Edward Lee Hammack
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Edw. Lee Hammack, Architect
- Based in
- San Francisco
- On San Francisco permits
- Feb 2003 to Sep 2026
130 permits since 2000 (architect on 124 permits, authorized agent-others on 3 permits, designer on 3 permits, engineer on 1 permit): 90 completed, 19 in progress, 8 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 130.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 3795 Market St | 265sqft 2nd flr bedroom addition above an existing street level garage at the front of home. horizontal addition. total aggregate flr area is less than 1000sqft.Details
265sqft 2nd flr bedroom addition above an existing street level garage at the front of home. horizontal addition. total aggregate flr area is less than 1000sqft. | $50,615 | |
| Apr 23, 2026 | In progress issued May 2026 | 1284 Mission St | Sewer Master | door and window replacementDetails
door and window replacement | $20,000 |
| Apr 21, 2026 | In progress issued May 2026 | 93 09th St | Sewer Master | new store frontDetails
new store front | $20,000 |
| Feb 23, 2026 | Completed final sign-off Mar 2026 | 1512 20th St | Douglas Gower Dba Mesa Construction | demo (e) backstair & deck at behest of insurance company to renew policy due to condition. no new replacement or reconstruction planned at this time.Details
demo (e) backstair & deck at behest of insurance company to renew policy due to condition. no new replacement or reconstruction planned at this time. | $500 |
| Feb 10, 2026 | In progress issued Mar 2026 | 2931 Fillmore St | Rinaldi Construction | new 1-hour rated window in a side/property line wall.Details
new 1-hour rated window in a side/property line wall. | $5,000 |
| Feb 9, 2026 | In progress filed Feb 2026, not yet issued | 20 Tingley St | construct a (n) 2nd floor bathroom, including the addtion of 10sf at the 2nd floor and replace (2) single glazed windows with 1 dual glazed windows. not visible from streetDetails
construct a (n) 2nd floor bathroom, including the addtion of 10sf at the 2nd floor and replace (2) single glazed windows with 1 dual glazed windows. not visible from street | $22,462 | |
| Jan 20, 2026 | Completed final sign-off Feb 2026 | 1284 Mission St | Sewer Master | deferred mep for 202410072461, 202512. delete a toilet and exhaust fan approved for installation under 202505037798. ref drawings attached.Details
deferred mep for 202410072461, 202512. delete a toilet and exhaust fan approved for installation under 202505037798. ref drawings attached. | |
| Jan 17, 2026 | In progress filed Jan 2026, not yet issued | 572 San Jose Av | rear addition to an existing 2 story, 2 family dweling. interior renovations including new kitchen and bathrooms.Details
rear addition to an existing 2 story, 2 family dweling. interior renovations including new kitchen and bathrooms. | $100,000 | |
| Jul 1, 2025 | Completed final sign-off Jun 2026 | 2047 22nd Av | North Bay Sunspace Inc. | construct a sunroom at the back of the buildingDetails
construct a sunroom at the back of the building | $34,380 |
| Jun 3, 2025 | Completed final sign-off Feb 2026 | 1284 Mission St | revision to 202410072461 and 202501299312 and compliance with unresolved violations on nov 2024-27441 comply with info sheet da-02. remove kitchen, covert laundry to 1/2 bath, remove full bath, modify partition layout. all other items resolved under prior permits. retail space only.Details
revision to 202410072461 and 202501299312 and compliance with unresolved violations on nov 2024-27441 comply with info sheet da-02. remove kitchen, covert laundry to 1/2 bath, remove full bath, modify partition layout. all other items resolved under prior permits. retail space only. | ||
| Mar 20, 2025 | In progress filed Mar 2025, not yet issued | 680 08th St | Yerba Buena Builders Inc | rear ramp-volutary modify the (e) ramp at the rear parking lot to comply with current access standards, including (n) concrete extensions and topping (n) guardrail and wheel guide (n) battery powered actuated door closer and new signageDetails
rear ramp-volutary modify the (e) ramp at the rear parking lot to comply with current access standards, including (n) concrete extensions and topping (n) guardrail and wheel guide (n) battery powered actuated door closer and new signage | $100,000 |
| Feb 28, 2025 | Completed final sign-off Jun 2025 | 145 Broadmoor Dr | Rebase Building | revision to bpa 2025-0114-8242 remove additional walls, revise approved posts & beam; revise cabinets & counters; install new flueDetails
revision to bpa 2025-0114-8242 remove additional walls, revise approved posts & beam; revise cabinets & counters; install new flue | |
| Jan 29, 2025 | Completed final sign-off Sep 2025 | 1284 Mission St | comply with abe program abe #201912039085Details
comply with abe program abe #201912039085 | $2,000 | |
| Jan 21, 2025 | Completed final sign-off Mar 2025 | 1432 Valencia St | revision 202309196885- remodel storefront with new windows taken out of scope. original windoows remain. bench seating in west side of dining area removed. fixed booth seating in east side of dining area taken out of scope. original bench seating removed. seating areas to be furnished with tablesDetails
revision 202309196885- remodel storefront with new windows taken out of scope. original windoows remain. bench seating in west side of dining area removed. fixed booth seating in east side of dining area taken out of scope. original bench seating removed. seating areas to be furnished with tables | ||
| Oct 7, 2024 | Completed final sign-off Feb 2026 | 1284 Mission St | change of use from medical cannabis dispensary to retail general market. to comply with nov 202427441, 200225321 & 2024003678enf. comply with info sheet da-02 attached. remove awning; reverse security gate swingDetails
change of use from medical cannabis dispensary to retail general market. to comply with nov 202427441, 200225321 & 2024003678enf. comply with info sheet da-02 attached. remove awning; reverse security gate swing | $5,000 | |
| Oct 4, 2024 | In progress issued Feb 2025 | 65 Aerial Wy | Zarc Construction Inc | alter site permit 202209082081-s: interior remodel at 1/f - remove service stair, remove garage post, install new beam. interior remodel at 2/f - remodel kitchen and 2 bathrooms, fill in service stair flr opening and service stair door opening. other - replace all windows in (e) rough openings.Details
alter site permit 202209082081-s: interior remodel at 1/f - remove service stair, remove garage post, install new beam. interior remodel at 2/f - remodel kitchen and 2 bathrooms, fill in service stair flr opening and service stair door opening. other - replace all windows in (e) rough openings. | |
| Jul 29, 2024 | Expired or cancelled withdrawn Sep 2024 | 65 Aerial Wy | 1/f: remove (e) post and reinforce (e) beam, remove (e) garage utility stair. 2/f: remodel (3) bathrooms and kitchen, replace windows.Details
1/f: remove (e) post and reinforce (e) beam, remove (e) garage utility stair. 2/f: remodel (3) bathrooms and kitchen, replace windows. | $50,000 | |
| Jun 3, 2024 | In progress issued Jun 2024 | 601 Vallejo St | for compliance with abe program. abe 201901033808 1. replace thumb turn latch set with lever hardware. 2. adjust door closer to max. 8.5 pounds opening force or replace with new closer with max. 6 pounds opening forceDetails
for compliance with abe program. abe 201901033808 1. replace thumb turn latch set with lever hardware. 2. adjust door closer to max. 8.5 pounds opening force or replace with new closer with max. 6 pounds opening force | $2,000 | |
| May 30, 2024 | In progress filed May 2024, not yet issued | 366 Columbus Av | for compliance with the abe program. abe #201901033810 replace door hardware with ada compliant hardware, techinical infeasibility for door bell, power door operator.Details
for compliance with the abe program. abe #201901033810 replace door hardware with ada compliant hardware, techinical infeasibility for door bell, power door operator. | $2,000 | |
| May 28, 2024 | In progress filed May 2024, not yet issued | 362 Columbus Av | for compliance with the abe program #201901033814: 1)install new sign the entrance is infeasible for lift or landing. 2)install nw doorbell or itercom to alert personal of customer outside needing curbside assistance. 3)adjust closer to max. 8.5 pounds t open, or replace with a closer withDetails
for compliance with the abe program #201901033814: 1)install new sign the entrance is infeasible for lift or landing. 2)install nw doorbell or itercom to alert personal of customer outside needing curbside assistance. 3)adjust closer to max. 8.5 pounds t open, or replace with a closer with | $4,000 | |
| May 23, 2024 | In progress issued Jun 2024 | 358 Columbus Av | for compliance with the abe program - abe 201901033817. install (n) sign the entrance is infeasible for lift or landing. install (n) doorbell or intercom to alert personnel of custoemr outside needing curtside assistance. replace (e) door with (n) 36" wide in-swing door. remove doormatDetails
for compliance with the abe program - abe 201901033817. install (n) sign the entrance is infeasible for lift or landing. install (n) doorbell or intercom to alert personnel of custoemr outside needing curtside assistance. replace (e) door with (n) 36" wide in-swing door. remove doormat | $4,000 | |
| May 1, 2024 | In progress issued May 2024 | 130 Belgrave Av | North Bay Sunspace Inc. | commencement of work not started under previously approved permit 200902111893. in-kind replacement of existing 3rd floor solarium at the back of the house.Details
commencement of work not started under previously approved permit 200902111893. in-kind replacement of existing 3rd floor solarium at the back of the house. | $75,000 |
| Apr 18, 2024 | Completed final sign-off May 2024 | 4036 18th St | revision to pa# 2021-0830-7365 to show wetbar near the kitchen. note 36" electric furnace in living room. change glass guardrail to metal guardrail in living roomDetails
revision to pa# 2021-0830-7365 to show wetbar near the kitchen. note 36" electric furnace in living room. change glass guardrail to metal guardrail in living room | ||
| Apr 17, 2024 | Completed final sign-off May 2024 | 4038 18th St | revision to pa# 2021-0830-7366 to show wetbar near the kitchen. note 36" electric furnace in living room and master bedroom. change glass guardrail to metal guardrail in living roomDetails
revision to pa# 2021-0830-7366 to show wetbar near the kitchen. note 36" electric furnace in living room and master bedroom. change glass guardrail to metal guardrail in living room | ||
| Mar 22, 2024 | Completed final sign-off Aug 2024 | 130 Belgrave Av | North Bay Sunspace Inc. | revision to solarium replacement project bpa#202307142235: to ensure privacy which has been compromised by neighbor. construction of an addition with windows that have views into the owner's ome, change clear glass to reflectiive in designated solarium glazed panels, & replace designated woodDetails
revision to solarium replacement project bpa#202307142235: to ensure privacy which has been compromised by neighbor. construction of an addition with windows that have views into the owner's ome, change clear glass to reflectiive in designated solarium glazed panels, & replace designated wood | |
| Mar 13, 2024 | In progress filed Mar 2024, not yet issued | 680 08th St | Yerba Buena Builders Inc | remodel 1 exit stair: replace (e) handrails. raise tops of guards to 42" above nosings. reinstall (e) doors to swing in direction of exit travel. install contrasting color nosing strips. level & reinforce (e) bottom landing to swing in direction of exit travel. remove (e) hatch door & patch opening.Details
remodel 1 exit stair: replace (e) handrails. raise tops of guards to 42" above nosings. reinstall (e) doors to swing in direction of exit travel. install contrasting color nosing strips. level & reinforce (e) bottom landing to swing in direction of exit travel. remove (e) hatch door & patch opening. | $5,000 |
| Mar 1, 2024 | Completed final sign-off May 2024 | 62 06th St | abe compliance abe #202401269343. comply w/ accessible business entrance program. install new metal ramp at entry doorDetails
abe compliance abe #202401269343. comply w/ accessible business entrance program. install new metal ramp at entry door | $1,000 | |
| Jan 25, 2024 | In progress issued Jun 2024 | 342 Columbus Av | to comply with abe program 201901033823 replace (e) pair of doors with (n) 3'w doors and sidelight. install (n) doorbell or intercome to alert employees of person needing assistance. install (n) signage and doorbell. replace (e) door mat with (n) secured doormat. install power door operator.Details
to comply with abe program 201901033823 replace (e) pair of doors with (n) 3'w doors and sidelight. install (n) doorbell or intercome to alert employees of person needing assistance. install (n) signage and doorbell. replace (e) door mat with (n) secured doormat. install power door operator. | $2,000 | |
| Jan 25, 2024 | In progress issued Jun 2024 | 348 Columbus Av | abe 201901033818 to comply with abe program. 1)install (n) power door operator in accordance 2 with information sheet da-04. 2)adjust door closer to reduce door opening force to max 8.5 pounds. 3)replace entry door & side light and reverse swing. 4)remove floor mat.Details
abe 201901033818 to comply with abe program. 1)install (n) power door operator in accordance 2 with information sheet da-04. 2)adjust door closer to reduce door opening force to max 8.5 pounds. 3)replace entry door & side light and reverse swing. 4)remove floor mat. | $4,000 | |
| Aug 28, 2023 | Completed final sign-off May 2024 | 4038 18th St | rev to pa 202108307366: (e) wall at north elevation of decks to remain at 2/f & 3/f. new walls at east elevation of decks; (e) roof above decks to remain.Details
rev to pa 202108307366: (e) wall at north elevation of decks to remain at 2/f & 3/f. new walls at east elevation of decks; (e) roof above decks to remain. | $10,000 | |
| Aug 21, 2023 | Never finaled issued Sep 2023, no final | 377 Hayes St | Prague Property Management Inc | to comply w/accessible building entrance program/ord 51-16, abe #202206071301, remove deadbolt @bottom of door, replace deadbolt/latch w/lever type hardware operable w/aforce of 5vos max w/out requiring twisting/grasping, not more than 48"/less than 15" high, adjust door closer to operate 8.5# maxDetails
to comply w/accessible building entrance program/ord 51-16, abe #202206071301, remove deadbolt @bottom of door, replace deadbolt/latch w/lever type hardware operable w/aforce of 5vos max w/out requiring twisting/grasping, not more than 48"/less than 15" high, adjust door closer to operate 8.5# max | $1,200 |
| Aug 1, 2023 | In progress issued Dec 2023 | 2632 03rd St | Prague Property Management Inc | comply with abe 202206302185, including new lever hardware & power door operator installation on each side of door.Details
comply with abe 202206302185, including new lever hardware & power door operator installation on each side of door. | $4,000 |
| Jul 5, 2023 | Expired or cancelled cancelled Jan 2026 | 680 08th St | Yerba Buena Builders Inc | to comply with abe# 202206081338, including partial sidewalk replacement & power door operator installation. voluntary upgrade of secondary entrances, including partial sidewalk replacement & installation of a wheelchair lift.Details
to comply with abe# 202206081338, including partial sidewalk replacement & power door operator installation. voluntary upgrade of secondary entrances, including partial sidewalk replacement & installation of a wheelchair lift. | $50,000 |
| Jun 16, 2023 | Never finaled filed Jun 2023, never issued | 2414 38th Av | legalize (1) 1st fl (e) unnpermiteed dwelling unit by adding a kitchen, 1 shower, 1 closet to (e) permitted habitable space building under pa201405065021. as-builts.Details
legalize (1) 1st fl (e) unnpermiteed dwelling unit by adding a kitchen, 1 shower, 1 closet to (e) permitted habitable space building under pa201405065021. as-builts. | $5,000 | |
| Jun 8, 2023 | Expired or cancelled cancelled Jan 2026 | 5625 Geary Bl | abe #202212135605 accessible business entrance per ordinance 51-16. replace sidewalk flags to create level landing @ both sides of entry door & reduce sidewalk slope. reduce door opening force (exterior work only)Details
abe #202212135605 accessible business entrance per ordinance 51-16. replace sidewalk flags to create level landing @ both sides of entry door & reduce sidewalk slope. reduce door opening force (exterior work only) | $4,000 | |
| Jun 7, 2023 | Completed final sign-off May 2024 | 1422 Cabrillo St | O M C Construction | 2/f: convert (e) laundry room to a bathroom; extend an (e) hall; move (e) bedroom doors. 1/f: move washer and dryer into garage.Details
2/f: convert (e) laundry room to a bathroom; extend an (e) hall; move (e) bedroom doors. 1/f: move washer and dryer into garage. | $45,764 |
| May 8, 2023 | Completed final sign-off Aug 2024 | 666 37th Av | We Do Construction Inc. | construct a new bathroom in existing closet space including 11 sqft lightwell infill; remodel bathroom and add two skylight to each bathroom at 2nd floor.Details
construct a new bathroom in existing closet space including 11 sqft lightwell infill; remodel bathroom and add two skylight to each bathroom at 2nd floor. | $64,797 |
| Mar 21, 2023 | Completed final sign-off Nov 2024 | 1558 Clay St | Eg Construction Inc | create new habitable spaces in the existing utility spaces at the g/f, including a kitchenette, a wine room, a gym, a media room and a bathroom. work to include new windows and doors in existing rough openings.Details
create new habitable spaces in the existing utility spaces at the g/f, including a kitchenette, a wine room, a gym, a media room and a bathroom. work to include new windows and doors in existing rough openings. | $180,000 |
| Dec 30, 2022 | Completed final sign-off May 2024 | 430 Cortland Av | to comply w/abe ordinance 51-16, technical infeasibility or unreasonable hardship/ordinance 51-16, abe#202209083979; install (1) a door bell. 2)install a new sign.Details
to comply w/abe ordinance 51-16, technical infeasibility or unreasonable hardship/ordinance 51-16, abe#202209083979; install (1) a door bell. 2)install a new sign. | $500 | |
| Dec 16, 2022 | In progress issued Jan 2025 | 1448 Plymouth Av | Fay Construction & Restoration Inc | const n) footings @ 1st/f build a habitable rm on the open area under the 2nd fl office, plus a bedroom, bathroom & a stair up to the 2nd fl; @ the 2nd fl demo hall closet & bathroom & build 2 new bathrooms & a closet & remodel the kitchen. replace all windows w/ identical windows & insulated glass.Details
const n) footings @ 1st/f build a habitable rm on the open area under the 2nd fl office, plus a bedroom, bathroom & a stair up to the 2nd fl; @ the 2nd fl demo hall closet & bathroom & build 2 new bathrooms & a closet & remodel the kitchen. replace all windows w/ identical windows & insulated glass. | $100,000 |
| Dec 12, 2022 | Expired or cancelled cancelled Jan 2026 | 1524 20th St | sidewalk slope - unreasonable hardship attached. level landings on both sides of door - approval of technical infeasibility request attached. abe 220212085509Details
sidewalk slope - unreasonable hardship attached. level landings on both sides of door - approval of technical infeasibility request attached. abe 220212085509 | $10,000 | |
| Dec 8, 2022 | Completed final sign-off Sep 2023 | 424 Cortland Av | to comply w/abe program abe#202208052713. abe program/ord 51-16. technical infeasibility/unreasonable hardship per ordinance 51-16. install powered door operator in accordance w/dbi sheets da-04/da-05. sidewalk slope unreasonable hardship request. level landings on both sides of door.Details
to comply w/abe program abe#202208052713. abe program/ord 51-16. technical infeasibility/unreasonable hardship per ordinance 51-16. install powered door operator in accordance w/dbi sheets da-04/da-05. sidewalk slope unreasonable hardship request. level landings on both sides of door. | $10,000 | |
| Dec 17, 2021 | Expired or cancelled cancelled Jan 2026 | 20 Tingley St | construct a new 2/f bathroom within the (e) 2/f footprint including replacement of one window.Details
construct a new 2/f bathroom within the (e) 2/f footprint including replacement of one window. | $13,606 | |
| Nov 8, 2021 | Completed final sign-off Mar 2022 | 305 Chenery St | Dunros Construction | minor revision to pa 2021-0902-7727 addition of a bedroom closetDetails
minor revision to pa 2021-0902-7727 addition of a bedroom closet | $500 |
| Sep 27, 2021 | Completed final sign-off Dec 2023 | 425 Holly Park Cr | The Sustainable Cbo Inc Dba Oliver Macki | revision to bpa#201612155093 to repair rear extension only, footings, repair deteriorated framing, remove/rebuild (1) exterior stair in-kind, new 1-hour rated property line wall & guard.Details
revision to bpa#201612155093 to repair rear extension only, footings, repair deteriorated framing, remove/rebuild (1) exterior stair in-kind, new 1-hour rated property line wall & guard. | $50,000 |
| Sep 2, 2021 | Completed final sign-off Mar 2022 | 305 Chenery St | Dunros Construction | minor interior remodel projects, including new closets and new electrical fixtures.Details
minor interior remodel projects, including new closets and new electrical fixtures. | $20,000 |
| Aug 17, 2021 | Completed final sign-off Jul 2026 | 260 Theresa St | Bayview Renovation & Development, Inc., O'reilly Construction | unit legalization at grnd flr udu. demo unpermitted bathrm & stair at rear. install dr & window at rear wall. construct (n) landing, replace front bedrm window. (n) alcove at garage entry to unit. 2nd flr- (n) opening btwn kitchen & storage. remove roof deck & stair. replace (e) rear wall dr w/ wndwDetails
unit legalization at grnd flr udu. demo unpermitted bathrm & stair at rear. install dr & window at rear wall. construct (n) landing, replace front bedrm window. (n) alcove at garage entry to unit. 2nd flr- (n) opening btwn kitchen & storage. remove roof deck & stair. replace (e) rear wall dr w/ wndw | $100,000 |
| Jul 20, 2021 | Completed final sign-off Jan 2022 | 401 Upper Tr | Prague Property Management Inc | reconfigure e pantry space to 1/2 bath (water closet and vanity) new water heater. elec/mech under sep permit. no structural workDetails
reconfigure e pantry space to 1/2 bath (water closet and vanity) new water heater. elec/mech under sep permit. no structural work | $7,100 |
| Apr 2, 2021 | Completed final sign-off Jun 2022 | 4058 26th St | Douglas Gower Dba Mesa Construction | remove (e) shingle & brick siding from the front facade; restore &/or replace (e) original shiplap wood siding. replace (e) front windows w/(n) 6" taller all wood windows. install (n) porch roof at the entry, (n) decorative pediments over 3/fl windows & a (n) shingled hood over 2/fl windows.Details
remove (e) shingle & brick siding from the front facade; restore &/or replace (e) original shiplap wood siding. replace (e) front windows w/(n) 6" taller all wood windows. install (n) porch roof at the entry, (n) decorative pediments over 3/fl windows & a (n) shingled hood over 2/fl windows. | $40,000 |
| Mar 23, 2021 | Completed final sign-off Dec 2021 | 125 Elsie St | finishing of storeroom as office and laundry room. new tile/cabinets in bathroom.Details
finishing of storeroom as office and laundry room. new tile/cabinets in bathroom. | $25,000 | |
| Oct 27, 2020 | Never finaled filed Oct 2020, never issued | 3640 Folsom St | replace an (e) roof deck guardrails. replace (e) 2x decking & stair treads in kind. re-roofing; replace (e) metal windows with matching vinyl windows in (e) openings. replacement of windows are not visible from street.Details
replace an (e) roof deck guardrails. replace (e) 2x decking & stair treads in kind. re-roofing; replace (e) metal windows with matching vinyl windows in (e) openings. replacement of windows are not visible from street. | $20,000 | |
| Oct 22, 2020 | Completed final sign-off May 2021 | 338 Missouri St | Fg Force Construction Inc | all work at 3rd fl. kitchen & bathroom remodel, new windows in (e) opening, new closet doors, new lighting & electrical workDetails
all work at 3rd fl. kitchen & bathroom remodel, new windows in (e) opening, new closet doors, new lighting & electrical work | $40,000 |
| Oct 21, 2020 | Completed final sign-off Apr 2022 | 16 Carnelian Wy | Aaa Construction & Design | 1/f: convert an (e) utility room & storage to a media room & new bathroom.Details
1/f: convert an (e) utility room & storage to a media room & new bathroom. | $44,595 |
| Oct 17, 2020 | Completed final sign-off May 2021 | 4058 26th St | Douglas Gower Dba Mesa Construction | structural strengthening at the ground floor. only general repairs as needed.Details
structural strengthening at the ground floor. only general repairs as needed. | $20,000 |
| Sep 24, 2020 | Completed final sign-off Feb 2022 | 249 Jersey St | restore a kitchen, dining room and bedroom extensively damaged by a plumbing leak that rendered the home uninhabitable; add one bath; ground floor structural upgrades; replace 3 existing windows with 2 new windows.Details
restore a kitchen, dining room and bedroom extensively damaged by a plumbing leak that rendered the home uninhabitable; add one bath; ground floor structural upgrades; replace 3 existing windows with 2 new windows. | $72,845 | |
| Feb 28, 2020 | In progress issued Aug 2024 | 615 Taylor St | accessible barrier removal at front entry to comply with sf abe program. installing door actuators per plans. request for tech infeasibilityDetails
accessible barrier removal at front entry to comply with sf abe program. installing door actuators per plans. request for tech infeasibility | $2,000 | |
| Feb 21, 2020 | Expired or cancelled withdrawn Dec 2020 | 4058 26th St | replace (e) shingles and brick facade with (n) shiplap wood siding & wood trim, install (n) exterior stairs, porch & roof at entry, replace in kind (e) windows at facade with (n) wood double hung windows, add a (n) shingled hood above living room windowsDetails
replace (e) shingles and brick facade with (n) shiplap wood siding & wood trim, install (n) exterior stairs, porch & roof at entry, replace in kind (e) windows at facade with (n) wood double hung windows, add a (n) shingled hood above living room windows | $52,150 | |
| Jan 24, 2020 | Completed final sign-off Feb 2022 | 7 Littlefield Tr | Rosconn Construction | convert an extg porch to a new mudroom.Details
convert an extg porch to a new mudroom. | $12,000 |
| Nov 15, 2019 | Completed final sign-off Nov 2020 | 7 Littlefield Tr | Outline General Contractors Inc | convert an extg closet and bath to 2 new bath.Details
convert an extg closet and bath to 2 new bath. | $20,000 |
| Jul 3, 2019 | Completed final sign-off Aug 2021 | 502 Jefferson St | Bryan Michelsen Construction | repair and reinforce e boat launch apron structural components. maintenance and repair of e bcdc required improvements. all work will be in kind except as noted. ex heights and areas will remain the same.Details
repair and reinforce e boat launch apron structural components. maintenance and repair of e bcdc required improvements. all work will be in kind except as noted. ex heights and areas will remain the same. | $25,000 |
| Jun 12, 2019 | Completed final sign-off Mar 2020 | 123 Laurel St | conversion of (e) 2nd fl kitchen to a study; conversion of (e) office & nook to kitchen & breakfast room; alterations to (e) windows & exterior door; new 3rd fl closet.Details
conversion of (e) 2nd fl kitchen to a study; conversion of (e) office & nook to kitchen & breakfast room; alterations to (e) windows & exterior door; new 3rd fl closet. | $60,752 | |
| May 15, 2019 | Expired or cancelled cancelled Jan 2026 | 23 Littlefield Tr | convert an existing closet & bath to 2 new bathroomsDetails
convert an existing closet & bath to 2 new bathrooms | $20,874 | |
| Mar 19, 2019 | Completed final sign-off Apr 2021 | 3935 18th St | Hungto Co Incorporation | construct(adu) w/ 1 bedroom and 1 bath at the ground floor of the owner's home at 3935 18th st per ord# 162-16.Details
construct(adu) w/ 1 bedroom and 1 bath at the ground floor of the owner's home at 3935 18th st per ord# 162-16. | $64,880 |
| Jan 30, 2019 | Completed final sign-off Nov 2019 | 936 Esmeralda Av | (n) 1st floor master bedroom suite in (e) utility space.Details
(n) 1st floor master bedroom suite in (e) utility space. | $69,933 | |
| Jan 25, 2019 | Completed final sign-off Nov 2020 | 2708 35th Av | Diviney Construction Inc | remodel/legalize (e) ground fl family room, add a bathroom at ground fl; remodel the existing 2nd fl.Details
remodel/legalize (e) ground fl family room, add a bathroom at ground fl; remodel the existing 2nd fl. | $51,989 |
| Jan 15, 2019 | Completed final sign-off May 2019 | 379 Nevada St | Behan Construction | add additional 1 bedrooms & 1 bathrooms at staraoage area in garage area with 2 additional closets in hallway.Details
add additional 1 bedrooms & 1 bathrooms at staraoage area in garage area with 2 additional closets in hallway. | $80,000 |
| Dec 12, 2018 | Completed final sign-off Jun 2020 | 323 Church St | Jimenez Construction Sf Inc | convert an (e) closet to a bathroom, replace 2 windows in (e) openings. no change to exterior elevationDetails
convert an (e) closet to a bathroom, replace 2 windows in (e) openings. no change to exterior elevation | $15,293 |
| Jul 5, 2018 | Never finaled issued Sep 2018, no final | 511 Anderson St | remodel (e) 2nd flr bathroom. add washer/dryer in (e) closetDetails
remodel (e) 2nd flr bathroom. add washer/dryer in (e) closet | $15,862 | |
| Mar 15, 2018 | Expired or cancelled cancelled Jan 2026 | 624 Guerrero St | kitchen remodl including new openings in non-bearing wallsDetails
kitchen remodl including new openings in non-bearing walls | $30,807 | |
| Jun 5, 2017 | Completed final sign-off Oct 2017 | 2443 16th Av | H Y Construction Inc. | 1st floor - removal of service staircase. 2nd floor - removal of non-load bearing wall; enlargement of 2 interior doorways, kitchen remodel, removal of exterior service door, replacement of existing windows with clad garden windows in light wellDetails
1st floor - removal of service staircase. 2nd floor - removal of non-load bearing wall; enlargement of 2 interior doorways, kitchen remodel, removal of exterior service door, replacement of existing windows with clad garden windows in light well | $12,000 |
| Dec 21, 2016 | Completed final sign-off Apr 2019 | 240 Andover St | Golden State Marble & Granite Inc. | convert 1015 sq ft of (e) ground floor utility space into habitable space including remove the (e) rear exterior stair; construct a new interior stair to the ground floor; add a new bathroom & a bar; new windows & doors to the rear yard; install a new rear yard patioDetails
convert 1015 sq ft of (e) ground floor utility space into habitable space including remove the (e) rear exterior stair; construct a new interior stair to the ground floor; add a new bathroom & a bar; new windows & doors to the rear yard; install a new rear yard patio | $101,402 |
| Dec 15, 2016 | Never finaled issued Nov 2017, no final | 69 Winfield St | Silver Arrows Paint Restoration | repair roofs, new flooring, replace windows and skylight. replace (e) floor heater, replace exist. water heater; replace treads and risers at (e) interior stair, remodel 2nd floor including kitchen remodel. replace bathroom fixtures in kind. patch & repair facade as req'd.Details
repair roofs, new flooring, replace windows and skylight. replace (e) floor heater, replace exist. water heater; replace treads and risers at (e) interior stair, remodel 2nd floor including kitchen remodel. replace bathroom fixtures in kind. patch & repair facade as req'd. | $100,000 |
| Dec 15, 2016 | Completed final sign-off Dec 2023 | 425 Holly Park Cr | legalize the 1st floor apartment under zoning density as a 2nd unit. remodel 2nd floor kitchen & back room; (n) double-hung wood window @ front; (n) windows @ rear; general repairs throughout.Details
legalize the 1st floor apartment under zoning density as a 2nd unit. remodel 2nd floor kitchen & back room; (n) double-hung wood window @ front; (n) windows @ rear; general repairs throughout. | $86,000 | |
| Nov 21, 2016 | Completed final sign-off Feb 2018 | 2815 Franklin St | Kilrea Construction Inc. | convert the (e) 1st floor utility area to a family room including new windows & doors in the rear wall, a bathroom & a laundry room. replace rear wall siding. install new skylights in teh 2nd floor ceiling & a rated parapet next to the skylights.Details
convert the (e) 1st floor utility area to a family room including new windows & doors in the rear wall, a bathroom & a laundry room. replace rear wall siding. install new skylights in teh 2nd floor ceiling & a rated parapet next to the skylights. | $93,957 |
| Sep 13, 2016 | Completed final sign-off Jul 2018 | 119 Ripley St | Building By Design | conversion of a 635 sq ft storage space to habitable home office/play room with a new bathroom. space dedicated to unit 119.Details
conversion of a 635 sq ft storage space to habitable home office/play room with a new bathroom. space dedicated to unit 119. | $64,837 |
| Aug 10, 2016 | Never finaled issued Sep 2016, no final | 1775 Noe St | Cullen Construction & Reconstruction | window replacement, siding repairs, partial re-roofing & leake repairs at the rear of the building.Details
window replacement, siding repairs, partial re-roofing & leake repairs at the rear of the building. | $50,000 |
| Jul 8, 2016 | Completed final sign-off Nov 2016 | 1347 33rd Av | Kilrea Construction Inc. | kitchen remodel, bathroom remodel, 2bd flr bathroom addition including 11 sf of lightwell infill. replace (e) windows in walls at the 2nd flr exteriorDetails
kitchen remodel, bathroom remodel, 2bd flr bathroom addition including 11 sf of lightwell infill. replace (e) windows in walls at the 2nd flr exterior | $40,000 |
| Feb 2, 2016 | Completed final sign-off Jan 2017 | 1227 44th Av | Evb General Contractor | 585 sq. ft. remodel & 170 sq. ft. addition to an (e) 2 story bedroom wing @ the rear including a bathroom remodel. not visible from the street.Details
585 sq. ft. remodel & 170 sq. ft. addition to an (e) 2 story bedroom wing @ the rear including a bathroom remodel. not visible from the street. | $77,742 |
| Jun 29, 2015 | Completed final sign-off Nov 2015 | 650 Joost Av | revision to application 2015-0120-6083. 1. delete new concrete footings, retaining wall and steps in garage. 2. delete new kitchen skylights from original scope of work.Details
revision to application 2015-0120-6083. 1. delete new concrete footings, retaining wall and steps in garage. 2. delete new kitchen skylights from original scope of work. | ||
| Mar 25, 2015 | Completed final sign-off Jan 2016 | 4635 25th St | Rinaldi Construction | build new non-structural partitions in (e) bedrm to create a new 71 sq.ft. home office & new 61 sq.ft. bathroom & closet; remodel an existing 33 sq.ft. bathroom.Details
build new non-structural partitions in (e) bedrm to create a new 71 sq.ft. home office & new 61 sq.ft. bathroom & closet; remodel an existing 33 sq.ft. bathroom. | $30,000 |
| Feb 20, 2015 | Expired or cancelled withdrawn Aug 2015 | 2443 16th Av | interior partial demo of private residence: remove (e) rooms at the ground floor rear and the 2nf flr, remove (e) coat closet & shower fixtures, no structural alterations. no exterior alterations.no alterations to openings between conditioned & un-conditioned spacesDetails
interior partial demo of private residence: remove (e) rooms at the ground floor rear and the 2nf flr, remove (e) coat closet & shower fixtures, no structural alterations. no exterior alterations.no alterations to openings between conditioned & un-conditioned spaces | $1,000 | |
| Feb 19, 2015 | Completed final sign-off Jan 2016 | 2443 16th Av | Rinaldi Construction | 1) first floor: remove unpermitted office room, convert 736 sq ft to office bathroom, laundry room, hall and stair, new rear deck less than 3' above grade with steps down. 2) second fl: replace extg service stair with new code complying open stair to ground floor. 50 sq ft lightwell in fill.Details
1) first floor: remove unpermitted office room, convert 736 sq ft to office bathroom, laundry room, hall and stair, new rear deck less than 3' above grade with steps down. 2) second fl: replace extg service stair with new code complying open stair to ground floor. 50 sq ft lightwell in fill. | $82,855 |
| Feb 12, 2015 | Completed final sign-off Nov 2017 | 650 Joost Av | G X Construction Co | horizontal addition. 337 sq. ft. bedroom & bath addition. 51 sq. ft. stair addition. new 1 hour wall between (e) garage & stairway.Details
horizontal addition. 337 sq. ft. bedroom & bath addition. 51 sq. ft. stair addition. new 1 hour wall between (e) garage & stairway. | $46,637 |
| Jan 20, 2015 | Completed final sign-off Nov 2017 | 650 Joost Av | new concrete steps at garage level. at 2nd fl add hall. remodel 1 bath, add a bath, replace windows and exterior doors, new windows, skylights, widen openings between living and dining roomsDetails
new concrete steps at garage level. at 2nd fl add hall. remodel 1 bath, add a bath, replace windows and exterior doors, new windows, skylights, widen openings between living and dining rooms | $40,000 | |
| Jan 13, 2015 | Completed final sign-off Oct 2015 | 1356 11th Av | Terence Keenan Construction | construct new stair connecting 2nd fl dwelling with an existing legal guest room at the 1st fl. remodel existing 1st fl bath. new sliding glass door and window in the 1st fl rear wallDetails
construct new stair connecting 2nd fl dwelling with an existing legal guest room at the 1st fl. remodel existing 1st fl bath. new sliding glass door and window in the 1st fl rear wall | $40,000 |
| Jan 8, 2015 | Completed final sign-off Aug 2015 | 246 22nd Av | Fma Builders | alterations to existing exterior openings erplace existing exterior stair with new deck & stair. new powder room at 1st floor. associated sturctural work.Details
alterations to existing exterior openings erplace existing exterior stair with new deck & stair. new powder room at 1st floor. associated sturctural work. | $35,000 |
| Dec 22, 2014 | Completed final sign-off Jul 2015 | 246 22nd Av | Fma Builders | voluntary seismic upgrade @ rear wall, int t.i. work at rear of bldg including (n) furring, insulation, framing & sheating, install (n) elec fixtures.Details
voluntary seismic upgrade @ rear wall, int t.i. work at rear of bldg including (n) furring, insulation, framing & sheating, install (n) elec fixtures. | $20,000 |
| Dec 22, 2014 | Completed final sign-off Mar 2015 | 76 Stanford Heights Av | William Pattengill | remodel existing ground floor bedroom including: add 90 sq.ft. r-3 conditioned space, relocate of existing bathroom, a new rear window, move existing furnace, water heater & laundry. no expansion of existing building envelope.Details
remodel existing ground floor bedroom including: add 90 sq.ft. r-3 conditioned space, relocate of existing bathroom, a new rear window, move existing furnace, water heater & laundry. no expansion of existing building envelope. | $40,000 |
| Nov 3, 2014 | Completed final sign-off May 2015 | 2630 Chestnut St | modification to pa #2013.0909.6257: stairway & property line wall deleted from the project & deck area reduced form 87 to 77 square ft.Details
modification to pa #2013.0909.6257: stairway & property line wall deleted from the project & deck area reduced form 87 to 77 square ft. | ||
| Aug 29, 2014 | Completed final sign-off Jun 2016 | 1280 Pine St | Joseph Mannion Construction | legalization of dwelling unit installed without permit. n/a for maher ordinance.Details
legalization of dwelling unit installed without permit. n/a for maher ordinance. | $4,500 |
| Jun 9, 2014 | Completed final sign-off Jul 2015 | 246 22nd Av | Terence Keenan Construction | 1/f- replace (e) furnace, remove (e) return air enclosure, install (n) laundry closet. 2/f- (n) windows, 3/f- (n) lighting, fill in (e) 14 sq,ft, lightwell, not visible from street, remodel (e) bathroom, (n) master bath & closet. remodel area 907 sq.ft.Details
1/f- replace (e) furnace, remove (e) return air enclosure, install (n) laundry closet. 2/f- (n) windows, 3/f- (n) lighting, fill in (e) 14 sq,ft, lightwell, not visible from street, remodel (e) bathroom, (n) master bath & closet. remodel area 907 sq.ft. | $40,000 |
| Apr 10, 2014 | Completed final sign-off Jul 2014 | 75 Buena Vista East Av | Joseph Mannion Construction | 200 sf deck serving existing 9th fl penthouse apt. deck replaces original deck built with the penthouse apartments and removed without a permit. maher--compliance with ordinance no. 155-13 not required.Details
200 sf deck serving existing 9th fl penthouse apt. deck replaces original deck built with the penthouse apartments and removed without a permit. maher--compliance with ordinance no. 155-13 not required. | $6,000 |
| Mar 14, 2014 | Completed final sign-off Aug 2015 | 246 22nd Av | Terence Keenan Construction | ground floor voluntary structural upgarde. second floor kitchen remodel, relocate powder room and rwmoval of walls at second floor rear room.Details
ground floor voluntary structural upgarde. second floor kitchen remodel, relocate powder room and rwmoval of walls at second floor rear room. | $50,000 |
| Jan 13, 2014 | Completed final sign-off Nov 2015 | 4188 Cesar Chavez St | Hornor Construction | add shearwall, steel beams to enlarge kitchen/dining rm. convert (e) bedrm to living rm on 2nd fl. convert (e) window to bay window on 3rd fl. add one new bathrm & one new family room on the 1st fl. repair & remodel facade & entry. add interior stair to 1st fl. replace (e) single glazed windows.Details
add shearwall, steel beams to enlarge kitchen/dining rm. convert (e) bedrm to living rm on 2nd fl. convert (e) window to bay window on 3rd fl. add one new bathrm & one new family room on the 1st fl. repair & remodel facade & entry. add interior stair to 1st fl. replace (e) single glazed windows. | $75,000 |
| Oct 25, 2013 | Expired or cancelled cancelled Jan 2026 | 155 Clifford Tr | replace existing metal window at front with wood window in same openingDetails
replace existing metal window at front with wood window in same opening | $2,000 | |
| Oct 25, 2013 | Completed final sign-off May 2014 | 155 Clifford Tr | Kilrea Construction Inc. | kitchen remodel, bath remodel, new skylights, doors, interior openings. not visible from streetDetails
kitchen remodel, bath remodel, new skylights, doors, interior openings. not visible from street | $50,000 |
| Sep 12, 2013 | Completed final sign-off Apr 2014 | 543 Victoria St | Stephen Giorgio De Martis | kitchen remodel-remove (e) exterior stairs, window & door replacement. bathroom remodel.Details
kitchen remodel-remove (e) exterior stairs, window & door replacement. bathroom remodel. | $40,000 |
| Sep 9, 2013 | Completed final sign-off May 2015 | 2630 Chestnut St | new 87 sq ft deck 2nd fl at the rear. incl a stairway down to the rear yard & a rated property line wall & guradrail.Details
new 87 sq ft deck 2nd fl at the rear. incl a stairway down to the rear yard & a rated property line wall & guradrail. | $20,000 | |
| Jul 26, 2013 | Completed final sign-off Jan 2014 | 1 Roanoke St | Working Class Construction | replace existing steps in the rear yard, replace existing 6' rear yard fence, landscape work, replace existing furnace & water heater.Details
replace existing steps in the rear yard, replace existing 6' rear yard fence, landscape work, replace existing furnace & water heater. | $20,000 |
| Feb 19, 2013 | Completed final sign-off Jan 2016 | 871 Lawton St | Royal Lyon Construction | remodel including: new 1/f coat closet, 376 sq. ft. 2/f rear addition & deck, new interior stairway wall openings, 2/f kitchen remodel, remodel 2/f powder room. new pocket doors at 2nd floor storage room; replace (e) windows & sliding glass doors at 2nd & 3rd floor, 142 sq.ft. 3rd floor front additnDetails
remodel including: new 1/f coat closet, 376 sq. ft. 2/f rear addition & deck, new interior stairway wall openings, 2/f kitchen remodel, remodel 2/f powder room. new pocket doors at 2nd floor storage room; replace (e) windows & sliding glass doors at 2nd & 3rd floor, 142 sq.ft. 3rd floor front additn | $125,000 |