Permit GraphShortlistSan Francisco building permits since 2000

Block 6518, lot 016

983 Capp St

City’s use
Multi-Family Residential
Built
1910
Stories
2
Units
4
Rooms
4 bedrooms, 4 bathrooms
Building
3,952 sq ft
Lot
3,737 sq ft
Zoning
RM2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

9 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 1, 2023Completed
final sign-off Jan 2025
983 Capp StArch Plumbing Inc2" combo (fire and domestic) water service for domestic water and nfpa 13r system #202210265164 by others. nfpa 24
Details
Permit
202303012811
Permit issued
Oct 23, 2023
Final sign-off
Jan 14, 2025

2" combo (fire and domestic) water service for domestic water and nfpa 13r system #202210265164 by others. nfpa 24

Open the permit page

$6,000
Oct 26, 2022Completed
final sign-off Nov 2023
983 Capp StProfessional Fire Safety Incf/s installation per nfpa 13r/2016. ref bpa #201912230412, #202207158593, #202207158592, #202207158591
Details
Permit
202210265164
Permit issued
Nov 14, 2022
Final sign-off
Nov 21, 2023

f/s installation per nfpa 13r/2016. ref bpa #201912230412, #202207158593, #202207158592, #202207158591

Open the permit page

$15,000
Jul 15, 2022Completed
final sign-off Dec 2023
983 Capp StAls Builders Pro Incstructural revision to approved permit 201912311053
Details
Permit
202207158592
Permit issued
Jul 18, 2022
Final sign-off
Dec 14, 2023

structural revision to approved permit 201912311053

Open the permit page

Jul 15, 2022Completed
final sign-off Dec 2023
989 Capp StAls Builders Pro Incstructural revision to approved permit 201912300957. (n) concrete foundation & wood framing.
Details
Permit
202207158591
Permit issued
Jul 18, 2022
Final sign-off
Dec 6, 2023

structural revision to approved permit 201912300957. (n) concrete foundation & wood framing.

Open the permit page

Dec 31, 2019Completed
final sign-off Feb 2024
983 Capp StAls Builders Pro Increar bldg. add unit per ord 162-17. add 1 adu-1 bedroom unit at the (e) rear detached garage, with a (n) kitchen and a (n) bath.
Details
Permit
201912311057
Permit issued
Jul 6, 2022
Final sign-off
Feb 29, 2024

rear bldg. add unit per ord 162-17. add 1 adu-1 bedroom unit at the (e) rear detached garage, with a (n) kitchen and a (n) bath.

Open the permit page

$80,000
Dec 31, 2019Completed
final sign-off Mar 2024
983 Capp StAls Builders Pro Incfront bldg. add 2 adu's per ord 162-17. two 1 bedroom units at 1/flr of (e) 3-story bldg. inclds 1 kitchen & 1 bath at each (n) unit. reference ab-094 voluntary seismic soft story pa# 201912230412 and separate unit legalizaiton under pa# 201912300957.
Details
Permit
201912311053
Permit issued
Jul 6, 2022
Final sign-off
Mar 1, 2024

front bldg. add 2 adu's per ord 162-17. two 1 bedroom units at 1/flr of (e) 3-story bldg. inclds 1 kitchen & 1 bath at each (n) unit. reference ab-094 voluntary seismic soft story pa# 201912230412 and separate unit legalizaiton under pa# 201912300957.

Open the permit page

$120,000
Dec 30, 2019Completed
final sign-off Dec 2023
983 Capp StAls Builders Pro Incunit legalization ord 43-14. legalize 1 (e) unit at 1/fl of (e) 3-story building. the (n) unit will be a 2 bedroom unit with a kitchen, a bath and a powder room. (e) rear detached garage not in scope.
Details
Permit
201912300957
Permit issued
Jul 6, 2022
Final sign-off
Dec 6, 2023

unit legalization ord 43-14. legalize 1 (e) unit at 1/fl of (e) 3-story building. the (n) unit will be a 2 bedroom unit with a kitchen, a bath and a powder room. (e) rear detached garage not in scope.

Open the permit page

$90,000
Dec 23, 2019Completed
final sign-off May 2023
989 Capp Stvoluntary seismic soft story. compliance with 2013 sf building code administrative bulletin ab-094
Details
Permit
201912230412
Permit issued
Jun 14, 2021
Final sign-off
May 2, 2023

voluntary seismic soft story. compliance with 2013 sf building code administrative bulletin ab-094

Open the permit page

$40,000
Aug 11, 2003Completed
final sign-off Aug 2003
983 Capp Streplace rim joist btwn 1st & 2nd fl. landings, repair in kind, less than 50% complying w/200336784
Details
Permit
200308111670
Permit issued
Aug 11, 2003
Final sign-off
Aug 27, 2003

replace rim joist btwn 1st & 2nd fl. landings, repair in kind, less than 50% complying w/200336784

Open the permit page

$1,500

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Als Builders Pro Inc (5), Arch Plumbing Inc, Professional Fire Safety Inc
Architects
John T. Hood (2), Donald David
Engineers
Donald David (2)

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.