352 permits since 2000 (engineer on 316 permits, authorized agent-others on 19 permits, architect on 18 permits, designer on 1 permit): 198 completed, 96 in progress, 29 never finaled, 29 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 352.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 259 17th Av | Sunset Remodeling And Design Inc | 2nd floor: convert existing single hung windows at dining room into a french door(same opening), convert existing single hung window at sunroom into a swing tempered glass door, new 315 sq. ft. roof deck, new wood staircase from roof to rear yard. 3rd fllo: convert (e) bathroom sliding window into aDetails
2nd floor: convert existing single hung windows at dining room into a french door(same opening), convert existing single hung window at sunroom into a swing tempered glass door, new 315 sq. ft. roof deck, new wood staircase from roof to rear yard. 3rd fllo: convert (e) bathroom sliding window into a | $20,000 |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 3740 Sacramento St | revision to approved permit #202512292877 and #202509256138. interior remodeling of second, third, and fourth floor. new skylight at staircase.Details
revision to approved permit #202512292877 and #202509256138. interior remodeling of second, third, and fourth floor. new skylight at staircase. | $200,000 | |
| Sep 14, 2026 | In progress issued Sep 2026 | 259 17th Av | Sunset Remodeling And Design Inc | demolish sheetrock. replace in kind 1st floor, 2nd floor, 3rd floor.Details
demolish sheetrock. replace in kind 1st floor, 2nd floor, 3rd floor. | $2,000 |
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 10 South Van Ness Av | demolish a 2-story, type 1 commercial building.Details
demolish a 2-story, type 1 commercial building. | $1,000,000 | |
| Sep 3, 2026 | In progress issued Sep 2026 | 940 Baker St | Urban West Construction Inc | unit 4 on 3/f: revision to permit 202503132200. remove juliet balcony. add window restrictor. no other work.Details
unit 4 on 3/f: revision to permit 202503132200. remove juliet balcony. add window restrictor. no other work. | $1,500 |
| Sep 3, 2026 | In progress issued Sep 2026 | 259 17th Av | Sunset Remodeling And Design Inc | first floor: rear yard addition, new primary bedroom, new primary bathroom, new 2 walk-in closets, new laundry closet. relocae water heater furnace.Details
first floor: rear yard addition, new primary bedroom, new primary bathroom, new 2 walk-in closets, new laundry closet. relocae water heater furnace. | $75,482 |
| Sep 3, 2026 | In progress issued Sep 2026 | 940 Baker St | Urban West Construction Inc | unit 2 on 2/f: revision to permit 202503132199. remove juliet balcony. add window restrictor. no other work.Details
unit 2 on 2/f: revision to permit 202503132199. remove juliet balcony. add window restrictor. no other work. | $1,500 |
| Aug 20, 2026 | In progress filed Aug 2026, not yet issued | 617 Sanchez St | installation of soldier beams for 617 sanchez per bpa # 201901150391Details
installation of soldier beams for 617 sanchez per bpa # 201901150391 | $80,000 | |
| Aug 13, 2026 | In progress issued Aug 2026 | 272 Grand View Av | Mission Home Remodeling Inc | underpinning along shared property line at 272 grand view due to new construction at 276 grand view (ref permit 202305258575)Details
underpinning along shared property line at 272 grand view due to new construction at 276 grand view (ref permit 202305258575) | $100,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 1871 45th Av | J & A Construction | rear horizontal addition and interior remodel. 1st fl. add a guest room, a full bathroom, a family room with wet bar. 2nd fl. remodel (e) bedrooms, kitchen bathroom. add a bath.Details
rear horizontal addition and interior remodel. 1st fl. add a guest room, a full bathroom, a family room with wet bar. 2nd fl. remodel (e) bedrooms, kitchen bathroom. add a bath. | $280,000 |
| Jul 16, 2026 | In progress filed Jul 2026, not yet issued | 83 Stanyan St | 1st floor convert 592 sf at garage into 2 bedroom, 1 bath, family room and (n) staircase to connect 1st to 2nd floor. 2nd floor (n) bathroom, dishwasher, remodel (e) kitchen, bathroom. 3rd floor new roof deck 436sf , 1 bedroom, 1 bathroom remodel (e) kitchen/bathroomDetails
1st floor convert 592 sf at garage into 2 bedroom, 1 bath, family room and (n) staircase to connect 1st to 2nd floor. 2nd floor (n) bathroom, dishwasher, remodel (e) kitchen, bathroom. 3rd floor new roof deck 436sf , 1 bedroom, 1 bathroom remodel (e) kitchen/bathroom | $140,000 | |
| Jul 15, 2026 | In progress filed Jul 2026, not yet issued | 2508 Bush St | rear bldg 2508 b bush st 3rd fl - kitchen remodel, new staircase to attic/4th fl; 4th fl - new bedroom, new bathroom, new 2 dormers, new 2 skylights; scope of work @ rear of bldg and main front bldg no workDetails
rear bldg 2508 b bush st 3rd fl - kitchen remodel, new staircase to attic/4th fl; 4th fl - new bedroom, new bathroom, new 2 dormers, new 2 skylights; scope of work @ rear of bldg and main front bldg no work | $8,000 | |
| Jul 14, 2026 | In progress issued Jul 2026 | 2419 Greenwich St | garage retrofit, steel 1-beam and remove posts, remove 2 - 7ft garage doors to replaced by one - 10 ft door.Details
garage retrofit, steel 1-beam and remove posts, remove 2 - 7ft garage doors to replaced by one - 10 ft door. | $50,000 | |
| Jul 10, 2026 | In progress filed Jul 2026, not yet issued | 352 06th Av | in unit#: 2 (352 6th av) on 3rd flr: add an attic access stair to existing atic space. add skylight.Details
in unit#: 2 (352 6th av) on 3rd flr: add an attic access stair to existing atic space. add skylight. | $9,000 | |
| Jul 6, 2026 | In progress issued Jul 2026 | 128 Noe St | revision to bpa: 202606042545 - modify door opening to be larger + structural.Details
revision to bpa: 202606042545 - modify door opening to be larger + structural. | $500 | |
| Jul 2, 2026 | In progress issued Sep 2026 | 3665 Clay St | field revision in reference to bpa# 202009103826 rev #4: minor adjustment on wood framing; doors in rear of building to pocket doors; remove 2 post in front of garage; remove accordian door on second floor.Details
field revision in reference to bpa# 202009103826 rev #4: minor adjustment on wood framing; doors in rear of building to pocket doors; remove 2 post in front of garage; remove accordian door on second floor. | $3,000 | |
| Jul 1, 2026 | In progress issued Sep 2026 | 969 Treat Av | Planart Construction Corp | install a retractable shade structure with fire-retardant fabric including all required mounting hardware and attachements in the second level deck.Details
install a retractable shade structure with fire-retardant fabric including all required mounting hardware and attachements in the second level deck. | $20,000 |
| Jun 24, 2026 | In progress issued Jun 2026 | 2918 Lyon St | Prime Construction & Renovation Inc. | revision to pa202603197944, reduce scope due to gudget constraints, remove all work at 1st floor. field revision to framing at roof level.Details
revision to pa202603197944, reduce scope due to gudget constraints, remove all work at 1st floor. field revision to framing at roof level. | |
| Jun 23, 2026 | In progress filed Jun 2026, not yet issued | 101 Utah St | Ewsf Inc. | removal of 8358 sqft on 2nd floor, relocation of brace frames. no change of use, interior work only.Details
removal of 8358 sqft on 2nd floor, relocation of brace frames. no change of use, interior work only. | $20,000 |
| Jun 17, 2026 | In progress issued Jun 2026 | 919 Fell St | San Francisco Developers | voluntary structural upgrade at ground floor. replacement of existing dropped wooden beams for new steel beam in the same location. no additional changes or scope of work above.Details
voluntary structural upgrade at ground floor. replacement of existing dropped wooden beams for new steel beam in the same location. no additional changes or scope of work above. | $25,000 |
| Jun 10, 2026 | In progress issued Jun 2026 | 212 Avila St | P 3 Construction & Remodeling Inc | demo walls per plans and cosmetic bathroom remodel. demo/move walls to construct new room and bathroom layout.Details
demo walls per plans and cosmetic bathroom remodel. demo/move walls to construct new room and bathroom layout. | $150,000 |
| Jun 8, 2026 | In progress issued Jun 2026 | 2770 Green St | Shorecal Engineering Inc. | install shoring piers and spread footing along gl-9 in reference of pa 202511250397.Details
install shoring piers and spread footing along gl-9 in reference of pa 202511250397. | $10,000 |
| Jun 8, 2026 | In progress issued Jul 2026 | 1682 24th Av | 1/f: infill (e) lightwell, new office, new bedroom, new bathroom. relocate (e) bathroom and family room. 2/f: infill (e) lightwell, new rear and side deck. relocate (e) kitchen and bathroom, new half bathroom, new master bathroom.Details
1/f: infill (e) lightwell, new office, new bedroom, new bathroom. relocate (e) bathroom and family room. 2/f: infill (e) lightwell, new rear and side deck. relocate (e) kitchen and bathroom, new half bathroom, new master bathroom. | $167,000 | |
| Jun 8, 2026 | Completed final sign-off Aug 2026 | 135 Kissling St | Ace Drilling Engineering Inc | 1st flr: remove 2 staircase. 2nd flr: remove office space, the outer concrete mason framing to remain. not visible from the street. rear structureDetails
1st flr: remove 2 staircase. 2nd flr: remove office space, the outer concrete mason framing to remain. not visible from the street. rear structure | $100,000 |
| Jun 5, 2026 | In progress issued Jun 2026 | 919 Fell St | San Francisco Developers | main and top floor interior remodel - relocation of (e) powder room at main floor. addition of new bathroom at top floor. new partition at top floor for new bedroom.Details
main and top floor interior remodel - relocation of (e) powder room at main floor. addition of new bathroom at top floor. new partition at top floor for new bedroom. | $50,000 |
| Jun 1, 2026 | In progress issued Jun 2026 | 4250 26th St | Shorecal Engineering Inc. | ref 201802141219- install shoring for below grade footing and wallsDetails
ref 201802141219- install shoring for below grade footing and walls | $20,000 |
| May 22, 2026 | Completed final sign-off Jul 2026 | 420 South Van Ness Av | to obtain final inspection for work approved under pa# 202002184739. all work is complete.Details
to obtain final inspection for work approved under pa# 202002184739. all work is complete. | ||
| May 14, 2026 | In progress issued Jun 2026 | 55 Rosewood Dr | installation of footings in sequence for house remodel.Details
installation of footings in sequence for house remodel. | $30,000 | |
| May 12, 2026 | In progress issued May 2026 | 57 Carmelita St | Olmec Builders Inc | sequencing for foundation and repair. no other work.to comply with nov 202655072.Details
sequencing for foundation and repair. no other work.to comply with nov 202655072. | $35,000 |
| May 12, 2026 | In progress issued May 2026 | 527 Diamond St | new pergola at yard patio. 10'0" height max.Details
new pergola at yard patio. 10'0" height max. | $2,000 | |
| May 4, 2026 | Completed final sign-off May 2026 | 1554 Grove St | Cdr Builders Inc | install 2' x 2' foundation. revision to permit 202602115756.Details
install 2' x 2' foundation. revision to permit 202602115756. | |
| May 4, 2026 | In progress issued Aug 2026 | 731 Irving St | Innovation Plumbing And Rooter | t.i. comply with nov#: 202649876. provide ada entry way for bathroom, relocate sink to rear of kitchen, remove booths, restore 4' x 4' concrete floor, new hood range.Details
t.i. comply with nov#: 202649876. provide ada entry way for bathroom, relocate sink to rear of kitchen, remove booths, restore 4' x 4' concrete floor, new hood range. | $45,000 |
| Apr 27, 2026 | In progress issued Sep 2026 | 2918 Mission St | West Builders Inc. | temporary shoring for new construction re issued pa #201612285987 (s)Details
temporary shoring for new construction re issued pa #201612285987 (s) | $300,000 |
| Apr 24, 2026 | In progress filed Apr 2026, not yet issued | 221 05th Av | to partiually abate nov 202290894 to include legalize the change in the ground floor structrual elements. install (n) structural elementsDetails
to partiually abate nov 202290894 to include legalize the change in the ground floor structrual elements. install (n) structural elements | ||
| Apr 21, 2026 | In progress filed Apr 2026, not yet issued | 589 Texas St | revision to pa #2025-1014-7319: 1st fl- 2 new full bathrooms, (e) interior wood staircase to be replaced, new laundry area, new rear bedroom (area to excavated). 2nd fl- (e) wall between living & sitting area to be removed, kitchen remodel, new powder room location, new deckDetails
revision to pa #2025-1014-7319: 1st fl- 2 new full bathrooms, (e) interior wood staircase to be replaced, new laundry area, new rear bedroom (area to excavated). 2nd fl- (e) wall between living & sitting area to be removed, kitchen remodel, new powder room location, new deck | $258,000 | |
| Apr 20, 2026 | In progress filed Apr 2026, not yet issued | 4101 San Bruno Av | convert existing garage space and storage room into new adu less than 700 sq ftDetails
convert existing garage space and storage room into new adu less than 700 sq ft | $75,000 | |
| Apr 15, 2026 | In progress issued Apr 2026 | 2766 Green St | Ace Drilling & Excavation | install underpinning at locations shown on sh 2.0 to allow excavation for new development at 2770 green st. does not affect public right of way.Details
install underpinning at locations shown on sh 2.0 to allow excavation for new development at 2770 green st. does not affect public right of way. | $50,000 |
| Apr 3, 2026 | In progress issued Jun 2026 | 701 San Bruno Av | rev 202508284097: basement - excavate area in order to accommodate a garage space. 1/f: new wood staircase to new basement. all work not visible to row.Details
rev 202508284097: basement - excavate area in order to accommodate a garage space. 1/f: new wood staircase to new basement. all work not visible to row. | $15,000 | |
| Mar 27, 2026 | In progress issued Mar 2026 | 659 Union St | Shorecal Engineering Inc. | demo 3-story, type 5, mixed use building.Details
demo 3-story, type 5, mixed use building. | $200,000 |
| Mar 25, 2026 | In progress issued Apr 2026 | 156 Missouri St | Shorecal Engineering Inc. | installation of underpinning below 156 missouri st to support existing foundations during new development @ 146-148 missouri stDetails
installation of underpinning below 156 missouri st to support existing foundations during new development @ 146-148 missouri st | $10,000 |
| Mar 25, 2026 | In progress issued Apr 2026 | 146 Missouri St | Shorecal Engineering Inc. | installation of footings in sequence and underpinning for new development @ 146-148 missouri stDetails
installation of footings in sequence and underpinning for new development @ 146-148 missouri st | $50,000 |
| Mar 24, 2026 | Completed final sign-off Oct 2026 | 2264 Beach St | Fornari Inc Dba Bold Construction | 1st fl: modify floor plan, relocate bathroom, replace window with french foor, (n) fire rated 1 hr wall. 2nd fl: enlarge kitchen opening. 3rd fl: bathroom addition with shower, (n) closets. knob and tube wiring replacement.Details
1st fl: modify floor plan, relocate bathroom, replace window with french foor, (n) fire rated 1 hr wall. 2nd fl: enlarge kitchen opening. 3rd fl: bathroom addition with shower, (n) closets. knob and tube wiring replacement. | $25,800 |
| Mar 13, 2026 | Expired or cancelled withdrawn Apr 2026 | 3740 Sacramento St | San Francisco Developers | interior remodeling of level 2 & level 3. new trades. upgrade of elecrical, mechanical & plumbingDetails
interior remodeling of level 2 & level 3. new trades. upgrade of elecrical, mechanical & plumbing | $150,000 |
| Mar 12, 2026 | In progress issued Jul 2026 | 2821 Steiner St | San Francisco Developers | attached adu within existing habitable space, conversion of existing wetbar into a full kitchen, addition of new powder room and new stairs between ground floor and first floor.Details
attached adu within existing habitable space, conversion of existing wetbar into a full kitchen, addition of new powder room and new stairs between ground floor and first floor. | $35,000 |
| Mar 6, 2026 | Completed final sign-off Mar 2026 | 1451 Montgomery St | Terence Mcmahon Construction | unit 4: existing non bearing portion of wall between kitchen and dining room to be removed.Details
unit 4: existing non bearing portion of wall between kitchen and dining room to be removed. | $63,000 |
| Feb 27, 2026 | In progress issued Mar 2026 | 570 44th Av | 1/f: infill at rear, 2 new bedrooms, new bathroom, new family room. 2/f: new master closet and master bathroom. relocation of (e) bedroom, (e) kitchen and (e) dining. new stairs from first to second floor.Details
1/f: infill at rear, 2 new bedrooms, new bathroom, new family room. 2/f: new master closet and master bathroom. relocation of (e) bedroom, (e) kitchen and (e) dining. new stairs from first to second floor. | $105,000 | |
| Feb 25, 2026 | Completed final sign-off Mar 2026 | 242 Ripley St | Abbeyside Construction Inc | revision to pa 202602035113 (e) balcony is 3' setback from west property line. fire wall not requiredDetails
revision to pa 202602035113 (e) balcony is 3' setback from west property line. fire wall not required | |
| Feb 3, 2026 | In progress issued Feb 2026 | 242 Ripley St | Abbeyside Construction Inc | rebuild (e) wood frame balcony on 2nd and 3rd floor. convert (e) cantilever balcony to be supported by posts below add 1 hour fire rated wall on property lineDetails
rebuild (e) wood frame balcony on 2nd and 3rd floor. convert (e) cantilever balcony to be supported by posts below add 1 hour fire rated wall on property line | $16,000 |
| Jan 27, 2026 | Completed final sign-off Feb 2026 | 2021 California St | De Brus Construction Inc | to comply with nov #202079907. 1) removal of unpermitted cinder blocks atep 20' high retaining wall with no rebar. 2) new 6' high fence setback 3'-0" from property line.Details
to comply with nov #202079907. 1) removal of unpermitted cinder blocks atep 20' high retaining wall with no rebar. 2) new 6' high fence setback 3'-0" from property line. | $1,600 |
| Jan 20, 2026 | In progress issued Jun 2026 | 167 20th Av | Ace Drilling Engineering Inc | temporary shoring for garage addition per permit application 2024-1008-2505. detached structure.Details
temporary shoring for garage addition per permit application 2024-1008-2505. detached structure. | $65,000 |
| Jan 20, 2026 | In progress filed Jan 2026, not yet issued | 2515 Broadway | Shorecal Engineering Inc. | install temporary shoring and excavation sequencing shown on sheet sh2.0 for residential remodel ref 201706260318Details
install temporary shoring and excavation sequencing shown on sheet sh2.0 for residential remodel ref 201706260318 | $15,000 |
| Dec 29, 2025 | In progress issued Jan 2026 | 3740 Sacramento St | San Francisco Developers | revision to pa 202509256138: conversion of ground level to habitable space to add one bedroom, one bathroom, one family room and laundry room. widen the garage doorDetails
revision to pa 202509256138: conversion of ground level to habitable space to add one bedroom, one bathroom, one family room and laundry room. widen the garage door | $100,000 |
| Dec 24, 2025 | Completed final sign-off Aug 2026 | 411 17th Av | Sunset Remodeling And Design Inc | 1/f: add new bedroom/bathroom; relocate (e) water heater. 2/f: kitchen remodel, (e) half bathroom remodel. replace (e) window by door at rear wall. 3/f: remodel 2 (e) bathroom; new laundry closet.Details
1/f: add new bedroom/bathroom; relocate (e) water heater. 2/f: kitchen remodel, (e) half bathroom remodel. replace (e) window by door at rear wall. 3/f: remodel 2 (e) bathroom; new laundry closet. | $50,000 |
| Dec 24, 2025 | In progress issued Apr 2026 | 38 Belcher St | replace (e) fire escape in kind from roof to light courtyardDetails
replace (e) fire escape in kind from roof to light courtyard | $10,000 | |
| Dec 20, 2025 | In progress issued Mar 2026 | 2770 Green St | install temp shoring, consiting of cantilever sodier beams, along locations showns sh2.0 to allow excavation for new development at property.Details
install temp shoring, consiting of cantilever sodier beams, along locations showns sh2.0 to allow excavation for new development at property. | $5,000 | |
| Dec 15, 2025 | In progress issued Dec 2025 | 2821 Steiner St | San Francisco Developers | 282floor plan modification at ground level to add 1 bedroom/gym, 1 bath, secondary laundry, and new elevator shaft.Details
282floor plan modification at ground level to add 1 bedroom/gym, 1 bath, secondary laundry, and new elevator shaft. | $35,000 |
| Dec 13, 2025 | In progress filed Dec 2025, not yet issued | 249 Peru Av | Steadfast Bay Construction | remove rear portion of the building, excavate crawl space and grade at rear yard to create new basement, new interior stairs connecting 1st floor with basement; horizontal addition at rear yard for 1st floor and basement, relocate kitchen and bathroom in first floor; new window and exterior doors.Details
remove rear portion of the building, excavate crawl space and grade at rear yard to create new basement, new interior stairs connecting 1st floor with basement; horizontal addition at rear yard for 1st floor and basement, relocate kitchen and bathroom in first floor; new window and exterior doors. | $250,000 |
| Dec 1, 2025 | Completed final sign-off Apr 2026 | 976 Noe St | D3 Construction | 1st fl: existing posts at garage to be removed. 3rd fl: existing portion of wall between kitchen and dining room to be removed.Details
1st fl: existing posts at garage to be removed. 3rd fl: existing portion of wall between kitchen and dining room to be removed. | $3,780 |
| Nov 25, 2025 | Completed final sign-off Apr 2026 | 2470 43rd Av | first floor: infill underneath of (e) popout. 2 (n)bedroom, (n) bathroom (n) family room. second flr: repurpose (e) study to (n) closet and (n)bathroom, (e)bedroom and (e) living room relocated kitchen remodel. (n) 190 sqft deck and stairs to rear yardDetails
first floor: infill underneath of (e) popout. 2 (n)bedroom, (n) bathroom (n) family room. second flr: repurpose (e) study to (n) closet and (n)bathroom, (e)bedroom and (e) living room relocated kitchen remodel. (n) 190 sqft deck and stairs to rear yard | $80,000 | |
| Nov 13, 2025 | In progress issued Nov 2025 | 154 15th Av | Edri Construction Inc *See Notes* | grouting in response to pa # 202508193412Details
grouting in response to pa # 202508193412 | $6,000 |
| Nov 13, 2025 | Expired or cancelled cancelled Jul 2026 | 162 15th Av | Edri Construction Inc *See Notes* | partial foundation replacement in response to pa # 202508193412Details
partial foundation replacement in response to pa # 202508193412 | $6,000 |
| Nov 5, 2025 | In progress issued Nov 2025 | 3029 Laguna St | Associated Builders | install temporary shoring to support (e) bldg and perform excavation sequencing below at locations show on sft 2.0 to allow excavation for residential remodel and vertical addition at 3029-3031 laguna st. for work proposed under permit # 202105110178.Details
install temporary shoring to support (e) bldg and perform excavation sequencing below at locations show on sft 2.0 to allow excavation for residential remodel and vertical addition at 3029-3031 laguna st. for work proposed under permit # 202105110178. | |
| Oct 31, 2025 | In progress issued Dec 2025 | 523 Chestnut St | Flores General Building | ref to 202503192581 & 202503192580. fireplace removal & infill chimney openingsDetails
ref to 202503192581 & 202503192580. fireplace removal & infill chimney openings | $5,000 |
| Oct 29, 2025 | In progress filed Oct 2025, not yet issued | 4369 21st St | 1st flr. voluntary foundation improvement, new foundation, replacement in-kind & new slab on grade.Details
1st flr. voluntary foundation improvement, new foundation, replacement in-kind & new slab on grade. | $15,000 | |
| Oct 27, 2025 | In progress issued Oct 2026 | 550 03rd Av | new adu on 1/f: new living/dining room, kitchen, berdoom, bathroom & 2 closets.Details
new adu on 1/f: new living/dining room, kitchen, berdoom, bathroom & 2 closets. | $30,000 | |
| Oct 20, 2025 | In progress issued Apr 2026 | 701 San Bruno Av | erect new 4 story type-4 2 unit residence.Details
erect new 4 story type-4 2 unit residence. | $380,000 | |
| Oct 20, 2025 | In progress issued Apr 2026 | 701 San Bruno Av | demolish (e) type 5b 2-story single family residence.Details
demolish (e) type 5b 2-story single family residence. | $36,500 | |
| Oct 14, 2025 | In progress issued Oct 2025 | 84 Sotelo Av | 1st fl: add 153 sqft of conditioned space (new sitting room), replace all existing rear windows. construction of new rear stairs from existing deck to grade. re-pace concrete walkway adjacent property.Details
1st fl: add 153 sqft of conditioned space (new sitting room), replace all existing rear windows. construction of new rear stairs from existing deck to grade. re-pace concrete walkway adjacent property. | $45,000 | |
| Oct 14, 2025 | In progress issued Oct 2025 | 589 Texas St | 1st fl: existing restroom to be removed. new full bathroom, (e) portion of footing on gridline "c" to be replaced, new kitchenette, new bedroom. 2nd fl: (e) kitchen remodel, new full bathroom, new powder room, new rear staircaseDetails
1st fl: existing restroom to be removed. new full bathroom, (e) portion of footing on gridline "c" to be replaced, new kitchenette, new bedroom. 2nd fl: (e) kitchen remodel, new full bathroom, new powder room, new rear staircase | $63,542 | |
| Oct 14, 2025 | In progress issued Oct 2025 | 3224 Jennings St | Rahimi Construction, Tromborg Royal Plumbing & Heating | to comply with nov# 202184779. return as-built crawl space back to 5' ceiling height. new 4" slab on grade back on grade dowel into exiting retaining foundation less than 42".Details
to comply with nov# 202184779. return as-built crawl space back to 5' ceiling height. new 4" slab on grade back on grade dowel into exiting retaining foundation less than 42". | $4,000 |
| Oct 9, 2025 | In progress issued Oct 2025 | 2821 Steiner St | San Francisco Developers | level 3 interior remodeling less than 30% removal of interior walls at middle of 3rd fl, closets, partitionsDetails
level 3 interior remodeling less than 30% removal of interior walls at middle of 3rd fl, closets, partitions | $40,000 |
| Oct 7, 2025 | In progress issued Oct 2025 | 20 Hill St | D K G Construction Inc | installation of footings in sequence for house remodel.Details
installation of footings in sequence for house remodel. | $10,000 |
| Oct 3, 2025 | In progress issued Jun 2026 | 156 Beaver St | R & C Mulholland Inc. | basement -legalization of (e) 2 story state adu attached to unit# 156 beaver street.Details
basement -legalization of (e) 2 story state adu attached to unit# 156 beaver street. | $75,000 |
| Sep 25, 2025 | In progress issued Oct 2025 | 3740 Sacramento St | San Francisco Developers | voluntary replacement of existing foundationDetails
voluntary replacement of existing foundation | $150,000 |
| Sep 17, 2025 | Completed final sign-off Oct 2025 | 957 Teresita Bl | ref pa # 2024-0827-9573. to extend (n) deck on grade structural posts and pad footing at the end of deck. pad footing are verified be installed at most flat soil.Details
ref pa # 2024-0827-9573. to extend (n) deck on grade structural posts and pad footing at the end of deck. pad footing are verified be installed at most flat soil. | $5,000 | |
| Sep 16, 2025 | Completed final sign-off Oct 2025 | 2260 Leavenworth St | Fornari Inc Dba Bold Construction | field revision to pa 202508284129 replacement of pad footing; add stemwall note as per detail 1/s3Details
field revision to pa 202508284129 replacement of pad footing; add stemwall note as per detail 1/s3 | $5,000 |
| Sep 11, 2025 | In progress issued Sep 2025 | 5025 Mission St | Area Development Inc. | revision to pa # 2023-1011-8461. new ada parking space locationDetails
revision to pa # 2023-1011-8461. new ada parking space location | $10,000 |
| Sep 8, 2025 | Completed final sign-off Mar 2026 | 1706 31st Av | Mattew Patrick Harty Construction | 2/fl- (n) sucken staircase from 2nd floor to roof. roof plan (n) 412sf roof deck with (n) 42 in height cable guardrail and (n) skylight.Details
2/fl- (n) sucken staircase from 2nd floor to roof. roof plan (n) 412sf roof deck with (n) 42 in height cable guardrail and (n) skylight. | $20,000 |
| Aug 28, 2025 | Completed final sign-off Oct 2025 | 2260 Leavenworth St | Fornari Inc Dba Bold Construction | address dry rot condition at ground fl based on wood destroying per termite report# 25524 by markoff stuctural pest control. replace dry rot at deck & stairsDetails
address dry rot condition at ground fl based on wood destroying per termite report# 25524 by markoff stuctural pest control. replace dry rot at deck & stairs | $23,500 |
| Aug 15, 2025 | In progress issued Aug 2025 | 778 39th Av | Jlq Construction Inc | sequencing shoring for previously approved permit 202506128620.Details
sequencing shoring for previously approved permit 202506128620. | $3,000 |
| Aug 5, 2025 | In progress issued Dec 2025 | 350 06th Av | Dj New Century Construction Inc | interior remodel: 1st fl-remodel (e) bedrooms, bathroom, add a wetbar for unit #1. 2nd fl unit #1- remodel bathrooms, bedrooms, relocate kitchen. 3rd fl unit #2- remodel bathrooms, bedrooms & relocate kitchen.Details
interior remodel: 1st fl-remodel (e) bedrooms, bathroom, add a wetbar for unit #1. 2nd fl unit #1- remodel bathrooms, bedrooms, relocate kitchen. 3rd fl unit #2- remodel bathrooms, bedrooms & relocate kitchen. | $200,000 |
| Aug 4, 2025 | Completed final sign-off Dec 2025 | 3983 19th St | San Francisco Developers | addition of (n) powder room on 2nd floor, remove portion of wall and post between hallway,kitchen and dining room, replace of facade windows at 2nd and 3rd floor. add (n) partition wall at 3rd floor to create two bedrooms, replace (e) and addition of (n) window at bedrooms at 3rd level. visibleDetails
addition of (n) powder room on 2nd floor, remove portion of wall and post between hallway,kitchen and dining room, replace of facade windows at 2nd and 3rd floor. add (n) partition wall at 3rd floor to create two bedrooms, replace (e) and addition of (n) window at bedrooms at 3rd level. visible | $50,000 |
| Aug 4, 2025 | In progress issued Sep 2025 | 940 Baker St | Urban West Construction Inc, Boss Construction Inc. | unit 2 on 2/f: revision to permit 202503132199. existing rear balcony to be removed.Details
unit 2 on 2/f: revision to permit 202503132199. existing rear balcony to be removed. | $5,000 |
| Aug 4, 2025 | In progress issued Sep 2025 | 940 Baker St | Urban West Construction Inc, Boss Construction Inc. | unit 4 on 3/f: revision to permit 202503132200. existing rear balcony to be removed.Details
unit 4 on 3/f: revision to permit 202503132200. existing rear balcony to be removed. | $5,000 |
| Jul 29, 2025 | Completed final sign-off Jul 2026 | 159 Fell St | Neeve Engineering Inc. | 15 ft of shoring on the west side of property for the elevator pit excavation for new construction.(reference: alter site #202311281457 and original site 201912200114 entitlement non-structural).Details
15 ft of shoring on the west side of property for the elevator pit excavation for new construction.(reference: alter site #202311281457 and original site 201912200114 entitlement non-structural). | $25,000 |
| Jul 24, 2025 | Completed final sign-off Sep 2025 | 2191 34th Av | T & L Construction | to comply with nov# 2024-31086 and perform work previously approved by 2022-1227-9187: remodel 2nd floor kitchen/bathroom, replace damaged beam above living room, convert portion of ground floor garage area (260 sq ft) into a non-sleeping office and full bathroom.Details
to comply with nov# 2024-31086 and perform work previously approved by 2022-1227-9187: remodel 2nd floor kitchen/bathroom, replace damaged beam above living room, convert portion of ground floor garage area (260 sq ft) into a non-sleeping office and full bathroom. | $75,000 |
| Jul 10, 2025 | Completed final sign-off Jan 2026 | 330 Harvard St | Sunset Remodeling And Design Inc | garage-(n) staircase to garage flr. 1st flr-(e) non- bearing walls to be removed. (e) bathrms remodel,(n)wood staircase to 2nd flr. 2nd flr-(n) wood staircase to 1st flr, kitchen remodel. general-replace 5 windows & 1 sliding door(not @ front of bldg),(e)rear deck repair less then 50%. front door..Details
garage-(n) staircase to garage flr. 1st flr-(e) non- bearing walls to be removed. (e) bathrms remodel,(n)wood staircase to 2nd flr. 2nd flr-(n) wood staircase to 1st flr, kitchen remodel. general-replace 5 windows & 1 sliding door(not @ front of bldg),(e)rear deck repair less then 50%. front door.. | $50,000 |
| Jul 3, 2025 | Completed final sign-off Jan 2026 | 734 Ashbury St | Devlin/Mcnally Construction | 3/f unit a: revision to permit 202503182436. existing portion of bearing wall between kitchen and hallway to be removed.Details
3/f unit a: revision to permit 202503182436. existing portion of bearing wall between kitchen and hallway to be removed. | $5,000 |
| Jun 25, 2025 | In progress issued Jul 2025 | 774 39th Av | Jlq Construction Inc | install permeation grouting within property at 774 39th ave.Details
install permeation grouting within property at 774 39th ave. | $200 |
| Jun 25, 2025 | Completed final sign-off Aug 2025 | 447 42nd Av | Doherty Construction | replace dry rotted section of the stud wall at lightwell. voluntary strengthening seismic resident elements, strengthen staircase by nailing exterior wallDetails
replace dry rotted section of the stud wall at lightwell. voluntary strengthening seismic resident elements, strengthen staircase by nailing exterior wall | $5,000 |
| Jun 12, 2025 | In progress issued Jul 2025 | 778 39th Av | Jlq Construction Inc | install permeation grouting within property at 778 39th ave for work approved under pa # 2025-0408-3945Details
install permeation grouting within property at 778 39th ave for work approved under pa # 2025-0408-3945 | $20,000 |
| Jun 3, 2025 | In progress issued Oct 2025 | 978 Noe St | D3 Construction | comply with complaint #202537453. first floor: new office, new bathroom, and new family room, renovate (e) bathroom. 2/f: remove portion of (e) wall between kitchen and dining room. remove (e) wall at staircare and add (n) 42" guardrail replacement of non conforming fence under sep permit.Details
comply with complaint #202537453. first floor: new office, new bathroom, and new family room, renovate (e) bathroom. 2/f: remove portion of (e) wall between kitchen and dining room. remove (e) wall at staircare and add (n) 42" guardrail replacement of non conforming fence under sep permit. | $8,500 |
| Jun 2, 2025 | In progress issued Jun 2025 | 565 Duncan St | Alex Builder Inc | 1/f: convert (e) storage into a new family room, bedroom, bathroom, laundry room, and utility room. 2/f: convert (e) lightwell space into conditioned space for living room.Details
1/f: convert (e) storage into a new family room, bedroom, bathroom, laundry room, and utility room. 2/f: convert (e) lightwell space into conditioned space for living room. | $70,000 |
| May 28, 2025 | In progress issued Nov 2025 | 2770 Green St | K 2 Builders Inc | rear horizontal addition at 1st-4th floors. addition of basement level at rear. remove pitched roofs behind facade and replace with low pitched roof above (4th floor). interior remodel at all levels. enlarge garage. new elevator. structural upgradeDetails
rear horizontal addition at 1st-4th floors. addition of basement level at rear. remove pitched roofs behind facade and replace with low pitched roof above (4th floor). interior remodel at all levels. enlarge garage. new elevator. structural upgrade | $420,000 |
| May 23, 2025 | Completed final sign-off Mar 2026 | 1706 31st Av | Mattew Patrick Harty Construction | first floor: relocate bathroom (n) living room. infill foyer on the second floor: (n) bathroom remodel kitchen and bathroomDetails
first floor: relocate bathroom (n) living room. infill foyer on the second floor: (n) bathroom remodel kitchen and bathroom | $131,000 |
| May 19, 2025 | In progress issued Oct 2025 | 2508 Bush St | Gavin Construction Inc | rear bldg, 2508 a bush st 1st fl - existing brick foundation replacement; addition of new bedroom and bathroom; 2nd fl - new staircasew to connect 1st and 2nd fl; existing bathroom remodelDetails
rear bldg, 2508 a bush st 1st fl - existing brick foundation replacement; addition of new bedroom and bathroom; 2nd fl - new staircasew to connect 1st and 2nd fl; existing bathroom remodel | $80,000 |
| May 16, 2025 | Completed final sign-off Oct 2025 | 527 Diamond St | to comply with 202534822, obtain the services of a structural engineer to access all work being done in rear yard. 1) replaced wood retaining wall with concrete block wall approx 25' long and 40'in height. 2) built approx 2' wood retaining wall above and behind the concrete block wall. 3) replaceDetails
to comply with 202534822, obtain the services of a structural engineer to access all work being done in rear yard. 1) replaced wood retaining wall with concrete block wall approx 25' long and 40'in height. 2) built approx 2' wood retaining wall above and behind the concrete block wall. 3) replace | $25,000 | |
| May 12, 2025 | Completed final sign-off Jan 2026 | 427 Madrid St | comply with nov 202430380; 2nd flr: new rear deck, new wood staircase to rear yard.Details
comply with nov 202430380; 2nd flr: new rear deck, new wood staircase to rear yard. | $30,000 | |
| May 9, 2025 | Completed final sign-off Oct 2025 | 2300 22nd Av | De Brus Construction Inc | revision to 201709016796 r1 per field inspector's request, document location of water heater and furnaces for each unit 1st fl, eero windows for bedrooms on each unit 1st floor. no material change to previously approved p/a.Details
revision to 201709016796 r1 per field inspector's request, document location of water heater and furnaces for each unit 1st fl, eero windows for bedrooms on each unit 1st floor. no material change to previously approved p/a. | |
| May 1, 2025 | In progress issued Sep 2025 | 64 Mars St | (n) 345 sqft 3/f bedroom and bath addition. 2/f kitchen and bathroom remodel. (n) 109 sqft deck & deck in rear yard. plumbing & electrical in addition & remodeled area.Details