Block 3984, lot 004
156 Missouri St
- City’s use
- Multi-Family Residential
- Built
- 1962
- Stories
- 3
- Units
- 7
- Rooms
- 7 bathrooms
- Building
- 3,587 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 25, 2026 | In progress issued Apr 2026 | 156 Missouri St | Shorecal Engineering Inc. | installation of underpinning below 156 missouri st to support existing foundations during new development @ 146-148 missouri stDetails
installation of underpinning below 156 missouri st to support existing foundations during new development @ 146-148 missouri st | $10,000 |
| Feb 27, 2020 | Never finaled issued Feb 2020, no final | 156 Missouri St | Ken Leung Construction Inc | #2: kitchen remodel; replace kitchen cabinets, electric stove, hood, disposal, dishwasher, appliances, light fixtures(led). new floor and paint. locations will remain the same. no structural work. no wall modification.Details
#2: kitchen remodel; replace kitchen cabinets, electric stove, hood, disposal, dishwasher, appliances, light fixtures(led). new floor and paint. locations will remain the same. no structural work. no wall modification. | $10,000 |
| Dec 30, 2019 | Completed final sign-off Feb 2020 | 156 Missouri St | Ken Leung Construction Inc | #3: replace kitchen cabinets with new, replace eletrical stove w/new. replace hood, disposal, dishwasher with new. same location for all appliances. replace all light fixtures with led lights. new floor & new paint. no new construction.Details
#3: replace kitchen cabinets with new, replace eletrical stove w/new. replace hood, disposal, dishwasher with new. same location for all appliances. replace all light fixtures with led lights. new floor & new paint. no new construction. | $6,000 |
| Jan 15, 2019 | Completed final sign-off May 2019 | 156 Missouri St | Crime Watch Security Sys Llc | installation of a new fire alarm system with sprinkler monitoring. ref app#201704123855. ref sprinkler app#201810021942Details
installation of a new fire alarm system with sprinkler monitoring. ref app#201704123855. ref sprinkler app#201810021942 | $14,000 |
| Jan 3, 2019 | Completed final sign-off Jan 2019 | 156 Missouri St | Ken Leung Construction Inc | comply with nov 201816591. replacement kitchen cabinet with new. replace the following with new fixtures at thesame location hood, faucet, dispenser, light fixtures, d.w., electrical stove range carpet with enginerring wood. no new construction. no alterations.Details
comply with nov 201816591. replacement kitchen cabinet with new. replace the following with new fixtures at thesame location hood, faucet, dispenser, light fixtures, d.w., electrical stove range carpet with enginerring wood. no new construction. no alterations. | $5,000 |
| Oct 17, 2018 | Completed final sign-off Oct 2018 | 156 Missouri St | Highland Construction S F Inc. | reroofingDetails
reroofing | $4,620 |
| Oct 2, 2018 | Completed final sign-off May 2019 | 156 Missouri St | Pro Plumbing & Fire Sprinkler Inc | ref pa# 201704123855; install new fire sprinkler at ground fl. entire pernfpa13 including new 2" dedicated fire service (toatal sprinklers 27)Details
ref pa# 201704123855; install new fire sprinkler at ground fl. entire pernfpa13 including new 2" dedicated fire service (toatal sprinklers 27) | $14,742 |
| Apr 10, 2018 | Completed final sign-off Sep 2019 | 156 Missouri St | revise pa # 201607182594 mandatory seismic retrofit. revised shear wall due to 1 hr fire exit corridor.Details
revise pa # 201607182594 mandatory seismic retrofit. revised shear wall due to 1 hr fire exit corridor. | ||
| Apr 12, 2017 | Completed final sign-off Sep 2019 | 156 Missouri St | Ken Leung Construction Inc | add two adu according to sf accesory dwelling unit program ord 162-16Details
add two adu according to sf accesory dwelling unit program ord 162-16 | $100,000 |
| Jul 18, 2016 | Completed final sign-off Sep 2019 | 156 Missouri St | Ken Leung Construction Inc | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. | $50,000 |
| Nov 30, 2015 | Never finaled issued Nov 2015, no final | 156 Missouri St | Topline Builders Corp | unit #1 & #5 - replace the ktichen cabinets & replace the tile for the bathroom. upgrade the electrical for the kitchen, add the beam by the plan.Details
unit #1 & #5 - replace the ktichen cabinets & replace the tile for the bathroom. upgrade the electrical for the kitchen, add the beam by the plan. | $25,000 |
| May 24, 2005 | Completed final sign-off Aug 2005 | 156 Missouri St | Western Builders | dry-rot repair (2nd floor landing at bottom of stair approx 40 sq. ft) build concrete footing of (e)Details
dry-rot repair (2nd floor landing at bottom of stair approx 40 sq. ft) build concrete footing of (e) | $19,800 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.