A. Gordon Atkinson
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- A. Gordon Atkinson Aia
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Sep 2026
256 permits since 2000 (architect on 244 permits, authorized agent-others on 6 permits, engineer on 5 permits, designer on 3 permits): 162 completed, 15 in progress, 43 never finaled, 36 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 256.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2026 | In progress filed Sep 2026, not yet issued | 2374 33rd Av | new deck at rear, kitchen, bedroom and bath renovations at 2nd and 3rd floor.Details
new deck at rear, kitchen, bedroom and bath renovations at 2nd and 3rd floor. | $100,000 | |
| Aug 20, 2026 | In progress issued Aug 2026 | 1899 Green St | comply w/ nov 202659159: provide handrails, repair rear exterior stairs, remove utility ladder, repair flue, repair rear exterior door jamb frame, provide fire extinguishers, and unit id #. reinforce glass panel entry doors + provide primary locking device strike plates. stair repair < 50%.Details
comply w/ nov 202659159: provide handrails, repair rear exterior stairs, remove utility ladder, repair flue, repair rear exterior door jamb frame, provide fire extinguishers, and unit id #. reinforce glass panel entry doors + provide primary locking device strike plates. stair repair < 50%. | $10,000 | |
| Aug 3, 2026 | In progress issued Sep 2026 | 1527 Mcallister St | Mc Mahon Masonry | replace in kind front entry stairs due to dryrot/weather damage.Details
replace in kind front entry stairs due to dryrot/weather damage. | $15,000 |
| Jul 31, 2026 | In progress filed Jul 2026, not yet issued | 2566 39th Av | N M S Brosnan Construction | revision to permit#202008121633, reference #202008121637, changes to the front yard landscaping.Details
revision to permit#202008121633, reference #202008121637, changes to the front yard landscaping. | |
| Jul 16, 2026 | In progress issued Sep 2026 | 1065 Carolina St | De Jong Construction | (n) powder room and laundry room at level 5.Details
(n) powder room and laundry room at level 5. | $15,000 |
| Apr 22, 2026 | In progress issued Sep 2026 | 1459 34th Av | Spiers & Sons Inc | new bedroom & bathroom at (e), non-habitable first floor space. new stairway & bathroom alterations at second floor.Details
new bedroom & bathroom at (e), non-habitable first floor space. new stairway & bathroom alterations at second floor. | $150,000 |
| Apr 6, 2026 | In progress issued Apr 2026 | 506 11th Av | Interior Renovations/Sf Renovations | kitchen and bathroom. add (n) prime bath and reconfigure closets.Details
kitchen and bathroom. add (n) prime bath and reconfigure closets. | $42,000 |
| Mar 30, 2026 | In progress issued Apr 2026 | 234 10th Av | Luxury Construction Llc | 3rd fl horizontal expansion at the rear. adding approximately 195 square foot on l3. new bathroom at 1st fl.Details
3rd fl horizontal expansion at the rear. adding approximately 195 square foot on l3. new bathroom at 1st fl. | $75,000 |
| Jan 29, 2026 | Completed final sign-off May 2026 | 1020 Pierce St | unit 1020 b: interior remodel to include (n) bathroom, space heating and windows at rear of buildling.Details
unit 1020 b: interior remodel to include (n) bathroom, space heating and windows at rear of buildling. | $40,000 | |
| Dec 15, 2025 | Completed final sign-off Mar 2026 | 2195 Green St | West Beam Construction Llc | unit #2: kitchen counter tops-2 vanity tops, add laundry hook ups, shower waterproof + tiles.Details
unit #2: kitchen counter tops-2 vanity tops, add laundry hook ups, shower waterproof + tiles. | $25,000 |
| Nov 5, 2025 | Completed final sign-off Jun 2026 | 2566 39th Av | N M S Brosnan Construction | revision to permit 202008121633 and 202008121637. add new skylight. change mech system and scheme changes. kitchen and bath remodel.Details
revision to permit 202008121633 and 202008121637. add new skylight. change mech system and scheme changes. kitchen and bath remodel. | $12,000 |
| Oct 16, 2025 | Completed final sign-off Sep 2026 | 2143 26th Av | O'shea Co. Home Grown Construction | revision 202310168710 and ref 202412136842. (n) bathroom layout and parapet detailDetails
revision 202310168710 and ref 202412136842. (n) bathroom layout and parapet detail | |
| Oct 3, 2025 | Completed final sign-off Apr 2026 | 325 Teresita Bl | new deck at basement rear yard and 1st fl.Details
new deck at basement rear yard and 1st fl. | $60,000 | |
| Sep 10, 2025 | Completed final sign-off Dec 2025 | 200 Edgehill Wy | revision to 202507110666. replacement in kind of existing stairs at front entry and stone veneer at base of exterior walls.Details
revision to 202507110666. replacement in kind of existing stairs at front entry and stone veneer at base of exterior walls. | $30,000 | |
| May 23, 2025 | Completed final sign-off Nov 2025 | 1829 10th Av | West Beam Construction Llc | replacement in kind of entry stairs. existing brick stairs to be replaced with brick.Details
replacement in kind of entry stairs. existing brick stairs to be replaced with brick. | $40,000 |
| May 15, 2025 | Completed final sign-off Apr 2026 | 85 Joost Av | new deck at rear back yard.Details
new deck at rear back yard. | $10,000 | |
| Jan 13, 2025 | Completed final sign-off Jun 2025 | 2546 15th Av | Rozen Home Builders Inc | bathroom remodel with new fixtures.Details
bathroom remodel with new fixtures. | $20,000 |
| Dec 19, 2024 | In progress filed Dec 2024, not yet issued | 48 Chenery St | new horizontal addition in rear yard, new roof deck, cupola, solarium, and kitchen alterations. and bedrooms.Details
new horizontal addition in rear yard, new roof deck, cupola, solarium, and kitchen alterations. and bedrooms. | $190,000 | |
| Dec 13, 2024 | Completed final sign-off Sep 2026 | 2143 26th Av | O'shea Co. Home Grown Construction | revision to pa # 202310168710 changes to structural plans, mechanical system & lightwellDetails
revision to pa # 202310168710 changes to structural plans, mechanical system & lightwell | |
| Apr 11, 2024 | Completed final sign-off Jun 2024 | 68 Ventura Av | O'kane Construction Llc | revision to permit 201602250565. add new stucco at exterior, revise window sizes, and new garage door (same size).Details
revision to permit 201602250565. add new stucco at exterior, revise window sizes, and new garage door (same size). | |
| Mar 30, 2024 | In progress filed Mar 2024, not yet issued | 1022 Powell St | new roof deckDetails
new roof deck | $13,440 | |
| Dec 12, 2023 | Completed final sign-off Jun 2024 | 39 Glover St | Van Construction | renovate (e) powder room to amke new bathroom and laundry closet on the 3rd fl.Details
renovate (e) powder room to amke new bathroom and laundry closet on the 3rd fl. | $23,500 |
| Nov 20, 2023 | In progress filed Nov 2023, not yet issued | 345 Edgehill Wy | add sub-floor addition below street (grade).Details
add sub-floor addition below street (grade). | $77,000 | |
| Nov 20, 2023 | Completed final sign-off Jan 2024 | 3748 Cesar Chavez St | revision to bpa#202210245028, amendment of plans for proposed office to remain bedroom #1 per p.a. 2016-0525-8401; no bedrooms on lower level (per city accessor's record, property contains 2 br)Details
revision to bpa#202210245028, amendment of plans for proposed office to remain bedroom #1 per p.a. 2016-0525-8401; no bedrooms on lower level (per city accessor's record, property contains 2 br) | ||
| Oct 16, 2023 | In progress issued Dec 2024 | 2143 26th Av | O'shea Co. Home Grown Construction | first floor renovation and horizontal expansion with new rear deck and roof deck inDetails
first floor renovation and horizontal expansion with new rear deck and roof deck in | $130,000 |
| Sep 28, 2023 | Never finaled filed Sep 2023, never issued | 1706 Church St | to comply with accessible business entrance program per ordinance 51-16. add power door, & regrade sidewalk. abe# 201812072816.Details
to comply with accessible business entrance program per ordinance 51-16. add power door, & regrade sidewalk. abe# 201812072816. | $3,500 | |
| Sep 28, 2023 | Never finaled filed Sep 2023, never issued | 3230 Scott St | to comply with accessible business entrance program per ordinance 51-16, technical infeasibility. add sign. abe# 201812122919.Details
to comply with accessible business entrance program per ordinance 51-16, technical infeasibility. add sign. abe# 201812122919. | ||
| Sep 19, 2023 | Never finaled filed Sep 2023, never issued | 1901 Hyde St | to comply with accessible business entrance program per ord 51-16. ref abe 201812122921. replace door with compliant door and power door operator.Details
to comply with accessible business entrance program per ord 51-16. ref abe 201812122921. replace door with compliant door and power door operator. | $1,000 | |
| Sep 19, 2023 | Never finaled filed Sep 2023, never issued | 1204 Green St | to comply with accessible business entrance program per ord 51-16. ref abe 201812243435. add doorbell and sign, and replace door hardware to comply with ada.Details
to comply with accessible business entrance program per ord 51-16. ref abe 201812243435. add doorbell and sign, and replace door hardware to comply with ada. | $100 | |
| Sep 19, 2023 | Never finaled filed Sep 2023, never issued | 347 Presidio Av | to comply with abe program. install new power door. relocate (e) door hardware to comply w/ ada. abe# 201812122922Details
to comply with abe program. install new power door. relocate (e) door hardware to comply w/ ada. abe# 201812122922 | $1,000 | |
| Sep 19, 2023 | Never finaled filed Sep 2023, never issued | 355 Presidio Av | to comply with abe program. install new power door. replace door hardware. remove mail slot. abe# 201812122924Details
to comply with abe program. install new power door. replace door hardware. remove mail slot. abe# 201812122924 | $1,000 | |
| Jul 12, 2023 | In progress issued Jun 2024 | 501 John Muir Dr | O'kane Construction Llc | to add new siding @ front facade of lakewood apartmentsDetails
to add new siding @ front facade of lakewood apartments | $50,000 |
| Jun 13, 2023 | Never finaled filed Jun 2023, never issued | 191 Edgehill Wy | new horizontal addition at basement level.Details
new horizontal addition at basement level. | $60,000 | |
| Jun 12, 2023 | Completed final sign-off Feb 2025 | 950 De Haro St | O'shea Co. Home Grown Construction | horizontal addition of two story enclosure and extension of kitchens in both units at rear.Details
horizontal addition of two story enclosure and extension of kitchens in both units at rear. | $49,999 |
| Apr 14, 2023 | Never finaled filed Apr 2023, never issued | 3901 Noriega St | to expand "the pizza place" restaurant into the neighboring storefront units. change of use of existing two adjecent units from business and retail incorporating them into the existing a-2 restaurant at 3901 noeiega st.Details
to expand "the pizza place" restaurant into the neighboring storefront units. change of use of existing two adjecent units from business and retail incorporating them into the existing a-2 restaurant at 3901 noeiega st. | $5,000 | |
| Apr 6, 2023 | Completed final sign-off Dec 2023 | 4301 24th St | to comply w/ accessible business entrance program, abe# 201901033792, submit catergory checklist compliance form, add hi-vis strip & change door closer.Details
to comply w/ accessible business entrance program, abe# 201901033792, submit catergory checklist compliance form, add hi-vis strip & change door closer. | $500 | |
| Feb 9, 2023 | Completed final sign-off Mar 2023 | 1455 05th Av | Rozen Home Builders Inc | revision to pa# 2022-1721-9005: repair of (e) decks and relace in-kind of exterior stairs document existing as buld 3 levels rear deck and non conforming stairs and make structural upgradesDetails
revision to pa# 2022-1721-9005: repair of (e) decks and relace in-kind of exterior stairs document existing as buld 3 levels rear deck and non conforming stairs and make structural upgrades | |
| Jan 20, 2023 | Completed final sign-off Apr 2024 | 1256 08th Av | Behan Construction | new deck at 2nd fl. at rear of property with stairs to rear yardDetails
new deck at 2nd fl. at rear of property with stairs to rear yard | $16,730 |
| Dec 2, 2022 | Never finaled issued Sep 2023, no final | 548 Jones St | accessible business entrance program per ordinance 51-16 techincal infeasibility or unreasonable hardship per ordinance 51-16 to comply with the accessable buisness entrance program #202001130893Details
accessible business entrance program per ordinance 51-16 techincal infeasibility or unreasonable hardship per ordinance 51-16 to comply with the accessable buisness entrance program #202001130893 | $200 | |
| Oct 24, 2022 | Completed final sign-off Jan 2024 | 3748 Cesar Chavez St | Rozen Home Builders Inc | bathroom renovation and new deck in rear yard.Details
bathroom renovation and new deck in rear yard. | $20,000 |
| Oct 20, 2022 | Completed final sign-off Feb 2023 | 131 Huntington Dr | replace (e) deck with new in rear yard.Details
replace (e) deck with new in rear yard. | $10,000 | |
| Aug 24, 2022 | Completed final sign-off Jan 2023 | 1687 37th Av | Interior Renovations/Sf Renovations | addition of new powder room, furnace & water heater @ interior 1/f. legalize office in rear 1st floor.Details
addition of new powder room, furnace & water heater @ interior 1/f. legalize office in rear 1st floor. | $6,000 |
| May 6, 2022 | Never finaled filed May 2022, never issued | 1899 Green St | horizontal rear yard addition, new roof deck above addition, interior alterations in 2nd floor kitchen and entry hall, patio alterations in rear yard, new rear windows/patio doors, remove (e) windows at east property line wall at 2nd floor kitchen and dining roomDetails
horizontal rear yard addition, new roof deck above addition, interior alterations in 2nd floor kitchen and entry hall, patio alterations in rear yard, new rear windows/patio doors, remove (e) windows at east property line wall at 2nd floor kitchen and dining room | $23,550 | |
| Mar 11, 2022 | Completed final sign-off Dec 2022 | 1526 24th Av | O'shea Co. Home Grown Construction | revision to the pa 202109108205 enclose interior courtyard at 2nd floor renovate kitchen and add full bath.Details
revision to the pa 202109108205 enclose interior courtyard at 2nd floor renovate kitchen and add full bath. | $15,000 |
| Mar 2, 2022 | Completed final sign-off Jun 2024 | 68 Ventura Av | O'kane Construction Llc | revision to permit 201602250565. change 2 wood beams to 2 steel beams.Details
revision to permit 201602250565. change 2 wood beams to 2 steel beams. | $3,000 |
| Dec 30, 2021 | Expired or cancelled expired Jun 2025 | 564 Ortega St | Carson Construction | revision to pa# 202009113935. structural only - use new column instead of replacing beam.Details
revision to pa# 202009113935. structural only - use new column instead of replacing beam. | |
| Nov 5, 2021 | Never finaled issued Dec 2022, no final | 267 Richland Av | Rozen Home Builders Inc | revision to bpa# 202003167175 to add 38 sq. ft. on the 3/f as horizontal expansionDetails
revision to bpa# 202003167175 to add 38 sq. ft. on the 3/f as horizontal expansion | $7,500 |
| Oct 22, 2021 | Completed final sign-off Apr 2022 | 3449 Fillmore St | O'shea Co. Home Grown Construction | revision to application #2021/0319/6938(adu). relocate exit egress vestibule & move sheap walls.Details
revision to application #2021/0319/6938(adu). relocate exit egress vestibule & move sheap walls. | |
| Sep 23, 2021 | Never finaled issued Sep 2021, no final | 2145 North Point St | renew for final 201010283912. all work is completeDetails
renew for final 201010283912. all work is complete | ||
| Jul 15, 2021 | Expired or cancelled cancelled Jan 2026 | 2152 16th Av | bathroom remodel & new powder room. legalize existing master bathroom.Details
bathroom remodel & new powder room. legalize existing master bathroom. | $10,561 | |
| Jun 14, 2021 | Completed final sign-off Oct 2024 | 306 Arlington St | Norwood Construction | revision to pa# 2019-0814-8780; new dormer, interior alterations to (e) bathrooms and bedroomDetails
revision to pa# 2019-0814-8780; new dormer, interior alterations to (e) bathrooms and bedroom | $28,685 |
| Jun 7, 2021 | Completed final sign-off Mar 2022 | 2784 Union St | stucco repair at front facade. stucco replacement on south and east elevations.Details
stucco repair at front facade. stucco replacement on south and east elevations. | $25,000 | |
| Mar 19, 2021 | Completed final sign-off Apr 2022 | 3449 Fillmore St | O'shea Co. Home Grown Construction | legalization of existing unit (udu) on first floor per government code section 65852.2. change of use from r-3 to r-3. seismic upgrade per sfebc section 506.4.3 exc. 2- first story only.Details
legalization of existing unit (udu) on first floor per government code section 65852.2. change of use from r-3 to r-3. seismic upgrade per sfebc section 506.4.3 exc. 2- first story only. | $76,000 |
| Feb 17, 2021 | Expired or cancelled cancelled Dec 2023 | 2120 Great Hy | addition of 391 square foot deck to serve as common usable open space for second and third floor units.Details
addition of 391 square foot deck to serve as common usable open space for second and third floor units. | $27,956 | |
| Jan 28, 2021 | Completed final sign-off May 2024 | 3946 Geary Bl | Young Kim Builders Inc | accessible business entrance compliance. revision to pa 201806071309.Details
accessible business entrance compliance. revision to pa 201806071309. | |
| Dec 21, 2020 | Completed final sign-off Dec 2021 | 1409 Kansas St | demo wall between dining room & kitchen $ install new posts & beam as neededDetails
demo wall between dining room & kitchen $ install new posts & beam as needed | $10,000 | |
| Oct 17, 2020 | Completed final sign-off Jul 2021 | 2546 15th Av | Lifetime Remodeling Inc | replace existing front stairs in -kind.Details
replace existing front stairs in -kind. | $2,800 |
| Sep 26, 2020 | Completed final sign-off Mar 2022 | 2784 Union St | existing stucco at front to remain. replace stucco w/wood siding on exterior walls @ east & north elevations. new waterproofing & insulation at associated exterior walls.Details
existing stucco at front to remain. replace stucco w/wood siding on exterior walls @ east & north elevations. new waterproofing & insulation at associated exterior walls. | $31,982 | |
| Aug 12, 2020 | In progress issued Jan 2025 | 2566 39th Av | N M S Brosnan Construction | two story rear yard horizontal addition. new bathroom at 2nd floor. new rear yard deck & stair. first floor addition & alterations, proposed under bpa #202008121637 to legalize unauthorized dwelling unit.Details
two story rear yard horizontal addition. new bathroom at 2nd floor. new rear yard deck & stair. first floor addition & alterations, proposed under bpa #202008121637 to legalize unauthorized dwelling unit. | $83,398 |
| Aug 12, 2020 | In progress issued Jan 2025 | 2566 39th Av | N M S Brosnan Construction | legalize existing unauthorized dwelling unit- adu per ordinance 162-16. new two story rear yard addition. 1st floor: new kitchen, bedroom, livingroom, & laundry room. remodel existing bathroom. 2nd floor: addition & alterations proposed under bpa# 202008121633.Details
legalize existing unauthorized dwelling unit- adu per ordinance 162-16. new two story rear yard addition. 1st floor: new kitchen, bedroom, livingroom, & laundry room. remodel existing bathroom. 2nd floor: addition & alterations proposed under bpa# 202008121633. | $83,398 |
| Jul 23, 2020 | Expired or cancelled cancelled Jan 2026 | 3148 San Bruno Av | renovations to existing third floor unit. remodel kitchen, living room,dining room, full bathroom & two bedrooms. new full bathroom. add 3 n dormers.Details
renovations to existing third floor unit. remodel kitchen, living room,dining room, full bathroom & two bedrooms. new full bathroom. add 3 n dormers. | $148,340 | |
| Jun 2, 2020 | Completed final sign-off Apr 2021 | 1409 Kansas St | front facade renovation: new siding, al-clad double-hung windows & millwork.Details
front facade renovation: new siding, al-clad double-hung windows & millwork. | $6,465 | |
| May 13, 2020 | Completed final sign-off Mar 2021 | 132 Church St | Kilrea Construction Inc. | replace rear yard stairs in-kindDetails
replace rear yard stairs in-kind | $15,983 |
| Mar 16, 2020 | Completed final sign-off Jul 2024 | 267 Richland Av | Rozen Home Builders Inc | horizontal addition to main dwelling unit, including kitchen and bathroom remodel. add adu under separate pa# 2020-0316-7179.Details
horizontal addition to main dwelling unit, including kitchen and bathroom remodel. add adu under separate pa# 2020-0316-7179. | $100,000 |
| Mar 16, 2020 | Never finaled issued Jul 2021, no final | 267 Richland Av | Rozen Home Builders Inc | addition of dwelling unit (adu) in garage under ord# 95-17. horizontal addition under separate pa# 2020-0316-7175.Details
addition of dwelling unit (adu) in garage under ord# 95-17. horizontal addition under separate pa# 2020-0316-7175. | $76,925 |
| Mar 9, 2020 | Expired or cancelled cancelled Jan 2026 | 257 Grant Av | mandatory business entrance accessibility compliance for 257 grant ave install new code compliant thresholdDetails
mandatory business entrance accessibility compliance for 257 grant ave install new code compliant threshold | ||
| Feb 6, 2020 | Expired or cancelled withdrawn Dec 2024 | 1020 Pierce St | legalize existing detached unauthorized storage shed as a new detached accessory dwelling unit per ordinance no. 162-16, (to comply w/ notice of violation #201898751)Details
legalize existing detached unauthorized storage shed as a new detached accessory dwelling unit per ordinance no. 162-16, (to comply w/ notice of violation #201898751) | $30,092 | |
| Dec 3, 2019 | Completed final sign-off Jun 2021 | 501 Fillmore St | Schoepp Construction Inc | 501-519 fillmore street & 702-704 oak street: voluntary paratial seismic upgrade, new 9/8" anchor bolts at 4' o.c throughout (e) foundations. 501 fillmore street: barrior removal at (e) entrance to comply with mandatorary disability access program ab 51-16Details
501-519 fillmore street & 702-704 oak street: voluntary paratial seismic upgrade, new 9/8" anchor bolts at 4' o.c throughout (e) foundations. 501 fillmore street: barrior removal at (e) entrance to comply with mandatorary disability access program ab 51-16 | $12,820 |
| Oct 16, 2019 | Never finaled issued Oct 2021, no final | 278 18th Av | Memgc Llc | addition of new deck & exterior stairs from 3rd floor unit to grade in rear yard in order to abate nov# 201920961 & 201923131.Details
addition of new deck & exterior stairs from 3rd floor unit to grade in rear yard in order to abate nov# 201920961 & 201923131. | $10,000 |
| Sep 24, 2019 | Expired or cancelled withdrawn Sep 2023 | 347 Presidio Av | mandatory disablity access program. compliance for 347 and 355 presidio ave.Details
mandatory disablity access program. compliance for 347 and 355 presidio ave. | $15,000 | |
| Sep 24, 2019 | Expired or cancelled withdrawn Sep 2023 | 1204 Green St | mandatory disablity access program. compliance for 1201 green st. and 1901 hyde streetDetails
mandatory disablity access program. compliance for 1201 green st. and 1901 hyde street | $30,000 | |
| Aug 22, 2019 | Never finaled issued Oct 2019, no final | 2554 32nd Av | Benjamim D Construction Inc | lightwell in-fill and kitchen & bathroom remodel at existing 2nd fl.Details
lightwell in-fill and kitchen & bathroom remodel at existing 2nd fl. | $30,000 |
| Aug 15, 2019 | Completed final sign-off Mar 2020 | 2850 Cabrillo St | Dohrmann Construction Inc. | remove non-bearing interior partition. new full bath at 1st floor.Details
remove non-bearing interior partition. new full bath at 1st floor. | $35,360 |
| Aug 14, 2019 | Completed final sign-off Oct 2024 | 306 Arlington St | Norwood Construction | alteration to the demmer residence. two new dormers at 3rd flr. new bedroom.Details
alteration to the demmer residence. two new dormers at 3rd flr. new bedroom. | $36,832 |
| Jun 26, 2019 | Completed final sign-off Jun 2020 | 1522 24th Av | O'kane Construction Llc | fill-in addition. new bedroom, bathroom & sitting room at 1st fl. replace existing interior stair.Details
fill-in addition. new bedroom, bathroom & sitting room at 1st fl. replace existing interior stair. | $89,482 |
| Jun 26, 2019 | Completed final sign-off Aug 2019 | 3715 Folsom St | revision to base permit #201708043967. omit 2nd fl spiral stair at balcony, spiral stair column to remain.Details
revision to base permit #201708043967. omit 2nd fl spiral stair at balcony, spiral stair column to remain. | ||
| May 7, 2019 | Never finaled issued May 2019, no final | 455 Joost Av | interior alterations to existing living room and kitchenDetails
interior alterations to existing living room and kitchen | $28,877 | |
| May 7, 2019 | Completed final sign-off Sep 2019 | 1950 Leavenworth St | Level 8 Construction Inc | convert pantry to bathroom at lower 2 unitsDetails
convert pantry to bathroom at lower 2 units | $16,000 |
| Apr 19, 2019 | Never finaled issued Nov 2021, no final | 3801 Irving St | O'kane Construction Llc | legalize existing unauthorized dwelling unit per unit legalization ord #43-14.Details
legalize existing unauthorized dwelling unit per unit legalization ord #43-14. | $100,000 |
| Apr 1, 2019 | Completed final sign-off Oct 2022 | 60 Manchester St | new habitable space in exising basement. new bedroom and bathroom.Details
new habitable space in exising basement. new bedroom and bathroom. | $114,000 | |
| Mar 18, 2019 | Completed final sign-off Jul 2019 | 638 Foerster St | Bent D Petersen | legalize extg family at 1st floorDetails
legalize extg family at 1st floor | $30,184 |
| Feb 27, 2019 | Completed final sign-off Dec 2019 | 2146 Mission St | Kieran Collins Construction | interior remodel to (e) retail establishment, 2 new ada compliant restrooms, add power actuator to front entry to meet ada compliance per mandatory disability acces programDetails
interior remodel to (e) retail establishment, 2 new ada compliant restrooms, add power actuator to front entry to meet ada compliance per mandatory disability acces program | $49,000 |
| Feb 13, 2019 | Never finaled issued Mar 2019, no final | 858 31st Av | Dliu Construction | new doors & decorative trim to facade. replace (e) stone tile with stuccoDetails
new doors & decorative trim to facade. replace (e) stone tile with stucco | $5,000 |
| Jan 25, 2019 | Completed final sign-off Dec 2019 | 2146 Mission St | change of use to b-occupancy, general entertainment. no work under this permit, administrative only for dcp approval.Details
change of use to b-occupancy, general entertainment. no work under this permit, administrative only for dcp approval. | $50,000 | |
| Dec 19, 2018 | Completed final sign-off Jan 2020 | 2719 35th Av | Michael De Jong Construction | addition of new accessory dwelling unit per ordinance 95-17. infill addition at rear yard, new bahroom, bedroom,living room and kitchen at new adu. new rear yard deckDetails
addition of new accessory dwelling unit per ordinance 95-17. infill addition at rear yard, new bahroom, bedroom,living room and kitchen at new adu. new rear yard deck | $79,000 |
| Dec 5, 2018 | Never finaled filed Dec 2018, never issued | 526 Molimo Dr | (n) 2 bedrms & 1.5 bathrm adu unit per ord# 95-17 @ (n) 1st & 2nd flrs(formally unconditioned basement) w/ (n) radiant flr heating. (n) home theather @(n) 2nd flr. intetior alterations @ (e) 3rd flr & 4th flrs(formally 1st & 2nd flr). (n) rear yard deck @ (n) 1st flr & (n) roof deck @ (e) 3rd flr.Details
(n) 2 bedrms & 1.5 bathrm adu unit per ord# 95-17 @ (n) 1st & 2nd flrs(formally unconditioned basement) w/ (n) radiant flr heating. (n) home theather @(n) 2nd flr. intetior alterations @ (e) 3rd flr & 4th flrs(formally 1st & 2nd flr). (n) rear yard deck @ (n) 1st flr & (n) roof deck @ (e) 3rd flr. | $304,147 | |
| Dec 4, 2018 | Completed final sign-off Jan 2020 | 2487 41st Av | Level 8 Construction Inc | revision to 201805111558. change spiral stair to straight stair at rear hard deck. new skylight at 2nd fl vestibule. raise ceiling at kitchen, living rm, bdrms 2nd flDetails
revision to 201805111558. change spiral stair to straight stair at rear hard deck. new skylight at 2nd fl vestibule. raise ceiling at kitchen, living rm, bdrms 2nd fl | |
| Nov 13, 2018 | Expired or cancelled withdrawn Feb 2022 | 436 Corbett Av | intrior renovations to e single family dwelling. alterations to e bathroom. convert e bedroom to studyDetails
intrior renovations to e single family dwelling. alterations to e bathroom. convert e bedroom to study | $22,000 | |
| Oct 30, 2018 | Completed final sign-off Oct 2020 | 1344 Clayton St | new deck at existing second flr roof deck. new rear deck at existing 1st flr and basement.Details
new deck at existing second flr roof deck. new rear deck at existing 1st flr and basement. | $29,954 | |
| Oct 30, 2018 | Completed final sign-off Jun 2020 | 2516 24th Av | Spryscapes Const Inc., Ogrcon Inc | replacement in kind of front stairs.Details
replacement in kind of front stairs. | $12,000 |
| Oct 24, 2018 | Completed final sign-off Jan 2021 | 620 Foerster St | Mela Construction Co | comply with nov 201398721 and merging 1st fl with 2nd floor. addition of media room and addition of bathroom on 1st floor. renovation of kitchen and bathroom on 2nd floor.Details
comply with nov 201398721 and merging 1st fl with 2nd floor. addition of media room and addition of bathroom on 1st floor. renovation of kitchen and bathroom on 2nd floor. | $30,000 |
| Oct 19, 2018 | Completed final sign-off Mar 2022 | 651 24th Av | Dliu Construction | horizontal addition @ rear of 1st floor. new 2nd unit with 2 bedrooms & 2 baths. interior alterations to 1st floor & new roof @ 2nd floor. revision to pa# 2016/08/26/6116.Details
horizontal addition @ rear of 1st floor. new 2nd unit with 2 bedrooms & 2 baths. interior alterations to 1st floor & new roof @ 2nd floor. revision to pa# 2016/08/26/6116. | $44,156 |
| Oct 4, 2018 | Never finaled issued Jan 2019, no final | 30 Hahn St | to comply with nov 201874693 interior alterations to the 2nd floor and new bathroom.@ 2nd fl remove (e) non compliant shed at rear yard. remove 1 door at entrance on 1st floorDetails
to comply with nov 201874693 interior alterations to the 2nd floor and new bathroom.@ 2nd fl remove (e) non compliant shed at rear yard. remove 1 door at entrance on 1st floor | $12,600 | |
| Oct 3, 2018 | Expired or cancelled cancelled Nov 2024 | 30 Hahn St | unit legalization ord 43-14. legalize (e) unauthorized dwelling unit at 1st fl. interior alterations to (e) 1st flr, 2nd flr & legalize rear yard deck. new opening in bearing wall at media room.Details
unit legalization ord 43-14. legalize (e) unauthorized dwelling unit at 1st fl. interior alterations to (e) 1st flr, 2nd flr & legalize rear yard deck. new opening in bearing wall at media room. | $20,000 | |
| Sep 25, 2018 | Completed final sign-off Jun 2019 | 1645 Ulloa St | revision to permit #201712217148 s1; to add new skylight.Details
revision to permit #201712217148 s1; to add new skylight. | $1,000 | |
| Sep 18, 2018 | Completed final sign-off May 2025 | 2215 Quesada Av | Golden One Construction Inc, Schoepp Construction Inc | tenant improvement and change of use of f-1 occupancy for the cultivation, manufacturing & distribution of cannabis products. compliance with nov# 201845511 & #201846062. - co2 enrichment system & monitoring under separate permitDetails
tenant improvement and change of use of f-1 occupancy for the cultivation, manufacturing & distribution of cannabis products. compliance with nov# 201845511 & #201846062. - co2 enrichment system & monitoring under separate permit | $20,000 |
| Jul 24, 2018 | Completed final sign-off Sep 2018 | 2827 Union St | Interior Renovations/Sf Renovations | new skylight (2) at existing attic.Details
new skylight (2) at existing attic. | $2,000 |
| Jul 11, 2018 | Completed final sign-off Oct 2018 | 819 45th Av | Interior Renovations/Sf Renovations | new skylight at existing kitchen.Details
new skylight at existing kitchen. | $1,861 |
| Jun 11, 2018 | Completed final sign-off Jan 2020 | 2487 41st Av | Level 8 Construction Inc | addition of master bedroom and bath, deck & remodel kitchen. replace front windows with a wood cladDetails
addition of master bedroom and bath, deck & remodel kitchen. replace front windows with a wood clad | $100,000 |
| Jun 7, 2018 | Completed final sign-off May 2024 | 3946 Geary Bl | Matthew Mcdivit Construction | mandatory disability access program compliance for rhinocerous locksmiths & fizzie's bar.Details
mandatory disability access program compliance for rhinocerous locksmiths & fizzie's bar. | $12,116 |