Permit GraphShortlistSan Francisco building permits since 2000

Adept Construction Solution Inc

Contractor license
1011699
State license record
Based in
San Francisco
On San Francisco permits
Aug 2016 to Jul 2020
Last 24 months
0 permits filed

9 permits since 2000: 7 completed, 2 never finaled.

Of the 2 never-finaled permits, 2 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllKitchen remodel 1Bathroom remodel 1
FiledOutcomeAddressWork described on the permitDeclared cost
Jul 14, 2020Completed
final sign-off May 2021
201 09th Strevision to pa 201905291933, residentail, revised design included relocate of plywood shear wall to work w/ existing arch design & revised moment frame spans & lowered depth below existing framing. a r of 6.5 used for 1st fl lateral design to address soft story, 2nd fl diaphragm was analyzed per ord
Details
Permit
202007140128
Status
complete
Filed
Jul 14, 2020
Permit issued
Sep 27, 2020
Final sign-off
May 3, 2021
Address
201 09th St

revision to pa 201905291933, residentail, revised design included relocate of plywood shear wall to work w/ existing arch design & revised moment frame spans & lowered depth below existing framing. a r of 6.5 used for 1st fl lateral design to address soft story, 2nd fl diaphragm was analyzed per ord

Open the permit page

Feb 21, 2020Completed
final sign-off May 2021
201 09th Strevision to structural only to approved permits app#201905291933.
Details
Permit
202002215078
Status
complete
Filed
Feb 21, 2020
Permit issued
Sep 27, 2020
Final sign-off
May 3, 2021
Address
201 09th St

revision to structural only to approved permits app#201905291933.

Open the permit page

Dec 31, 2019Completed
final sign-off May 2022
1163 South Van Ness Avadd three adu's per ord 162-17 at the 1st floor of the existing three-story bldg, two 2-bedrm units, one 1-bedrm unit, each with a kitchen and a bath. per ab-094,voluntary seismic upgrade per previous pa #201912048654, existing rear cottage not in scope
Details
Permit
201912311107
Status
complete
Filed
Dec 31, 2019
Permit issued
May 5, 2021
Final sign-off
May 19, 2022
Declared cost
$200,000
Address
1163 South Van Ness Av

add three adu's per ord 162-17 at the 1st floor of the existing three-story bldg, two 2-bedrm units, one 1-bedrm unit, each with a kitchen and a bath. per ab-094,voluntary seismic upgrade per previous pa #201912048654, existing rear cottage not in scope

Open the permit page

$200,000
Oct 7, 2019Completed
final sign-off Dec 2019
1163 South Van Ness Avrevision for pa# 2019-0711-5670. hold downs and shear walls embedments for future seismic retrofit. embedments are installed for future possible hold downs and hss posts. no additional work. no review for structural value.
Details
Permit
201910073673
Status
complete
Filed
Oct 7, 2019
Permit issued
Oct 7, 2019
Final sign-off
Dec 4, 2019
Address
1163 South Van Ness Av

revision for pa# 2019-0711-5670. hold downs and shear walls embedments for future seismic retrofit. embedments are installed for future possible hold downs and hss posts. no additional work. no review for structural value.

Open the permit page

Sep 30, 2019Completed
final sign-off Apr 2022
1169 South Van Ness Avto comply with nov 201981091 remove slab on grade at lightwell area 9'x4' excavate down to (m) grade at munis 2'8" replace w/new slab on grade at side area not street facing
Details
Permit
201909303066
Status
complete
Filed
Sep 30, 2019
Permit issued
Sep 30, 2019
Final sign-off
Apr 7, 2022
Declared cost
$2,500
Address
1169 South Van Ness Av

to comply with nov 201981091 remove slab on grade at lightwell area 9'x4' excavate down to (m) grade at munis 2'8" replace w/new slab on grade at side area not street facing

Open the permit page

$2,500
Jul 11, 2019Completed
final sign-off Apr 2022
1163 South Van Ness Avsectional removal and replace (e) brick foundation w/mat slab & retaining walls. replace (e) wood posts & install new anchor bolts & holddowns for future seismic retrofit of wood framed structure. replace sewer/ water lines as needed. upgrade gas,ele panels now work above basement-under sep permit
Details
Permit
201907115670
Status
complete
Filed
Jul 11, 2019
Permit issued
Jul 16, 2019
Final sign-off
Apr 12, 2022
Declared cost
$110,500
Address
1163 South Van Ness Av

sectional removal and replace (e) brick foundation w/mat slab & retaining walls. replace (e) wood posts & install new anchor bolts & holddowns for future seismic retrofit of wood framed structure. replace sewer/ water lines as needed. upgrade gas,ele panels now work above basement-under sep permit

Open the permit page

$110,500
Oct 18, 2017Never finaled
issued Oct 2017, no final
2534 Mission Stadd below grade perforated pipe and catch basin in rear patio, catch basin in rear patio, patch or replace e concrete paving at (n) trench, work limited to back patio area. no interior work. maher not req
Details
Permit
201710181546
Status
issued
Filed
Oct 18, 2017
Permit issued
Oct 23, 2017
Declared cost
$8,500
Address
2534 Mission St

add below grade perforated pipe and catch basin in rear patio, catch basin in rear patio, patch or replace e concrete paving at (n) trench, work limited to back patio area. no interior work. maher not req

Open the permit page

$8,500
May 2, 2017Never finaled
issued May 2017, no final
2201 Chestnut Strepairs to (e) water discharge system below grade in basement. replace 3 sump pump. install apprx 70 linear ft of drain pipes under (e) slab patch slab concrete. hook-up sump pump to (e) plumbing.
Details
Permit
201705025407
Status
issued
Filed
May 2, 2017
Permit issued
May 2, 2017
Declared cost
$18,500
Address
2201 Chestnut St

repairs to (e) water discharge system below grade in basement. replace 3 sump pump. install apprx 70 linear ft of drain pipes under (e) slab patch slab concrete. hook-up sump pump to (e) plumbing.

Open the permit page

$18,500
Aug 24, 2016Completed
final sign-off May 2017
5637 Geary Blt.i. at (e) 2 spaces, combine into single space/usage, remodel (2) existing toilets, add ada restroom, remove middle partition wall & add (2) drop beams, upgrade electrical and plumbing, (n) drywall, repair storefront, replace (e) ada entry.
Details
Permit
201608245886
Status
complete
Filed
Aug 24, 2016
Permit issued
Sep 28, 2016
Final sign-off
May 11, 2017
Declared cost
$35,000
Address
5637 Geary Bl

t.i. at (e) 2 spaces, combine into single space/usage, remodel (2) existing toilets, add ada restroom, remove middle partition wall & add (2) drop beams, upgrade electrical and plumbing, (n) drywall, repair storefront, replace (e) ada entry.

Open the permit page

$35,000