Block 0502, lot 012
1355 Lombard St
16 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 26, 2023 | Expired or cancelled | 1355 Lombard St | B-Side Inc. | 2/f unit #202:to comply w/ complaint #202304786, install electrical heaters in two bedrooms and living room. no demo of wood stud/ structure, only sheet rock removal at units. | $2,000 |
| Oct 26, 2021 | Completed | 1355 Lombard St | Axel8 Construction | to obtain final inspection for work approved under pa# 201805048282, 202007170415. all work is complete. | |
| Jan 28, 2021 | Never finaled | 1355 Lombard St | S L M Development Inc. | replace deteriorated wood fence and construct site retaining wall. | $7,000 |
| Aug 22, 2020 | Completed | 1355 Lombard St | Au Electric Corporation/Aec Alarms | upgrade ( e ) fire alarm system to compy w/ sffc 1103.7.6.1 & nfpa 72 | $25,000 |
| Aug 21, 2020 | Completed | 1353 Lombard St | Saehan Fire Protection Inc | installation of fire sprinkler in new conversion including pathway exit. install new double dector assembly on the riser. | $10,000 |
| Jul 17, 2020 | Completed | 1355 Lombard St | Axel8 Construction | #300: 1)revision to app#201805048282 2)enlarged master bedroom balcony sliders. 3)rehabilitate extg bathrooms. | $20,000 |
| May 4, 2018 | Completed | 1355 Lombard St | Axel8 Construction | unit #300, work on 3rd floor only convert enclosed sunroom to exterior balcony. install new 15'6 door opening to balcony. rehabilitate existing kitchen. install 3rd bath | $40,000 |
| Sep 8, 2017 | Completed | 1355 Lombard St | S L M Development Inc. | per ord 162-16: (1) studio adu w/ kitchen & bath | $70,000 |
| Jun 5, 2017 | Expired or cancelled | 1355 Lombard St | all windows to be replaced plus 2 sliding doors | $35,000 | |
| Jul 1, 2016 | Completed | 1355 Lombard St | Markoff Structural Pest Control | to comply with nov#201623695: repair rear stair system in-kind. less than 50%. | $6,500 |
| Jun 7, 2012 | Completed | 1355 Lombard St | M M Bay Area Construction Inc | work in unit 202: bathroom and kitchen remodel. lighting must comply with cec 150(k). | $15,000 |
| Apr 10, 2012 | Completed | 1355 Lombard St | M M Bay Area Construction Inc | work in unit 101: remodel the bathroom tub, sink, toilet. remodel kitchen cabinet and countertop. | $12,000 |
| Mar 26, 2012 | Completed | 1355 Lombard St | J C Tan Builders | unit 103: replace kitchen cabinet, countertop, new appliances, new bath fixtures, tiles, lavatory sink, tub remain new flooring | $15,000 |
| Mar 19, 2012 | Completed | 1355 Lombard St | M M Bay Area Construction Inc | #201 kitchen and bathroom remodel only, kitchen and lighting shall comply with cec 150(k)8,11; bathroom exh fan verify in field | $15,000 |
| Aug 15, 2011 | Completed | 1355 Lombard St | Warren Construction & Reroofing Inc. | reroofing | $9,000 |
| Jun 3, 2009 | Never finaled | 1355 Lombard St | D3 Construction | work @ unit# 300 only. replace vanity & tile in bathroom. replace 30% of kitchen cabinet. add hardwood floor in kitchen. paint of entire unit. | $15,000 |