David Owen Crestfield
- License
- C50629
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C50629 at the Board for Professional Engineers
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Triangle Engineering
- Based in
- San Francisco
- On San Francisco permits
- Jul 2003 to Nov 2025
121 permits since 2000 (engineer on 104 permits, architect on 11 permits, authorized agent-others on 6 permits, designer on 2 permits): 94 completed, 2 in progress, 12 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Amone Corp (14), Mulhall Construction Inc. (11), F D C Construction Inc (7), S M Construction And Assoc (4), Donald Lewis Gen. Contr.Inc. (3), Angotti & Reilly Inc. (2), Arana Group, Inc. (2), Associated Builders (2), Castle Construction (2), Hennessy Construciton (2), Ncr Construction Inc (2), Planart Construction Corp (2), Singha Construction Inc (2), Alpha Construction Co *Stop Issusing*, Cook Construction, Daniels Development Group Inc, Forney Construction, Guilfoyle Construction, Hammerhouse Construction, Handy Construction Team Inc, Karl Marcrae Consulting, Mrcc, Olexo Construction Company, R C Construction, Ryan Construction, Saint Lazarus General Construction, The G B Group Inc., Unicon Construction Solutions Llc
- Architects
- Brent Martin (4), Daniel Perez (4), Steven Suzuki (4), Zahary Nathan (2), Ashley Wallace, Harry Wong, Jeff Gard, Lawrence Schadt, Lisa Gelfand, Mark Jensen, Michelle Sullivan, R.Thomas Jones, Robert Michael Olexo
- Engineers
- Bruce Douglas (4), Rosanna Lerma (4), Meng Hsiu Chen
Most recent permits
Showing the 100 most recent of 121.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 18, 2025 | In progress filed Nov 2025, not yet issued | 101 Gough St | rehabilitation of 21 (e) units & provide 2 new dwelling units including new bathrooms & kitchens.provide new accessible entry and lobby, new finishes throughout, new hvac, plumbing system, electrical system and structural upgrades.Details
rehabilitation of 21 (e) units & provide 2 new dwelling units including new bathrooms & kitchens.provide new accessible entry and lobby, new finishes throughout, new hvac, plumbing system, electrical system and structural upgrades. | $9,300,000 | |
| Jul 18, 2025 | Completed final sign-off Nov 2025 | 657 Clay St | Amone Corp | 2/f: voluntary seismic wall ties at 2/f lightwells.Details
2/f: voluntary seismic wall ties at 2/f lightwells. | $45,000 |
| Feb 25, 2025 | In progress filed Feb 2025, not yet issued | 190 Park St | voluntary basement seismic retrofit at front building per cebc appendix ch a4Details
voluntary basement seismic retrofit at front building per cebc appendix ch a4 | $65,000 | |
| Feb 24, 2025 | Completed final sign-off Nov 2025 | 657 Clay St | Amone Corp | revision to pa 202404190348 to add wall ties to remaining half of 2nd fl. structural revision onlyDetails
revision to pa 202404190348 to add wall ties to remaining half of 2nd fl. structural revision only | $25,000 |
| Aug 9, 2024 | Completed final sign-off Feb 2026 | 593 Banks St | R C Construction | retain (e) foundation & concrete slab & add (n) short cross wall foundation @ (n) garage door grade beam & 2 (n) shear wall. above (e) garage utility rm & middle bedrm add 2nd story include (n) stair to 2nd story, 2 bedrms,1 bath & 2 decks.covert gas to electrical: ev charger, cooktop,hp hvac.Details
retain (e) foundation & concrete slab & add (n) short cross wall foundation @ (n) garage door grade beam & 2 (n) shear wall. above (e) garage utility rm & middle bedrm add 2nd story include (n) stair to 2nd story, 2 bedrms,1 bath & 2 decks.covert gas to electrical: ev charger, cooktop,hp hvac. | $200,000 |
| Jul 26, 2024 | Completed final sign-off Sep 2026 | 85 Mirabel Av | Planart Construction Corp | revision to bpa# 202303103513: remove the new stair connection north of gird line a from the scope of work. the rest of the project is as proposed per original project.Details
revision to bpa# 202303103513: remove the new stair connection north of gird line a from the scope of work. the rest of the project is as proposed per original project. | |
| Apr 19, 2024 | Completed final sign-off Nov 2025 | 657 Clay St | Amone Corp | scope:repair & normal maintenance for in kind replacement of appliances & finishes, providing a utility sink, insulating extg hot water laterals, mech. repairs & hallway ventilation, in kind lighting fixutres & receptacles, new flooring, interior painting, in kind window replacement,Details
scope:repair & normal maintenance for in kind replacement of appliances & finishes, providing a utility sink, insulating extg hot water laterals, mech. repairs & hallway ventilation, in kind lighting fixutres & receptacles, new flooring, interior painting, in kind window replacement, | $2,500,000 |
| Jan 24, 2024 | Expired or cancelled expired Sep 2026 | 2852 22nd St | Olexo Construction Company | lower garge level slab 12" replace perimeter foundation (81') 50% partial voluntary seismic strengtheningDetails
lower garge level slab 12" replace perimeter foundation (81') 50% partial voluntary seismic strengthening | $40,000 |
| Dec 6, 2023 | Completed final sign-off Aug 2024 | 665 Clay St | Amone Corp | revision to pa# 201910255615, changes ae: installation of tie beam to ground floor along commerical st, new concrete columns need to extend down about 20" more, relocation of auxiliary support steel column to align w/ pilaster below.Details
revision to pa# 201910255615, changes ae: installation of tie beam to ground floor along commerical st, new concrete columns need to extend down about 20" more, relocation of auxiliary support steel column to align w/ pilaster below. | $10,000 |
| Aug 16, 2023 | Completed final sign-off Feb 2024 | 1175 Oakdale Av | Mulhall Construction Inc. | work on 6 unit bldg (1183-1187 oakdale): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement onlyDetails
work on 6 unit bldg (1183-1187 oakdale): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement only | $75,000 |
| Aug 16, 2023 | Completed final sign-off Feb 2024 | 766 Kirkwood Av | Mulhall Construction Inc. | work on 10 unit bldg (778-782 kirkwood): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement onlyDetails
work on 10 unit bldg (778-782 kirkwood): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement only | $75,000 |
| Aug 16, 2023 | Completed final sign-off Mar 2024 | 1065 Oakdale Av | Mulhall Construction Inc. | work on 7 unit bldg (1071-1077 oakdale): mandatory soft-story retrofit to foundation/basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement onlyDetails
work on 7 unit bldg (1071-1077 oakdale): mandatory soft-story retrofit to foundation/basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement only | $75,000 |
| Aug 16, 2023 | Completed final sign-off Feb 2024 | 784 Kirkwood Av | Mulhall Construction Inc. | work on 10 unit bldg (788-792 kirkwood): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement onlyDetails
work on 10 unit bldg (788-792 kirkwood): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement only | $75,000 |
| Aug 16, 2023 | Completed final sign-off Mar 2024 | 1130 Palou Av | Mulhall Construction Inc. | work on 10 unit bldg (1148-1152 palou): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement onlyDetails
work on 10 unit bldg (1148-1152 palou): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement only | $75,000 |
| Aug 15, 2023 | Completed final sign-off Mar 2024 | 1056 Palou Av | Mulhall Construction Inc. | 1064-1068 palou/10-unit building: mandatory soft story retrofit, foundation/basement level based on calif (e) building code appendix a-4. crawl space/basement level only.Details
1064-1068 palou/10-unit building: mandatory soft story retrofit, foundation/basement level based on calif (e) building code appendix a-4. crawl space/basement level only. | $75,000 |
| Aug 15, 2023 | Completed final sign-off Feb 2024 | 734 Kirkwood Av | Mulhall Construction Inc. | 742-752 kirkwood/10-unit building: mandatory soft story retrofit, foundation/basement level based on calif (e) building code appendix a-4. crawl space/basement level only.Details
742-752 kirkwood/10-unit building: mandatory soft story retrofit, foundation/basement level based on calif (e) building code appendix a-4. crawl space/basement level only. | $75,000 |
| Aug 11, 2023 | Completed final sign-off Apr 2024 | 1013 Oakdale Av | Mulhall Construction Inc. | work is in 10-unit building at 1013-1017 oakdale. mandatory soft-story retrofit to the foundation/basement level. based on the california existing building code appendix a-4. work limited to the crawl space/basement level only.Details
work is in 10-unit building at 1013-1017 oakdale. mandatory soft-story retrofit to the foundation/basement level. based on the california existing building code appendix a-4. work limited to the crawl space/basement level only. | $75,000 |
| Aug 11, 2023 | Completed final sign-off Mar 2024 | 1163 Oakdale Av | Mulhall Construction Inc. | work is only for 10-unit building (1163-1167 oakdale): mandatory soft-story retrofit to foundation/ basement level. ca bldg code appendix a-4. work limit to crawl space/basement level onlyDetails
work is only for 10-unit building (1163-1167 oakdale): mandatory soft-story retrofit to foundation/ basement level. ca bldg code appendix a-4. work limit to crawl space/basement level only | $75,000 |
| Jun 29, 2023 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | add a residential laundry room, adjacent to lounge, for sro tenants of the building on the upper floors of the 5-story building. lounge was permitted under pa# 202204142240.Details
add a residential laundry room, adjacent to lounge, for sro tenants of the building on the upper floors of the 5-story building. lounge was permitted under pa# 202204142240. | $129,500 |
| Jun 29, 2023 | Completed final sign-off Mar 2024 | 1001 Powell St | Amone Corp | owner improvement of 1001 powell includes replacing e restroom with accessible single occupancy restroom,replacement of wall and floor finishes,replacement e light fixtures,power at laundromat,mech rm, storage. accessible entrance provided under 202202228422Details
owner improvement of 1001 powell includes replacing e restroom with accessible single occupancy restroom,replacement of wall and floor finishes,replacement e light fixtures,power at laundromat,mech rm, storage. accessible entrance provided under 202202228422 | $170,000 |
| Apr 13, 2023 | Never finaled issued Apr 2023, no final | 121 Randall St | Mrcc | revision to pa 2022-1228-9224 to voluntarily add shearwall on line a6 and d at garage level; change rear stair foundation detailDetails
revision to pa 2022-1228-9224 to voluntarily add shearwall on line a6 and d at garage level; change rear stair foundation detail | $200 |
| Mar 10, 2023 | Completed final sign-off Sep 2026 | 85 Mirabel Av | Planart Construction Corp | addition consists of bay windows over sidewalk. widened garage door, new entry, roof deck on 3rd flr facing rear yard. new firewall @ new stair & deck. new hardscape deck @ rear. new stair connection to rear yard terraces & stairs.Details
addition consists of bay windows over sidewalk. widened garage door, new entry, roof deck on 3rd flr facing rear yard. new firewall @ new stair & deck. new hardscape deck @ rear. new stair connection to rear yard terraces & stairs. | $600,000 |
| Oct 13, 2022 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | partial replacement of footings to correct conditions found during construction under permit #202204142240Details
partial replacement of footings to correct conditions found during construction under permit #202204142240 | $10,000 |
| Jul 25, 2022 | Completed final sign-off Jun 2024 | 681 12th Av | Hammerhouse Construction | revision to bpa# 202110291470. incorporating structural sketches based on existing conditions; foundation cap, stairs support, rear wall ties.Details
revision to bpa# 202110291470. incorporating structural sketches based on existing conditions; foundation cap, stairs support, rear wall ties. | $20,000 |
| Apr 14, 2022 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | to comply with nov#201803424.replace entries.former residential lobby will become sro manager office.reconfigure entry.warp sidewalk to provide landing.add ramp in the office for accessibility.modify(e)storage areas to a trash room, lounge & restroom.mep improvements.infill vault&cover at sidewalkDetails
to comply with nov#201803424.replace entries.former residential lobby will become sro manager office.reconfigure entry.warp sidewalk to provide landing.add ramp in the office for accessibility.modify(e)storage areas to a trash room, lounge & restroom.mep improvements.infill vault&cover at sidewalk | $150,000 |
| Feb 25, 2022 | Completed final sign-off Feb 2024 | 768 Jerrold Av | Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d engineering criteria cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria cebc appendix a-4. | $75,000 |
| Feb 25, 2022 | Completed final sign-off Jan 2024 | 1900 Green St | Cook Construction | exterior: replace vinyl windows with wood. front yard landscaping + fence. interior: convert garage to laundry. remove walls in kitchen. remodel basement, 1st fl & partial 2nd fl. remove brick fireplaces.Details
exterior: replace vinyl windows with wood. front yard landscaping + fence. interior: convert garage to laundry. remove walls in kitchen. remodel basement, 1st fl & partial 2nd fl. remove brick fireplaces. | $1,200,000 |
| Feb 22, 2022 | Completed final sign-off Apr 2024 | 123 Edgewood Av | The G B Group Inc. | replacement of retaining wall in front yard in same location and height 3'6" max retained height. revision to add bin pad next to garage with 4'9" max retained height with braced walls.Details
replacement of retaining wall in front yard in same location and height 3'6" max retained height. revision to add bin pad next to garage with 4'9" max retained height with braced walls. | $20,000 |
| Feb 11, 2022 | Never finaled filed Feb 2022, never issued | 2040 O'farrell St | barrier removal at building entry-path of travel. provide new ada compliant ramp/walkway from sidewalk to main entry; powered door opener/actuator at entry door.Details
barrier removal at building entry-path of travel. provide new ada compliant ramp/walkway from sidewalk to main entry; powered door opener/actuator at entry door. | $45,000 | |
| Feb 11, 2022 | Never finaled filed Feb 2022, never issued | 2060 Ofarrell St | barrier removal at building entry-paath of travel. provide new ada compliant ramp/walkway from sidewalk to main entry; powered door opener/actuator at entry door.Details
barrier removal at building entry-paath of travel. provide new ada compliant ramp/walkway from sidewalk to main entry; powered door opener/actuator at entry door. | $45,000 | |
| Sep 30, 2021 | Completed final sign-off Nov 2023 | 937 Clay St | Amone Corp | add waste/recycling chute sys & trash rm within the bldg, reconfig of kitchens incl instal new exhaust sys, repl of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom unit. 2 new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferredDetails
add waste/recycling chute sys & trash rm within the bldg, reconfig of kitchens incl instal new exhaust sys, repl of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom unit. 2 new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferred | $400,000 |
| Aug 13, 2021 | Completed final sign-off May 2024 | 834 Jones St | Forney Construction | new roof deck (500 sf)Details
new roof deck (500 sf) | $55,000 |
| Jul 2, 2021 | Never finaled issued Jul 2021, no final | 1785 San Jose Av | Unicon Construction Solutions Llc | revision to pa 2019-0205-2082 s1 - add hot tub @ deck, widen stair from deck to grade and add gas heaters @ deckDetails
revision to pa 2019-0205-2082 s1 - add hot tub @ deck, widen stair from deck to grade and add gas heaters @ deck | $4,500 |
| Jan 13, 2021 | Never finaled issued Feb 2022, no final | 121 Randall St | removal of (e) interior walls, doors & fixtures to accommodate an in-kind kitchen remodel. exterior stair & landing connecting 1st fl to rear yard, expansion of (e) window opening to create doorway at rear facade & west side sunroom. revised window openings at west lightwell & 1st fl rear facade.Details
removal of (e) interior walls, doors & fixtures to accommodate an in-kind kitchen remodel. exterior stair & landing connecting 1st fl to rear yard, expansion of (e) window opening to create doorway at rear facade & west side sunroom. revised window openings at west lightwell & 1st fl rear facade. | $75,000 | |
| Oct 19, 2020 | Completed final sign-off Feb 2022 | 800 Clement St | Amone Corp | voluntary lateral strengthening and associated repairs to floor in area of seismic work. also accessibility per 20% rule.Details
voluntary lateral strengthening and associated repairs to floor in area of seismic work. also accessibility per 20% rule. | $25,000 |
| May 11, 2020 | Completed final sign-off Oct 2021 | 1535 Jackson St | Amone Corp | revision to permit application number 2019-1114-7307 for mandatory soft story retrofit using cebc appendix a-4. revision includes changes based field conditions and eliminates two shear lines for value engineering.Details
revision to permit application number 2019-1114-7307 for mandatory soft story retrofit using cebc appendix a-4. revision includes changes based field conditions and eliminates two shear lines for value engineering. | |
| Feb 25, 2020 | Expired or cancelled expired Oct 2022 | 1201 Powell St | Amone Corp | mandatory soft story retrofit of gr fl and basement based on 2019 cebc appendix ch a4. includes accesibility improvments to commercial entry. automatic door. comply with nov 201803426Details
mandatory soft story retrofit of gr fl and basement based on 2019 cebc appendix ch a4. includes accesibility improvments to commercial entry. automatic door. comply with nov 201803426 | $40,000 |
| Feb 25, 2020 | Completed final sign-off Oct 2022 | 1201 Powell St | Amone Corp | mandatory soft story retrofit of gr fl basement based on 2019 cebc appendix chapter a4. comply with nov 201803429Details
mandatory soft story retrofit of gr fl basement based on 2019 cebc appendix chapter a4. comply with nov 201803429 | $200,000 |
| Nov 19, 2019 | Completed final sign-off Apr 2020 | 253 Mullen Av | repair rear stairs and dedk in kind, less than 50%Details
repair rear stairs and dedk in kind, less than 50% | $10,000 | |
| Oct 25, 2019 | Completed final sign-off Sep 2024 | 665 Clay St | install grd.flr.concrete moment frame on rear wall(commercial)to complete mandatory unreinforced masonry bldg.retrofit under pa2005-0127-4099 & associated connections. design per sfbc 4a&4b.correct bolts w/irregularities,& acessibility upgrade.Details
install grd.flr.concrete moment frame on rear wall(commercial)to complete mandatory unreinforced masonry bldg.retrofit under pa2005-0127-4099 & associated connections. design per sfbc 4a&4b.correct bolts w/irregularities,& acessibility upgrade. | $25,000 | |
| Sep 9, 2019 | Expired or cancelled cancelled Jan 2026 | 255 Mullen Av | Handy Construction Team Inc | rebuild existing rear roof deck in kind | $20,000 |
| Jun 7, 2019 | Completed final sign-off Sep 2019 | 925 Guerrero St | Singha Construction Inc | revision to app#201611021725 for soft story retrofit. this revision reverts to the extg rear window configuration and changes one shearwall to consolidate the sorage, plus incorporating minor repairs and conditions uncovered during construction.Details
revision to app#201611021725 for soft story retrofit. this revision reverts to the extg rear window configuration and changes one shearwall to consolidate the sorage, plus incorporating minor repairs and conditions uncovered during construction. | |
| Jun 5, 2019 | Completed final sign-off Feb 2020 | 462 Green St | F D C Construction Inc | structural alterations associaged with new adu unit (submitted under sep permit) including lowering slab 6" raise stair landing for headroom, provide framing for larger window, provide subsurface drainage, (adu/soft story sep permit)Details
structural alterations associaged with new adu unit (submitted under sep permit) including lowering slab 6" raise stair landing for headroom, provide framing for larger window, provide subsurface drainage, (adu/soft story sep permit) | $15,000 |
| Apr 17, 2019 | Completed final sign-off Jul 2019 | 462 Green St | F D C Construction Inc | minor alterations & repairs to ground floor (basement). work includes in kind replacement of stairs from basement to 1st fl; exit deck repairs, shifting of passageway door to provide clearance and slab replacement.Details
minor alterations & repairs to ground floor (basement). work includes in kind replacement of stairs from basement to 1st fl; exit deck repairs, shifting of passageway door to provide clearance and slab replacement. | $25,000 |
| Apr 15, 2019 | Completed final sign-off Jan 2020 | 1034 Clay St | voluntary partial soft story retrofit per sfbc chapter 4d unsing the 2016 cbc appx a4. work limited to basement floor onlyDetails
voluntary partial soft story retrofit per sfbc chapter 4d unsing the 2016 cbc appx a4. work limited to basement floor only | $50,000 | |
| Apr 15, 2019 | Completed final sign-off Feb 2020 | 462 Green St | F D C Construction Inc | mandatory soft story retrofit using 2016 cbc appx a4 (not on soft story list) work limited to gnd flr only. projects includes coordination with new adu 201903195622, plus some foundation capping, rot repair and in kind replacement of stairs from basement to 1st flrDetails
mandatory soft story retrofit using 2016 cbc appx a4 (not on soft story list) work limited to gnd flr only. projects includes coordination with new adu 201903195622, plus some foundation capping, rot repair and in kind replacement of stairs from basement to 1st flr | $80,000 |
| Feb 5, 2019 | Completed final sign-off Nov 2021 | 70 Belcher St | S M Construction And Assoc | 70 & 72a: voluntary seismic improvements to cripple walls (bolting & bracing); 47' footing cap on south side. work limited to crawl-space level only.Details
70 & 72a: voluntary seismic improvements to cripple walls (bolting & bracing); 47' footing cap on south side. work limited to crawl-space level only. | $20,000 |
| Feb 5, 2019 | Never finaled issued Apr 2019, no final | 72 Belcher St | S M Construction And Assoc | 72b & 72c: voluntary seismic improvements to cripple walls (bolting & bracing); replacement of 28' of footing at rer. repair & replace 125 sf of deteriorated floor at rear. work limited to crawl-space level only (including joists)Details
72b & 72c: voluntary seismic improvements to cripple walls (bolting & bracing); replacement of 28' of footing at rer. repair & replace 125 sf of deteriorated floor at rear. work limited to crawl-space level only (including joists) | $25,000 |
| Dec 28, 2018 | Completed final sign-off Oct 2019 | 72 Belcher St | S M Construction And Assoc | (rear) 72b-72c belcher st:preparation/repairs in construction w/seismic soft story work under sep permit. removal on non compliant rear shed addition at back bld, patio, roofing repairs, unit 72b & 72cDetails
(rear) 72b-72c belcher st:preparation/repairs in construction w/seismic soft story work under sep permit. removal on non compliant rear shed addition at back bld, patio, roofing repairs, unit 72b & 72c | $40,000 |
| Nov 5, 2018 | Completed final sign-off Jul 2019 | 534 Broadway | Amone Corp | foundation cap at north west side to correct wood near or below grade (180')Details
foundation cap at north west side to correct wood near or below grade (180') | $45,000 |
| Sep 6, 2018 | Completed final sign-off Aug 2020 | 1785 San Jose Av | Alpha Construction Co *Stop Issusing* | interior remodel and legalizing of first flr bedroom, master bath and walk-in closets, voluntary seismic retrofit at first flrDetails
interior remodel and legalizing of first flr bedroom, master bath and walk-in closets, voluntary seismic retrofit at first flr | $97,000 |
| Aug 30, 2018 | Never finaled issued Sep 2018, no final | 30 Ramona Av | Mulhall Construction Inc. | mandatory soft story retrofit per sfbc chapter 34b, using 2016 cebc appendix a4, work limited to gr fl iDetails
mandatory soft story retrofit per sfbc chapter 34b, using 2016 cebc appendix a4, work limited to gr fl i | $75,000 |
| Aug 30, 2018 | Completed final sign-off Dec 2018 | 524 28th St | Saint Lazarus General Construction | cripple wall bracing, partial foundation replacement 60 ft work limited to basement/crawl space onlyDetails
cripple wall bracing, partial foundation replacement 60 ft work limited to basement/crawl space only | $40,000 |
| Jul 27, 2018 | Completed final sign-off Jan 2022 | 70 Belcher St | S M Construction And Assoc | preparation/repairs in construction w/seismic soft story work under sep permit. removal on non-compliant rear shed addition at back bld, patio, roofing repairs, commmunication unit improvements at fron bld unit 72aDetails
preparation/repairs in construction w/seismic soft story work under sep permit. removal on non-compliant rear shed addition at back bld, patio, roofing repairs, commmunication unit improvements at fron bld unit 72a | $40,000 |
| Dec 13, 2017 | Completed final sign-off Jan 2020 | 18 Saturn St | replacement in kind of front stairs & railing. stairs are primary entrance to house. install fence in front yard. (e) deck & supports to remain.Details
replacement in kind of front stairs & railing. stairs are primary entrance to house. install fence in front yard. (e) deck & supports to remain. | $15,000 | |
| Nov 2, 2017 | Expired or cancelled expired Feb 2023 | 568 Natoma St | Arana Group, Inc. | mandatory soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maherDetails
mandatory soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher | $75,000 |
| Aug 21, 2017 | Completed final sign-off Dec 2019 | 2030 Taraval St | Angotti & Reilly Inc. | commericial area: no work in commercial area:mandatory soft-story retrofit using 2016 cebc appendix 4. work limited to ground floor only. no work in commercial storefront.new moment frame to be installed outside storefront and rear ground floor.windows to be replaced to provide more sheerall length.Details
commericial area: no work in commercial area:mandatory soft-story retrofit using 2016 cebc appendix 4. work limited to ground floor only. no work in commercial storefront.new moment frame to be installed outside storefront and rear ground floor.windows to be replaced to provide more sheerall length. | $8,100 |
| Aug 21, 2017 | Completed final sign-off Dec 2019 | 2028 Taraval St | Angotti & Reilly Inc. | residential area only: mandatory soft-story retrofit using 2016 cebc appendix 4. work limited to ground floor only. no work in commercial storefront. new moment frame to be installed outside storefront and rear ground floor. windows to be replaced to provide more sheerall length.Details
residential area only: mandatory soft-story retrofit using 2016 cebc appendix 4. work limited to ground floor only. no work in commercial storefront. new moment frame to be installed outside storefront and rear ground floor. windows to be replaced to provide more sheerall length. | $81,900 |
| Aug 21, 2017 | Completed final sign-off Aug 2019 | 1376 Church St | Ryan Construction | mandatory soft-story retrofit per sfebc chapter 4d cebc append 4.2016 cebc appendix a all work is on the g/f. no exterior changes.Details
mandatory soft-story retrofit per sfebc chapter 4d cebc append 4.2016 cebc appendix a all work is on the g/f. no exterior changes. | $100,000 |
| Aug 9, 2017 | Completed final sign-off Oct 2018 | 1427 Larkin St | mandatory soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a for maher.Details
mandatory soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a for maher. | $75,000 | |
| Dec 30, 2016 | Completed final sign-off Jul 2018 | 568 Natoma St | Arana Group, Inc. | repair improvements to grnd flr bld and ada improvements to unit and path of travel at grnd flr. roof replacement, exterior repairs, repair/in-kind replacement of fixtures & cabintry at upper units, minor mep as neccessary- under sep permit maher naDetails
repair improvements to grnd flr bld and ada improvements to unit and path of travel at grnd flr. roof replacement, exterior repairs, repair/in-kind replacement of fixtures & cabintry at upper units, minor mep as neccessary- under sep permit maher na | $160,000 |
| Dec 30, 2016 | Completed final sign-off Dec 2019 | 1370 California St | Ncr Construction Inc | minor revisions to app. 2016-0914-7740, soft story retrofit to coordinate with proposed architectural changes. plywood shearwalls instead of strong wall panels in 3 lines & added shear walls. see also 2017-0113-7196.Details
minor revisions to app. 2016-0914-7740, soft story retrofit to coordinate with proposed architectural changes. plywood shearwalls instead of strong wall panels in 3 lines & added shear walls. see also 2017-0113-7196. | $1,000 |
| Dec 21, 2016 | Completed final sign-off Dec 2017 | 560 15th Av | Donald Lewis Gen. Contr.Inc. | alteration of garage to eliminate post & replace post & beam with wall. partial seismic improvements per iebc: voluntaryDetails
alteration of garage to eliminate post & replace post & beam with wall. partial seismic improvements per iebc: voluntary | $40,000 |
| Dec 14, 2016 | Expired or cancelled cancelled Feb 2020 | 925 Guerrero St | adv program in mandatory seismic retrofit bldg per ord. 162-16. propose 2 add'l dwg units on basement level at rear of bldg. replace (e)windows at rear of bldg, add bathroom & kitchens, remodel of doors & finishesDetails
adv program in mandatory seismic retrofit bldg per ord. 162-16. propose 2 add'l dwg units on basement level at rear of bldg. replace (e)windows at rear of bldg, add bathroom & kitchens, remodel of doors & finishes | $40,000 | |
| Nov 15, 2016 | Never finaled issued Nov 2016, no final | 4026 Mission St | Associated Builders | revision to pa 2016-0504-6562 - replace posts with damaged footings under rear porch with new 2x6 wall on new t-footing per sk1 & sk2Details
revision to pa 2016-0504-6562 - replace posts with damaged footings under rear porch with new 2x6 wall on new t-footing per sk1 & sk2 | $6,100 |
| Nov 2, 2016 | Completed final sign-off Sep 2019 | 925 Guerrero St | Singha Construction Inc | mandatory soft story per sfbc 34b using 2012 iebc app a4Details
mandatory soft story per sfbc 34b using 2012 iebc app a4 | $150,000 |
| Oct 12, 2016 | Never finaled issued Apr 2017, no final | 73 Downey St | revision to application 201405095312/s1(r1). to remove partial height wall in middle bedroom and provide structural reinforcing to compensate.Details
revision to application 201405095312/s1(r1). to remove partial height wall in middle bedroom and provide structural reinforcing to compensate. | $1,000 | |
| Sep 23, 2016 | Completed final sign-off Dec 2016 | 1447 Mcallister St | Donald Lewis Gen. Contr.Inc. | repair of failed overstressed beams in garage. repair or replace portion (15" long) of deteriorated footing. partial voluntary seismic strengthening at gr flDetails
repair of failed overstressed beams in garage. repair or replace portion (15" long) of deteriorated footing. partial voluntary seismic strengthening at gr fl | $30,000 |
| Sep 14, 2016 | Completed final sign-off Dec 2019 | 1370 California St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $300,000 | |
| Sep 2, 2016 | Completed final sign-off Nov 2017 | 3806 Clay St | Hennessy Construciton | replace front concrete steps on grade with similar stepss but with reduced rise that meets current code. install handrail done in conjuction with book-matched house at 3808 clayDetails
replace front concrete steps on grade with similar stepss but with reduced rise that meets current code. install handrail done in conjuction with book-matched house at 3808 clay | $2,500 |
| Sep 2, 2016 | Completed final sign-off Nov 2017 | 3808 Clay St | Hennessy Construciton | replace front concrete steps on grade with similar stepss but woth reduced rise that meets current code. install handrail done in conjuction with book-matched house at 3806 clay.Details
replace front concrete steps on grade with similar stepss but woth reduced rise that meets current code. install handrail done in conjuction with book-matched house at 3806 clay. | $2,500 |
| Aug 9, 2016 | Completed final sign-off Dec 2016 | 17 Godeus St | revision to app#201606200410 for field conditions, adding footing where none extg in garage, deleting shear meters, lengthening shearwall to preserve extg footing, revision of collector details. soft story retrofit using 2012 iebc appendix a-4.Details
revision to app#201606200410 for field conditions, adding footing where none extg in garage, deleting shear meters, lengthening shearwall to preserve extg footing, revision of collector details. soft story retrofit using 2012 iebc appendix a-4. | $1,000 | |
| Jun 20, 2016 | Completed final sign-off Dec 2016 | 17 Godeus St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $75,000 | |
| May 4, 2016 | Never finaled issued May 2016, no final | 4026 Mission St | Associated Builders | replace rear stairs from both units due to rot. new configuration designed for current code and extends 18" further back into rear yard. lower stair will reduce landing but not extende beyond extg. guardrails & handrails will be brought up to code. replace front stairs in kind & concrete steps withDetails
replace rear stairs from both units due to rot. new configuration designed for current code and extends 18" further back into rear yard. lower stair will reduce landing but not extende beyond extg. guardrails & handrails will be brought up to code. replace front stairs in kind & concrete steps with | $20,000 |
| Sep 24, 2015 | Completed final sign-off Jan 2016 | 200 Central Av | replace deteriorated window sashes (53 total sashes) in kind: custom made wood sashes installed in (e) frames. new sashes with 1/4" laminated glass. new window guards including egress guard ( 3 sashes total); replace 2 garage doors & person door, widening person door from 2'-6" to 3'-0".Details
replace deteriorated window sashes (53 total sashes) in kind: custom made wood sashes installed in (e) frames. new sashes with 1/4" laminated glass. new window guards including egress guard ( 3 sashes total); replace 2 garage doors & person door, widening person door from 2'-6" to 3'-0". | $30,000 | |
| Sep 1, 2015 | Completed final sign-off May 2016 | 149 Duboce Av | reconstruction in kind of exterior 3rd flr stair landing of rear (side) stairs, new x-brace frame as limited voluntary seismic strengthening, capping of 25' of foundation correct earth-wood separation.Details
reconstruction in kind of exterior 3rd flr stair landing of rear (side) stairs, new x-brace frame as limited voluntary seismic strengthening, capping of 25' of foundation correct earth-wood separation. | $30,000 | |
| Sep 1, 2015 | Completed final sign-off Sep 2016 | 19 Scott St | Donald Lewis Gen. Contr.Inc. | foundation replacement and ground floor (garage level); alterations.Details
foundation replacement and ground floor (garage level); alterations. | $160,000 |
| Jun 1, 2015 | Expired or cancelled cancelled Mar 2021 | 731 Commercial St | Castle Construction | revision to 201005051750, reinstated 12-29-11. add convenience steps between 731/735 commercialDetails
revision to 201005051750, reinstated 12-29-11. add convenience steps between 731/735 commercial | $1,000 |
| Mar 11, 2015 | Completed final sign-off Jul 2015 | 680 Congo St | minor structural alterations to kitchen/dining area including removing non-structural partition & structural posts, adding a new beam, raising (e) beam to be flush framed, adding skylight and reframing kitchen ceiling. ref bpa#201412244450Details
minor structural alterations to kitchen/dining area including removing non-structural partition & structural posts, adding a new beam, raising (e) beam to be flush framed, adding skylight and reframing kitchen ceiling. ref bpa#201412244450 | $5,000 | |
| Sep 30, 2014 | Expired or cancelled cancelled May 2015 | 731 Commercial St | Castle Construction | add 4 risers stair between 731 and 731 and provide improved entrance accessiblity to 731. new doors to match wood existing and to include power door assist.Details
add 4 risers stair between 731 and 731 and provide improved entrance accessiblity to 731. new doors to match wood existing and to include power door assist. | $9,000 |
| Sep 5, 2014 | Expired or cancelled withdrawn Mar 2016 | 220 Anderson St | to comply with 201487601. revision to pa# 2014-0312-0568 to change work in rear from repairs to reconstruction of the rear 8'. the new roof springs from the same high corner as the e roof but has lower slope & a consistent curb elevation, resulting in portions being higher. bldg sag is corrected.Details
to comply with 201487601. revision to pa# 2014-0312-0568 to change work in rear from repairs to reconstruction of the rear 8'. the new roof springs from the same high corner as the e roof but has lower slope & a consistent curb elevation, resulting in portions being higher. bldg sag is corrected. | $5,000 | |
| May 14, 2014 | Completed final sign-off Jun 2014 | 4022 Mission St | to comply with nov 201472101 item 1. repair footing stemwall along north east passageway, add bracket to (e) beam at rear.Details
to comply with nov 201472101 item 1. repair footing stemwall along north east passageway, add bracket to (e) beam at rear. | $20,000 | |
| Apr 28, 2014 | Never finaled issued Jan 2015, no final | 80 Turk St | Ncr Construction Inc | no change of use, commercial tenant improvements to an existing theater bldg. limited demolition, lighting and hvac upgrades, new elevator, accessible restrooms, improved fire sprinkler system (trade permit), new mezzanine at 1/f.Details
no change of use, commercial tenant improvements to an existing theater bldg. limited demolition, lighting and hvac upgrades, new elevator, accessible restrooms, improved fire sprinkler system (trade permit), new mezzanine at 1/f. | $1,200,000 |
| Mar 12, 2014 | Completed final sign-off Mar 2015 | 1051 Page St | mandatory soft story wood frame retrofit to basement level only. compliance with ordinance #155-13 not reuqired.Details
mandatory soft story wood frame retrofit to basement level only. compliance with ordinance #155-13 not reuqired. | $30,000 | |
| Dec 31, 2013 | Completed final sign-off Jul 2014 | 4022 Mission St | addition of railing around extg roof creating a roof deck at the 3rd floor. (on 2nd floor roof)Details
addition of railing around extg roof creating a roof deck at the 3rd floor. (on 2nd floor roof) | $1,000 | |
| Nov 6, 2012 | Completed final sign-off Jul 2014 | 4022 Mission St | alteration and repairs in conjunction with app 201208308664 for fire damage repair. additinal scope includes eliminatin of 3rd fl lightwell, reconfigure bath, bedrooms, living rms. replace windows,reconstruct bottom rear stairs inkind,misc repairs voluntary seismic strengthening of gr flDetails
alteration and repairs in conjunction with app 201208308664 for fire damage repair. additinal scope includes eliminatin of 3rd fl lightwell, reconfigure bath, bedrooms, living rms. replace windows,reconstruct bottom rear stairs inkind,misc repairs voluntary seismic strengthening of gr fl | $150,000 | |
| Aug 30, 2012 | Completed final sign-off Apr 2014 | 4022 Mission St | to comply w/nov #201148868 - fire repair of 875 sq ft on north side wall. not visible from street. close all windows at or 5ft within property line.Details
to comply w/nov #201148868 - fire repair of 875 sq ft on north side wall. not visible from street. close all windows at or 5ft within property line. | $25,000 | |
| Mar 15, 2011 | Expired or cancelled cancelled Jan 2026 | 120 Elsie St | Guilfoyle Construction | revision to appl #201101258993 - replace existing rotted deck at rear, no difference in size or sq ft, remodel of second bathroom, new floor tile, toilet, vanity @ intermediate level, new electrical, ceiling cans, new gas furnace, replacement in kind, wrap existing ducting, no new ducting.Details
revision to appl #201101258993 - replace existing rotted deck at rear, no difference in size or sq ft, remodel of second bathroom, new floor tile, toilet, vanity @ intermediate level, new electrical, ceiling cans, new gas furnace, replacement in kind, wrap existing ducting, no new ducting. | $8,500 |
| Jan 31, 2011 | Completed final sign-off Nov 2011 | 200 Central Av | to comply with his nov# 201058301 dated 7.20.10. install handrails at rear stairs and at central and page street entry stepsDetails
to comply with his nov# 201058301 dated 7.20.10. install handrails at rear stairs and at central and page street entry steps | $3,500 | |
| Jan 25, 2011 | Completed final sign-off Mar 2012 | 1415 Scott St | F D C Construction Inc | replacement in kind of stairs #1 & #2Details
replacement in kind of stairs #1 & #2 | $150,000 |
| Jan 25, 2011 | Completed final sign-off Mar 2012 | 2040 O'farrell St | F D C Construction Inc | replacement in kind of stairs #3Details
replacement in kind of stairs #3 | $75,000 |
| Jan 25, 2011 | Completed final sign-off Mar 2012 | 1450 Divisadero St | F D C Construction Inc | replacement in kind of stairs #8Details
replacement in kind of stairs #8 | $75,000 |
| Jan 25, 2011 | Completed final sign-off Mar 2012 | 2121 Geary Bl | F D C Construction Inc | replacement in kind of stairs #9 & #12.Details
replacement in kind of stairs #9 & #12. | $150,000 |
| Aug 12, 2010 | Completed final sign-off Aug 2011 | 518 Valencia St | Karl Marcrae Consulting | renovation of (e) main entry for ada accessibility, provide 1 new uni-sex ada accessible wc, provide fire-rated 2nd means of egress-corridor, provide fire-rated finish @ (e) walls / ceiling of new meeting room, provide new structural beams @ new meeting room. remove (e) beams @ new meeting room,Details
renovation of (e) main entry for ada accessibility, provide 1 new uni-sex ada accessible wc, provide fire-rated 2nd means of egress-corridor, provide fire-rated finish @ (e) walls / ceiling of new meeting room, provide new structural beams @ new meeting room. remove (e) beams @ new meeting room, | $78,000 |
| Nov 19, 2009 | Completed final sign-off Dec 2009 | 44 Ashbury St | Daniels Development Group Inc | addition of a steel post at ne corner of bldg at the mechanic's alley to limit additional deflection. post used to adjust trim of ocmmercial style windows above only, no structural post.Details
addition of a steel post at ne corner of bldg at the mechanic's alley to limit additional deflection. post used to adjust trim of ocmmercial style windows above only, no structural post. | $100 |
| Sep 18, 2009 | Completed final sign-off Dec 2009 | 507 Capp St | repair of front steps including reconstruction of side walls & footings, re-support of stairs, and provision of new guardrails & handrails. all work is exterior.Details
repair of front steps including reconstruction of side walls & footings, re-support of stairs, and provision of new guardrails & handrails. all work is exterior. | $10,000 | |
| Mar 25, 2009 | Completed final sign-off Jul 2009 | 350 Page St | remove e vertical ladder and plywood in attic space. install n pulldown ladder in n location. n plywood floor, collar ties, skylights, 1 new window in rear.Details
remove e vertical ladder and plywood in attic space. install n pulldown ladder in n location. n plywood floor, collar ties, skylights, 1 new window in rear. | $10,000 | |
| Mar 19, 2009 | Completed final sign-off Aug 2009 | 415 Congo St | replace e retaining wall inside garageDetails
replace e retaining wall inside garage | $15,000 | |
| Aug 29, 2008 | Completed final sign-off Dec 2008 | 283 Clinton Pk | alteration of wall between kitchen and rear enclosed porch. also removed small non-bearing partition in kitchen. revision to application 200807297892.Details
alteration of wall between kitchen and rear enclosed porch. also removed small non-bearing partition in kitchen. revision to application 200807297892. | $5,000 | |
| Apr 25, 2008 | Completed final sign-off Jun 2008 | 2141 Geary Bl | revision to appl #200708038751 - clarification of stair width, no change in work.Details
revision to appl #200708038751 - clarification of stair width, no change in work. |