- 3 permits filed
14 permits since 2000: 7 completed, 4 in progress, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2025 | In progress issued Mar 2025 | 301 Masonic Av | rev 202412116636- as builts for orignal fire alarm onlyDetails
rev 202412116636- as builts for orignal fire alarm only | $40,000 |
| Feb 11, 2025 | In progress issued Feb 2025 | 555 Bartlett St | install new call communicator for an existing fire alarm monitoring system.Details
install new call communicator for an existing fire alarm monitoring system. | $3,153 |
| Dec 11, 2024 | In progress issued Jan 2025 | 301 Masonic Av | installion of 1 fire-like es-50 facu, 1 annunciator, 13 smoke detectors,, 6 heat detectors, 2 pull station, 1 water flow monitor module, 10 lf horns/strobes, 4 strobes, 1 ext. horn/strobe, 1 10amp power supply, 1 cellular communicator, and 1 document box, conduit, backboxes and wiring.voluntary instDetails
installion of 1 fire-like es-50 facu, 1 annunciator, 13 smoke detectors,, 6 heat detectors, 2 pull station, 1 water flow monitor module, 10 lf horns/strobes, 4 strobes, 1 ext. horn/strobe, 1 10amp power supply, 1 cellular communicator, and 1 document box, conduit, backboxes and wiring.voluntary inst | $40,000 |
| May 6, 2024 | In progress issued May 2024 | 666 Sacramento St | this is a replacement of existitng fire alarm systemDetails
this is a replacement of existitng fire alarm system | $31,885 |
| Apr 22, 2024 | Completed final sign-off Nov 2024 | 354 Columbus Av | all existing in unit horn will be replace with lf hornDetails
all existing in unit horn will be replace with lf horn | $39,000 |
| May 2, 2019 | Completed final sign-off Jul 2019 | 354 Columbus Av | retrofit upgrading fire panel, device and adding aes communicatorDetails
retrofit upgrading fire panel, device and adding aes communicator | $56,000 |
| Mar 8, 2019 | Completed final sign-off Apr 2019 | 362 Columbus Av | ref pa# 201607263387; add 2 fire sprinkler head and relocate 3 demo heads, 11 relocateDetails
ref pa# 201607263387; add 2 fire sprinkler head and relocate 3 demo heads, 11 relocate | $6,000 |
| Feb 27, 2019 | Never finaled issued Feb 2019, no final | 354 Columbus Av | emergency panel replacement for new fire panel is farenhyt ifp-300 ul certification #fa112528321Details
emergency panel replacement for new fire panel is farenhyt ifp-300 ul certification #fa112528321 | $56,000 |
| Jul 19, 2018 | Completed final sign-off Aug 2019 | 222 Parnassus Av | fire alarm system upgrade to comply with sffc 1103.7.6.1, including replacing existing initiating devices and new panel and annuciatorDetails
fire alarm system upgrade to comply with sffc 1103.7.6.1, including replacing existing initiating devices and new panel and annuciator | $15,000 |
| Mar 28, 2017 | Completed final sign-off Nov 2019 | 639 Geary St | add fire alarm modules and smoke detectors for north elevator bank modernization projectDetails
add fire alarm modules and smoke detectors for north elevator bank modernization project | $20,000 |
| Dec 12, 2014 | Never finaled issued Dec 2014, no final | 348 Columbus Av | fp as builts, change speaker temp. from 175 degree temp. to 200 degree temp. ref app#201402259274Details
fp as builts, change speaker temp. from 175 degree temp. to 200 degree temp. ref app#201402259274 | |
| Apr 3, 2014 | Completed final sign-off Jan 2015 | 354 Columbus Av | fire sprinkler upgrade and eqb upgrade per 5 year inspection. fire sprinkler alteration.Details
fire sprinkler upgrade and eqb upgrade per 5 year inspection. fire sprinkler alteration. | $10,000 |
| Feb 25, 2014 | Never finaled issued Feb 2014, no final | 348 Columbus Av | 1st floor and basement: fire sprinkler alteration x 25 sprinkler. ref app# 201305015887Details
1st floor and basement: fire sprinkler alteration x 25 sprinkler. ref app# 201305015887 | $10,000 |
| Jan 29, 2013 | Completed final sign-off Jun 2013 | 323 29th St | common area - fire alarm system replacement. facu: silent knight model 5700, ul cert. # 561908-001Details
common area - fire alarm system replacement. facu: silent knight model 5700, ul cert. # 561908-001 | $5,000 |