Block 0146, lot 001
609 Vallejo St
- City’s use
- Commercial Hotel
- Built
- 1908
- Stories
- 4
- Units
- 11
- Rooms
- 14 bathrooms
- Building
- 20,640 sq ft
- Lot
- 4,922 sq ft
- Zoning
- NBEACH
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
39 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 7, 2024 | Completed final sign-off Jun 2024 | 609 Vallejo St | Elux Construction Inc | for notice of violation #202420803. discuss with inspector chris francis to replace the wood panels like for like. appx 20sfDetails
for notice of violation #202420803. discuss with inspector chris francis to replace the wood panels like for like. appx 20sf | |
| Jun 3, 2024 | In progress issued Jun 2024 | 601 Vallejo St | for compliance with abe program. abe 201901033808 1. replace thumb turn latch set with lever hardware. 2. adjust door closer to max. 8.5 pounds opening force or replace with new closer with max. 6 pounds opening forceDetails
for compliance with abe program. abe 201901033808 1. replace thumb turn latch set with lever hardware. 2. adjust door closer to max. 8.5 pounds opening force or replace with new closer with max. 6 pounds opening force | $2,000 | |
| May 30, 2024 | In progress filed May 2024, not yet issued | 366 Columbus Av | for compliance with the abe program. abe #201901033810 replace door hardware with ada compliant hardware, techinical infeasibility for door bell, power door operator.Details
for compliance with the abe program. abe #201901033810 replace door hardware with ada compliant hardware, techinical infeasibility for door bell, power door operator. | $2,000 | |
| May 28, 2024 | In progress filed May 2024, not yet issued | 362 Columbus Av | for compliance with the abe program #201901033814: 1)install new sign the entrance is infeasible for lift or landing. 2)install nw doorbell or itercom to alert personal of customer outside needing curbside assistance. 3)adjust closer to max. 8.5 pounds t open, or replace with a closer withDetails
for compliance with the abe program #201901033814: 1)install new sign the entrance is infeasible for lift or landing. 2)install nw doorbell or itercom to alert personal of customer outside needing curbside assistance. 3)adjust closer to max. 8.5 pounds t open, or replace with a closer with | $4,000 | |
| May 23, 2024 | In progress issued Jun 2024 | 358 Columbus Av | for compliance with the abe program - abe 201901033817. install (n) sign the entrance is infeasible for lift or landing. install (n) doorbell or intercom to alert personnel of custoemr outside needing curtside assistance. replace (e) door with (n) 36" wide in-swing door. remove doormatDetails
for compliance with the abe program - abe 201901033817. install (n) sign the entrance is infeasible for lift or landing. install (n) doorbell or intercom to alert personnel of custoemr outside needing curtside assistance. replace (e) door with (n) 36" wide in-swing door. remove doormat | $4,000 | |
| Apr 22, 2024 | Completed final sign-off Nov 2024 | 354 Columbus Av | Performance Systems Integration Inc | all existing in unit horn will be replace with lf hornDetails
all existing in unit horn will be replace with lf horn | $39,000 |
| Jan 25, 2024 | In progress issued Jun 2024 | 342 Columbus Av | to comply with abe program 201901033823 replace (e) pair of doors with (n) 3'w doors and sidelight. install (n) doorbell or intercome to alert employees of person needing assistance. install (n) signage and doorbell. replace (e) door mat with (n) secured doormat. install power door operator.Details
to comply with abe program 201901033823 replace (e) pair of doors with (n) 3'w doors and sidelight. install (n) doorbell or intercome to alert employees of person needing assistance. install (n) signage and doorbell. replace (e) door mat with (n) secured doormat. install power door operator. | $2,000 | |
| Jan 25, 2024 | In progress issued Jun 2024 | 348 Columbus Av | abe 201901033818 to comply with abe program. 1)install (n) power door operator in accordance 2 with information sheet da-04. 2)adjust door closer to reduce door opening force to max 8.5 pounds. 3)replace entry door & side light and reverse swing. 4)remove floor mat.Details
abe 201901033818 to comply with abe program. 1)install (n) power door operator in accordance 2 with information sheet da-04. 2)adjust door closer to reduce door opening force to max 8.5 pounds. 3)replace entry door & side light and reverse swing. 4)remove floor mat. | $4,000 | |
| Jan 11, 2021 | Completed final sign-off Jan 2021 | 362 Columbus Av | cafe with japanese food. change cu to allow alcohol sales to sell beer, wine, and sake with our food. pursuant section 722 and 780.3Details
cafe with japanese food. change cu to allow alcohol sales to sell beer, wine, and sake with our food. pursuant section 722 and 780.3 | ||
| May 16, 2019 | Never finaled filed May 2019, never issued | 342 Columbus Av | add new moment frame at facade line of columbus to ground floor, comply with nov 201803421 soft story (commercialDetails
add new moment frame at facade line of columbus to ground floor, comply with nov 201803421 soft story (commercial | $50,000 | |
| May 2, 2019 | Completed final sign-off Jul 2019 | 354 Columbus Av | Performance Systems Integration Inc | retrofit upgrading fire panel, device and adding aes communicatorDetails
retrofit upgrading fire panel, device and adding aes communicator | $56,000 |
| Mar 8, 2019 | Completed final sign-off Apr 2019 | 362 Columbus Av | Performance Systems Integration Inc | ref pa# 201607263387; add 2 fire sprinkler head and relocate 3 demo heads, 11 relocateDetails
ref pa# 201607263387; add 2 fire sprinkler head and relocate 3 demo heads, 11 relocate | $6,000 |
| Feb 27, 2019 | Never finaled issued Feb 2019, no final | 354 Columbus Av | Performance Systems Integration Inc | emergency panel replacement for new fire panel is farenhyt ifp-300 ul certification #fa112528321Details
emergency panel replacement for new fire panel is farenhyt ifp-300 ul certification #fa112528321 | $56,000 |
| Feb 19, 2019 | Never finaled issued Feb 2019, no final | 362 Columbus Av | street space.Details
street space. | ||
| Dec 17, 2018 | Never finaled issued Dec 2018, no final | 362 Columbus Av | street space onlyDetails
street space only | ||
| Nov 17, 2017 | Completed final sign-off Aug 2019 | 362 Columbus Av | Block 12 Construction | t.i. tro extg restaurant including, food service, finishes, mech, elect. extg restroom to remain. replacement of extg door only. (e) windows to remain.Details
t.i. tro extg restaurant including, food service, finishes, mech, elect. extg restroom to remain. replacement of extg door only. (e) windows to remain. | $126,800 |
| Jul 26, 2016 | Completed final sign-off Aug 2019 | 362 Columbus Av | Block 12 Construction, S And L Tec Construction Co Inc | t.i. to extg food service facility with extg type 1 exhaust hood. improvements inc. new type 2 hood, food service equip., lighting, finishes. extg restroom to remain.Details
t.i. to extg food service facility with extg type 1 exhaust hood. improvements inc. new type 2 hood, food service equip., lighting, finishes. extg restroom to remain. | $82,000 |
| Dec 12, 2014 | Never finaled issued Dec 2014, no final | 348 Columbus Av | Performance Systems Integration Inc | fp as builts, change speaker temp. from 175 degree temp. to 200 degree temp. ref app#201402259274Details
fp as builts, change speaker temp. from 175 degree temp. to 200 degree temp. ref app#201402259274 | |
| Apr 3, 2014 | Completed final sign-off Jan 2015 | 354 Columbus Av | Performance Systems Integration Inc | fire sprinkler upgrade and eqb upgrade per 5 year inspection. fire sprinkler alteration.Details
fire sprinkler upgrade and eqb upgrade per 5 year inspection. fire sprinkler alteration. | $10,000 |
| Feb 25, 2014 | Never finaled issued Feb 2014, no final | 348 Columbus Av | Performance Systems Integration Inc | 1st floor and basement: fire sprinkler alteration x 25 sprinkler. ref app# 201305015887Details
1st floor and basement: fire sprinkler alteration x 25 sprinkler. ref app# 201305015887 | $10,000 |
| Feb 18, 2014 | Never finaled issued Feb 2014, no final | 362 Columbus Av | Aura Fire Safety Inc | upgrade fire system for hood and duct in the kitched area to meet ul300 standards.Details
upgrade fire system for hood and duct in the kitched area to meet ul300 standards. | $1,900 |
| Nov 26, 2013 | Never finaled issued Dec 2013, no final | 366 Columbus Av | Clear Channel Outdoor | to obtain final inspection for work approved under pa 201001154844; all work is completeDetails
to obtain final inspection for work approved under pa 201001154844; all work is complete | |
| Sep 9, 2013 | Completed final sign-off Jan 2014 | 354 Columbus Av | Connolly Bros Glass | replace existing milgard white vinyl windows with marvin wood clad windows - 83 windows. to comply nov 200669907.Details
replace existing milgard white vinyl windows with marvin wood clad windows - 83 windows. to comply nov 200669907. | $73,000 |
| Jun 24, 2013 | Never finaled issued Jun 2013, no final | 354 Columbus Av | street space & sidewalkDetails
street space & sidewalk | ||
| May 30, 2013 | Completed final sign-off Jul 2013 | 354 Columbus Av | to comply with ordinance 029-13. grab bars located at: 1st floor-1 toilet & 1 shower; 2nd floor-4 toilets & 3 showers; 3rd floor-4 toilets & 3 showers. total grab bar installation = 16.Details
to comply with ordinance 029-13. grab bars located at: 1st floor-1 toilet & 1 shower; 2nd floor-4 toilets & 3 showers; 3rd floor-4 toilets & 3 showers. total grab bar installation = 16. | $2,500 | |
| May 30, 2013 | Completed final sign-off Feb 2014 | 348 Columbus Av | revision to appl #2013.05.01.5887- removal of mezzanine, relocated wood oven, reconfigured restroom.Details
revision to appl #2013.05.01.5887- removal of mezzanine, relocated wood oven, reconfigured restroom. | $500 | |
| May 22, 2013 | Completed final sign-off Feb 2014 | 362 Columbus Av | All Food Service Installations | interior t.i. to extg: basement:storage, sinks, prep area. 1st floor: revise entrance due to ada compliance. 2nd floor:new equipment in extg kitchen. comply with nov # 200669907Details
interior t.i. to extg: basement:storage, sinks, prep area. 1st floor: revise entrance due to ada compliance. 2nd floor:new equipment in extg kitchen. comply with nov # 200669907 | $40,000 |
| May 1, 2013 | Completed final sign-off Feb 2014 | 348 Columbus Av | C E R | t.i. upgrade extg non complying restrooms to 1 fully accessible restroom. reconfigure extg kitchen.Details
t.i. upgrade extg non complying restrooms to 1 fully accessible restroom. reconfigure extg kitchen. | $40,000 |
| Apr 30, 2013 | Never finaled issued Apr 2013, no final | 348 Columbus Av | street spaceDetails
street space | ||
| Apr 9, 2013 | Completed final sign-off Feb 2014 | 348 Columbus Av | C E R | demolition of non load bearing partitions, remove restroom walls and fixture. demo only. ab-17 vacant space.Details
demolition of non load bearing partitions, remove restroom walls and fixture. demo only. ab-17 vacant space. | $1,800 |
| Apr 16, 2012 | Never finaled issued Apr 2012, no final | 354 Columbus Av | street space permitDetails
street space permit | ||
| Jan 7, 2011 | Completed final sign-off Jan 2011 | 354 Columbus Av | Bay C T Construction Inc. | reroofingDetails
reroofing | $5,000 |
| Jan 15, 2010 | Never finaled issued Mar 2011, no final | 366 Columbus Av | Clear Channel Outdoor | legalize existing sign located at 366 columbus avenue sign id orig14 per nor dated 11/23/09.Details
legalize existing sign located at 366 columbus avenue sign id orig14 per nor dated 11/23/09. | $5,000 |
| May 11, 2009 | Never finaled issued May 2009, no final | 346 Columbus Av | street space & sidewalk permit only.Details
street space & sidewalk permit only. | ||
| Jun 7, 2006 | Never finaled filed Jun 2006, never issued | 342 Columbus Av | to comply nov 200669907. replace existing alum wood windows & install white vinyl single hung / dual glazed (low e insulated glass) w/ screens u=0.38. 80 windows total.Details
to comply nov 200669907. replace existing alum wood windows & install white vinyl single hung / dual glazed (low e insulated glass) w/ screens u=0.38. 80 windows total. | $35,000 | |
| May 4, 2004 | Expired or cancelled expired Feb 2007 | 342 Columbus Av | Fire Protection Retrofit Specialist | renew expired appln #2002/10/04/8290 fire sprinklers to comply with ordinanceDetails
renew expired appln #2002/10/04/8290 fire sprinklers to comply with ordinance | |
| May 1, 2003 | Expired or cancelled expired Feb 2007 | 342 Columbus Av | Aa/Acme Locksmiths | installation of sprinkler flow monitoring system includes 1 manual pull station, 1 smoke/heat detectDetails
installation of sprinkler flow monitoring system includes 1 manual pull station, 1 smoke/heat detect | $6,287 |
| Oct 4, 2002 | Expired or cancelled expired Mar 2004 | 342 Columbus Av | Fire Protection Retrofit Specialist | to install fire sprinkler system through to comply w/0rd 172-02Details
to install fire sprinkler system through to comply w/0rd 172-02 | $60,000 |
| Mar 4, 2002 | Completed final sign-off Jan 2003 | 1249 Grant Av | seismic strengthening-seismic trigger sidewalk repairDetails
seismic strengthening-seismic trigger sidewalk repair | $75,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.