada compliant ramp at entryway.

Open the permit page

$25,000
May 7, 2019Never finaled
issued Jun 2019, no final
50 Thomas More WyBuild Group Inc.voluntary structural upgrade
Details
Permit
201905079955
Permit issued
Jun 13, 2019

voluntary structural upgrade

Open the permit page

$400,000
Oct 23, 2018Completed
final sign-off Jun 2021
1563 Fulton StRonan O'dea Inc Dba O'dea Ronan Increpair & remodel 4 fire damaged apartments. no building expansion, no new units
Details
Permit
201810233954
Permit issued
Mar 21, 2019
Final sign-off
Jun 10, 2021

repair & remodel 4 fire damaged apartments. no building expansion, no new units

Open the permit page

$300,000
Oct 15, 2018Completed
final sign-off Dec 2022
330 Parker Averect 1-story, type 2-b, no basement, no dwelling unit, recycling & waste facility bldg.
Details
Permit
201810153184
Permit issued
Aug 20, 2019
Final sign-off
Dec 20, 2022

erect 1-story, type 2-b, no basement, no dwelling unit, recycling & waste facility bldg.

Open the permit page

$350,000
Dec 15, 2017Completed
final sign-off Feb 2018
2350 Turk BlMai Construction Inc.removal of an (e) stud partition wall & renovation of (e) offices & classrooms maher na
Details
Permit
201712156657
Permit issued
Jan 22, 2018
Final sign-off
Feb 9, 2018

removal of an (e) stud partition wall & renovation of (e) offices & classrooms maher na

Open the permit page

$100,000
Nov 27, 2017Expired or cancelled
expired Jan 2026
2800 Turk BlCahill Const Service Incaccessibility upgrades consisting of the removal of an (e) non-compliant ramp on the 1st fl along with corridor and adjacent office plan re-configurations to accomodate new ramp length, fire under separate permit(s)
Details
Permit
201711274843
Permit issued
Jan 22, 2018

accessibility upgrades consisting of the removal of an (e) non-compliant ramp on the 1st fl along with corridor and adjacent office plan re-configurations to accomodate new ramp length, fire under separate permit(s)

Open the permit page

$400,000
Mar 16, 2017Never finaled
issued Jun 2017, no final
476 24th AvBach Construction, Inc.includes accommodating structural seismic strengthening to (e) building. project also includes providing fully complaint access into the main building as well as providing a fully compliant ada unixex bathroom in the basement level of the building
Details
Permit
201703161599
Permit issued
Jun 14, 2017

includes accommodating structural seismic strengthening to (e) building. project also includes providing fully complaint access into the main building as well as providing a fully compliant ada unixex bathroom in the basement level of the building

Open the permit page

$575,000
Mar 16, 2017Never finaled
issued Jun 2017, no final
3801 Balboa StBach Construction, Inc.includes accommodating structural seismic strengthening to the existing building. project also includes providing a unisex ada restroom
Details
Permit
201703161598
Permit issued
Jun 14, 2017

includes accommodating structural seismic strengthening to the existing building. project also includes providing a unisex ada restroom

Open the permit page

$775,000
Jan 10, 2017Completed
final sign-off Jan 2020
2350 Turk Blremoval of (e) dilapidated greenhouse & installation of new pre-fabricated & pre-engineered , de-mountable greenhouse structure supplied by igc.
Details
Permit
201701106845
Permit issued
Aug 9, 2018
Final sign-off
Jan 31, 2020

removal of (e) dilapidated greenhouse & installation of new pre-fabricated & pre-engineered , de-mountable greenhouse structure supplied by igc.

Open the permit page

$5,000
Dec 5, 2016Never finaled
issued Jan 2017, no final
1330 14th AvRonan O'dea Inc Dba O'dea Ronan Incdemo of existing bathrooms and new tenant improvements, including accessibility upgrades on 2nd and 3rd floor of existing st. annes' convent.
Details
Permit
201612054145
Permit issued
Jan 17, 2017

demo of existing bathrooms and new tenant improvements, including accessibility upgrades on 2nd and 3rd floor of existing st. annes' convent.

Open the permit page

$1,100,000
May 13, 2016Completed
final sign-off Dec 2016
2445 Golden Gate AvMai Construction Inc.interior renovations to an existing 'b' occupancy area within the 3/f of a 5-story bldg. renovations to include new offices and laboratory. n/a ordinance #155-13
Details
Permit
201605137396
Permit issued
Jun 23, 2016
Final sign-off
Dec 13, 2016

interior renovations to an existing 'b' occupancy area within the 3/f of a 5-story bldg. renovations to include new offices and laboratory. n/a ordinance #155-13

Open the permit page

$750,000
Oct 8, 2013Expired or cancelled
cancelled Jan 2026
2130 Fulton St5/f- rev. to pa# 201307081302 restroom accessibility.
Details
Permit
201310088804

5/f- rev. to pa# 201307081302 restroom accessibility.

Open the permit page

Sep 21, 2012Expired or cancelled
withdrawn Dec 2015
284 Stanyan Ststructurel seismic work & interior tenant improvement of existing offices.
Details
Permit
201209210400

structurel seismic work & interior tenant improvement of existing offices.

Open the permit page

$200,000
Jul 3, 2012Completed
final sign-off Feb 2015
2345 Golden Gate AvTurner Construction Coaccessiblity entry upgrade with elevation & internal renovations. mep under separate permit. include new entry steps to (e) exterior & new curtain wall system & 1st floor north side. demo (e) office & restroom & install new replacement accessible restroom & relocated.
Details
Permit
201207034034
Permit issued
Nov 9, 2012
Final sign-off
Feb 11, 2015

accessiblity entry upgrade with elevation & internal renovations. mep under separate permit. include new entry steps to (e) exterior & new curtain wall system & 1st floor north side. demo (e) office & restroom & install new replacement accessible restroom & relocated.

Open the permit page

$2,000,000
Jun 7, 2012Completed
final sign-off Sep 2012
2375 Golden Gate AvTurner Construction Conew fireplace & new entry door along with new ceiling & interior finiahes. m.e.p under seperate permit
Details
Permit
201206072121
Permit issued
Jun 26, 2012
Final sign-off
Sep 25, 2012

new fireplace & new entry door along with new ceiling & interior finiahes. m.e.p under seperate permit

Open the permit page

$200,000
Jun 4, 2012Completed
final sign-off Aug 2012
2101 Fulton StTurner Construction Colibrary renovations - first & second floor office reconfiguration.mep under separate permit
Details
Permit
201206041776
Permit issued
Jun 19, 2012
Final sign-off
Aug 16, 2012

library renovations - first & second floor office reconfiguration.mep under separate permit

Open the permit page

$500,000
Mar 6, 2012Completed
final sign-off May 2012
101 Howard StBcci Construction Company4th floor-renovations & remodeling of a partial area of the (e) 4th floor converting 1 large classroom into 3 smaller classrooms along with other minor floor plan modifications. mep & fire protection under separate permit.
Details
Permit
201203065488
Permit issued
Mar 29, 2012
Final sign-off
May 29, 2012

4th floor-renovations & remodeling of a partial area of the (e) 4th floor converting 1 large classroom into 3 smaller classrooms along with other minor floor plan modifications. mep & fire protection under separate permit.

Open the permit page

$321,000
Jan 27, 2012Completed
final sign-off Aug 2014
2345 Golden Gate AvTurner Construction Cointerior remodel of ground floor entry area and floors 2-6 dorm rooms and bathrooms
Details
Permit
201201273064
Permit issued
Mar 28, 2012
Final sign-off
Aug 7, 2014

interior remodel of ground floor entry area and floors 2-6 dorm rooms and bathrooms

Open the permit page

$2,000,000
Nov 29, 2011Completed
final sign-off Jan 2013
2305 Golden Gate Avdemolition of (e) fence & installation of new 8' fence on property line & trees
Details
Permit
201111299732
Permit issued
Jun 26, 2012
Final sign-off
Jan 10, 2013

demolition of (e) fence & installation of new 8' fence on property line & trees

Open the permit page

$20,000
Apr 7, 2011Completed
final sign-off Feb 2012
22 Chabot TrGelling & Judd Inc.remodel kitchen and bath at 2nd floor. new interior stair between 1st and 2nd fl, change window to french door, convert storage at gr floor to bedroom, family room, and bath. elec, plumb, mech under sep permit
Details
Permit
201104073666
Permit issued
Apr 14, 2011
Final sign-off
Feb 16, 2012

remodel kitchen and bath at 2nd floor. new interior stair between 1st and 2nd fl, change window to french door, convert storage at gr floor to bedroom, family room, and bath. elec, plumb, mech under sep permit

Open the permit page

$250,000
Mar 2, 2011Completed
final sign-off Aug 2014
2345 Golden Gate AvTurner Construction Cousf phelan hall. for limited voluntary seismic upgrade to existing basement thru the sixth floor of the 7-story bldg. local structural member strengthening. no change of occupancy (per general portion of asce-41 procedure with certain exceptions). see engineer's statement dated 4-18-11 attached.
Details
Permit
201103021231
Permit issued
May 19, 2011
Final sign-off
Aug 7, 2014

usf phelan hall. for limited voluntary seismic upgrade to existing basement thru the sixth floor of the 7-story bldg. local structural member strengthening. no change of occupancy (per general portion of asce-41 procedure with certain exceptions). see engineer's statement dated 4-18-11 attached.

Open the permit page

$890,000
May 19, 2010Completed
final sign-off Nov 2010
2375 Golden Gate AvSchikore Constructionlocalized food strengthening of new security grille and new gyp bd along with minor non struct non rated demo work
Details
Permit
201005192760
Permit issued
May 27, 2010
Final sign-off
Nov 15, 2010

localized food strengthening of new security grille and new gyp bd along with minor non struct non rated demo work

Open the permit page

$100,000
Jul 10, 2009Completed
final sign-off Aug 2009
2130 Fulton StSchikore Constructionnew storefront & entrances to (e) storefront. electrical permit under separate permit.
Details
Permit
200907102388
Permit issued
Jul 17, 2009
Final sign-off
Aug 26, 2009

new storefront & entrances to (e) storefront. electrical permit under separate permit.

Open the permit page

$100,000
Jun 18, 2009Completed
final sign-off Dec 2009
2497 Golden Gate AvSchikore Constructionrevision to pa# 2008/09/19/2126, revise previous building from concrete to pre engineered steel cladding (pre-engineered structure)
Details
Permit
200906180750
Permit issued
Aug 10, 2009
Final sign-off
Dec 15, 2009

revision to pa# 2008/09/19/2126, revise previous building from concrete to pre engineered steel cladding (pre-engineered structure)

Open the permit page

Jul 9, 2008Completed
final sign-off Apr 2009
2130 Fulton Stnew stand alone canopy. including colums & beams supporting a translucent glazing system.
Details
Permit
200807096292
Permit issued
Jul 9, 2008
Final sign-off
Apr 17, 2009

new stand alone canopy. including colums & beams supporting a translucent glazing system.

Open the permit page

$100,000
Mar 27, 2007Expired or cancelled
expired Mar 2010
2130 Fulton Sterect ground electric single faced replacement sign.
Details
Permit
200703277421
Permit issued
Mar 27, 2007

erect ground electric single faced replacement sign.

Open the permit page

Jan 23, 2007Expired or cancelled
withdrawn Jun 2017
4614 California Stto erect four story pre-school and administration new building
Details
Permit
200701232361

to erect four story pre-school and administration new building

Open the permit page

$3,000,000
Jan 23, 2007Expired or cancelled
withdrawn Jun 2017
4614 California Stto demolish 4 story pre-school and administration
Details
Permit
200701232357

to demolish 4 story pre-school and administration

Open the permit page

May 16, 2006Completed
final sign-off Jan 2008
2800 Turk Blrenovation of extg elevator lobby areas to floors 4 through 7. to correct extg lobby/elevator code infranction
Details
Permit
200605161749
Permit issued
May 16, 2006
Final sign-off
Jan 17, 2008

renovation of extg elevator lobby areas to floors 4 through 7. to correct extg lobby/elevator code infranction

Open the permit page

$350,000
Mar 8, 2006Expired or cancelled
expired Feb 2009
2800 Turk Blremove (e) glass entry & construct new entry colamade. ref to previous pa# 2005/08/10/9898 for title 24 access complete dated: 09/21/05.
Details
Permit
200603086241
Permit issued
Apr 27, 2006

remove (e) glass entry & construct new entry colamade. ref to previous pa# 2005/08/10/9898 for title 24 access complete dated: 09/21/05.

Open the permit page

$500,000
Sep 21, 2005Completed
final sign-off Oct 2005
2800 Turk Strevision to permit#200508109898. ading new grand doors & screens & bean rated wall section. as built
Details
Permit
200509213496
Permit issued
Sep 21, 2005
Final sign-off
Oct 6, 2005

revision to permit#200508109898. ading new grand doors & screens & bean rated wall section. as built

Open the permit page

$20,000
Aug 12, 2005Never finaled
issued Aug 2005, no final
2130 Fulton Strenovation of (e) office area including removal of (e) partition & construction of new non-structura
Details
Permit
200508120216
Permit issued
Aug 12, 2005

renovation of (e) office area including removal of (e) partition & construction of new non-structura

Open the permit page

$250,000
Jun 13, 2005Never finaled
issued Jun 2005, no final
2130 Fulton Stminor renoation to (e) locker room areas within (e) university gym, including creation of (n)
Details
Permit
200506134953
Permit issued
Jun 13, 2005

minor renoation to (e) locker room areas within (e) university gym, including creation of (n)

Open the permit page

$400,000
Apr 4, 2002Completed
final sign-off Aug 2002
2130 Fulton Stbuild new office & voctional training area within 1st fl area.incl modify garage door & north elevat
Details
Permit
200204043155
Permit issued
Apr 4, 2002
Final sign-off
Aug 28, 2002

build new office & voctional training area within 1st fl area.incl modify garage door & north elevat

Open the permit page

$350,000