Block 0502, lot 012
1355 Lombard St
- City’s use
- Multi-Family Residential
- Built
- 1962
- Stories
- 3
- Units
- 7
- Rooms
- 10 bathrooms
- Building
- 6,277 sq ft
- Lot
- 5,270 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 26, 2023 | Expired or cancelled withdrawn May 2024 | 1355 Lombard St | B-Side Inc. | 2/f unit #202:to comply w/ complaint #202304786, install electrical heaters in two bedrooms and living room. no demo of wood stud/ structure, only sheet rock removal at units.Details
2/f unit #202:to comply w/ complaint #202304786, install electrical heaters in two bedrooms and living room. no demo of wood stud/ structure, only sheet rock removal at units. | $2,000 |
| Oct 26, 2021 | Completed final sign-off Nov 2021 | 1355 Lombard St | Axel8 Construction | to obtain final inspection for work approved under pa# 201805048282, 202007170415. all work is complete.Details
to obtain final inspection for work approved under pa# 201805048282, 202007170415. all work is complete. | |
| Jan 28, 2021 | Never finaled issued Jul 2021, no final | 1355 Lombard St | S L M Development Inc. | replace deteriorated wood fence and construct site retaining wall.Details
replace deteriorated wood fence and construct site retaining wall. | $7,000 |
| Aug 22, 2020 | Completed final sign-off Nov 2021 | 1355 Lombard St | Au Electric Corporation/Aec Alarms | upgrade ( e ) fire alarm system to compy w/ sffc 1103.7.6.1 & nfpa 72Details
upgrade ( e ) fire alarm system to compy w/ sffc 1103.7.6.1 & nfpa 72 | $25,000 |
| Aug 21, 2020 | Completed final sign-off Nov 2021 | 1353 Lombard St | Saehan Fire Protection Inc | installation of fire sprinkler in new conversion including pathway exit. install new double dector assembly on the riser.Details
installation of fire sprinkler in new conversion including pathway exit. install new double dector assembly on the riser. | $10,000 |
| Jul 17, 2020 | Completed final sign-off Nov 2021 | 1355 Lombard St | Axel8 Construction | #300: 1)revision to app#201805048282 2)enlarged master bedroom balcony sliders. 3)rehabilitate extg bathrooms.Details
#300: 1)revision to app#201805048282 2)enlarged master bedroom balcony sliders. 3)rehabilitate extg bathrooms. | $20,000 |
| May 4, 2018 | Completed final sign-off Nov 2021 | 1355 Lombard St | Axel8 Construction | unit #300, work on 3rd floor only convert enclosed sunroom to exterior balcony. install new 15'6 door opening to balcony. rehabilitate existing kitchen. install 3rd bathDetails
unit #300, work on 3rd floor only convert enclosed sunroom to exterior balcony. install new 15'6 door opening to balcony. rehabilitate existing kitchen. install 3rd bath | $40,000 |
| Sep 8, 2017 | Completed final sign-off Dec 2021 | 1355 Lombard St | S L M Development Inc. | per ord 162-16: (1) studio adu w/ kitchen & bathDetails
per ord 162-16: (1) studio adu w/ kitchen & bath | $70,000 |
| Jun 5, 2017 | Expired or cancelled cancelled Jan 2026 | 1355 Lombard St | all windows to be replaced plus 2 sliding doors | $35,000 | |
| Jul 1, 2016 | Completed final sign-off Aug 2016 | 1355 Lombard St | Markoff Structural Pest Control | to comply with nov#201623695: repair rear stair system in-kind. less than 50%.Details
to comply with nov#201623695: repair rear stair system in-kind. less than 50%. | $6,500 |
| Jun 7, 2012 | Completed final sign-off Aug 2012 | 1355 Lombard St | M M Bay Area Construction Inc | work in unit 202: bathroom and kitchen remodel. lighting must comply with cec 150(k).Details
work in unit 202: bathroom and kitchen remodel. lighting must comply with cec 150(k). | $15,000 |
| Apr 10, 2012 | Completed final sign-off May 2012 | 1355 Lombard St | M M Bay Area Construction Inc | work in unit 101: remodel the bathroom tub, sink, toilet. remodel kitchen cabinet and countertop.Details
work in unit 101: remodel the bathroom tub, sink, toilet. remodel kitchen cabinet and countertop. | $12,000 |
| Mar 26, 2012 | Completed final sign-off May 2012 | 1355 Lombard St | J C Tan Builders | unit 103: replace kitchen cabinet, countertop, new appliances, new bath fixtures, tiles, lavatory sink, tub remain new flooringDetails
unit 103: replace kitchen cabinet, countertop, new appliances, new bath fixtures, tiles, lavatory sink, tub remain new flooring | $15,000 |
| Mar 19, 2012 | Completed final sign-off May 2012 | 1355 Lombard St | M M Bay Area Construction Inc | #201 kitchen and bathroom remodel only, kitchen and lighting shall comply with cec 150(k)8,11; bathroom exh fan verify in fieldDetails
#201 kitchen and bathroom remodel only, kitchen and lighting shall comply with cec 150(k)8,11; bathroom exh fan verify in field | $15,000 |
| Aug 15, 2011 | Completed final sign-off Jan 2012 | 1355 Lombard St | Warren Construction & Reroofing Inc. | reroofingDetails
reroofing | $9,000 |
| Jun 3, 2009 | Never finaled issued Jun 2009, no final | 1355 Lombard St | D3 Construction | work @ unit# 300 only. replace vanity & tile in bathroom. replace 30% of kitchen cabinet. add hardwood floor in kitchen. paint of entire unit.Details
work @ unit# 300 only. replace vanity & tile in bathroom. replace 30% of kitchen cabinet. add hardwood floor in kitchen. paint of entire unit. | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Axel8 Construction (3), M M Bay Area Construction Inc (3), S L M Development Inc. (2), Au Electric Corporation/Aec Alarms, B-Side Inc., D3 Construction, J C Tan Builders, Markoff Structural Pest Control, Saehan Fire Protection Inc, Warren Construction & Reroofing Inc.
- Architects
- John T. Hood
- Engineers
- Joe Kon, Joe Kon
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.