Block 0156, lot 055
1125 Broadway
- City’s use
- Multi-Family Residential
- Built
- 1927
- Stories
- 3
- Units
- 15
- Rooms
- 3 bedrooms, 15 bathrooms
- Building
- 9,291 sq ft
- Lot
- 4,138 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
22 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 1, 2024 | Completed final sign-off Feb 2024 | 1125 Broadway | Au Electric Corporation/Aec Alarms | install new low frequency sounders in all sleeping areas on the existing fa system to comply with sffc 1103.7.6.1Details
install new low frequency sounders in all sleeping areas on the existing fa system to comply with sffc 1103.7.6.1 | $31,000 |
| Mar 16, 2022 | Completed final sign-off Jun 2022 | 1125 Broadway | B-Side Inc. | unit 203 - install one (n) clothes washer & dryer; note: no structural wall demoDetails
unit 203 - install one (n) clothes washer & dryer; note: no structural wall demo | $2,500 |
| Jul 16, 2021 | Never finaled issued Jul 2021, no final | 1125 Broadway | Axel8 Construction | unit 102 - 2nd flr: 1. convert existing kitchen to bedroom 2. relocate kitchen 3. rehabilitate existing bathroom 4. install washer and dryer.Details
unit 102 - 2nd flr: 1. convert existing kitchen to bedroom 2. relocate kitchen 3. rehabilitate existing bathroom 4. install washer and dryer. | $40,000 |
| May 24, 2021 | Completed final sign-off Dec 2021 | 1125 Broadway | Axel8 Construction | unit 104 - 2nd flr: convert existing kitchen to study. relocate kitchen. rehabilitate existing bathroom. install washer and dryer.Details
unit 104 - 2nd flr: convert existing kitchen to study. relocate kitchen. rehabilitate existing bathroom. install washer and dryer. | $40,000 |
| Aug 6, 2020 | Expired or cancelled cancelled Jan 2026 | 1125 Broadway | unit 202: convert (e) katchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer/dryerDetails
unit 202: convert (e) katchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer/dryer | $40,000 | |
| Feb 5, 2020 | Never finaled issued Feb 2020, no final | 1125 Broadway | street spaceDetails
street space | ||
| Oct 31, 2019 | Completed final sign-off Mar 2020 | 1125 Broadway | Axel8 Construction | apt 305 - convert (e) kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom and install washer/dryerDetails
apt 305 - convert (e) kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom and install washer/dryer | $40,000 |
| Oct 23, 2019 | Never finaled issued Oct 2019, no final | 1125 Broadway | Axel8 Construction | street spaceDetails
street space | |
| Aug 28, 2019 | Completed final sign-off Dec 2019 | 1125 Broadway | Axel8 Construction | unit #105 - rehabilitate (e) bathroom, convert (e) kitchen to bedroom, relocate kitchen, install w/d.Details
unit #105 - rehabilitate (e) bathroom, convert (e) kitchen to bedroom, relocate kitchen, install w/d. | $40,000 |
| Dec 4, 2018 | Completed final sign-off Apr 2019 | 1125 Broadway | West Coast Premier Construction Inc | revision to app#201808137148: replace moment frame at grid 1.2 with plywood shear wall. provide c.j. along grid 1, at detail 9/s6.1 & 10/s6.1 to match field. omit sw along grid b. revise smf-2 and sw along grid a & e.Details
revision to app#201808137148: replace moment frame at grid 1.2 with plywood shear wall. provide c.j. along grid 1, at detail 9/s6.1 & 10/s6.1 to match field. omit sw along grid b. revise smf-2 and sw along grid a & e. | |
| Aug 13, 2018 | Completed final sign-off Apr 2019 | 1125 Broadway | West Coast Premier Construction Inc | soft story retrofit per sfebc ch. 4d engineering criteria 2016 cebc appendix a-4. maher n/a.Details
soft story retrofit per sfebc ch. 4d engineering criteria 2016 cebc appendix a-4. maher n/a. | $100,000 |
| Jul 13, 2018 | Completed final sign-off Jul 2018 | 1125 Broadway | Markoff Structural Pest Control | markof structural pest control, rep #18250. item #1. no stairsDetails
markof structural pest control, rep #18250. item #1. no stairs | $47,000 |
| Feb 13, 2018 | Never finaled issued Feb 2018, no final | 1125 Broadway | street spaceDetails
street space | ||
| May 30, 2017 | Never finaled filed May 2017, never issued | 1125 Broadway | interior alterations @ 1st floor of an 9e) 4 story 15 units residential building to convert (e) garage; storage space into 4 new accessory dwelling units.Details
interior alterations @ 1st floor of an 9e) 4 story 15 units residential building to convert (e) garage; storage space into 4 new accessory dwelling units. | $100,000 | |
| Mar 29, 2017 | Expired or cancelled withdrawn Sep 2018 | 1125 Broadway | compliance with mandatory seismic retrofit program 2012 iebc appx a-4 & 2016 iebc sec 41Details
compliance with mandatory seismic retrofit program 2012 iebc appx a-4 & 2016 iebc sec 41 | $65,000 | |
| Jun 15, 2016 | Completed final sign-off Aug 2016 | 1125 Broadway | Make Ready Maintenance Inc | unit #303: kitchen and bathroom remodel. move bedroom wall. no change to occupancy or egress.Details
unit #303: kitchen and bathroom remodel. move bedroom wall. no change to occupancy or egress. | $27,000 |
| Jan 21, 2016 | Completed final sign-off Dec 2017 | 1125 Broadway | Make Ready Maintenance Inc | unit #203: revision to 201611203214; add plans to move bedroom wall. no change to occupancy or egress.Details
unit #203: revision to 201611203214; add plans to move bedroom wall. no change to occupancy or egress. | $300 |
| Nov 20, 2015 | Completed final sign-off Dec 2017 | 1125 Broadway | Make Ready Maintenance Inc | unit 203: kitchen & bathroom.Details
unit 203: kitchen & bathroom. | $27,000 |
| Oct 10, 2008 | Completed final sign-off Mar 2009 | 1125 Broadway | work @ unit# 103 only. kitchen & bathroom remodel. no structural work. no changes to configuration of floor plan.Details
work @ unit# 103 only. kitchen & bathroom remodel. no structural work. no changes to configuration of floor plan. | $24,000 | |
| Jul 29, 2008 | Completed final sign-off Sep 2008 | 1125 Broadway | unit#202,& #302.kitchen and bath remodel. no structural work.Details
unit#202,& #302.kitchen and bath remodel. no structural work. | $40,000 | |
| May 7, 2008 | Completed final sign-off Jul 2008 | 1125 Broadway | unit 102 - kitchen and bath remodel. no structural work. replace bck aluminum windows with vinyl windows, double pane. replace in kind. windows not facing the street.Details
unit 102 - kitchen and bath remodel. no structural work. replace bck aluminum windows with vinyl windows, double pane. replace in kind. windows not facing the street. | $35,000 | |
| Jan 16, 2008 | Completed final sign-off Apr 2008 | 1125 Broadway | kitchen and bathroom remodel in units 305,101 &105. no structural work.50% of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescent or on occupant sensor.Details
kitchen and bathroom remodel in units 305,101 &105. no structural work.50% of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescent or on occupant sensor. | $12,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Axel8 Construction (5), Make Ready Maintenance Inc (3), West Coast Premier Construction Inc (2), Au Electric Corporation/Aec Alarms, B-Side Inc., Markoff Structural Pest Control
- Architects
- Joe Win Kon, John T. Hood
- Engineers
- Donald David (2), Joe Win Kon (2), Joe Kon
- Authorized agent-otherss
- Jorge Castillo
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.