Adept Construction Solution Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2016 to Jul 2020
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2020 | Completed final sign-off May 2021 | 201 09th St | revision to pa 201905291933, residentail, revised design included relocate of plywood shear wall to work w/ existing arch design & revised moment frame spans & lowered depth below existing framing. a r of 6.5 used for 1st fl lateral design to address soft story, 2nd fl diaphragm was analyzed per ordDetails
revision to pa 201905291933, residentail, revised design included relocate of plywood shear wall to work w/ existing arch design & revised moment frame spans & lowered depth below existing framing. a r of 6.5 used for 1st fl lateral design to address soft story, 2nd fl diaphragm was analyzed per ord | |
| Feb 21, 2020 | Completed final sign-off May 2021 | 201 09th St | revision to structural only to approved permits app#201905291933.Details
revision to structural only to approved permits app#201905291933. | |
| Dec 31, 2019 | Completed final sign-off May 2022 | 1163 South Van Ness Av | add three adu's per ord 162-17 at the 1st floor of the existing three-story bldg, two 2-bedrm units, one 1-bedrm unit, each with a kitchen and a bath. per ab-094,voluntary seismic upgrade per previous pa #201912048654, existing rear cottage not in scopeDetails
add three adu's per ord 162-17 at the 1st floor of the existing three-story bldg, two 2-bedrm units, one 1-bedrm unit, each with a kitchen and a bath. per ab-094,voluntary seismic upgrade per previous pa #201912048654, existing rear cottage not in scope | $200,000 |
| Oct 7, 2019 | Completed final sign-off Dec 2019 | 1163 South Van Ness Av | revision for pa# 2019-0711-5670. hold downs and shear walls embedments for future seismic retrofit. embedments are installed for future possible hold downs and hss posts. no additional work. no review for structural value.Details
revision for pa# 2019-0711-5670. hold downs and shear walls embedments for future seismic retrofit. embedments are installed for future possible hold downs and hss posts. no additional work. no review for structural value. | |
| Sep 30, 2019 | Completed final sign-off Apr 2022 | 1169 South Van Ness Av | to comply with nov 201981091 remove slab on grade at lightwell area 9'x4' excavate down to (m) grade at munis 2'8" replace w/new slab on grade at side area not street facingDetails
to comply with nov 201981091 remove slab on grade at lightwell area 9'x4' excavate down to (m) grade at munis 2'8" replace w/new slab on grade at side area not street facing | $2,500 |
| Jul 11, 2019 | Completed final sign-off Apr 2022 | 1163 South Van Ness Av | sectional removal and replace (e) brick foundation w/mat slab & retaining walls. replace (e) wood posts & install new anchor bolts & holddowns for future seismic retrofit of wood framed structure. replace sewer/ water lines as needed. upgrade gas,ele panels now work above basement-under sep permitDetails
sectional removal and replace (e) brick foundation w/mat slab & retaining walls. replace (e) wood posts & install new anchor bolts & holddowns for future seismic retrofit of wood framed structure. replace sewer/ water lines as needed. upgrade gas,ele panels now work above basement-under sep permit | $110,500 |
| Oct 18, 2017 | Never finaled issued Oct 2017, no final | 2534 Mission St | add below grade perforated pipe and catch basin in rear patio, catch basin in rear patio, patch or replace e concrete paving at (n) trench, work limited to back patio area. no interior work. maher not reqDetails
add below grade perforated pipe and catch basin in rear patio, catch basin in rear patio, patch or replace e concrete paving at (n) trench, work limited to back patio area. no interior work. maher not req | $8,500 |
| May 2, 2017 | Never finaled issued May 2017, no final | 2201 Chestnut St | repairs to (e) water discharge system below grade in basement. replace 3 sump pump. install apprx 70 linear ft of drain pipes under (e) slab patch slab concrete. hook-up sump pump to (e) plumbing.Details
repairs to (e) water discharge system below grade in basement. replace 3 sump pump. install apprx 70 linear ft of drain pipes under (e) slab patch slab concrete. hook-up sump pump to (e) plumbing. | $18,500 |
| Aug 24, 2016 | Completed final sign-off May 2017 | 5637 Geary Bl | t.i. at (e) 2 spaces, combine into single space/usage, remodel (2) existing toilets, add ada restroom, remove middle partition wall & add (2) drop beams, upgrade electrical and plumbing, (n) drywall, repair storefront, replace (e) ada entry.Details
t.i. at (e) 2 spaces, combine into single space/usage, remodel (2) existing toilets, add ada restroom, remove middle partition wall & add (2) drop beams, upgrade electrical and plumbing, (n) drywall, repair storefront, replace (e) ada entry. | $35,000 |