Back to kitchen remodel contractors
Evb General Contractor
- Based in
- Novato
- On San Francisco permits
- Jul 2002 to Dec 2017
- Last 24 months
- 0 permits filed
35 permits since 2000: 35 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 4 days from filing to permit and 249 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2017 | Completed final sign-off Oct 2018 | 906 Chenery St | foundation replacement, lateral strengthing, partial roof framing replacement for vaulted ceiling, 2 new skylights, new roofing. interior remodel includes kitchen & bath remodel & new finishes. new sliding doors at rear, new windows at sides & rear. repair/replace as necessary off any rot-damge.Details
foundation replacement, lateral strengthing, partial roof framing replacement for vaulted ceiling, 2 new skylights, new roofing. interior remodel includes kitchen & bath remodel & new finishes. new sliding doors at rear, new windows at sides & rear. repair/replace as necessary off any rot-damge. | $95,000 |
| Mar 21, 2017 | Completed final sign-off Oct 2020 | 68 Agua Wy | ground floor to be developed for new bedrooms. bathrooms & office. horizontal addition to the rer, new 2nd floor wood deck & 1st floor patio, kitchen remodel.Details
ground floor to be developed for new bedrooms. bathrooms & office. horizontal addition to the rer, new 2nd floor wood deck & 1st floor patio, kitchen remodel. | $260,000 |
| Feb 17, 2017 | Completed final sign-off Apr 2017 | 1231 44th Av | (1) kitchen remodel - replace drywall, cabinets, appliances, counters. no structuralDetails
(1) kitchen remodel - replace drywall, cabinets, appliances, counters. no structural | $20,000 |
| Oct 15, 2015 | Completed final sign-off Mar 2016 | 38 Sequoia Wy | provide new residential elevator and fire rated shaft. add new powder room at 2nd floor. other misc. remodeling items include radiant floor heating system option, re-orienting cabinets at kitchen, new stair handrails & interior door replacementsDetails
provide new residential elevator and fire rated shaft. add new powder room at 2nd floor. other misc. remodeling items include radiant floor heating system option, re-orienting cabinets at kitchen, new stair handrails & interior door replacements | $50,000 |
| Oct 11, 2012 | Completed final sign-off Sep 2015 | 555 Rockdale Dr | excavate down &extend toward rear yard to develop 1st flr rooms which include a bedrm, family rm, laundry rm and bathrm, at 2nd flr, enlarge & remodel kitchen, bathrm,& extend rear bedrms toward rear yard. add new 3rd flr which includes master bedrm suite & office & roof deck.Details
excavate down &extend toward rear yard to develop 1st flr rooms which include a bedrm, family rm, laundry rm and bathrm, at 2nd flr, enlarge & remodel kitchen, bathrm,& extend rear bedrms toward rear yard. add new 3rd flr which includes master bedrm suite & office & roof deck. | $275,000 |
| Sep 15, 2009 | Completed final sign-off Feb 2010 | 812 Stanyan St | kitchen remodel interior only repalce cabinets countertops appliances and floor covering min 50% of kitchen light watts shall be of high efficiency lightsDetails
kitchen remodel interior only repalce cabinets countertops appliances and floor covering min 50% of kitchen light watts shall be of high efficiency lights | $25,000 |