Permit GraphShortlistSan Francisco building permits since 2000

Block 3729, lot 082

201 09th St

City’s use
Commercial Hotel
Built
1907
Stories
3
Units
2
Rooms
10 bathrooms
Building
11,180 sq ft
Lot
2,800 sq ft
Zoning
RCD
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

38 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 17, 2026In progress
issued Jun 2026
201 09th StOccidental Expressbasement: n) walk-in cooler at (e) storage room. new changing room/dry storage. 1st/f: n) power door operators at (e) restrooms & restroom accessibility upgrades, new accessible counter at bar, new bench seating area & dj area.
Details
Permit
202603177768
Permit issued
Jun 29, 2026

basement: n) walk-in cooler at (e) storage room. new changing room/dry storage. 1st/f: n) power door operators at (e) restrooms & restroom accessibility upgrades, new accessible counter at bar, new bench seating area & dj area.

Open the permit page

$90,000
Mar 15, 2021Completed
final sign-off Apr 2021
201 09th StA M West Mechanical Inc.as-builts. cut existing sprinkler pipes to allow installation of (n) w12x96 moment frame w/ w16x77 columns. reinstall sprinkler piping and connect to existing system ref. soft-story permits 2019-0529-1930 & 2020-0714-0128
Details
Permit
202103156564
Permit issued
Apr 5, 2021
Final sign-off
Apr 14, 2021

as-builts. cut existing sprinkler pipes to allow installation of (n) w12x96 moment frame w/ w16x77 columns. reinstall sprinkler piping and connect to existing system ref. soft-story permits 2019-0529-1930 & 2020-0714-0128

Open the permit page

$1,000
Jul 14, 2020Completed
final sign-off May 2021
201 09th StAdept Construction Solution Increvision to pa 201905291933, residentail, revised design included relocate of plywood shear wall to work w/ existing arch design & revised moment frame spans & lowered depth below existing framing. a r of 6.5 used for 1st fl lateral design to address soft story, 2nd fl diaphragm was analyzed per ord
Details
Permit
202007140128
Permit issued
Sep 27, 2020
Final sign-off
May 3, 2021

revision to pa 201905291933, residentail, revised design included relocate of plywood shear wall to work w/ existing arch design & revised moment frame spans & lowered depth below existing framing. a r of 6.5 used for 1st fl lateral design to address soft story, 2nd fl diaphragm was analyzed per ord

Open the permit page

Jun 11, 2020Never finaled
issued Jun 2020, no final
201 09th Ststreet space
Details
Permit
M1208947
Permit issued
Jun 12, 2020

street space

Open the permit page

Feb 21, 2020Completed
final sign-off May 2021
201 09th StAdept Construction Solution Increvision to structural only to approved permits app#201905291933.
Details
Permit
202002215078
Permit issued
Sep 27, 2020
Final sign-off
May 3, 2021

revision to structural only to approved permits app#201905291933.

Open the permit page

Aug 12, 2019Completed
final sign-off Apr 2022
205 09th StGil Construction & Assoc Inc.stair repair less than 50% repair. repair in-kind. to comply with nov #201956201 number 2. rear stairs on north side.
Details
Permit
201908128558
Permit issued
Aug 13, 2019
Final sign-off
Apr 27, 2022

stair repair less than 50% repair. repair in-kind. to comply with nov #201956201 number 2. rear stairs on north side.

Open the permit page

$1,500
May 29, 2019Completed
final sign-off May 2021
201 09th Stsoft-story upgrade per sfebc chapter 4d. design criteria from cebc appendix chapter a4. commercial. ref residential soft-story pa 201905291930
Details
Permit
201905291933
Permit issued
Feb 20, 2020
Final sign-off
May 3, 2021

soft-story upgrade per sfebc chapter 4d. design criteria from cebc appendix chapter a4. commercial. ref residential soft-story pa 201905291930

Open the permit page

$15,000
May 29, 2019Completed
final sign-off May 2021
201 09th Stsoft-story upgrade per sfebc chapter 4d. design criteria from cebc appendix chapter a4. residential. ref commercial soft-story pa 201905291933
Details
Permit
201905291930
Permit issued
Feb 20, 2020
Final sign-off
May 3, 2021

soft-story upgrade per sfebc chapter 4d. design criteria from cebc appendix chapter a4. residential. ref commercial soft-story pa 201905291933

Open the permit page

$200,000
Jan 11, 2018Never finaled
issued Jan 2018, no final
205 09th Ststreet space
Details
Permit
M875967
Permit issued
Jan 11, 2018

street space

Open the permit page

Apr 24, 2017Completed
final sign-off Jan 2018
205 09th StHusher Inc Dba Husher Constructionto obtain final inspection for work approved under pa 2012-0806-6649, 2016-0301-0891 and 2015-1222-5719. all work is complete
Details
Permit
201704244744
Permit issued
Apr 24, 2017
Final sign-off
Jan 17, 2018

to obtain final inspection for work approved under pa 2012-0806-6649, 2016-0301-0891 and 2015-1222-5719. all work is complete

Open the permit page

Apr 24, 2017Completed
final sign-off Jan 2018
205 09th StHusher Inc Dba Husher Constructionto obtain final inspection for work approved under pa 2016-0310-1756. all work is complete
Details
Permit
201704244746
Permit issued
Apr 24, 2017
Final sign-off
Jan 17, 2018

to obtain final inspection for work approved under pa 2016-0310-1756. all work is complete

Open the permit page

Jul 12, 2016Never finaled
issued Jul 2016, no final
205 09th Ststreet space permit
Details
Permit
M704667
Permit issued
Jul 12, 2016

street space permit

Open the permit page

Jun 14, 2016Expired or cancelled
withdrawn Jan 2018
205 09th StHusher Inc Dba Husher Constructioninterior work to add (10) bathrooms to existing rooms. new non-bearing walls, pocket door, and plumbing fixtures, new light and exhaust fan, no structural; maher n/a
Details
Permit
201606149975

interior work to add (10) bathrooms to existing rooms. new non-bearing walls, pocket door, and plumbing fixtures, new light and exhaust fan, no structural; maher n/a

Open the permit page

$60,000
May 26, 2016Never finaled
issued May 2016, no final
205 09th Ststreet space
Details
Permit
M694767
Permit issued
May 26, 2016

street space

Open the permit page

Mar 10, 2016Completed
final sign-off Jan 2018
205 09th StHusher Inc Dba Husher Constructionrepair (e) tile work and fixtures in all restrooms (4) shower rooms + (4) toilet rooms. existing plumbing to remain. replace (e) fans, grab bars etc. all in kind. n/a maher ord. 155-13
Details
Permit
201603101756
Permit issued
Mar 10, 2016
Final sign-off
Jan 17, 2018

repair (e) tile work and fixtures in all restrooms (4) shower rooms + (4) toilet rooms. existing plumbing to remain. replace (e) fans, grab bars etc. all in kind. n/a maher ord. 155-13

Open the permit page

$10,000
Mar 1, 2016Completed
final sign-off Jan 2018
205 09th StHusher Inc Dba Husher Constructionremove doors in 33 rooms and change to commercial 20 minute fire rated doors as required by code.
Details
Permit
201603010891
Permit issued
Mar 1, 2016
Final sign-off
Jan 17, 2018

remove doors in 33 rooms and change to commercial 20 minute fire rated doors as required by code.

Open the permit page

$34,000
Feb 9, 2016Completed
final sign-off Feb 2016
205 09th StHusher Inc Dba Husher Constructionto comply w/nov #201464751 item #2 - add grab bars to all restrooms (4 toilets, 4 showers). n/a maher ordinance
Details
Permit
201602099199
Permit issued
Feb 9, 2016
Final sign-off
Feb 11, 2016

to comply w/nov #201464751 item #2 - add grab bars to all restrooms (4 toilets, 4 showers). n/a maher ordinance

Open the permit page

$200
Jan 6, 2016Completed
final sign-off May 2017
205 09th StHusher Inc Dba Husher Constructionto obtain final inspection for work approved under pa# 200311210801 all work is complete.
Details
Permit
201601066502
Permit issued
Jan 6, 2016
Final sign-off
May 8, 2017

to obtain final inspection for work approved under pa# 200311210801 all work is complete.

Open the permit page

Dec 22, 2015Completed
final sign-off Jan 2018
205 09th StHusher Inc Dba Husher Constructionto renew pa# 201309197270for remainder of work
Details
Permit
201512225719
Permit issued
Dec 22, 2015
Final sign-off
Jan 17, 2018

to renew pa# 201309197270for remainder of work

Open the permit page

$50,000
Sep 19, 2013Never finaled
issued Sep 2013, no final
205 09th StBright Eagles Constructionthis permit is for all rooms. replace doors. install floors over existing, patch sheet rock, replace (e) conduit & replace w/romex behind walls. paint. minimum 1-3/4" forty five minute fire rated doors. to comply with his nov's 200236439, 201244401, 201313221, 201314151.
Details
Permit
201309197270
Permit issued
Sep 19, 2013

this permit is for all rooms. replace doors. install floors over existing, patch sheet rock, replace (e) conduit & replace w/romex behind walls. paint. minimum 1-3/4" forty five minute fire rated doors. to comply with his nov's 200236439, 201244401, 201313221, 201314151.

Open the permit page

$100,000
Sep 12, 2013Completed
final sign-off Sep 2014
201 09th Stto obtain final inspection for work approved under pa 200705161447; all work is complete
Details
Permit
201309126590
Permit issued
Sep 12, 2013
Final sign-off
Sep 4, 2014

to obtain final inspection for work approved under pa 200705161447; all work is complete

Open the permit page

Aug 28, 2013Never finaled
issued Aug 2013, no final
205 09th Ststreet space
Details
Permit
M421567
Permit issued
Aug 28, 2013

street space

Open the permit page

Jul 2, 2013Never finaled
issued Jul 2013, no final
205 09th Ststreet space
Details
Permit
M405207
Permit issued
Jul 2, 2013

street space

Open the permit page

May 28, 2013Completed
final sign-off Apr 2015
201 09th StFire & Security & Alarm Co/ F.S.A.C.voluntary panel replacement with new alarm system. ifp 100 unit on the 2nd floor. install notification devices in every room and througout. install new 10 smokes and 1 pull station. install modules to monitor existing waterflow and ansul system
Details
Permit
201305287967
Permit issued
May 28, 2013
Final sign-off
Apr 14, 2015

voluntary panel replacement with new alarm system. ifp 100 unit on the 2nd floor. install notification devices in every room and througout. install new 10 smokes and 1 pull station. install modules to monitor existing waterflow and ansul system

Open the permit page

$16,800
Aug 6, 2012Completed
final sign-off Jan 2018
205 09th Strenewal of the pa #200804109343 which renewed # 200311210801. installation of sprinkler system to comply with sro ordinance #170-02. for final inspection all work complete. to comply with complaint # 200236439.
Details
Permit
201208066648
Permit issued
Aug 8, 2012
Final sign-off
Jan 17, 2018

renewal of the pa #200804109343 which renewed # 200311210801. installation of sprinkler system to comply with sro ordinance #170-02. for final inspection all work complete. to comply with complaint # 200236439.

Open the permit page

Aug 6, 2012Never finaled
issued Aug 2012, no final
205 09th StMiann Builders Inc.to comply w/comp #201244401 & 200236439 - replace shower pan east side 2nd fl common shower.
Details
Permit
201208066649
Permit issued
Aug 9, 2012

to comply w/comp #201244401 & 200236439 - replace shower pan east side 2nd fl common shower.

Open the permit page

$800
Jan 29, 2009Expired or cancelled
cancelled Nov 2011
201 09th Stremove and replace old umts micro cabinets with new 3518 micro cabinets, install 2 rru's remote radio units, install one new 111 foot x 1 1/4 coax cable, install one new fiber cable, back up battery pack, no new electrical & reuse extg diplexers & jumper cables
Details
Permit
200901291083

remove and replace old umts micro cabinets with new 3518 micro cabinets, install 2 rru's remote radio units, install one new 111 foot x 1 1/4 coax cable, install one new fiber cable, back up battery pack, no new electrical & reuse extg diplexers & jumper cables

Open the permit page

$8,000
Apr 10, 2008Never finaled
issued Apr 2008, no final
205 09th Strenew pa#200311210801 for final inspection.
Details
Permit
200804109343
Permit issued
Apr 10, 2008

renew pa#200311210801 for final inspection.

Open the permit page

May 16, 2007Never finaled
issued May 2007, no final
201 09th StKitchen Installation H Sreplacing (e) exhaust hood in kitchen (1st floor). comply with nov# 200236439 (hid). comply with nov# 200670921 (hid)
Details
Permit
200705161447
Permit issued
May 16, 2007

replacing (e) exhaust hood in kitchen (1st floor). comply with nov# 200236439 (hid). comply with nov# 200670921 (hid)

Open the permit page

$10,000
Oct 3, 2005Expired or cancelled
expired Jun 2006
205 09th StMazzys Fire Protectionadd one fire sprinkler to area.
Details
Permit
200510034590
Permit issued
Oct 3, 2005

add one fire sprinkler to area.

Open the permit page

$750
Jul 21, 2005Never finaled
issued Jul 2005, no final
205 09th Stsidewalk
Details
Permit
M33488
Permit issued
Jul 21, 2005

sidewalk

Open the permit page

Apr 6, 2005Expired or cancelled
expired Mar 2007
201 09th StFrank Myers Constructionrestore fire damaged hotel room. replace activated sprinklers. repair electr
Details
Permit
200504069277
Permit issued
Apr 6, 2005

restore fire damaged hotel room. replace activated sprinklers. repair electr

Open the permit page

$12,000
Nov 21, 2003Expired or cancelled
expired Jan 2006
205 09th StFire Protection Retrofit Specialistto install fire sprinkler system to comply w/ ord. #170-02
Details
Permit
200311210801
Permit issued
Apr 5, 2004

to install fire sprinkler system to comply w/ ord. #170-02

Open the permit page

$11,200
Oct 17, 2003Expired or cancelled
expired Apr 2007
201 09th StSimplex Grinnelltear out of extg fire sprinklers system in kchn exhuast hood & upgradeing it to ul 300 ansul wet
Details
Permit
200310177800
Permit issued
Oct 17, 2003

tear out of extg fire sprinklers system in kchn exhuast hood & upgradeing it to ul 300 ansul wet

Open the permit page

$3,000
Oct 9, 2002Never finaled
issued Oct 2002, no final
201 09th Stsidewalk
Details
Permit
M21915
Permit issued
Oct 9, 2002

sidewalk

Open the permit page

Aug 10, 2001Expired or cancelled
expired Dec 2001
205 09th Stpatch plaster walls and ceiling replace exit door to roof
Details
Permit
200108105820
Permit issued
Aug 10, 2001

patch plaster walls and ceiling replace exit door to roof

Open the permit page

$1,200
Mar 9, 2001Completed
final sign-off May 2001
205 09th StSun Roofing & Constr. Company, Inc.reroofing
Details
Permit
200103093934
Permit issued
Mar 9, 2001
Final sign-off
May 2, 2001

reroofing

Open the permit page

$12,000
Jun 2, 2000Expired or cancelled
expired Jan 2001
201 09th Stinstall awning along howard & 9th st sides of buiilding.
Details
Permit
200006021666
Permit issued
Jun 2, 2000

install awning along howard & 9th st sides of buiilding.

Open the permit page

$3,900

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Husher Inc Dba Husher Construction (8), Adept Construction Solution Inc (2), A M West Mechanical Inc., Bright Eagles Construction, Fire & Security & Alarm Co/ F.S.A.C., Fire Protection Retrofit Specialist, Frank Myers Construction, Gil Construction & Assoc Inc., Kitchen Installation H S, Mazzys Fire Protection, Miann Builders Inc., Occidental Express, Simplex Grinnell, Sun Roofing & Constr. Company, Inc.
Architects
Gordon Atkinson, Jeffrey Rome
Engineers
Harold E Howe (2), Mark Tomita
Designers
Henry Karnilowicz

Find contractors for work like this