- May 2013 to Sep 2026
821 permits since 2000 (contractor on 819 permits, authorized agent-others on 9 permits): 618 completed, 19 in progress, 143 never finaled, 41 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 821.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress issued Sep 2026 | 1016 Washington St | Axel8 Construction | to obtain final inspection for work approved under pa# 201706068560. all work is complete.Details
to obtain final inspection for work approved under pa# 201706068560. all work is complete. | |
| Sep 10, 2026 | In progress issued Sep 2026 | 1668 Washington St | Axel8 Construction | to obtain final inspection for work approved under pa# 201711012836, 201704123820, 202207269350. all work is complete.Details
to obtain final inspection for work approved under pa# 201711012836, 201704123820, 202207269350. all work is complete. | |
| Sep 10, 2026 | Completed final sign-off Oct 2026 | 1163 Pine St | Axel8 Construction | #4. to obtain final inspection for work approved under pa#201911046343. all work is complete.Details
#4. to obtain final inspection for work approved under pa#201911046343. all work is complete. | |
| Sep 10, 2026 | In progress issued Sep 2026 | 1163 Pine St | Axel8 Construction | #1. to obtain final inspection for work approved under pa#202012221554 & 202102184929. all work is completeDetails
#1. to obtain final inspection for work approved under pa#202012221554 & 202102184929. all work is complete | |
| Sep 10, 2026 | In progress issued Sep 2026 | 1163 Pine St | Axel8 Construction | #15. to obtain final inspection for work approved under pa#202101192874 & 202102164753. all work is completeDetails
#15. to obtain final inspection for work approved under pa#202101192874 & 202102164753. all work is complete | |
| Jul 6, 2026 | In progress issued Jul 2026 | 1668 Washington St | Axel8 Construction | unit 7: rehabilitate existing kitchen. rehabilitate existing bathroom. no removeal of structural walls.Details
unit 7: rehabilitate existing kitchen. rehabilitate existing bathroom. no removeal of structural walls. | $58,000 |
| Jul 2, 2026 | Completed final sign-off Sep 2026 | 1163 Pine St | Axel8 Construction | unit 3 - rehabilitate existing kitchen (replace countertops, cabinets, appliances) and bathroom (replace plumbings fixtures); install washer and dryerDetails
unit 3 - rehabilitate existing kitchen (replace countertops, cabinets, appliances) and bathroom (replace plumbings fixtures); install washer and dryer | $62,000 |
| Jun 23, 2026 | Completed final sign-off Jun 2026 | 1216 Jackson St | Axel8 Construction | to obtain final inspection for work approved under pa# 202302071518. all work is complete.Details
to obtain final inspection for work approved under pa# 202302071518. all work is complete. | |
| Jun 23, 2026 | Completed final sign-off Jun 2026 | 1214 Jackson St | Axel8 Construction | to obtain final inspection for work approved under pa# 202302101777. all work is complete.Details
to obtain final inspection for work approved under pa# 202302101777. all work is complete. | |
| Jun 23, 2026 | Completed final sign-off Jun 2026 | 1212 Jackson St | Axel8 Construction | to obtain final inspection for work approved under pa# 202302101774. all work is approved.Details
to obtain final inspection for work approved under pa# 202302101774. all work is approved. | |
| Jun 23, 2026 | Completed final sign-off Jun 2026 | 1200 Jackson St | Axel8 Construction | to obtain final inspection for work approved under pa# 202301170277. all work is complete.Details
to obtain final inspection for work approved under pa# 202301170277. all work is complete. | |
| Jun 23, 2026 | Completed final sign-off Jun 2026 | 1204 Jackson St | Axel8 Construction | to obtain final inspection for work approved under pa#202302071506. all work is complete.Details
to obtain final inspection for work approved under pa#202302071506. all work is complete. | |
| Jun 23, 2026 | Completed final sign-off Jun 2026 | 1210 Jackson St | Axel8 Construction | to obtain final inspection for work approved under pa# 202302071504. all work is complete.Details
to obtain final inspection for work approved under pa# 202302071504. all work is complete. | |
| Jun 23, 2026 | Completed final sign-off Jun 2026 | 1202 Jackson St | Axel8 Construction | to obtain final inspection for work approved under pa# 202304246332. all work is complete.Details
to obtain final inspection for work approved under pa# 202304246332. all work is complete. | |
| Jun 23, 2026 | Completed final sign-off Jun 2026 | 1218 Jackson St | Axel8 Construction | to obtain final inspection for work approved under pa# 202302071519. all work is complete.Details
to obtain final inspection for work approved under pa# 202302071519. all work is complete. | |
| Jun 1, 2026 | In progress issued Jun 2026 | 3351 Jackson St | Axel8 Construction | recommencement and completion of work approved under pa# 202504164517.Details
recommencement and completion of work approved under pa# 202504164517. | $8,000 |
| May 21, 2026 | Completed final sign-off Jul 2026 | 275 27th Av | Axel8 Construction | replace kitchen cabinets and counter tops in kitchen, in kind. replace shower wall liner in bathroom.Details
replace kitchen cabinets and counter tops in kitchen, in kind. replace shower wall liner in bathroom. | $5,000 |
| Apr 14, 2026 | Completed final sign-off Aug 2026 | 107 Germania St | Axel8 Construction | repair dry rot within the 1st and 2nd floors, and walls @ the east side of the building. ref siding permit bldg-26-218Details
repair dry rot within the 1st and 2nd floors, and walls @ the east side of the building. ref siding permit bldg-26-218 | $25,000 |
| Feb 20, 2026 | Completed final sign-off Feb 2026 | 1374 29th Av | Axel8 Construction | repair and replace like for like external stairway from garage to second flr kitchen. non street facing, less than 50% repair. treads and stringers to be replaced with pt wood. reference to complaint 202546877.Details
repair and replace like for like external stairway from garage to second flr kitchen. non street facing, less than 50% repair. treads and stringers to be replaced with pt wood. reference to complaint 202546877. | $3,000 |
| Jan 5, 2026 | Completed final sign-off Jan 2026 | 1656 Sacramento St | Axel8 Construction | to obtain final inspection for work approved under pa# 201911066648. all work is complete.Details
to obtain final inspection for work approved under pa# 201911066648. all work is complete. | |
| Jan 5, 2026 | In progress issued Jan 2026 | 901 Pine St | Axel8 Construction | to obtain final inspection for work approved under pa# 202411064518. all work is complete.Details
to obtain final inspection for work approved under pa# 202411064518. all work is complete. | |
| Oct 7, 2025 | Completed final sign-off Dec 2025 | 2509 Bryant St | Axel8 Construction | revision to 201903145204 for dropped floor in unit d to comply with nov 202301973Details
revision to 201903145204 for dropped floor in unit d to comply with nov 202301973 | |
| Oct 6, 2025 | Completed final sign-off Jan 2026 | 1656 Sacramento St | Axel8 Construction | revision to pa #201911066648 to widen exterior slider doors facing backyard and remove washer dryer from scope to create a camera room.Details
revision to pa #201911066648 to widen exterior slider doors facing backyard and remove washer dryer from scope to create a camera room. | |
| Sep 25, 2025 | Completed final sign-off Mar 2026 | 22 Vandewater St | Axel8 Construction | unit 108: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls.Details
unit 108: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. | $63,000 |
| Sep 15, 2025 | In progress issued Sep 2025 | 3351 Jackson St | Axel8 Construction | revision to 202504164517. layout change in kitchen and pantry (scullery). pantry to be moved to south of kitchen, adjacent to primary bath. replacement of 2 windows in kitchen and 1 window in new pantry location with in-kind wood frame double-hung windows. new window locations due to layout change.Details
revision to 202504164517. layout change in kitchen and pantry (scullery). pantry to be moved to south of kitchen, adjacent to primary bath. replacement of 2 windows in kitchen and 1 window in new pantry location with in-kind wood frame double-hung windows. new window locations due to layout change. | $22,000 |
| Sep 11, 2025 | Completed final sign-off Sep 2025 | 880 26th Av | Axel8 Construction | at back stairway repair/replace handrail in kind, less than 50% non street visible.Details
at back stairway repair/replace handrail in kind, less than 50% non street visible. | $600 |
| Aug 29, 2025 | Completed final sign-off Dec 2025 | 2829 23rd St | Axel8 Construction | to obtain final inspection for work approved under 201903145203 and 202208301600Details
to obtain final inspection for work approved under 201903145203 and 202208301600 | |
| Aug 29, 2025 | Completed final sign-off Feb 2026 | 502 Church St | Axel8 Construction | unit 502a 1. rehabilitate existing kitchen, rehabilitate existing bathroom, install washer and dryerDetails
unit 502a 1. rehabilitate existing kitchen, rehabilitate existing bathroom, install washer and dryer | $78,000 |
| Aug 26, 2025 | Completed final sign-off Sep 2025 | 826 47th Av | Axel8 Construction | at lightwell fire escape derust/replace in kind 3 rusted bolts at guard rails and ladder. install a single missing deck plank at 2nd fl fire escape platformDetails
at lightwell fire escape derust/replace in kind 3 rusted bolts at guard rails and ladder. install a single missing deck plank at 2nd fl fire escape platform | $2,000 |
| Aug 6, 2025 | Completed final sign-off Sep 2025 | 990 Fulton St | Axel8 Construction | at 1st to 6th floors back stairway: replace plaster on walls in kind with sheetrock, typical 25 sq ft on each floor.Details
at 1st to 6th floors back stairway: replace plaster on walls in kind with sheetrock, typical 25 sq ft on each floor. | $20,000 |
| Jul 15, 2025 | Completed final sign-off Mar 2026 | 1234 Jones St | Axel8 Construction | remodel existing storage room to meet requirements for use as a trash room.Details
remodel existing storage room to meet requirements for use as a trash room. | $11,000 |
| Jul 15, 2025 | In progress filed Jul 2025, not yet issued | 1234 Francisco St | Axel8 Construction | concrete repair, reconstruct or improve approximately 20 sqft of damaged/cracked sidewalk in front of property. ref rfa# 21584423Details
concrete repair, reconstruct or improve approximately 20 sqft of damaged/cracked sidewalk in front of property. ref rfa# 21584423 | $1,000 |
| Jun 27, 2025 | Completed final sign-off Dec 2025 | 415 Buchanan St | Axel8 Construction | unit #u. 1. rehab existing kitchen. 2. rehab existing bathroom. 3. install washer and dryer. new vents not to exceed height of existing roof parapets.Details
unit #u. 1. rehab existing kitchen. 2. rehab existing bathroom. 3. install washer and dryer. new vents not to exceed height of existing roof parapets. | $75,000 |
| Jun 18, 2025 | Completed final sign-off Dec 2025 | 415 Buchanan St | Axel8 Construction | unit #t: rehab existing kitchen, rehab existing bathroom, install washer and dryer.Details
unit #t: rehab existing kitchen, rehab existing bathroom, install washer and dryer. | $75,000 |
| Jun 17, 2025 | Completed final sign-off Dec 2025 | 1450 Golden Gate Av | Axel8 Construction | unit 102- convert (e) kitchen to bedroom, relocate kitchen and remodel (e) bathroom, install washer and dryer in (n) with (n) hookups.Details
unit 102- convert (e) kitchen to bedroom, relocate kitchen and remodel (e) bathroom, install washer and dryer in (n) with (n) hookups. | $65,000 |
| May 7, 2025 | Completed final sign-off Jun 2025 | 1117 Guerrero St | Axel8 Construction | comply with 202536781 revision to 202405212584. repair i kind detoeriorated components of exiding secondary staircase. replace 75% of the stair and landing. replacing in kind the landing at 2/f and 3/f level, decking surfaces and guardrails. stair is (e) non-conforming. no change to stair layout andDetails
comply with 202536781 revision to 202405212584. repair i kind detoeriorated components of exiding secondary staircase. replace 75% of the stair and landing. replacing in kind the landing at 2/f and 3/f level, decking surfaces and guardrails. stair is (e) non-conforming. no change to stair layout and | $2,000 |
| Apr 16, 2025 | In progress issued May 2025 | 3351 Jackson St | Axel8 Construction | remove staircase in laundry room nest to kitchen and fill opening. install (n) open space access stair on the west facade in side yard. remodel kitchen ,pantry , laundry , primary bath and closet, jack and jill bath and hall bath.Details
remove staircase in laundry room nest to kitchen and fill opening. install (n) open space access stair on the west facade in side yard. remodel kitchen ,pantry , laundry , primary bath and closet, jack and jill bath and hall bath. | $60,000 |
| Apr 15, 2025 | Completed final sign-off Aug 2025 | 3727 Sacramento St | Axel8 Construction | 3727 sacramento st - convert existing bedroom to bathroom. rehabilitate one existing bathroom. replace existing washer and dryer. convert existing living room to bedroomDetails
3727 sacramento st - convert existing bedroom to bathroom. rehabilitate one existing bathroom. replace existing washer and dryer. convert existing living room to bedroom | $68,000 |
| Apr 4, 2025 | Completed final sign-off May 2025 | 2380 California St | Axel8 Construction | unit 301: rehabilitate existing kitchen and bathroom in kind, like for like. no structural wall demo.Details
unit 301: rehabilitate existing kitchen and bathroom in kind, like for like. no structural wall demo. | $64,000 |
| Mar 21, 2025 | Completed final sign-off Aug 2025 | 148 Fillmore St | Axel8 Construction | 148 fillmore: rehabilitate (e) kitchen, rehabilitate (e) bath, and install washer dryer. add closet at study.Details
148 fillmore: rehabilitate (e) kitchen, rehabilitate (e) bath, and install washer dryer. add closet at study. | $75,000 |
| Feb 21, 2025 | In progress issued Mar 2025 | 880 26th Av | Axel8 Construction | unit #4: 1) convert existing kitchen to study. 2)relocate kitchen. 3)rehabilitate existing bathroom. 4)install washer and dryer.Details
unit #4: 1) convert existing kitchen to study. 2)relocate kitchen. 3)rehabilitate existing bathroom. 4)install washer and dryer. | $74,000 |
| Feb 21, 2025 | Completed final sign-off Sep 2025 | 880 26th Av | Axel8 Construction | unit #6 4/f. revision to pa # 202409170965 (kitchen & bath no-plans): convert (e) kitchen to study, relocate kitchen, rehabilitate (e) bathroom, install washer & dryer.Details
unit #6 4/f. revision to pa # 202409170965 (kitchen & bath no-plans): convert (e) kitchen to study, relocate kitchen, rehabilitate (e) bathroom, install washer & dryer. | $16,000 |
| Feb 21, 2025 | Completed final sign-off Sep 2025 | 880 26th Av | Axel8 Construction | unit 1, 2nd floor: revision to pa# 202501228841 (kitchen & bath no plans). convert existing kitchen to study. relocate kitchen, rehabilitation existing bathroom. install washer and dryer.Details
unit 1, 2nd floor: revision to pa# 202501228841 (kitchen & bath no plans). convert existing kitchen to study. relocate kitchen, rehabilitation existing bathroom. install washer and dryer. | $24,000 |
| Feb 20, 2025 | Completed final sign-off Apr 2025 | 50 Moulton St | Axel8 Construction | rehabilitate (e) kitchen and bathroom in-kind. no structural wall demo.Details
rehabilitate (e) kitchen and bathroom in-kind. no structural wall demo. | $75,000 |
| Feb 20, 2025 | Completed final sign-off Jun 2025 | 2583 31st Av | Axel8 Construction | replace existing rear deck beam, strengthen existing framing, less than 50% replacement.Details
replace existing rear deck beam, strengthen existing framing, less than 50% replacement. | $10,000 |
| Jan 22, 2025 | Completed final sign-off Sep 2025 | 880 26th Av | Axel8 Construction | unit #1: 1) rehabilitate existing kitchen. 2)replace existing bathroom toilet and vinity. 3)tile work. 4) no structural wall demo, no change in plumbing fixture count.Details
unit #1: 1) rehabilitate existing kitchen. 2)replace existing bathroom toilet and vinity. 3)tile work. 4) no structural wall demo, no change in plumbing fixture count. | $50,000 |
| Dec 2, 2024 | Completed final sign-off Mar 2025 | 535 Taylor St | Axel8 Construction | unit# 402: rehabilitate exsiting kitchen, bathroom and install washer and dryer.Details
unit# 402: rehabilitate exsiting kitchen, bathroom and install washer and dryer. | $65,000 |
| Dec 2, 2024 | Completed final sign-off Mar 2025 | 535 Taylor St | Axel8 Construction | unit 106, 2nd fl - convert (e) kitchen to bedroom; relocate (e) kitchen; rehabilitate (e) bathroom; install washer and dryerDetails
unit 106, 2nd fl - convert (e) kitchen to bedroom; relocate (e) kitchen; rehabilitate (e) bathroom; install washer and dryer | $65,000 |
| Nov 18, 2024 | In progress issued Nov 2024 | 1117 Guerrero St | Axel8 Construction | unit #6: revision to pa #202406033585 to add new gas furnace to scope and revise lighting layout.Details
unit #6: revision to pa #202406033585 to add new gas furnace to scope and revise lighting layout. | $10,000 |
| Nov 18, 2024 | Completed final sign-off Mar 2025 | 3101 Laguna St | Axel8 Construction | unit#: 204 1) convert existing kitchen to bedroom. 2) relocate kitchen. 3) rehabilitate existing bathroom. 4) install washer and dryer. work on 3rd floor.Details
unit#: 204 1) convert existing kitchen to bedroom. 2) relocate kitchen. 3) rehabilitate existing bathroom. 4) install washer and dryer. work on 3rd floor. | $62,000 |
| Nov 6, 2024 | In progress issued Nov 2024 | 901 Pine St | Axel8 Construction | revision to pa # 2022-1223-9112 revise fire sprinkler specification from (e) nfpa 13 to (e) nfpa 13r. provide nfpa 13r fire sprinkler system at proposed unitDetails
revision to pa # 2022-1223-9112 revise fire sprinkler specification from (e) nfpa 13 to (e) nfpa 13r. provide nfpa 13r fire sprinkler system at proposed unit | |
| Nov 5, 2024 | Completed final sign-off Aug 2025 | 880 26th Av | Axel8 Construction | unit 3 - 3rd fl: convert (e) kitchen to study. relocate kitchen. rehabitate (e) bathroom. install washer/gas dryer.Details
unit 3 - 3rd fl: convert (e) kitchen to study. relocate kitchen. rehabitate (e) bathroom. install washer/gas dryer. | $68,000 |
| Nov 5, 2024 | Completed final sign-off Apr 2025 | 1 Cabrillo St | Axel8 Construction | unit #205: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer & dryerDetails
unit #205: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer | $60,000 |
| Nov 5, 2024 | Completed final sign-off Aug 2025 | 880 26th Av | Axel8 Construction | unit 2: revision to no plan pa# 202409170963. convert e) kitchen to study. relocate kitchen. rehabitate e) bathroom. install washer/dryerDetails
unit 2: revision to no plan pa# 202409170963. convert e) kitchen to study. relocate kitchen. rehabitate e) bathroom. install washer/dryer | $10,000 |
| Oct 21, 2024 | Completed final sign-off May 2025 | 6730 Fulton St | Axel8 Construction | replace in kind (e) deteriorated rear balcony at the second and third floor level. no change to balcony sizes.Details
replace in kind (e) deteriorated rear balcony at the second and third floor level. no change to balcony sizes. | $10,000 |
| Oct 16, 2024 | Completed final sign-off Aug 2025 | 880 26th Av | Axel8 Construction | unit #5: convert (e) kitchen to study. relocate kitchen. rehabilitate (e) bathroom. install washer and dryer.Details
unit #5: convert (e) kitchen to study. relocate kitchen. rehabilitate (e) bathroom. install washer and dryer. | $68,000 |
| Oct 8, 2024 | Completed final sign-off Aug 2025 | 1117 Guerrero St | Axel8 Construction | unit #2: revision to pa # 202405101910 to add (n) furnace to scope and revise lighting layout.Details
unit #2: revision to pa # 202405101910 to add (n) furnace to scope and revise lighting layout. | $10,000 |
| Sep 30, 2024 | In progress issued Oct 2024 | 1117 Guerrero St | Axel8 Construction | unit #5: revision to pa #202406033583 to add new furnace to scope and revise lighting layout.Details
unit #5: revision to pa #202406033583 to add new furnace to scope and revise lighting layout. | $10,000 |
| Sep 30, 2024 | In progress issued Oct 2024 | 1117 Guerrero St | Axel8 Construction | unit #3: revision to pa #202405212596 to add new furnace to scope and revise lighting layout.Details
unit #3: revision to pa #202405212596 to add new furnace to scope and revise lighting layout. | $10,000 |
| Sep 17, 2024 | Completed final sign-off Sep 2025 | 880 26th Av | Axel8 Construction | unit #6: rehab (1) (e) kitchen in kind. rehab (1) (e) bathroom in kind. no structural wall demolition or construction.Details
unit #6: rehab (1) (e) kitchen in kind. rehab (1) (e) bathroom in kind. no structural wall demolition or construction. | $58,000 |
| Sep 17, 2024 | Completed final sign-off Aug 2025 | 880 26th Av | Axel8 Construction | unit #2: rehab (1) (e) kitchen in kind. rehab (1) (e) bathroom in kind. no structural wall demolition or construction.Details
unit #2: rehab (1) (e) kitchen in kind. rehab (1) (e) bathroom in kind. no structural wall demolition or construction. | $58,000 |
| Sep 10, 2024 | Completed final sign-off Nov 2024 | 535 Taylor St | Axel8 Construction | unit 503 on 6/f: rehabilitate existing kitchen, rehabilitate existing bathroom. install washer and dryer.Details
unit 503 on 6/f: rehabilitate existing kitchen, rehabilitate existing bathroom. install washer and dryer. | $60,000 |
| Aug 2, 2024 | Completed final sign-off Feb 2025 | 1075 Ofarrell St | Axel8 Construction | unit #10: rehab (1) (e) kitchen. rehab (1) (e) bathroom. no structural wall demo. no structural work will be performed.Details
unit #10: rehab (1) (e) kitchen. rehab (1) (e) bathroom. no structural wall demo. no structural work will be performed. | $60,000 |
| Jul 16, 2024 | Completed final sign-off Jan 2025 | 28 02nd St | Axel8 Construction | deferred mep for pa# 202312082195. no exterior workDetails
deferred mep for pa# 202312082195. no exterior work | $80,000 |
| Jul 10, 2024 | Completed final sign-off Oct 2024 | 81 Cervantes Bl | Axel8 Construction | remodel existing kitchen, rhabilitate existing baths, install washer and dryerDetails
remodel existing kitchen, rhabilitate existing baths, install washer and dryer | $80,000 |
| Jul 10, 2024 | Completed final sign-off Sep 2024 | 1380 Pacific Av | Axel8 Construction | 1380 pacific: 1. rehabilitate existing kitchen. 2. rehabilitate existing bathroom 3. no wall demo.Details
1380 pacific: 1. rehabilitate existing kitchen. 2. rehabilitate existing bathroom 3. no wall demo. | $60,000 |
| Jun 28, 2024 | In progress issued Jul 2024 | 901 Pine St | Axel8 Construction | revision to pa 202212239112 revise concrete footings and wood beamsDetails
revision to pa 202212239112 revise concrete footings and wood beams | |
| Jun 13, 2024 | Completed final sign-off Aug 2024 | 501 Greenwich St | Axel8 Construction | unit 515: rehabilation existing kithen in kind. no wall demo or structural work proposed.Details
unit 515: rehabilation existing kithen in kind. no wall demo or structural work proposed. | $35,000 |
| Jun 3, 2024 | Completed final sign-off Jun 2025 | 1117 Guerrero St | Axel8 Construction | unit 6 - rehabilitate (e) kitchen & bathroom; install washer & dryerDetails
unit 6 - rehabilitate (e) kitchen & bathroom; install washer & dryer | $75,000 |
| Jun 3, 2024 | Completed final sign-off Jun 2025 | 1117 Guerrero St | Axel8 Construction | unit 5 - rehabilitate (e) kitchen & bathroom; install 2nd bathroom; install washer & dryerDetails
unit 5 - rehabilitate (e) kitchen & bathroom; install 2nd bathroom; install washer & dryer | $80,000 |
| May 21, 2024 | Completed final sign-off Apr 2025 | 1117 Guerrero St | Axel8 Construction | unit 3: rehabitate e) kitchen & bathroom. install 2nd bathroom. install washer/dryer. capture 42 sf of commmon corridor to unit envelope, new unit gross area 731 sfDetails
unit 3: rehabitate e) kitchen & bathroom. install 2nd bathroom. install washer/dryer. capture 42 sf of commmon corridor to unit envelope, new unit gross area 731 sf | $80,000 |
| May 21, 2024 | Completed final sign-off Jun 2025 | 1117 Guerrero St | Axel8 Construction | repair in kind deteriorated parts of secondary stairs. no more than 50% replacement. replace all treads and subfloor with 2x p.t. decking.Details
repair in kind deteriorated parts of secondary stairs. no more than 50% replacement. replace all treads and subfloor with 2x p.t. decking. | $5,000 |
| May 10, 2024 | Completed final sign-off Apr 2025 | 1117 Guerrero St | Axel8 Construction | unit 1: relocate e) kitchen, rehabilitate e) bathroom, install washer/dryer. no exterior workDetails
unit 1: relocate e) kitchen, rehabilitate e) bathroom, install washer/dryer. no exterior work | $62,000 |
| May 10, 2024 | Completed final sign-off Aug 2025 | 1117 Guerrero St | Axel8 Construction | unit 2: rehabitate e) kitchen & e) bathroom, install washer/dryer. no exterior workDetails
unit 2: rehabitate e) kitchen & e) bathroom, install washer/dryer. no exterior work | $82,000 |
| May 3, 2024 | Completed final sign-off May 2024 | 1658 Sacramento St | Axel8 Construction | to obtain final inspection for work approved under pa# 201809109602. all work is complete.Details
to obtain final inspection for work approved under pa# 201809109602. all work is complete. | |
| May 3, 2024 | Completed final sign-off May 2024 | 1656 Sacramento St | Axel8 Construction | to obtain final inspection for work approved under pa# 201809109601. all work is completeDetails
to obtain final inspection for work approved under pa# 201809109601. all work is complete | |
| May 1, 2024 | Completed final sign-off Jul 2024 | 1472 Jackson St | Axel8 Construction | rehabilitate existing kitchen in-kind, no structural work.Details
rehabilitate existing kitchen in-kind, no structural work. | $37,000 |
| Apr 16, 2024 | Completed final sign-off Oct 2025 | 1234 Francisco St | Axel8 Construction | reroofingDetails
reroofing | $26,000 |
| Apr 9, 2024 | Completed final sign-off Jun 2024 | 1450 Castro St | Axel8 Construction | unit #17: rev to pa# 2024-0227-6672 to revise kitchen layoutDetails
unit #17: rev to pa# 2024-0227-6672 to revise kitchen layout | |
| Mar 8, 2024 | Completed final sign-off May 2024 | 535 Taylor St | Axel8 Construction | unit 203: convert existing living room to bedroom. relocate kitchen, rehabilitate existing bathroom, install w/d.Details
unit 203: convert existing living room to bedroom. relocate kitchen, rehabilitate existing bathroom, install w/d. | $60,000 |
| Feb 27, 2024 | Completed final sign-off Jun 2024 | 1450 Castro St | Axel8 Construction | unit#17: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathrooms. 3)install washer and dryer.Details
unit#17: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathrooms. 3)install washer and dryer. | $70,000 |
| Jan 29, 2024 | Completed final sign-off May 2024 | 2354 Polk St | Axel8 Construction, Modular Remodeling & Design Inc | create a new opening in non structural wall to combine two tenant spaces into one larger retail space. tenant space to remain vacant until tenant improvement is filed, issued, inspected and final inspected.Details
create a new opening in non structural wall to combine two tenant spaces into one larger retail space. tenant space to remain vacant until tenant improvement is filed, issued, inspected and final inspected. | $6,000 |
| Jan 12, 2024 | In progress issued Jan 2024 | 1400 Filbert St | Axel8 Construction | unit #6: rehabilitate (e) kitchen in-kind, replace bathroom sink and toilet in-kind, no structural work or wall demo will be performedDetails
unit #6: rehabilitate (e) kitchen in-kind, replace bathroom sink and toilet in-kind, no structural work or wall demo will be performed | $60,000 |
| Dec 12, 2023 | Completed final sign-off Apr 2024 | 550 Baker St | Axel8 Construction | #3: convert (e) kitchen to study. convert (e) dining to family. relocate kitchen. rehabilitate (e) bathroom. install second bathroom. replace and relocate (e) w/d.Details
#3: convert (e) kitchen to study. convert (e) dining to family. relocate kitchen. rehabilitate (e) bathroom. install second bathroom. replace and relocate (e) w/d. | $90,000 |
| Dec 8, 2023 | Completed final sign-off Jan 2025 | 28 02nd St | Axel8 Construction | 2/f: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork and finishes. mep and life safety under a separate permit.Details
2/f: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork and finishes. mep and life safety under a separate permit. | $215,000 |
| Nov 22, 2023 | Completed final sign-off Jan 2026 | 1234 Francisco St | Axel8 Construction | provide private roof decks over (e) roof for use by 4 indiviual unis. replace/install new fire escape ladders facing back yardDetails
provide private roof decks over (e) roof for use by 4 indiviual unis. replace/install new fire escape ladders facing back yard | $40,000 |
| Nov 22, 2023 | Completed final sign-off Aug 2025 | 1234 Francisco St | Axel8 Construction | unit 2: relocate kitchen, rehab 2 (e) bathrooms, install 2 new bathrooms, replace (e) w/d, install new furnace & condenser, capture +/-199 sqft laundry/ garage space to unit envelope, new unit gross area 1903 sqft, capture +/-270 sqft of rear yard for new private yard, increase opening height.Details
unit 2: relocate kitchen, rehab 2 (e) bathrooms, install 2 new bathrooms, replace (e) w/d, install new furnace & condenser, capture +/-199 sqft laundry/ garage space to unit envelope, new unit gross area 1903 sqft, capture +/-270 sqft of rear yard for new private yard, increase opening height. | $174,000 |
| Nov 14, 2023 | In progress issued Nov 2023 | 2509 Bryant St | Axel8 Construction | provide gas appliance fireplaces in 2 first story units 2509 & 2509a bryant st. ref pmw20231106418 - plum/mech. no change to approved unit sizes or location.Details
provide gas appliance fireplaces in 2 first story units 2509 & 2509a bryant st. ref pmw20231106418 - plum/mech. no change to approved unit sizes or location. | $10,000 |
| Nov 8, 2023 | Completed final sign-off Feb 2024 | 1075 Ofarrell St | Axel8 Construction | unit 1: rehab (e) kitchen in-kind, rehab (e) bathroom in-kind. no structural work proposed.Details
unit 1: rehab (e) kitchen in-kind, rehab (e) bathroom in-kind. no structural work proposed. | $60,000 |
| Oct 10, 2023 | Completed final sign-off Apr 2024 | 2356 Polk St | Axel8 Construction | revision to 202307212689 and 202308305592 to include in scope: build new drop ceiling throughout retail space.add new lighting to the ceiling. adding electrical outletsDetails
revision to 202307212689 and 202308305592 to include in scope: build new drop ceiling throughout retail space.add new lighting to the ceiling. adding electrical outlets | |
| Oct 5, 2023 | Completed final sign-off Jul 2025 | 1234 Francisco St | Axel8 Construction | unit# 1: convert (e) kitchen to study; relocate kitchen; rehabilitate (e) bathroom; install 2nd bathroom; install washer and washerDetails
unit# 1: convert (e) kitchen to study; relocate kitchen; rehabilitate (e) bathroom; install 2nd bathroom; install washer and washer | $82,000 |
| Oct 4, 2023 | Completed final sign-off Mar 2025 | 1234 Francisco St | Axel8 Construction | unit #4: convert (e) kitchen to study. relocate kitchen. rehab (e) bathroom. install second bathroom. install washer/dryer.Details
unit #4: convert (e) kitchen to study. relocate kitchen. rehab (e) bathroom. install second bathroom. install washer/dryer. | $82,000 |
| Sep 29, 2023 | Completed final sign-off Sep 2023 | 1146 Taylor St | Axel8 Construction | to obtain final inspection for work approved under permit apllication # 2019-1009-4038 all work is completeDetails
to obtain final inspection for work approved under permit apllication # 2019-1009-4038 all work is complete | |
| Sep 15, 2023 | Completed final sign-off Nov 2024 | 1234 Francisco St | Axel8 Construction | unit 5: convert (e) kitchen to study, relocate kitchen, rehab (e) bathroom, add 2nd bathroom, install washer/dryerDetails
unit 5: convert (e) kitchen to study, relocate kitchen, rehab (e) bathroom, add 2nd bathroom, install washer/dryer | $82,000 |
| Sep 15, 2023 | Completed final sign-off Mar 2025 | 1234 Francisco St | Axel8 Construction | unit 6: convert (e) kitchen to study, relocate kitchen, rehab (e) bathroom, add 2nd bathroom, install washer/dryerDetails
unit 6: convert (e) kitchen to study, relocate kitchen, rehab (e) bathroom, add 2nd bathroom, install washer/dryer | $82,000 |
| Sep 12, 2023 | Completed final sign-off Mar 2024 | 510 Church St | Axel8 Construction | accessible business entrance, abarrier removal only to comply with ord 51-16 at 510 church st ref abe 201909096020Details
accessible business entrance, abarrier removal only to comply with ord 51-16 at 510 church st ref abe 201909096020 | $1,000 |
| Aug 30, 2023 | Completed final sign-off Apr 2024 | 2356 Polk St | Axel8 Construction | revision to pa# 202307212689. to include scope: demo (e) hardlid ceiling throughout retail space and replace bathroom exhaust fan.Details
revision to pa# 202307212689. to include scope: demo (e) hardlid ceiling throughout retail space and replace bathroom exhaust fan. | $1,500 |
| Aug 16, 2023 | Completed final sign-off Dec 2023 | 901 Broderick St | Axel8 Construction | unit 10: rehab (e) kitchen, relocate bathroom, install washer/dryerDetails
unit 10: rehab (e) kitchen, relocate bathroom, install washer/dryer | $70,000 |
| Aug 14, 2023 | Completed final sign-off Dec 2023 | 737 Pine St | Axel8 Construction | unit 6 - rehabilitate existing kitchen and bathroom; install washer/dryerDetails
unit 6 - rehabilitate existing kitchen and bathroom; install washer/dryer | $45,000 |
| Aug 1, 2023 | Completed final sign-off Nov 2023 | 65 Buena Vista East Av | Axel8 Construction | unit# 103: rehabilitate existing kitchen, bathroom and install washer & dryer.Details