Evb General Contractor
- Based in
- Novato
- On San Francisco permits
- Jul 2002 to Dec 2017
- Last 24 months
- 0 permits filed
35 permits since 2000: 35 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 20, 2017 | Completed final sign-off Jul 2018 | 906 Chenery St | shoring permit for building pa #201711174220. no soil shoring required. no adjacent footings affected.Details
shoring permit for building pa #201711174220. no soil shoring required. no adjacent footings affected. | $3,500 |
| Nov 17, 2017 | Completed final sign-off Oct 2018 | 906 Chenery St | foundation replacement, lateral strengthing, partial roof framing replacement for vaulted ceiling, 2 new skylights, new roofing. interior remodel includes kitchen & bath remodel & new finishes. new sliding doors at rear, new windows at sides & rear. repair/replace as necessary off any rot-damge.Details
foundation replacement, lateral strengthing, partial roof framing replacement for vaulted ceiling, 2 new skylights, new roofing. interior remodel includes kitchen & bath remodel & new finishes. new sliding doors at rear, new windows at sides & rear. repair/replace as necessary off any rot-damge. | $95,000 |
| Mar 30, 2017 | Completed final sign-off Nov 2017 | 114 Encline Ct | gr fl remodel, stairway alteration and new deck. new gr fl rooms include 2 bedrooms, 1 1/12 baths, media rm, laundry rmDetails
gr fl remodel, stairway alteration and new deck. new gr fl rooms include 2 bedrooms, 1 1/12 baths, media rm, laundry rm | $95,000 |
| Mar 21, 2017 | Completed final sign-off Oct 2020 | 68 Agua Wy | ground floor to be developed for new bedrooms. bathrooms & office. horizontal addition to the rer, new 2nd floor wood deck & 1st floor patio, kitchen remodel.Details
ground floor to be developed for new bedrooms. bathrooms & office. horizontal addition to the rer, new 2nd floor wood deck & 1st floor patio, kitchen remodel. | $260,000 |
| Feb 17, 2017 | Completed final sign-off Apr 2017 | 1231 44th Av | (1) kitchen remodel - replace drywall, cabinets, appliances, counters. no structuralDetails
(1) kitchen remodel - replace drywall, cabinets, appliances, counters. no structural | $20,000 |
| Feb 2, 2016 | Completed final sign-off Jan 2017 | 1227 44th Av | 585 sq. ft. remodel & 170 sq. ft. addition to an (e) 2 story bedroom wing @ the rear including a bathroom remodel. not visible from the street.Details
585 sq. ft. remodel & 170 sq. ft. addition to an (e) 2 story bedroom wing @ the rear including a bathroom remodel. not visible from the street. | $77,742 |
| Oct 15, 2015 | Completed final sign-off Mar 2016 | 38 Sequoia Wy | provide new residential elevator and fire rated shaft. add new powder room at 2nd floor. other misc. remodeling items include radiant floor heating system option, re-orienting cabinets at kitchen, new stair handrails & interior door replacementsDetails
provide new residential elevator and fire rated shaft. add new powder room at 2nd floor. other misc. remodeling items include radiant floor heating system option, re-orienting cabinets at kitchen, new stair handrails & interior door replacements | $50,000 |
| Oct 11, 2012 | Completed final sign-off Sep 2015 | 555 Rockdale Dr | excavate down &extend toward rear yard to develop 1st flr rooms which include a bedrm, family rm, laundry rm and bathrm, at 2nd flr, enlarge & remodel kitchen, bathrm,& extend rear bedrms toward rear yard. add new 3rd flr which includes master bedrm suite & office & roof deck.Details
excavate down &extend toward rear yard to develop 1st flr rooms which include a bedrm, family rm, laundry rm and bathrm, at 2nd flr, enlarge & remodel kitchen, bathrm,& extend rear bedrms toward rear yard. add new 3rd flr which includes master bedrm suite & office & roof deck. | $275,000 |
| Jul 11, 2012 | Completed final sign-off Mar 2014 | 1227 44th Av | new garage & deck on top.Details
new garage & deck on top. | $65,000 |
| Aug 8, 2011 | Completed final sign-off Apr 2012 | 472 37th Av | reroofing, dryrot repair, non structural work, less than 50%, replace in kind.Details
reroofing, dryrot repair, non structural work, less than 50%, replace in kind. | $28,550 |
| Apr 27, 2011 | Completed final sign-off May 2011 | 2377 Filbert St | install new 5/8" diameter, epoxied all thread anchor bolts at 48" on center to all perimeter mudsills. install new 1/2" plywood to inside of crawl space walls fasened with 8d at 4" on edges and 12" in the field. all nails & bolts to be galvanized. anchor bolts to be embeded 7" into (e) concrete.Details
install new 5/8" diameter, epoxied all thread anchor bolts at 48" on center to all perimeter mudsills. install new 1/2" plywood to inside of crawl space walls fasened with 8d at 4" on edges and 12" in the field. all nails & bolts to be galvanized. anchor bolts to be embeded 7" into (e) concrete. | $3,500 |
| Dec 16, 2009 | Completed final sign-off Mar 2010 | 495 Collingwood St | replace 8 windows in existing openings. no change to openiongs. all work on back of the house. no work on front wall. not visible from street. replace in kind. no structural work.Details
replace 8 windows in existing openings. no change to openiongs. all work on back of the house. no work on front wall. not visible from street. replace in kind. no structural work. | $24,000 |
| Sep 15, 2009 | Completed final sign-off Feb 2010 | 812 Stanyan St | kitchen remodel interior only repalce cabinets countertops appliances and floor covering min 50% of kitchen light watts shall be of high efficiency lightsDetails
kitchen remodel interior only repalce cabinets countertops appliances and floor covering min 50% of kitchen light watts shall be of high efficiency lights | $25,000 |
| Jun 18, 2009 | Completed final sign-off Jul 2009 | 2956 22nd St | revision to permit app#200901230711 to document per district building inspector that the ceiling heigh of garage 1st floor is 6'-9" 1927 and the + - pre- 1950's bathroom at garage is 6'-9" also.Details
revision to permit app#200901230711 to document per district building inspector that the ceiling heigh of garage 1st floor is 6'-9" 1927 and the + - pre- 1950's bathroom at garage is 6'-9" also. | |
| Feb 25, 2009 | Completed final sign-off May 2009 | 188 Eureka St | revision to 200902091625. pour new concrete walls alongside existing brick foundation walls in garageDetails
revision to 200902091625. pour new concrete walls alongside existing brick foundation walls in garage | $10,000 |
| Feb 9, 2009 | Completed final sign-off May 2009 | 188 Eureka St | replace crumbling concrete retaining wall in garageDetails
replace crumbling concrete retaining wall in garage | $12,000 |
| Oct 21, 2008 | Completed final sign-off Oct 2008 | 488 17th Av | larbor/material to add foundation bolting in the garage, anchor bolts to be 5/8" diameter, spaced 32" on center. 7" embedment, min 2 bolts per pc. of lumber, all bolts, erpoxey anchored for the entire permeter of garage.Details
larbor/material to add foundation bolting in the garage, anchor bolts to be 5/8" diameter, spaced 32" on center. 7" embedment, min 2 bolts per pc. of lumber, all bolts, erpoxey anchored for the entire permeter of garage. | $1,375 |
| Aug 1, 2008 | Completed final sign-off Feb 2009 | 3966 22nd St | remove crumbling rubble and mortar retaining wall with new 8" concrete retaining wall in front yard next to sidewalk. this is a landscape wall only, not supporting any structure. height varies from 3' to 6'Details
remove crumbling rubble and mortar retaining wall with new 8" concrete retaining wall in front yard next to sidewalk. this is a landscape wall only, not supporting any structure. height varies from 3' to 6' | $14,924 |
| Aug 30, 2007 | Completed final sign-off Nov 2007 | 2261 Market St | revise foundation detail for east wall. ref. appl#200705111023Details
revise foundation detail for east wall. ref. appl#200705111023 | $16,000 |
| May 11, 2007 | Completed final sign-off Nov 2007 | 2261 Market St | replace existing brick foundation with new reinforced concrete foundation.Details
replace existing brick foundation with new reinforced concrete foundation. | $68,000 |
| Dec 7, 2006 | Completed final sign-off Feb 2007 | 2912 Van Ness Av | dry rot repair for exterior stairs. will not exceed more than 50%. at rear.Details
dry rot repair for exterior stairs. will not exceed more than 50%. at rear. | $4,000 |
| Jun 7, 2006 | Completed final sign-off Dec 2006 | 2912 Van Ness Av | revision to appl#200308121860 revise interior stair (2nd to 3rd floor)Details
revision to appl#200308121860 revise interior stair (2nd to 3rd floor) | $5,000 |
| Sep 19, 2005 | Completed final sign-off Sep 2006 | 120 Upper Tr | to comply with correction notice 200410045862 increase valuation of scope of work by $200,000.00Details
to comply with correction notice 200410045862 increase valuation of scope of work by $200,000.00 | $200,000 |
| Sep 19, 2005 | Completed final sign-off Feb 2006 | 120 Upper Tr | replace (e) entry stair & porch top match existingDetails
replace (e) entry stair & porch top match existing | $20,000 |
| May 12, 2004 | Completed final sign-off Aug 2004 | 3830 Cesar Chavez St | remove concr shingles to expose siding at front, replace 9 alum windows w/ wood/alum dbl hung,inter/Details
remove concr shingles to expose siding at front, replace 9 alum windows w/ wood/alum dbl hung,inter/ | $30,000 |
| Apr 20, 2004 | Completed final sign-off Jul 2004 | 3966 22nd St | dryrot repair, studdo replacement, front bay roofing replacement.Details
dryrot repair, studdo replacement, front bay roofing replacement. | $10,000 |
| Sep 17, 2003 | Completed final sign-off Feb 2004 | 3848 Cesar Chavez St | remove stucco fr facade.repair wood siding,dryrot,9 windows,2 posts & piers for bay window.Details
remove stucco fr facade.repair wood siding,dryrot,9 windows,2 posts & piers for bay window. | $14,000 |
| Jun 20, 2003 | Completed final sign-off Jul 2003 | 2912 Van Ness Av | steel beam modification, amendment to permit 200212274260 per planDetails
steel beam modification, amendment to permit 200212274260 per plan | $5,000 |
| Apr 17, 2003 | Completed final sign-off Jul 2003 | 2912 Van Ness Av | structural foundation revision detail 1/s2 under app 200212274260Details
structural foundation revision detail 1/s2 under app 200212274260 | $5,000 |
| Mar 17, 2003 | Completed final sign-off Mar 2004 | 2912 Van Ness Av | interior remodel for !st lfoor only - all other ongoing work under separate permitDetails
interior remodel for !st lfoor only - all other ongoing work under separate permit | $50,000 |
| Feb 10, 2003 | Completed final sign-off Mar 2003 | 2912 Van Ness Av | renew#200206138923 for final inspectionDetails
renew#200206138923 for final inspection | |
| Dec 27, 2002 | Completed final sign-off Apr 2003 | 2912 Van Ness Av | convert commercial space to residential home officeDetails
convert commercial space to residential home office | |
| Dec 27, 2002 | Completed final sign-off Mar 2004 | 2912 Van Ness Av | garage underneath in basementDetails
garage underneath in basement | $80,000 |
| Oct 7, 2002 | Completed final sign-off Mar 2003 | 2912 Van Ness Av | replace window sash and/or windows, 4 on front, 10 on side, 8 on south sideDetails
replace window sash and/or windows, 4 on front, 10 on side, 8 on south side | $8,000 |
| Jul 18, 2002 | Completed final sign-off Sep 2002 | 3974 22nd St | replace windows inclduing front of bldg.Details
replace windows inclduing front of bldg. | $15,000 |