Block 6539, lot 004
1450 Castro St
- City’s use
- Multi-Family Residential
- Built
- 1912
- Stories
- 3
- Units
- 25
- Rooms
- 25 bathrooms
- Building
- 13,965 sq ft
- Lot
- 7,117 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
24 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 9, 2024 | Completed final sign-off Jun 2024 | 1450 Castro St | Axel8 Construction | unit #17: rev to pa# 2024-0227-6672 to revise kitchen layoutDetails
unit #17: rev to pa# 2024-0227-6672 to revise kitchen layout | |
| Feb 27, 2024 | Completed final sign-off Jun 2024 | 1450 Castro St | Axel8 Construction | unit#17: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathrooms. 3)install washer and dryer.Details
unit#17: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathrooms. 3)install washer and dryer. | $70,000 |
| Dec 4, 2023 | Completed final sign-off Jan 2024 | 1450 Castro St | Bkr Services Inc Dba Bkr Construction Se | unit #9: kitchen remodel. upgrade plumbing and electrical to service new kitchen layout. no changes to the wall layout.Details
unit #9: kitchen remodel. upgrade plumbing and electrical to service new kitchen layout. no changes to the wall layout. | $40,000 |
| Jul 20, 2023 | Never finaled issued Jul 2023, no final | 1450 Castro St | Axel8 Construction | unit 10 - 2nd flr - revision to 202304125562. show e post at demoed closet shall remainDetails
unit 10 - 2nd flr - revision to 202304125562. show e post at demoed closet shall remain | |
| May 1, 2023 | Completed final sign-off May 2023 | 1450 Castro St | Parksway Construction Inc | reroofing. modified bitumen roofing systemDetails
reroofing. modified bitumen roofing system | $48,500 |
| Apr 19, 2023 | Completed final sign-off Feb 2024 | 1450 Castro St | Au Electric Corporation/Aec Alarms | upgrade the existing facu with a new f/a system to comply with sffc 1103.7.6.1 by installing wireless lf sounders in all sleeping areas and like for like replacements for (e) pull stations, smoke and horn/strobes in common areas.Details
upgrade the existing facu with a new f/a system to comply with sffc 1103.7.6.1 by installing wireless lf sounders in all sleeping areas and like for like replacements for (e) pull stations, smoke and horn/strobes in common areas. | $40,000 |
| Apr 12, 2023 | Completed final sign-off Sep 2023 | 1450 Castro St | Axel8 Construction | unit 20 rehabilitate e kitchen. rehabilitate existing bath in kind. install washer dryerDetails
unit 20 rehabilitate e kitchen. rehabilitate existing bath in kind. install washer dryer | $65,000 |
| Apr 12, 2023 | Completed final sign-off Sep 2023 | 1450 Castro St | Axel8 Construction | unit 10: rehab (e) kitchen & (e) bath. install washer & dryerDetails
unit 10: rehab (e) kitchen & (e) bath. install washer & dryer | $65,000 |
| Oct 18, 2022 | Completed final sign-off Oct 2023 | 4208 25th St | Axel8 Construction | rehab (e) kitchen and bathroom. install washer and dryer. no removal of structural walls.Details
rehab (e) kitchen and bathroom. install washer and dryer. no removal of structural walls. | $32,000 |
| Oct 18, 2022 | Completed final sign-off Sep 2023 | 1450 Castro St | Axel8 Construction | unit #11: 1) rehabilitate extg kitchen. 2) rehabilitate extg bathroom. 3)install washer and dryer.Details
unit #11: 1) rehabilitate extg kitchen. 2) rehabilitate extg bathroom. 3)install washer and dryer. | $40,000 |
| Oct 11, 2022 | Completed final sign-off Aug 2023 | 1450 Castro St | Axel8 Construction | unit #12 and 14 - 2nd flr: 1)rehabilitate in extg kitchens. 2)rehabilitate extg bathrooms. 3)install washer and elec dryers. 4)no structural demo.Details
unit #12 and 14 - 2nd flr: 1)rehabilitate in extg kitchens. 2)rehabilitate extg bathrooms. 3)install washer and elec dryers. 4)no structural demo. | $80,000 |
| Oct 6, 2022 | Expired or cancelled cancelled Jan 2026 | 1450 Castro St | unit 4: rehab (e) kitchen & bathroom. install washer & dryer. no structural walls removalDetails
unit 4: rehab (e) kitchen & bathroom. install washer & dryer. no structural walls removal | $40,000 | |
| Sep 26, 2022 | Never finaled issued Oct 2022, no final | 1450 Castro St | units 6 & 7 - rehabilitate (e) kitchens and bathrooms; install washer & dryerDetails
units 6 & 7 - rehabilitate (e) kitchens and bathrooms; install washer & dryer | $80,000 | |
| Sep 26, 2022 | Completed final sign-off Sep 2023 | 1450 Castro St | Axel8 Construction | units 18 & 22: rehab (e) kitchens, (e) bathrooms, install washers/dryers, no wall demo, no structural workDetails
units 18 & 22: rehab (e) kitchens, (e) bathrooms, install washers/dryers, no wall demo, no structural work | $80,000 |
| Sep 26, 2022 | Never finaled issued Oct 2022, no final | 1450 Castro St | Axel8 Construction | units 8 & 15: rehab (e) kitchens, (e) bathrooms, install washers/dryers, no wall demo, no structural workDetails
units 8 & 15: rehab (e) kitchens, (e) bathrooms, install washers/dryers, no wall demo, no structural work | $80,000 |
| Sep 23, 2022 | Never finaled issued Sep 2022, no final | 1450 Castro St | units 1 & 3 - rehabilitate (e) kitchens and bathrooms; install washer & dryerDetails
units 1 & 3 - rehabilitate (e) kitchens and bathrooms; install washer & dryer | $80,000 | |
| Sep 10, 2021 | Completed final sign-off Sep 2021 | 4208 25th St | for documentation purpose the legal use of the front building is one story single family unit. this determination is based on review of city records & a site visit. no work under this permit.Details
for documentation purpose the legal use of the front building is one story single family unit. this determination is based on review of city records & a site visit. no work under this permit. | ||
| May 22, 2018 | Completed final sign-off Jun 2018 | 1450 Castro St | Sgdm Llc | #2 & #9: to comply w/201864053. new kitchen cabinets, n granite, countertops, n sink & faucet, n appliances, refrigerator & 24" stove, new linoleum fl. reroute gas line & install shut off valve in bottom left cabinet. install new lino. fl in bathrm. install n cabinet, low flow toilet, light fixture.Details
#2 & #9: to comply w/201864053. new kitchen cabinets, n granite, countertops, n sink & faucet, n appliances, refrigerator & 24" stove, new linoleum fl. reroute gas line & install shut off valve in bottom left cabinet. install new lino. fl in bathrm. install n cabinet, low flow toilet, light fixture. | $30,000 |
| Feb 6, 2018 | Completed final sign-off Oct 2018 | 1450 Castro St | Sgdm Llc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maherDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher | $68,000 |
| Sep 20, 2016 | Expired or cancelled withdrawn Feb 2018 | 1450 Castro St | 1st flr: softy story retrofit per sfbc ch 34b; 2012 iebc app a-4; and rational design;maher n/aDetails
1st flr: softy story retrofit per sfbc ch 34b; 2012 iebc app a-4; and rational design;maher n/a | $90,000 | |
| Mar 5, 2015 | Never finaled issued Mar 2015, no final | 1450 Castro St | work in unit #16: revision to 201502027241: remove one interior wall. maher not reqDetails
work in unit #16: revision to 201502027241: remove one interior wall. maher not req | $3,500 | |
| Feb 2, 2015 | Never finaled issued Feb 2015, no final | 1450 Castro St | work in unit #16: strip unit down ot studs; replace sheetrocks, trim, new electrical and plumbing where needed, new kitchen, new bathroom; to comply with cec150.0(k)3&5Details
work in unit #16: strip unit down ot studs; replace sheetrocks, trim, new electrical and plumbing where needed, new kitchen, new bathroom; to comply with cec150.0(k)3&5 | $30,000 | |
| Aug 13, 2007 | Completed final sign-off Nov 2007 | 1450 Castro St | interior remodel dry wall work neew kitchen , sink cabinets and counter tops, bathroom, new tile surrounfd vanity, tiliet, linoliiumen floor, electrical upgrade painting no stucturaal work. kitchen, fluorescent a heart 50%$ by watts, bathroom, fluorescent or occupant sensor control.Details
interior remodel dry wall work neew kitchen , sink cabinets and counter tops, bathroom, new tile surrounfd vanity, tiliet, linoliiumen floor, electrical upgrade painting no stucturaal work. kitchen, fluorescent a heart 50%$ by watts, bathroom, fluorescent or occupant sensor control. | $10,000 | |
| Jul 11, 2002 | Never finaled issued Sep 2002, no final | 1450 Castro St | American Window /All About Windows Inc. | replace by retrofit extg windows w/new double pne vinyl wndw no chnge in sizes or styles/vsbl frm stDetails
replace by retrofit extg windows w/new double pne vinyl wndw no chnge in sizes or styles/vsbl frm st | $29,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Axel8 Construction (10), Sgdm Llc (2), American Window /All About Windows Inc., Au Electric Corporation/Aec Alarms, Bkr Services Inc Dba Bkr Construction Se, Parksway Construction Inc
- Architects
- Jorge Carbonell, Wai Mar
- Engineers
- Joe Kwon (11), Joe Kon (2), Lawrence Liao
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.