John Hood
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Hood Thomas Architects
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jun 2026
181 permits since 2000 (architect on 174 permits, designer on 5 permits, authorized agent-others on 1 permit, engineer on 1 permit): 112 completed, 8 in progress, 31 never finaled, 30 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 181.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 14, 2026 | In progress filed Jun 2026, not yet issued | 4232 25th St | convert part of detached garage into adu (state program), with 1-bedroom unit with kitchen and bathroom. (n) unit to be provided with nfpa13r automatic fire sprinkler system under separate permit. fire alarm under separate permit.Details
convert part of detached garage into adu (state program), with 1-bedroom unit with kitchen and bathroom. (n) unit to be provided with nfpa13r automatic fire sprinkler system under separate permit. fire alarm under separate permit. | $350,000 | |
| Aug 15, 2025 | In progress filed Aug 2025, not yet issued | 940 Laguna Honda Bl | revision to pa #2025-0501-5587. remove approved outletDetails
revision to pa #2025-0501-5587. remove approved outlet | ||
| May 1, 2025 | Completed final sign-off Nov 2025 | 940 Laguna Honda Bl | Guzman Construction Group Inc. | alterations to bathrooms to make accessible.Details
alterations to bathrooms to make accessible. | $200,000 |
| Apr 28, 2025 | In progress issued May 2025 | 99 25th Av | Mac Tec Construction Company Inc | replace existing windows in kind,replace existing exterior stairs in kind, replace exterior stucco, replace existing fire place foundation and chimney. revision to pa#202312072083Details
replace existing windows in kind,replace existing exterior stairs in kind, replace exterior stucco, replace existing fire place foundation and chimney. revision to pa#202312072083 | $50,000 |
| Apr 23, 2025 | In progress issued Jan 2026 | 4230 25th St | Fogarty James A | rear bldg: legalize one (e) unit at first flr of the (e) northwest single family bldg. the unit will be 1-bedroom unit w/ a kitchen and a bath. no work proposed on other, the legalized unit to be provided with nfpa 13r automatice fire sprinkler system under separate permit.Details
rear bldg: legalize one (e) unit at first flr of the (e) northwest single family bldg. the unit will be 1-bedroom unit w/ a kitchen and a bath. no work proposed on other, the legalized unit to be provided with nfpa 13r automatice fire sprinkler system under separate permit. | $150,000 |
| Dec 7, 2023 | In progress issued Aug 2024 | 99 25th Av | Mac Tec Construction Company Inc | int. & ext. alts: conv. part of garage to liv. space. remodel (e) kit. and 3 bdrms, 3 haths, powder rm, into 4 bdrms, 5 baths, 1 powder rm. all (n) interior finishes to replace (e) finishes. raise partial mansard roof to convert attic to 4th story. remove (e) window @ south facade. nfpa 13r sprklsDetails
int. & ext. alts: conv. part of garage to liv. space. remodel (e) kit. and 3 bdrms, 3 haths, powder rm, into 4 bdrms, 5 baths, 1 powder rm. all (n) interior finishes to replace (e) finishes. raise partial mansard roof to convert attic to 4th story. remove (e) window @ south facade. nfpa 13r sprkls | $950,000 |
| Jul 14, 2023 | In progress issued Mar 2024 | 2080 Mcallister St | Arthur Mcnulty Construction | comply w/nov20230792 for rear stairs to be removed. remove all lathe&plaster&sheetrock.all wall coverings on top 2 flrs.interior remodel to include kitchens,baths to all unit.convert portion of garage to habitable space connected to 1 unit.seismic upgrade per plans attached.sprinkler separate permitDetails
comply w/nov20230792 for rear stairs to be removed. remove all lathe&plaster&sheetrock.all wall coverings on top 2 flrs.interior remodel to include kitchens,baths to all unit.convert portion of garage to habitable space connected to 1 unit.seismic upgrade per plans attached.sprinkler separate permit | $480,000 |
| Nov 15, 2022 | In progress issued May 2025 | 3223 Folsom St | J P F Construction | commencment of work under pa201708215412 for a soft story original permit granted in 2017. we are now ready to begin work and the original permit needs to be looked at again to comply with nov#202045653.Details
commencment of work under pa201708215412 for a soft story original permit granted in 2017. we are now ready to begin work and the original permit needs to be looked at again to comply with nov#202045653. | |
| Nov 1, 2022 | Completed final sign-off Dec 2023 | 2999 Pacific Av | Larkspur Builders Inc. | unit 2: remove & relocate non bearing frame walls @ bath, remodel/ reconfigure 2 bath & study. all (n) interior finishes replaced. upfate recess lights.Details
unit 2: remove & relocate non bearing frame walls @ bath, remodel/ reconfigure 2 bath & study. all (n) interior finishes replaced. upfate recess lights. | $95,000 |
| Jul 15, 2022 | Completed final sign-off Apr 2025 | 983 Capp St | Als Builders Pro Inc | structural revision to approved permit 201912311057Details
structural revision to approved permit 201912311057 | |
| Jul 15, 2022 | Completed final sign-off Dec 2023 | 983 Capp St | Als Builders Pro Inc | structural revision to approved permit 201912311053Details
structural revision to approved permit 201912311053 | |
| Jul 15, 2022 | Completed final sign-off Dec 2023 | 989 Capp St | Als Builders Pro Inc | structural revision to approved permit 201912300957. (n) concrete foundation & wood framing.Details
structural revision to approved permit 201912300957. (n) concrete foundation & wood framing. | |
| Jun 6, 2022 | Completed final sign-off Apr 2024 | 2200 Turk Bl | Yefa Construction Inc | revision to pa#201707212564. revise unit b studio layout on the first floor of the extg four story buildingDetails
revision to pa#201707212564. revise unit b studio layout on the first floor of the extg four story building | |
| Apr 28, 2022 | Never finaled issued Apr 2022, no final | 1163 South Van Ness Av | change fau to radiant floor. ref #201912048654Details
change fau to radiant floor. ref #201912048654 | ||
| Apr 15, 2022 | Never finaled issued Apr 2022, no final | 1163 South Van Ness Av | to comply with nov# 202287914. replace (e) fence with 6' tall fence.Details
to comply with nov# 202287914. replace (e) fence with 6' tall fence. | $3,000 | |
| Feb 16, 2022 | Completed final sign-off Nov 2022 | 3848 24th St | M Rivera Construction Inc. | to comply nov 202025420: legalize a 11ft-10in x 12ft-3in storage at rear of commericial space.Details
to comply nov 202025420: legalize a 11ft-10in x 12ft-3in storage at rear of commericial space. | $1,000 |
| Sep 16, 2021 | Completed final sign-off Oct 2023 | 2224 Union St | J P F Construction | tenant improvedment: construct new demising wall. 2 new ada compliant single occupancy restrooms. new egress door and stairs. remove existing wall finishes back to taped gypsum board finish throughout. safe off abandoned plumbing, and associated electrical.Details
tenant improvedment: construct new demising wall. 2 new ada compliant single occupancy restrooms. new egress door and stairs. remove existing wall finishes back to taped gypsum board finish throughout. safe off abandoned plumbing, and associated electrical. | $90,000 |
| Sep 10, 2021 | Expired or cancelled withdrawn Mar 2025 | 4232 25th St | legalize (e) rear building to north of the (e) single-family main residence per (e) 3r report, water record, & building card, no architectural/structural work proposed.Details
legalize (e) rear building to north of the (e) single-family main residence per (e) 3r report, water record, & building card, no architectural/structural work proposed. | ||
| Jun 30, 2021 | Expired or cancelled cancelled Jan 2026 | 932 Church St | interior alterarion: remodel 1 kitchen & 1 bath.Details
interior alterarion: remodel 1 kitchen & 1 bath. | $20,000 | |
| Jun 23, 2021 | Completed final sign-off Apr 2022 | 934 Church St | David M Goray | interior alteration: remodel kitchen. no structural work.Details
interior alteration: remodel kitchen. no structural work. | $15,000 |
| Apr 6, 2021 | Expired or cancelled cancelled Jan 2026 | 499 29th St | accessible business entrance upgrade per ordinance 51-15. plae of accomodation to have the primary entry and path or travel into the building accessible by persons with disabilities.Details
accessible business entrance upgrade per ordinance 51-15. plae of accomodation to have the primary entry and path or travel into the building accessible by persons with disabilities. | $30,000 | |
| Jan 7, 2021 | Never finaled issued Jul 2023, no final | 2086 Mission St | 2086: to comply with accessible business entrance program per org 51-16. place of accommodation to have primary entry & path of traval into the bldg accessible by person with disabilities.Details
2086: to comply with accessible business entrance program per org 51-16. place of accommodation to have primary entry & path of traval into the bldg accessible by person with disabilities. | $3,000 | |
| Jan 5, 2021 | Expired or cancelled cancelled Jan 2026 | 731 Jackson St | accessible business entracne upgrade per ordinance 51-15, place of accommodation to have the primary entry and path of travel into the building accessible by people with disabilities.Details
accessible business entracne upgrade per ordinance 51-15, place of accommodation to have the primary entry and path of travel into the building accessible by people with disabilities. | $4,000 | |
| Dec 11, 2020 | Never finaled issued Jul 2023, no final | 2080 Mission St | to comply with accessible business entrance program per ord 51-16. place of accommodation to have primary entry & path of travel into the bldg accessible by person with disabilities. retail only.Details
to comply with accessible business entrance program per ord 51-16. place of accommodation to have primary entry & path of travel into the bldg accessible by person with disabilities. retail only. | $6,000 | |
| Nov 18, 2020 | Expired or cancelled cancelled Jan 2026 | 749 Jackson St | accessible business entrance program per ordinance 51-16: place accommodation to have the primary entry and path of travel into the building accessible by person with disabilities.Details
accessible business entrance program per ordinance 51-16: place accommodation to have the primary entry and path of travel into the building accessible by person with disabilities. | $16,000 | |
| Oct 16, 2020 | Never finaled filed Oct 2020, never issued | 3223 Folsom St | to construct a type v-b, 2-story, 1-single family residential bldg with no basement. detached in rear of existing property - adu per state ab-881.Details
to construct a type v-b, 2-story, 1-single family residential bldg with no basement. detached in rear of existing property - adu per state ab-881. | $130,000 | |
| Oct 10, 2020 | Expired or cancelled withdrawn Sep 2024 | 500 Cambridge St | interior remodel: renovate (e) interior stair. add new bedroom, bath, laundry to the first floor in the rear, not visible from street.Details
interior remodel: renovate (e) interior stair. add new bedroom, bath, laundry to the first floor in the rear, not visible from street. | $80,000 | |
| Jun 11, 2020 | Expired or cancelled withdrawn Feb 2021 | 3223 Folsom St | (front building) add one adu per ordinance no. 162-17. at the first floor of an (e) 6-unit building. the (n) unit will be a studio unit with a kitchen and a bath. (unit legalization for 7th unit ref pa #2020-0610-8373)Details
(front building) add one adu per ordinance no. 162-17. at the first floor of an (e) 6-unit building. the (n) unit will be a studio unit with a kitchen and a bath. (unit legalization for 7th unit ref pa #2020-0610-8373) | $60,000 | |
| Jun 10, 2020 | Expired or cancelled cancelled Nov 2024 | 3223 Folsom St | (front building) legalize one (e) dwelling unit per ordinance 43-14 at the first floor of an (e) 6-unit building. the unit will be a studio unit with a kitchen and a bath.Details
(front building) legalize one (e) dwelling unit per ordinance 43-14 at the first floor of an (e) 6-unit building. the unit will be a studio unit with a kitchen and a bath. | $100,000 | |
| Mar 16, 2020 | Expired or cancelled cancelled Nov 2024 | 348 Waller St | revision to pa 2016-0707-1808 add steps and landing @ the front of the property for access to the escape/rescue corridor. work is in sidewalk.Details
revision to pa 2016-0707-1808 add steps and landing @ the front of the property for access to the escape/rescue corridor. work is in sidewalk. | $1,000 | |
| Mar 6, 2020 | Never finaled issued Oct 2021, no final | 62 Concord St | Competente Construction Inc | addition remodel: add a 3 story addition of 2 bedroom & 2 baths. remodel 2 beds & 2 baths.Details
addition remodel: add a 3 story addition of 2 bedroom & 2 baths. remodel 2 beds & 2 baths. | $200,000 |
| Jan 23, 2020 | In progress issued Aug 2024 | 2755 Harrison St | Roosters Light Corp, Boman Deign & Construction Inc | remodel the (e) 5-bedroom, 2 bath upper unit at the 1st & 2nd fl. of a single family residential buitlding, add 1 (n) bath to the 2nd fl.Details
remodel the (e) 5-bedroom, 2 bath upper unit at the 1st & 2nd fl. of a single family residential buitlding, add 1 (n) bath to the 2nd fl. | $250,000 |
| Dec 31, 2019 | Completed final sign-off May 2022 | 1163 South Van Ness Av | Adept Construction Solution Inc | add three adu's per ord 162-17 at the 1st floor of the existing three-story bldg, two 2-bedrm units, one 1-bedrm unit, each with a kitchen and a bath. per ab-094,voluntary seismic upgrade per previous pa #201912048654, existing rear cottage not in scopeDetails
add three adu's per ord 162-17 at the 1st floor of the existing three-story bldg, two 2-bedrm units, one 1-bedrm unit, each with a kitchen and a bath. per ab-094,voluntary seismic upgrade per previous pa #201912048654, existing rear cottage not in scope | $200,000 |
| Oct 21, 2019 | Never finaled issued Nov 2020, no final | 1020 Post St | legalize (e) non-documented dwelling unit on the 6th flr of a 42 unit apt bldg per ordinance no. 43-14. also to comply with nov 200556923.Details
legalize (e) non-documented dwelling unit on the 6th flr of a 42 unit apt bldg per ordinance no. 43-14. also to comply with nov 200556923. | $2,500 | |
| Oct 16, 2019 | Never finaled filed Oct 2019, never issued | 780 Joost Av | rear cottage. legalize (e) dwelling unit under ordinance no.43-14. electrical or plumbing work required. construction of new stair at existing court yard.Details
rear cottage. legalize (e) dwelling unit under ordinance no.43-14. electrical or plumbing work required. construction of new stair at existing court yard. | $10,000 | |
| Jun 20, 2019 | Completed final sign-off Jul 2020 | 499 29th St | Schalich Brothers Construction Inc | ada upgrade to existing commercial restroom space and voluntary partial seismic upgrade of commercial space @ 1st floor of the existing buildingDetails
ada upgrade to existing commercial restroom space and voluntary partial seismic upgrade of commercial space @ 1st floor of the existing building | $5,000 |
| May 8, 2019 | Completed final sign-off Feb 2022 | 1148 Montgomery St | J C Construction Co | revisio to 201609218400 front bldg. window to comply with eg-05Details
revisio to 201609218400 front bldg. window to comply with eg-05 | |
| May 8, 2019 | Completed final sign-off Feb 2022 | 1148 Montgomery St | J C Construction Co | revision to 201506229509. rear bldg window to comply with eg-05Details
revision to 201506229509. rear bldg window to comply with eg-05 | |
| May 3, 2019 | Completed final sign-off Feb 2022 | 1148 Montgomery St | J C Construction Co | rear bldg - revision to pa 2015-0622-9509 bathroom floor plan revisionDetails
rear bldg - revision to pa 2015-0622-9509 bathroom floor plan revision | |
| May 3, 2019 | Completed final sign-off Feb 2022 | 1148 Montgomery St | J C Construction Co | front bldg - revision to pa 2016-0921-8400 bathroom floor plan revisionDetails
front bldg - revision to pa 2016-0921-8400 bathroom floor plan revision | |
| Apr 15, 2019 | Expired or cancelled cancelled Nov 2022 | 2713 Clay St | add units per ord #162-16. add 2 adus into lower level (ground floor) refer to voluntary soft story 2019-04-05-7270.Details
add units per ord #162-16. add 2 adus into lower level (ground floor) refer to voluntary soft story 2019-04-05-7270. | $100,000 | |
| Mar 18, 2019 | Completed final sign-off Oct 2019 | 2077 Hayes St | Dollard Construction Inc. | accessible business entrance upgrade per ordiance 51-16. place of accommodation to have the primary entry and path of travel into the building accessible by person of disabilities. install power door @ (2) entrances & upgrade to compliance (3) entrances.Details
accessible business entrance upgrade per ordiance 51-16. place of accommodation to have the primary entry and path of travel into the building accessible by person of disabilities. install power door @ (2) entrances & upgrade to compliance (3) entrances. | $500 |
| Mar 18, 2019 | Completed final sign-off Jun 2022 | 1206 Masonic Av | E F Gomez Cement Contractor | accessible business entrance upgrade per ordiance 51-16. place of accommodation to have the primary entry and path of travel into the building accessible by person of disabilities. barrier removal.Details
accessible business entrance upgrade per ordiance 51-16. place of accommodation to have the primary entry and path of travel into the building accessible by person of disabilities. barrier removal. | $2,000 |
| Mar 6, 2019 | Never finaled issued May 2020, no final | 1345 Lombard St | Axel8 Construction | legalize one (e) dwelling unit on the 1st flr of an (e) 3-unit building. the new unit will be a studio unit w/ a kitchen and a bath per ord# 43-14.Details
legalize one (e) dwelling unit on the 1st flr of an (e) 3-unit building. the new unit will be a studio unit w/ a kitchen and a bath per ord# 43-14. | $80,000 |
| Feb 27, 2019 | Completed final sign-off Feb 2022 | 333 Hyde St | remodel (e) dwelling unit in basement of a 3-story building. the unit will be a studio with a kitchen and bath.Details
remodel (e) dwelling unit in basement of a 3-story building. the unit will be a studio with a kitchen and bath. | $48,000 | |
| Feb 6, 2019 | Completed final sign-off Nov 2020 | 2955 Cesar Chavez St | interior remodel, non load bearing partition. remodel kitchen and add bathroom. change of use from single family to 2 families. **maher n/a**Details
interior remodel, non load bearing partition. remodel kitchen and add bathroom. change of use from single family to 2 families. **maher n/a** | $60,000 | |
| Nov 20, 2018 | Never finaled filed Nov 2018, never issued | 2221 Pacific Av | exterior alteration - replace decking on the fourth floor, to comply with nov 201775101 items 2,3. replace (e) kitchen window with (n) door @ (e) deck. replace (e) decking in kind.Details
exterior alteration - replace decking on the fourth floor, to comply with nov 201775101 items 2,3. replace (e) kitchen window with (n) door @ (e) deck. replace (e) decking in kind. | $12,000 | |
| Jul 19, 2018 | Completed final sign-off Aug 2022 | 725 Ofarrell St | per ordinance 162-16, (4) adu in the basement; (3) 2-bedroom units and (1) 1-bedroom unit.Details
per ordinance 162-16, (4) adu in the basement; (3) 2-bedroom units and (1) 1-bedroom unit. | $120,000 | |
| Jul 10, 2018 | Never finaled issued Jul 2018, no final | 125 Villa Tr | revision to pa 2017-0925-9497, steel post to wood at deck. steel beam to wood.Details
revision to pa 2017-0925-9497, steel post to wood at deck. steel beam to wood. | ||
| May 1, 2018 | Never finaled issued Jun 2023, no final | 2755 Harrison St | Baracke Dba Infinity Construction, Roosters Light Corp, Boman Deign & Construction Inc, David M Goray | permit to comply w/ nov #201396191 legalize an illegal unit in basementDetails
permit to comply w/ nov #201396191 legalize an illegal unit in basement | $85,000 |
| Feb 22, 2018 | Never finaled issued Sep 2019, no final | 900 Potrero Av | add 5 units: 2 one bedroom units & 3 studio units. 1 kitchen and 1 bath for each unit. add units per ordinance 162-17Details
add 5 units: 2 one bedroom units & 3 studio units. 1 kitchen and 1 bath for each unit. add units per ordinance 162-17 | $300,000 | |
| Feb 8, 2018 | Never finaled issued Jul 2020, no final | 144 Parnassus Av | demolish (e) ground floor garages & replace w/ three (n) accessory dwelling units. three adu per ordinance #162-16. reference to unit legalization under permit# 2018-0124-9368.Details
demolish (e) ground floor garages & replace w/ three (n) accessory dwelling units. three adu per ordinance #162-16. reference to unit legalization under permit# 2018-0124-9368. | $125,000 | |
| Feb 8, 2018 | Never finaled issued Feb 2018, no final | 497 29th St | Schalich Brothers Construction Inc | interior remodel of a 1 bedroom unit at the 2nd floor of an exsting two story bldg over basement. add 1 washer/dryer unitDetails
interior remodel of a 1 bedroom unit at the 2nd floor of an exsting two story bldg over basement. add 1 washer/dryer unit | $30,000 |
| Feb 2, 2018 | Never finaled issued Nov 2018, no final | 443 Stevenson St | base building interior improvement to demo existing non-structural partitions and interior finishes. construct new non-structural partitions, new ceiling, lights, and associated plumbing and finishesDetails
base building interior improvement to demo existing non-structural partitions and interior finishes. construct new non-structural partitions, new ceiling, lights, and associated plumbing and finishes | $225,000 | |
| Jan 24, 2018 | Never finaled issued Jul 2020, no final | 144 Parnassus Av | unit legalization to include (2)new windows, lower fl level to meet required 7'6" ceiling height in studio apt per ord# 43-14. reference to adu #201802080846.Details
unit legalization to include (2)new windows, lower fl level to meet required 7'6" ceiling height in studio apt per ord# 43-14. reference to adu #201802080846. | $88,000 | |
| Oct 12, 2017 | Completed final sign-off Dec 2021 | 2285 Broadway | De Brus Construction Inc | add unit per ordinance# 162-16. add 3 new units on the ground floor of an (e) 6 units building. 2 studio & 1 one bedroom unit. a bath & kitchen in each. soft story pa# 2017/09/06/6951. ** maher: n/a **Details
add unit per ordinance# 162-16. add 3 new units on the ground floor of an (e) 6 units building. 2 studio & 1 one bedroom unit. a bath & kitchen in each. soft story pa# 2017/09/06/6951. ** maher: n/a ** | $90,000 |
| Sep 25, 2017 | Completed final sign-off Dec 2018 | 125 Villa Tr | renovate the rear yard of an existing 3-story building into a landscape yard. remove spiral staircase and build new concrete stairs in different location.Details
renovate the rear yard of an existing 3-story building into a landscape yard. remove spiral staircase and build new concrete stairs in different location. | $20,000 | |
| Sep 25, 2017 | Completed final sign-off Dec 2018 | 3316 Laguna St | replace (e) windows on an existing 3-story building in kind.Details
replace (e) windows on an existing 3-story building in kind. | $20,000 | |
| Sep 8, 2017 | Expired or cancelled cancelled Jul 2025 | 252 Alma St | per ordinance 162-16: soft story per 201708296182. add (2) units: (1) studio, (1) bedroom unit, (1) kitchen & bath for each unit.Details
per ordinance 162-16: soft story per 201708296182. add (2) units: (1) studio, (1) bedroom unit, (1) kitchen & bath for each unit. | $100,000 | |
| Sep 8, 2017 | Completed final sign-off Dec 2021 | 1355 Lombard St | S L M Development Inc. | per ord 162-16: (1) studio adu w/ kitchen & bathDetails
per ord 162-16: (1) studio adu w/ kitchen & bath | $70,000 |
| Aug 31, 2017 | Completed final sign-off Sep 2024 | 2476 Bush St | legalize (e) unit on ground floor to comply w/ ordinance 43-14.Details
legalize (e) unit on ground floor to comply w/ ordinance 43-14. | ||
| Aug 22, 2017 | Completed final sign-off Jun 2019 | 2263 Greenwich St | Kevin Webb Construction Inc | rear patio with fireplace. maher n/aDetails
rear patio with fireplace. maher n/a | $15,000 |
| Jul 14, 2017 | Expired or cancelled cancelled Mar 2023 | 3383 Washington St | rear addition of exercise room and game room @ 4th flr of an (e) 4-story bldg where rear roof terrace was.Details
rear addition of exercise room and game room @ 4th flr of an (e) 4-story bldg where rear roof terrace was. | $200,000 | |
| Jun 12, 2017 | Completed final sign-off May 2023 | 2220 Turk Bl | Yefa Construction Inc | add 3 adus per ord. 162-16. (2) studio units & (1) 1-bedroom unit. (1) kitchen & (1) bath for each unit. soft story permit #2017-0612-9016.Details
add 3 adus per ord. 162-16. (2) studio units & (1) 1-bedroom unit. (1) kitchen & (1) bath for each unit. soft story permit #2017-0612-9016. | $200,000 |
| Jun 5, 2017 | Completed final sign-off Apr 2024 | 2210 Turk Bl | Yefa Construction Inc | ground fl: add (2) studio units with (1) kitchen & (1) bath for each unit. per ord 162-16. seismic done under 2017-0605-8380. sprinkler to nfpa 13-r deferred.Details
ground fl: add (2) studio units with (1) kitchen & (1) bath for each unit. per ord 162-16. seismic done under 2017-0605-8380. sprinkler to nfpa 13-r deferred. | $200,000 |
| May 30, 2017 | Completed final sign-off May 2023 | 2230 Turk Bl | Yefa Construction Inc | add 3 adus per ord. 162-16. (1) 2-bedroom unit, (2) 1-bedroom units; (1) kitchen & (1) bath for each unit. soft story permit pa #201705267737.Details
add 3 adus per ord. 162-16. (1) 2-bedroom unit, (2) 1-bedroom units; (1) kitchen & (1) bath for each unit. soft story permit pa #201705267737. | $200,000 |
| May 30, 2017 | Never finaled filed May 2017, never issued | 1125 Broadway | interior alterations @ 1st floor of an 9e) 4 story 15 units residential building to convert (e) garage; storage space into 4 new accessory dwelling units.Details
interior alterations @ 1st floor of an 9e) 4 story 15 units residential building to convert (e) garage; storage space into 4 new accessory dwelling units. | $100,000 | |
| May 3, 2017 | Completed final sign-off Dec 2017 | 3400 Clay St | C H Burnham Inc | interior alteration: remove raised floor in the lower level, new fixtures & fittings in the third level & fourth level bathroom, wet bar in the lower level.Details
interior alteration: remove raised floor in the lower level, new fixtures & fittings in the third level & fourth level bathroom, wet bar in the lower level. | $10,000 |
| Mar 22, 2017 | Completed final sign-off Feb 2019 | 305 San Carlos St | Future General Construction Inc | ada bathroom upgrade, two unisex bathrooms in commercial space. soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 (commercial). soft story for residential under pa 201607283620Details
ada bathroom upgrade, two unisex bathrooms in commercial space. soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 (commercial). soft story for residential under pa 201607283620 | $6,000 |
| Feb 28, 2017 | Completed final sign-off Aug 2019 | 577 42nd Av | Competente Construction Inc | unit legaliztion ord 43-14. legalize (e) dwelling unit on 1st floor of 2nd unit 3-story building. unit will be a bedroom w/ kitchen & bath.Details
unit legaliztion ord 43-14. legalize (e) dwelling unit on 1st floor of 2nd unit 3-story building. unit will be a bedroom w/ kitchen & bath. | $30,000 |
| Feb 14, 2017 | Completed final sign-off Jun 2019 | 2263 Greenwich St | Kevin Webb Construction Inc | interior remodeling: kitchen, bathrooms, master bedroom, living room; replace (e) handrail/guardrail; exterior remodeling. replace (e) entry door & rear door. maher naDetails
interior remodeling: kitchen, bathrooms, master bedroom, living room; replace (e) handrail/guardrail; exterior remodeling. replace (e) entry door & rear door. maher na | $100,000 |
| Feb 3, 2017 | Completed final sign-off Mar 2021 | 1405 15th St | Green City Construction Inc | per unit legalization ordinance# 43-14. legalize (e) dwelling unit on the 1st floor to become 4 to 5 units building. legalize unit will be a (1) bedroom unit w/ kitchen & bath. soft story per 201701187351. maher n/a.Details
per unit legalization ordinance# 43-14. legalize (e) dwelling unit on the 1st floor to become 4 to 5 units building. legalize unit will be a (1) bedroom unit w/ kitchen & bath. soft story per 201701187351. maher n/a. | $150,000 |
| Feb 3, 2017 | Never finaled issued Nov 2018, no final | 305 San Carlos St | remodel 1st fl of (e) 3-story building. remodel to include (2)(n) accessory dwelling units (one studio and one 1-br) from 4 garage spaces. each unit to have a kitchen & bath. soft story per 201607283620. ordinance 162-16Details
remodel 1st fl of (e) 3-story building. remodel to include (2)(n) accessory dwelling units (one studio and one 1-br) from 4 garage spaces. each unit to have a kitchen & bath. soft story per 201607283620. ordinance 162-16 | $275,000 | |
| Nov 8, 2016 | Expired or cancelled cancelled Aug 2026 | 1230 Jackson St | Axel8 Construction | construct studio unit on the 1st flr @ rear of a 4 story 6 unit bldg. one bdrm to include a kitchen & bath. a standard unit addition.Details
construct studio unit on the 1st flr @ rear of a 4 story 6 unit bldg. one bdrm to include a kitchen & bath. a standard unit addition. | $50,000 |
| Oct 14, 2016 | Completed final sign-off Oct 2023 | 2125 Hyde St | Liang's Remodeling Inc. | interior alterations remodel 1 unit into 2 units 1 studio units w/bath kitchen & w/d . a 1 bedroom unit w/bath kitchen & w/d soft story retrofit done under sep permit 201609218391Details
interior alterations remodel 1 unit into 2 units 1 studio units w/bath kitchen & w/d . a 1 bedroom unit w/bath kitchen & w/d soft story retrofit done under sep permit 201609218391 | $120,000 |
| Oct 5, 2016 | Expired or cancelled cancelled Dec 2017 | 1148 Montgomery St | new adu (studio apartment) at basement of 2 story, 2-unit building @ rear building on property. (add unit per ordinance no.162-16.Details
new adu (studio apartment) at basement of 2 story, 2-unit building @ rear building on property. (add unit per ordinance no.162-16. | $141,841 | |
| Sep 13, 2016 | Completed final sign-off Jul 2020 | 497 29th St | Schalich Brothers Construction Inc | add 1 unit = studio unit with kitchen & 1 bathroom. remodel an (e) unit. soft story approved per #2016-0822-5608.Details
add 1 unit = studio unit with kitchen & 1 bathroom. remodel an (e) unit. soft story approved per #2016-0822-5608. | $225,000 |
| Sep 13, 2016 | Completed final sign-off Jul 2020 | 497 29th St | Schalich Brothers Construction Inc | accessibility upgrade to commercial per soft story ref pa 201608225608Details
accessibility upgrade to commercial per soft story ref pa 201608225608 | $6,100 |
| Sep 13, 2016 | Completed final sign-off May 2018 | 1555 Greenwich St | add (1) unit = studio unit with 1 ktichen & 1 bathroom per ord 30-15. soft story approved per #2016-0817-5224.Details
add (1) unit = studio unit with 1 ktichen & 1 bathroom per ord 30-15. soft story approved per #2016-0817-5224. | $175,000 | |
| Jul 28, 2016 | Completed final sign-off Mar 2019 | 305 San Carlos St | Future General Construction Inc | soft story upgrade per 2012 iebc appendix a-4 (residential). commercial soft story under pa 201703222076Details
soft story upgrade per 2012 iebc appendix a-4 (residential). commercial soft story under pa 201703222076 | $80,000 |
| Jul 21, 2016 | Completed final sign-off Oct 2021 | 651 Scott St | mandatory soft story using iebc appn, a-4 per sfbc chap 34b.Details
mandatory soft story using iebc appn, a-4 per sfbc chap 34b. | $80,000 | |
| Jul 21, 2016 | Completed final sign-off Oct 2021 | 651 Scott St | add 3 units: 1 studio unit & 2 one bedroom units. 1 kitchen & 1 bathroom for each unit. per ord 30-15.Details
add 3 units: 1 studio unit & 2 one bedroom units. 1 kitchen & 1 bathroom for each unit. per ord 30-15. | $250,000 | |
| Jul 18, 2016 | Completed final sign-off Apr 2019 | 2 Coso Av | Make Ready Maintenance Inc | per ord 30-15. add 2 units : 2 studio units, 1 kitchen & 1 bedroom for each unit. soft story appl 2016-07-18-2596.Details
per ord 30-15. add 2 units : 2 studio units, 1 kitchen & 1 bedroom for each unit. soft story appl 2016-07-18-2596. | $250,000 |
| Jul 18, 2016 | Completed final sign-off May 2018 | 2 Coso Av | ab107 mandatory softstory sfbc chapter 34b, 2012 iebc appendix a-4.Details
ab107 mandatory softstory sfbc chapter 34b, 2012 iebc appendix a-4. | $100,000 | |
| Jul 15, 2016 | Completed final sign-off Sep 2022 | 1743 Golden Gate Av | soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. ** maher: n/a **Details
soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. ** maher: n/a ** | $102,600 | |
| Jul 15, 2016 | Expired or cancelled expired May 2023 | 1743 Golden Gate Av | add 2 units per ordinance# 30-15. 2 - one bedroom units. 1 kitchen & 1 bathroom for each unit. fire under separate permits. soft story under pa# 201607152529. ** maher: n/a **Details
add 2 units per ordinance# 30-15. 2 - one bedroom units. 1 kitchen & 1 bathroom for each unit. fire under separate permits. soft story under pa# 201607152529. ** maher: n/a ** | $250,000 | |
| Jul 7, 2016 | Expired or cancelled cancelled Jan 2026 | 348 Waller St | front bldg. ab094 voluntary seismic upgrade for soft sotry per 2012iebc appendix a-4.Details
front bldg. ab094 voluntary seismic upgrade for soft sotry per 2012iebc appendix a-4. | $80,000 | |
| Jul 7, 2016 | Completed final sign-off Feb 2021 | 348 Waller St | Dollard Construction Inc. | front bldg. add unit per ord 30-15. add 2 units: 1 one-bedroom unit & 1 studio unit. 1 kitchen & 1 bathroom for each unit.Details
front bldg. add unit per ord 30-15. add 2 units: 1 one-bedroom unit & 1 studio unit. 1 kitchen & 1 bathroom for each unit. | $170,000 |
| Jun 28, 2016 | Completed final sign-off Mar 2017 | 1036 Polk St | Boss Construction Inc. | unit #302 & #302a - revision to ref pa 2015 0213 8346: revise kitchen layout - note: this applicaion will increase # of unit from 37 to 38 - maher naDetails
unit #302 & #302a - revision to ref pa 2015 0213 8346: revise kitchen layout - note: this applicaion will increase # of unit from 37 to 38 - maher na | |
| Jun 28, 2016 | Completed final sign-off Mar 2017 | 1036 Polk St | Boss Construction Inc. | unit #408 & #408a - revision to ref pa 201512225755: revise kitchen layout - note: this application will increase # 0f units from (e) 36 to 37 - maher naDetails
unit #408 & #408a - revision to ref pa 201512225755: revise kitchen layout - note: this application will increase # 0f units from (e) 36 to 37 - maher na | |
| May 12, 2016 | Completed final sign-off Jan 2019 | 1231 Grove St | interior & exterior alterations: construct 1 studio unit on the 1st floor in an (e) garage: a new kitchen, bath & washer/dryer. remove garage door - repair and replace with windows.Details
interior & exterior alterations: construct 1 studio unit on the 1st floor in an (e) garage: a new kitchen, bath & washer/dryer. remove garage door - repair and replace with windows. | $90,000 | |
| Apr 11, 2016 | Never finaled issued Apr 2016, no final | 2125 Hyde St | Liang's Remodeling Inc. | revision to ref pa 2016 0311 1833: interior alteration to unit #2125. to include the kitchen, bathroom, & add 2 bathrooms, 2 washer/dryer connections. compliance with maher ordinance no 155-13 not required.Details
revision to ref pa 2016 0311 1833: interior alteration to unit #2125. to include the kitchen, bathroom, & add 2 bathrooms, 2 washer/dryer connections. compliance with maher ordinance no 155-13 not required. | $40,000 |
| Mar 15, 2016 | Completed final sign-off Apr 2017 | 999 Green St | Gleason & Tankard | #1702: remodel kitchen and 3 baths, remove and relocate non load bearing partitions. enclose balcony with glass to match. no change in unit count or existing size.Details
#1702: remodel kitchen and 3 baths, remove and relocate non load bearing partitions. enclose balcony with glass to match. no change in unit count or existing size. | $300,000 |
| Mar 11, 2016 | Never finaled issued Mar 2016, no final | 2125 Hyde St | Liang's Remodeling Inc. | revision to scope of work on pa# 201603020990, add 2 bathrooms, in unit # 2125Details
revision to scope of work on pa# 201603020990, add 2 bathrooms, in unit # 2125 | $40,000 |
| Feb 10, 2016 | Expired or cancelled cancelled Sep 2023 | 500 Bartlett St | convert (e) ground floor into 4 unit space. 3 studio units & 1 - one bedroom unit. maher ord applied.Details
convert (e) ground floor into 4 unit space. 3 studio units & 1 - one bedroom unit. maher ord applied. | $500,000 | |
| Jan 25, 2016 | Completed final sign-off Feb 2017 | 570 06th Av | remodel kitchen and 2 baths along with structural work. unit 572 @ the upper unit. new ceiling beam reset to tyhe joistDetails
remodel kitchen and 2 baths along with structural work. unit 572 @ the upper unit. new ceiling beam reset to tyhe joist | $25,000 | |
| Dec 22, 2015 | Completed final sign-off Mar 2017 | 1036 Polk St | Boss Construction Inc. | apt 408 & 408a: 2interior alteration, convert 2 bedroom apartment into a studio and 1 bedroom apartment. 408a: add a kitchen, bath. 408: remodel (e) kitchen and bath. 408/408a add laundry box to each unit.Details
apt 408 & 408a: 2interior alteration, convert 2 bedroom apartment into a studio and 1 bedroom apartment. 408a: add a kitchen, bath. 408: remodel (e) kitchen and bath. 408/408a add laundry box to each unit. | $40,000 |
| Dec 22, 2015 | Never finaled issued Dec 2015, no final | 98 25th Av | Mac Tec Construction Company Inc | remodel bedroom #4, bathroom #4, and storage on 3rd fl. remodel bonus room on the 4th flDetails
remodel bedroom #4, bathroom #4, and storage on 3rd fl. remodel bonus room on the 4th fl | $30,000 |
| Dec 10, 2015 | Completed final sign-off Feb 2017 | 570 06th Av | remodel kitchen and bathroom. add a full bathDetails
remodel kitchen and bathroom. add a full bath | $65,600 | |
| Jul 22, 2015 | Never finaled issued Jul 2015, no final | 999 Green St | Gleason & Tankard | remodel kitchen and 2 baths and relocate non load bearing partitions. enclosing the balcony with glass to matchDetails
remodel kitchen and 2 baths and relocate non load bearing partitions. enclosing the balcony with glass to match | $125,000 |