Block 2770, lot 020
495 Collingwood St
- City’s use
- Multi-Family Residential
- Built
- 1975
- Stories
- 4
- Units
- 2
- Rooms
- 4 bedrooms, 5 bathrooms
- Building
- 4,295 sq ft
- Lot
- 1,875 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 16, 2026 | Completed final sign-off Jun 2026 | 495 Collingwood St | nov 202651106: in kind repair of (e) brick wall. adjacent to entry door and public stairs. approx. 15 lf.Details
nov 202651106: in kind repair of (e) brick wall. adjacent to entry door and public stairs. approx. 15 lf. | $8,000 | |
| May 22, 2017 | Completed final sign-off Mar 2019 | 495 Collingwood St | Keen Construction Incorporated | reconfigure 3rd floor (top unit) - relocate kitchen, plumbing and appliances. upgrade new flooring in the entry foyer and on the 3rd level. upgrade guard rail for code complianceDetails
reconfigure 3rd floor (top unit) - relocate kitchen, plumbing and appliances. upgrade new flooring in the entry foyer and on the 3rd level. upgrade guard rail for code compliance | $100,000 |
| Sep 11, 2013 | Completed final sign-off Feb 2014 | 495 Collingwood St | Keen Construction Incorporated | bathroom remodel. replace vanity, sink, toilet, shower in kind. exterior work, rot repair on balcony. facia onlyDetails
bathroom remodel. replace vanity, sink, toilet, shower in kind. exterior work, rot repair on balcony. facia only | $20,000 |
| Feb 25, 2013 | Completed final sign-off Jun 2013 | 495 Collingwood St | Keen Construction Incorporated | complete remodel of two bathrooms, no structural workDetails
complete remodel of two bathrooms, no structural work | $40,000 |
| Jul 12, 2012 | Never finaled issued Jul 2012, no final | 495 Collingwood St | street spaceDetails
street space | ||
| Jun 6, 2012 | Completed final sign-off Jul 2012 | 495 Collingwood St | Keen Construction Incorporated | replace aluminum windows (11) on front of bldg w/ aluminum clad exterior. replace front door in kind.Details
replace aluminum windows (11) on front of bldg w/ aluminum clad exterior. replace front door in kind. | $12,000 |
| Jun 15, 2011 | Completed final sign-off Aug 2011 | 495 Collingwood St | Standardconstr/Standardroof | reroofingDetails
reroofing | $14,960 |
| May 25, 2011 | Completed final sign-off Sep 2011 | 495 Collingwood St | Keen Construction Incorporated | revision to permit #201007156731. enlarge window and associated structural changes.Details
revision to permit #201007156731. enlarge window and associated structural changes. | $200 |
| Apr 4, 2011 | Expired or cancelled cancelled Jul 2011 | 495 Collingwood St | Dura Foam, Inc | reroofingDetails
reroofing | $13,000 |
| Jul 26, 2010 | Completed final sign-off Dec 2010 | 495 Collingwood St | install sero clearance direct vent gas burning fireplace into existing fireplace opening in bedroom.Details
install sero clearance direct vent gas burning fireplace into existing fireplace opening in bedroom. | $4,315 | |
| Jul 15, 2010 | Completed final sign-off Sep 2011 | 495 Collingwood St | Keen Construction Incorporated | add 3'-0" horizontal extension to (e) penthouse & extend (e) roof deck & windscreen approx 3'-8".Details
add 3'-0" horizontal extension to (e) penthouse & extend (e) roof deck & windscreen approx 3'-8". | $20,000 |
| Dec 16, 2009 | Completed final sign-off Mar 2010 | 495 Collingwood St | Evb General Contractor | replace 8 windows in existing openings. no change to openiongs. all work on back of the house. no work on front wall. not visible from street. replace in kind. no structural work.Details
replace 8 windows in existing openings. no change to openiongs. all work on back of the house. no work on front wall. not visible from street. replace in kind. no structural work. | $24,000 |
| Nov 7, 2007 | Completed final sign-off Feb 2008 | 495 Collingwood St | Bay Area Metro Builders Inc | remove/replace 3 doors and 14 windows on the south and east face of the house with like in kind. no change in size or type/location. remove/replace stucco around window at south and east side approx 50 sf. repair dry rot at balcony and replace waterproofing on balcony surfaceDetails
remove/replace 3 doors and 14 windows on the south and east face of the house with like in kind. no change in size or type/location. remove/replace stucco around window at south and east side approx 50 sf. repair dry rot at balcony and replace waterproofing on balcony surface | $35,000 |
| Dec 20, 2004 | Expired or cancelled expired Dec 2006 | 495 Collingwood St | R D Rossi And Son | pay additional fees to cover increase in scope of work for kitchen remodelDetails
pay additional fees to cover increase in scope of work for kitchen remodel | $21,500 |
| Sep 2, 2004 | Expired or cancelled expired Dec 2006 | 495 Collingwood St | R D Rossi And Son | remove and replace extg kchnDetails
remove and replace extg kchn | $8,500 |
| Aug 16, 2001 | Completed final sign-off May 2002 | 495 Collingwood St | replace extg rotted landing & stairs to side yard/add hot tub/per app #200118608Details
replace extg rotted landing & stairs to side yard/add hot tub/per app #200118608 | $14,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Keen Construction Incorporated (6), R D Rossi And Son (2), Bay Area Metro Builders Inc, Dura Foam, Inc, Evb General Contractor, Standardconstr/Standardroof
- Architects
- Cassandra Mettling-Davis (2), Sarah Willmer
- Authorized agent-otherss
- Lisa Wong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.