Block 5524, lot 033
119 Ripley St
- City’s use
- Multi-Family Residential
- Built
- 1981
- Stories
- 3
- Units
- 2
- Rooms
- 7 bedrooms, 7 bathrooms
- Building
- 4,526 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 9, 2018 | Never finaled issued Mar 2018, no final | 119 Ripley St | Bay Alarm Company | install dedicated function sprinkler monitoring system. sprinkler permit under pa 2017-0605-845, bldg pa 2016-0913-7586Details
install dedicated function sprinkler monitoring system. sprinkler permit under pa 2017-0605-845, bldg pa 2016-0913-7586 | $2,495 |
| Dec 11, 2017 | Never finaled issued Dec 2017, no final | 119 Ripley St | street spaceDetails
street space | ||
| Jun 5, 2017 | Completed final sign-off Mar 2018 | 119 Ripley St | Superior Plumbing & Fire Protection | install new fire sprinkler system at 1st fl bottom level, staircase and 2" undeground fire service. ref: #201609137586Details
install new fire sprinkler system at 1st fl bottom level, staircase and 2" undeground fire service. ref: #201609137586 | $3,000 |
| Sep 13, 2016 | Completed final sign-off Jul 2018 | 119 Ripley St | Building By Design | conversion of a 635 sq ft storage space to habitable home office/play room with a new bathroom. space dedicated to unit 119.Details
conversion of a 635 sq ft storage space to habitable home office/play room with a new bathroom. space dedicated to unit 119. | $64,837 |
| Jan 14, 2014 | Never finaled issued Jan 2014, no final | 119 Ripley St | replace existing bath tub (except toilets) in 2 bathrooms, retile floors and paint walls, replace 1 batht tub/shower, 1 shower stall, 2 sinks, all will be in their original locations, all work done by ownerDetails
replace existing bath tub (except toilets) in 2 bathrooms, retile floors and paint walls, replace 1 batht tub/shower, 1 shower stall, 2 sinks, all will be in their original locations, all work done by owner | $10,000 | |
| Sep 20, 2010 | Completed final sign-off Oct 2010 | 119 Ripley St | Armstrong Installation Service | rim joist replacements on bay windows, sister existing joists, replace window framing in kind. like for like, min 2"x10" or match existing floor joist w/161 @ 12" top and bottom.Details
rim joist replacements on bay windows, sister existing joists, replace window framing in kind. like for like, min 2"x10" or match existing floor joist w/161 @ 12" top and bottom. | $1,500 |
| Sep 8, 2010 | Completed final sign-off Oct 2010 | 119 Ripley St | Armstrong Installation Service | dry rot repair, replace wood trim (1"x4", etc) and plywood, in kind, 200 sq.ft. at frontDetails
dry rot repair, replace wood trim (1"x4", etc) and plywood, in kind, 200 sq.ft. at front | $2,600 |
| Dec 29, 2008 | Completed final sign-off Feb 2009 | 119 Ripley St | Armstrong Installation Service | reroofingDetails
reroofing | $18,000 |
| Sep 20, 2000 | Expired or cancelled expired Dec 2001 | 119 Ripley St | reroofingDetails
reroofing | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Armstrong Installation Service (3), Bay Alarm Company, Building By Design, Superior Plumbing & Fire Protection
- Architects
- Edward Lee Hammack
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.