Permit GraphShortlistSan Francisco building permits since 2000

Block 3646, lot 017

1117 Guerrero St

City’s use
Multi-Family Residential
Built
1906
Stories
3
Units
6
Rooms
6 bathrooms
Building
5,184 sq ft
Lot
2,500 sq ft
Zoning
RH3
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

17 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 7, 2025Completed
final sign-off Jun 2025
1117 Guerrero StAxel8 Constructioncomply with 202536781 revision to 202405212584. repair i kind detoeriorated components of exiding secondary staircase. replace 75% of the stair and landing. replacing in kind the landing at 2/f and 3/f level, decking surfaces and guardrails. stair is (e) non-conforming. no change to stair layout and
Details
Permit
202505076002
Permit issued
May 15, 2025
Final sign-off
Jun 16, 2025

comply with 202536781 revision to 202405212584. repair i kind detoeriorated components of exiding secondary staircase. replace 75% of the stair and landing. replacing in kind the landing at 2/f and 3/f level, decking surfaces and guardrails. stair is (e) non-conforming. no change to stair layout and

Open the permit page

$2,000
Nov 18, 2024In progress
issued Nov 2024
1117 Guerrero StAxel8 Constructionunit #6: revision to pa #202406033585 to add new gas furnace to scope and revise lighting layout.
Details
Permit
202411185236
Permit issued
Nov 19, 2024

unit #6: revision to pa #202406033585 to add new gas furnace to scope and revise lighting layout.

Open the permit page

$10,000
Oct 8, 2024Completed
final sign-off Aug 2025
1117 Guerrero StAxel8 Constructionunit #2: revision to pa # 202405101910 to add (n) furnace to scope and revise lighting layout.
Details
Permit
202410082545
Permit issued
Oct 9, 2024
Final sign-off
Aug 8, 2025

unit #2: revision to pa # 202405101910 to add (n) furnace to scope and revise lighting layout.

Open the permit page

$10,000
Oct 4, 2024Completed
final sign-off Jul 2025
1117 Guerrero StAu Electric Corporation/Aec Alarmsfire alarm only install low frequency sounders in sleeping areas on the existing fa system to comply with sffc 1103.7.6.1
Details
Permit
202410042310
Permit issued
Oct 4, 2024
Final sign-off
Jul 10, 2025

fire alarm only install low frequency sounders in sleeping areas on the existing fa system to comply with sffc 1103.7.6.1

Open the permit page

$14,000
Sep 30, 2024In progress
issued Oct 2024
1117 Guerrero StAxel8 Constructionunit #3: revision to pa #202405212596 to add new furnace to scope and revise lighting layout.
Details
Permit
202409301996
Permit issued
Oct 1, 2024

unit #3: revision to pa #202405212596 to add new furnace to scope and revise lighting layout.

Open the permit page

$10,000
Sep 30, 2024In progress
issued Oct 2024
1117 Guerrero StAxel8 Constructionunit #5: revision to pa #202406033583 to add new furnace to scope and revise lighting layout.
Details
Permit
202409301997
Permit issued
Oct 8, 2024

unit #5: revision to pa #202406033583 to add new furnace to scope and revise lighting layout.

Open the permit page

$10,000
Jun 3, 2024Completed
final sign-off Jun 2025
1117 Guerrero StAxel8 Constructionunit 5 - rehabilitate (e) kitchen & bathroom; install 2nd bathroom; install washer & dryer
Details
Permit
202406033583
Permit issued
Jun 17, 2024
Final sign-off
Jun 25, 2025

unit 5 - rehabilitate (e) kitchen & bathroom; install 2nd bathroom; install washer & dryer

Open the permit page

$80,000
Jun 3, 2024Completed
final sign-off Jun 2025
1117 Guerrero StAxel8 Constructionunit 6 - rehabilitate (e) kitchen & bathroom; install washer & dryer
Details
Permit
202406033585
Permit issued
Jun 4, 2024
Final sign-off
Jun 25, 2025

unit 6 - rehabilitate (e) kitchen & bathroom; install washer & dryer

Open the permit page

$75,000
May 21, 2024Completed
final sign-off Jun 2025
1117 Guerrero StAxel8 Constructionrepair in kind deteriorated parts of secondary stairs. no more than 50% replacement. replace all treads and subfloor with 2x p.t. decking.
Details
Permit
202405212584
Permit issued
May 21, 2024
Final sign-off
Jun 16, 2025

repair in kind deteriorated parts of secondary stairs. no more than 50% replacement. replace all treads and subfloor with 2x p.t. decking.

Open the permit page

$5,000
May 21, 2024Completed
final sign-off Apr 2025
1117 Guerrero StAxel8 Constructionunit 3: rehabitate e) kitchen & bathroom. install 2nd bathroom. install washer/dryer. capture 42 sf of commmon corridor to unit envelope, new unit gross area 731 sf
Details
Permit
202405212596
Permit issued
Jun 3, 2024
Final sign-off
Apr 23, 2025

unit 3: rehabitate e) kitchen & bathroom. install 2nd bathroom. install washer/dryer. capture 42 sf of commmon corridor to unit envelope, new unit gross area 731 sf

Open the permit page

$80,000
May 10, 2024Completed
final sign-off Aug 2025
1117 Guerrero StAxel8 Constructionunit 2: rehabitate e) kitchen & e) bathroom, install washer/dryer. no exterior work
Details
Permit
202405101910
Permit issued
May 10, 2024
Final sign-off
Aug 8, 2025

unit 2: rehabitate e) kitchen & e) bathroom, install washer/dryer. no exterior work

Open the permit page

$82,000
May 10, 2024Completed
final sign-off Apr 2025
1117 Guerrero StAxel8 Constructionunit 1: relocate e) kitchen, rehabilitate e) bathroom, install washer/dryer. no exterior work
Details
Permit
202405101908
Permit issued
May 10, 2024
Final sign-off
Apr 23, 2025

unit 1: relocate e) kitchen, rehabilitate e) bathroom, install washer/dryer. no exterior work

Open the permit page

$62,000
Apr 12, 2019Never finaled
issued Apr 2019, no final
1117 Guerrero Ststreet space
Details
Permit
M1065487
Permit issued
Apr 12, 2019

street space

Open the permit page

Aug 3, 2017Completed
final sign-off Jul 2019
1117 Guerrero Stseismic retrofit program (soft-story) per sfebc chapter 4d, per 2016 iebc appendix a-4.
Details
Permit
201708033729
Permit issued
Feb 14, 2019
Final sign-off
Jul 2, 2019

seismic retrofit program (soft-story) per sfebc chapter 4d, per 2016 iebc appendix a-4.

Open the permit page

$70,000
Dec 10, 2015Completed
final sign-off Dec 2015
1117 Guerrero StPing Kuen Constructiontermite dry rot repair. termite report#1511181.
Details
Permit
201512104716
Permit issued
Dec 10, 2015
Final sign-off
Dec 17, 2015

termite dry rot repair. termite report#1511181.

Open the permit page

$2,500
Sep 18, 2014Never finaled
issued Sep 2014, no final
1117 Guerrero StGateway Roofing And Water Proofing Increroofing
Details
Permit
201409186740
Permit issued
Sep 18, 2014

reroofing

Open the permit page

$21,500
Jul 1, 2002Never finaled
issued Jul 2002, no final
1117 Guerrero Strepair stairs(riser)to comply w/ routine insp.complaint#20022808.less than 50% of structure.
Details
Permit
200207010344
Permit issued
Jul 1, 2002

repair stairs(riser)to comply w/ routine insp.complaint#20022808.less than 50% of structure.

Open the permit page

$200

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Axel8 Construction (11), Au Electric Corporation/Aec Alarms, Gateway Roofing And Water Proofing Inc, Ping Kuen Construction
Engineers
Joe Win Kon (7)

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.