Permit GraphShortlistSan Francisco building permits since 2000

Doug Tom

License
C12405
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C12405 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, designer, engineer
Firm
Tef Design
Based in
San Francisco
On San Francisco permits
Jan 2005 to Feb 2025

168 permits since 2000 (architect on 161 permits, designer on 5 permits, engineer on 3 permits, authorized agent-others on 1 permit): 116 completed, 39 never finaled, 13 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Hathaway Dinwiddie Co. (27), C C I Commercial Construction & Improv (7), Plant Construction Co, Lp (6), E B W Builders Inc (4), Field Construction Inc. (4), Plant Construction Company Lp (4), Gci, Inc (3), Hasz Construction Inc (2), Nibbi Bros Assoc Inc. (2), Novo Construction Inc (2), Premier Structures Inc (2), Atlantis Fire Protection, Bhogal Brothers Construction Inc, Cci Com'l Constr & Improv**See 985808***, Commercial Interior Builders Inc, Eco Bay Services Inc., Palmera Construction Co, Paradigm General Contractors, Vila Construction Co
Engineers
Edward Rivera, Munson Fong, Randy Collins, Ryan Billante
Authorized agents
Jill Kuper, Karen Anne Eichler

Most recent permits

Showing the 100 most recent of 168.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Feb 24, 2025Completed
final sign-off Jul 2025
660 03rd StC C I Commercial Construction & Improvground floor- minor interior office upgrade at level 1. (n) single user restroom/shower. connecting suites 100 and 110 by removing and relocating common corridor walls.
Details
Permit
202502240978
Permit issued
Mar 4, 2025
Final sign-off
Jul 31, 2025

ground floor- minor interior office upgrade at level 1. (n) single user restroom/shower. connecting suites 100 and 110 by removing and relocating common corridor walls.

Open the permit page

$73,000
Jun 15, 2023Completed
final sign-off Oct 2023
450 Sansome StGci, Inc16/f: operable partition wall ref pa 2022-1223-9077 & 2021-0728-5242
Details
Permit
202306150156
Permit issued
Jun 21, 2023
Final sign-off
Oct 5, 2023

16/f: operable partition wall ref pa 2022-1223-9077 & 2021-0728-5242

Open the permit page

$2,000
Jun 9, 2023Completed
final sign-off Apr 2024
660 03rd StC C I Commercial Construction & Improvinterior office renovation at level 1, suite 110a/b, interior main lobby renovation, new interior walls, storefront glazing, finishes, doors, hardware, access control, millwork at break area, plumbing area, lighting controls, power/data outlet. ref: 202205265059. fire alarm/fire sprinklers deferred.
Details
Permit
202306099692
Permit issued
Aug 10, 2023
Final sign-off
Apr 16, 2024

interior office renovation at level 1, suite 110a/b, interior main lobby renovation, new interior walls, storefront glazing, finishes, doors, hardware, access control, millwork at break area, plumbing area, lighting controls, power/data outlet. ref: 202205265059. fire alarm/fire sprinklers deferred.

Open the permit page

$850,000
Dec 23, 2022Completed
final sign-off May 2023
450 Sansome StGci, Increvision to pa# 2021-0728-5242, removing operable wall from scope along w/ structural support
Details
Permit
202212239077
Permit issued
Dec 23, 2022
Final sign-off
May 2, 2023

revision to pa# 2021-0728-5242, removing operable wall from scope along w/ structural support

Open the permit page

Dec 9, 2022Completed
final sign-off Apr 2023
660 03rd StC C I Commercial Construction & Improvground flr - (n) opening at (e) brick wall. reloacation of (e) electrical panel currently located at proposed (n) brick opening. removing gyp/mtl stud wall & associated doors @ (e) brick opening. portion of (n) concrete infill wall to be gyp/mtl stud wall for potnetial future double doors....
Details
Permit
202212098020
Permit issued
Dec 13, 2022
Final sign-off
Apr 14, 2023

ground flr - (n) opening at (e) brick wall. reloacation of (e) electrical panel currently located at proposed (n) brick opening. removing gyp/mtl stud wall & associated doors @ (e) brick opening. portion of (n) concrete infill wall to be gyp/mtl stud wall for potnetial future double doors....

Open the permit page

$150,000
May 26, 2022Completed
final sign-off Feb 2025
660 03rd Stadminstrative permit to document a change of use from retail to office. total conversion is approx 40,212 sqft change to building occupancy code. no change of use to basement. change of use approved under pc motion no. 21025
Details
Permit
202205265059
Permit issued
Aug 10, 2023
Final sign-off
Feb 26, 2025

adminstrative permit to document a change of use from retail to office. total conversion is approx 40,212 sqft change to building occupancy code. no change of use to basement. change of use approved under pc motion no. 21025

Open the permit page

Sep 2, 2021Never finaled
issued Sep 2021, no final
116 ChannelHasz Construction Incamend to pa 202103186794-s1. erect fence around playground. details requested by bid. the fence was already approved on pa# 202103186794. this permit is to specify the foundation details of this fence.
Details
Permit
202109027674
Permit issued
Sep 17, 2021

amend to pa 202103186794-s1. erect fence around playground. details requested by bid. the fence was already approved on pa# 202103186794. this permit is to specify the foundation details of this fence.

Open the permit page

Jul 28, 2021Completed
final sign-off May 2023
450 Sansome StGci, Inc16/f: demo non-structural partitions, fixtures, millwork & finishes. construction of new non-structural partitions, fixtures, millwork & finishes. structural support (1) moveable partition
Details
Permit
202107285242
Permit issued
Aug 12, 2021
Final sign-off
May 2, 2023

16/f: demo non-structural partitions, fixtures, millwork & finishes. construction of new non-structural partitions, fixtures, millwork & finishes. structural support (1) moveable partition

Open the permit page

$692,514
Mar 18, 2021Never finaled
issued Jun 2021, no final
116 ChannelHasz Construction Incfirst time ti of level 1 suite. the dahlia school of sf is building a child care center w/ 2 main rooms: toddler & pre-school room, 2 admin spaces, multi-purpose space, & new fenced exterior play area. mep deferred.
Details
Permit
202103186794
Permit issued
Jun 21, 2021

first time ti of level 1 suite. the dahlia school of sf is building a child care center w/ 2 main rooms: toddler & pre-school room, 2 admin spaces, multi-purpose space, & new fenced exterior play area. mep deferred.

Open the permit page

$525,000
Dec 19, 2019Expired or cancelled
cancelled Jan 2026
855 Howard Stti to the 1st fl entry lobby to 2nd fl. 2nd fl demolition of (e) non-structural partitions, fixtures, millwork & finishes. construction of (n) non-structural partitions, fixtures, millwork & finishes. change of use to office on 2nd floor.
Details
Permit
201912190002

ti to the 1st fl entry lobby to 2nd fl. 2nd fl demolition of (e) non-structural partitions, fixtures, millwork & finishes. construction of (n) non-structural partitions, fixtures, millwork & finishes. change of use to office on 2nd floor.

Open the permit page

$340,121
Dec 17, 2019Never finaled
filed Dec 2019, never issued
2550 Van Ness Avpriority process - change of use.r1(hotel to r-2(dormitory).pursuant dcp case 20080586-fr last legal tourist hotel use to 136 grp hsing bedrooms&306 beds w/student housing use char.add wk incl new curb cut&infill.class 1&2 bicycle parking & signage.maher n/a.
Details
Permit
201912179808

priority process - change of use.r1(hotel to r-2(dormitory).pursuant dcp case 20080586-fr last legal tourist hotel use to 136 grp hsing bedrooms&306 beds w/student housing use char.add wk incl new curb cut&infill.class 1&2 bicycle parking & signage.maher n/a.

Open the permit page

$25,000
Oct 22, 2019Expired or cancelled
cancelled Jan 2026
660 03rd Streplace main entry doors maher not req
Details
Permit
201910225216

replace main entry doors maher not req

Open the permit page

$1,200
Aug 23, 2019Never finaled
issued Sep 2019, no final
1061 Market StPremier Structures Incaddition of 2 meeting rooms to existing office space on 2nd floor. no demo, existing ceiling, lighting & sprinklers to remain. work on 2nd story.
Details
Permit
201908239705
Permit issued
Sep 24, 2019

addition of 2 meeting rooms to existing office space on 2nd floor. no demo, existing ceiling, lighting & sprinklers to remain. work on 2nd story.

Open the permit page

$8,838
Apr 23, 2019Never finaled
issued May 2019, no final
499 Alabama StE B W Builders Increplacement of (e) entry doors, add (n) door & wall to separate entry vestibule, flooring mod for (n) sloped plane, add (n) exterior courtyard rolling door which is not visible from right of way, all work in theater space only.
Details
Permit
201904238673
Permit issued
May 2, 2019

replacement of (e) entry doors, add (n) door & wall to separate entry vestibule, flooring mod for (n) sloped plane, add (n) exterior courtyard rolling door which is not visible from right of way, all work in theater space only.

Open the permit page

$25,235
Dec 13, 2018Completed
final sign-off Jun 2019
575 Market StField Construction Inc.18th fl, ste 1850 ti demo of (e) non-structural partitions, doors, glazing & ceiling etc. mep, life safety and sprinklers under separate permit
Details
Permit
201812138188
Permit issued
Dec 21, 2018
Final sign-off
Jun 13, 2019

18th fl, ste 1850 ti demo of (e) non-structural partitions, doors, glazing & ceiling etc. mep, life safety and sprinklers under separate permit

Open the permit page

$416,000
Nov 15, 2018Completed
final sign-off Jun 2019
575 Market StField Construction Inc.18/19/20/29th floors: renovation of common areas, corridors and restrooms. n/a for maher.
Details
Permit
201811155926
Permit issued
Nov 20, 2018
Final sign-off
Jun 13, 2019

18/19/20/29th floors: renovation of common areas, corridors and restrooms. n/a for maher.

Open the permit page

$850,000
Nov 1, 2018Completed
final sign-off Apr 2019
660 03rd StNovo Construction Inct.i to (e) offices to incl (n) finishes at restrooms and kitchen areas w/ plumbing fixture replacement. 3rd and 4th floor only.
Details
Permit
201811014809
Permit issued
Jan 28, 2019
Final sign-off
Apr 18, 2019

t.i to (e) offices to incl (n) finishes at restrooms and kitchen areas w/ plumbing fixture replacement. 3rd and 4th floor only.

Open the permit page

$149,850
Sep 24, 2018Completed
final sign-off Nov 2018
312 Sutter StE B W Builders Inct.i. on level 4. scope of work includes: removal and construction of interior non-load bearing partitions, ceiling. electrical lighting and mechanical to be completed under a sep permit. no sturctural orplumbing work.
Details
Permit
201809241186
Permit issued
Sep 26, 2018
Final sign-off
Nov 30, 2018

t.i. on level 4. scope of work includes: removal and construction of interior non-load bearing partitions, ceiling. electrical lighting and mechanical to be completed under a sep permit. no sturctural orplumbing work.

Open the permit page

$71,250
Jun 22, 2018Never finaled
issued Jul 2018, no final
450 Guerrero Streplacement of (e) entry doors to building.
Details
Permit
201806222715
Permit issued
Jul 3, 2018

replacement of (e) entry doors to building.

Open the permit page

$20,000
Jun 20, 2018Completed
final sign-off Mar 2023
538 Eddy Stremove (e) fencing-fence foundation and pylor. install (n) security & gates & fencing. work is on eddy st
Details
Permit
201806202489
Permit issued
Jul 24, 2018
Final sign-off
Mar 1, 2023

remove (e) fencing-fence foundation and pylor. install (n) security & gates & fencing. work is on eddy st

Open the permit page

$50,000
Jun 15, 2018Completed
final sign-off Jan 2019
575 Market StField Construction Inc.12th fl suite 1200 ti demo of e non structural partitions, doors, glazing, ceiling etc. new non structural partitions, doors, ceiling, etc, mep, ls and sprinklers under sep permit
Details
Permit
201806151994
Permit issued
Jun 19, 2018
Final sign-off
Jan 9, 2019

12th fl suite 1200 ti demo of e non structural partitions, doors, glazing, ceiling etc. new non structural partitions, doors, ceiling, etc, mep, ls and sprinklers under sep permit

Open the permit page

$600,000
May 31, 2018Completed
final sign-off Feb 2021
1800 Mission StEco Bay Services Inc.selective demo work of basement, level 2 & level 3. no changes to demo of structure & rated construction. no exterior work. no work to landmark areas. space to remain vacant per ab017. n/a for maher
Details
Permit
201805310613
Permit issued
Oct 4, 2018
Final sign-off
Feb 22, 2021

selective demo work of basement, level 2 & level 3. no changes to demo of structure & rated construction. no exterior work. no work to landmark areas. space to remain vacant per ab017. n/a for maher

Open the permit page

$35,000
May 2, 2018Completed
final sign-off Feb 2019
900 North Point StBhogal Brothers Construction Incspace j102: renovation of (e) tenant space, rmeoval of (e) abandoned electrical data & features (mirrors and lockers) update finishes.
Details
Permit
201805028029
Permit issued
Jun 4, 2018
Final sign-off
Feb 26, 2019

space j102: renovation of (e) tenant space, rmeoval of (e) abandoned electrical data & features (mirrors and lockers) update finishes.

Open the permit page

$50,000
Apr 13, 2018Completed
final sign-off Jun 2018
660 03rd StNovo Construction Incti of (e) offices. work includes patch and repair of finishes at partitions previously demoed under pa #201804035417. maher na
Details
Permit
201804136358
Permit issued
Apr 19, 2018
Final sign-off
Jun 6, 2018

ti of (e) offices. work includes patch and repair of finishes at partitions previously demoed under pa #201804035417. maher na

Open the permit page

$40,000
Feb 21, 2018Completed
final sign-off Jul 2018
851 Beach Stinterior t.i. for extg retail space to include demo & new ada restrooms, storage room and counter , new rolling door in interior. fire protection & mep under seperate permits. n/a for maher
Details
Permit
201802211860
Permit issued
Mar 19, 2018
Final sign-off
Jul 30, 2018

interior t.i. for extg retail space to include demo & new ada restrooms, storage room and counter , new rolling door in interior. fire protection & mep under seperate permits. n/a for maher

Open the permit page

$175,000
Feb 9, 2018Completed
final sign-off Mar 2019
575 Market StField Construction Inc.office , minor partition and door relocation, millwork, selective demo. ti lighting and electrical work deferred maher not req
Details
Permit
201802090894
Permit issued
Feb 16, 2018
Final sign-off
Mar 1, 2019

office , minor partition and door relocation, millwork, selective demo. ti lighting and electrical work deferred maher not req

Open the permit page

$250,000
Jan 26, 2018Completed
final sign-off Apr 2018
1011 Turk Sttenant improvement 2nd fl training rm 251-b, training managers 251-c. maher na
Details
Permit
201801269690
Permit issued
Jan 31, 2018
Final sign-off
Apr 26, 2018

tenant improvement 2nd fl training rm 251-b, training managers 251-c. maher na

Open the permit page

$103,000
Jan 22, 2018Completed
final sign-off Nov 2018
1501 Mariposa StPlant Construction Co, Lpti to expand the middle school classrooms to the 2nd floor (change of use), adding classrooms, wc's, study hall and offices. create new opening at extg 2nd floor, non-bearing cmu wall to connect to 1555 mariposa. new stair at southeast corner for exiting from 1st & 2nd floor.
Details
Permit
201801229151
Permit issued
May 1, 2018
Final sign-off
Nov 20, 2018

ti to expand the middle school classrooms to the 2nd floor (change of use), adding classrooms, wc's, study hall and offices. create new opening at extg 2nd floor, non-bearing cmu wall to connect to 1555 mariposa. new stair at southeast corner for exiting from 1st & 2nd floor.

Open the permit page

$950,000
Nov 8, 2017Never finaled
issued Nov 2017, no final
625 Polk Stroof leak detection and repair of existing slate roof and flashing at the southwest corner of the roof.
Details
Permit
201711083463
Permit issued
Nov 22, 2017

roof leak detection and repair of existing slate roof and flashing at the southwest corner of the roof.

Open the permit page

$5,000
Oct 26, 2017Completed
final sign-off Aug 2018
37 Grove Stexterior storefront modification at level 1 at both market st and grove st. change of use under pa# 2017-0815-4941.
Details
Permit
201710262297
Permit issued
May 15, 2018
Final sign-off
Aug 13, 2018

exterior storefront modification at level 1 at both market st and grove st. change of use under pa# 2017-0815-4941.

Open the permit page

$8,000
Oct 23, 2017Completed
final sign-off Aug 2018
37 Grove Stall floors- interior t.i. to includes toilets, stairs, ada upgrades, seperate permits for mep work is design build including modification to (e) fire sprinkler system. ext. storefront modification under seperate permit. change of use pa#201708154941, change of use
Details
Permit
201710232010
Permit issued
Feb 26, 2018
Final sign-off
Aug 13, 2018

all floors- interior t.i. to includes toilets, stairs, ada upgrades, seperate permits for mep work is design build including modification to (e) fire sprinkler system. ext. storefront modification under seperate permit. change of use pa#201708154941, change of use

Open the permit page

$1,000,000
Oct 10, 2017Never finaled
issued Oct 2017, no final
1011 Turk Stt.i. to rooms 102 and 251a to facilitate (n) training room furniture installation. including finishes, electrical and metal framing/gyp brd work. maher n/a.
Details
Permit
201710100836
Permit issued
Oct 19, 2017

t.i. to rooms 102 and 251a to facilitate (n) training room furniture installation. including finishes, electrical and metal framing/gyp brd work. maher n/a.

Open the permit page

$150,000
Sep 19, 2017Completed
final sign-off Feb 2018
312 Sutter StE B W Builders Inc2nd floor - removal & construction of interior non-rated non-load bearing partitions, ceiling & lighting modifications & finish patching. electrical & fire life safety under separate permit.
Details
Permit
201709198960
Permit issued
Sep 22, 2017
Final sign-off
Feb 13, 2018

2nd floor - removal & construction of interior non-rated non-load bearing partitions, ceiling & lighting modifications & finish patching. electrical & fire life safety under separate permit.

Open the permit page

$37,702
Aug 24, 2017Completed
final sign-off Oct 2018
1136 Sutter StPalmera Construction Codemo interior of storage room down to framing. no structural work
Details
Permit
201708245797
Permit issued
Aug 24, 2017
Final sign-off
Oct 9, 2018

demo interior of storage room down to framing. no structural work

Open the permit page

$5,000
Jul 14, 2017Never finaled
issued Jul 2017, no final
3004 16th StPremier Structures Incti to include upgrade to (1) existing single occupant toilet, new non-structural interior partitions. mep, fire alarm & sprinkler under separate permit
Details
Permit
201707141867
Permit issued
Jul 21, 2017

ti to include upgrade to (1) existing single occupant toilet, new non-structural interior partitions. mep, fire alarm & sprinkler under separate permit

Open the permit page

$200,000
Jun 2, 2017Completed
final sign-off Mar 2019
1555 Mariposa StPlant Construction Co, Lpdemolition of (e) exit stairs, addition of new stair. addition of communicating opening to 1501 mariposa. demolition of stair, new roof top play area. new topping slab @ roof (mahner n/a). fire alarm and sprinklers deferred, if necessary.
Details
Permit
201706028237
Permit issued
May 21, 2018
Final sign-off
Mar 22, 2019

demolition of (e) exit stairs, addition of new stair. addition of communicating opening to 1501 mariposa. demolition of stair, new roof top play area. new topping slab @ roof (mahner n/a). fire alarm and sprinklers deferred, if necessary.

Open the permit page

$1,200,000
Jun 2, 2017Expired or cancelled
withdrawn Feb 2018
1501 Mariposa StPlant Construction Co, Lpaddition of 2/f to (e) school (change of use) addition of exit & exit stair, new restrms, removal of 2 columns, demo of (e) 2/f finishes communicating opening to 1555 mariposa (mahner ordinance n/a)
Details
Permit
201706028226

addition of 2/f to (e) school (change of use) addition of exit & exit stair, new restrms, removal of 2 columns, demo of (e) 2/f finishes communicating opening to 1555 mariposa (mahner ordinance n/a)

Open the permit page

$1,600,000
Dec 13, 2016Never finaled
issued Dec 2016, no final
731 Sansome StCommercial Interior Builders Inc5th floor: revision to 201610281369 - ada restroom change; n/a maher
Details
Permit
201612134766
Permit issued
Dec 13, 2016

5th floor: revision to 201610281369 - ada restroom change; n/a maher

Open the permit page

Sep 22, 2016Completed
final sign-off Dec 2016
3000 16th StC C I Commercial Construction & Improvas builts for ref 201504214138, 201605187737 & 201603041226
Details
Permit
201609228545
Permit issued
Sep 28, 2016
Final sign-off
Dec 14, 2016

as builts for ref 201504214138, 201605187737 & 201603041226

Open the permit page

Aug 26, 2016Never finaled
filed Aug 2016, never issued
79 New Montgomery StHathaway Dinwiddie Co.this permit is for a change of use from office to office/post secondary educaional institution. ** maher: n/a **
Details
Permit
201608266143

this permit is for a change of use from office to office/post secondary educaional institution. ** maher: n/a **

Open the permit page

$71,000
Aug 26, 2016Never finaled
filed Aug 2016, never issued
180 New Montgomery StHathaway Dinwiddie Co.this permit is for a change of use from office to office/post secondary education institution. ** maher: n/a **
Details
Permit
201608266139

this permit is for a change of use from office to office/post secondary education institution. ** maher: n/a **

Open the permit page

$53,000
Jul 21, 2016Never finaled
filed Jul 2016, never issued
2801 Leavenworth Stfirst floor t.i to include non structural partitions, new restrooms, and finish upgrades. mep included. no exterior work. n/a for maher ordinance no. 155-13
Details
Permit
201607212932

first floor t.i to include non structural partitions, new restrooms, and finish upgrades. mep included. no exterior work. n/a for maher ordinance no. 155-13

Open the permit page

$165,540
Jul 20, 2016Completed
final sign-off Aug 2016
860 Sutter StHathaway Dinwiddie Co.replace gyp board ceiling in (e) 4th floor bathroom. new accessible door hardware at main entrance door to replace existing. maher na
Details
Permit
201607202916
Permit issued
Jul 27, 2016
Final sign-off
Aug 19, 2016

replace gyp board ceiling in (e) 4th floor bathroom. new accessible door hardware at main entrance door to replace existing. maher na

Open the permit page

$1,000
Apr 7, 2016Completed
final sign-off Dec 2016
333 14th Stconstruct 3 vestibules on north end of drill court to improve sound attenuation vestibules will include egress doors. no impact on extg use occupancy. all work wil be interior. n/a for maher
Details
Permit
201604074231
Permit issued
Apr 7, 2016
Final sign-off
Dec 20, 2016

construct 3 vestibules on north end of drill court to improve sound attenuation vestibules will include egress doors. no impact on extg use occupancy. all work wil be interior. n/a for maher

Open the permit page

$20,000
Feb 19, 2016Completed
final sign-off Jul 2016
312 Sutter StE B W Builders Inc6th floor: partial remodel including under ceiling partition demolition, new finishes, and ada upgrades. electrical and mechanical deferred submittal.
Details
Permit
201602190029
Permit issued
Apr 4, 2016
Final sign-off
Jul 28, 2016

6th floor: partial remodel including under ceiling partition demolition, new finishes, and ada upgrades. electrical and mechanical deferred submittal.

Open the permit page

$82,720
Dec 23, 2015Expired or cancelled
withdrawn Jan 2016
1555 Mariposa StPlant Construction Co, Lppartial remodel (t.i.) of ground floor of (e) school (k-8). convert shell space to commerical kitche. (n) partitions, (n) ceilings, (n) lighting, equipment connections to (e) utilities. mep under separate permit
Details
Permit
201512235862

partial remodel (t.i.) of ground floor of (e) school (k-8). convert shell space to commerical kitche. (n) partitions, (n) ceilings, (n) lighting, equipment connections to (e) utilities. mep under separate permit

Open the permit page

$100,000
Aug 10, 2015Never finaled
issued Aug 2015, no final
499 Alabama Stthis drawing is for an egress plan check only. there is no construction. the only change to the space is new maximum occupancy signage for the dance studio area; maher n/a
Details
Permit
201508103761
Permit issued
Aug 11, 2015

this drawing is for an egress plan check only. there is no construction. the only change to the space is new maximum occupancy signage for the dance studio area; maher n/a

Open the permit page

Jul 6, 2015Completed
final sign-off Nov 2015
1501 Mariposa StPlant Construction Co, Lprevision to permit 201506118731; adds new lighting, fan coil units and fire sprinkler drain.; maher n/a
Details
Permit
201507060726
Permit issued
Jul 27, 2015
Final sign-off
Nov 18, 2015

revision to permit 201506118731; adds new lighting, fan coil units and fire sprinkler drain.; maher n/a

Open the permit page

$45,000
Apr 21, 2015Completed
final sign-off Dec 2016
3000 16th StC C I Commercial Construction & Improvrevision to pa# 2015.0402.2593; grnd leevel: add an exterior egress door
Details
Permit
201504214138
Permit issued
Mar 23, 2016
Final sign-off
Dec 14, 2016

revision to pa# 2015.0402.2593; grnd leevel: add an exterior egress door

Open the permit page

$5,000
Apr 3, 2015Completed
final sign-off Dec 2015
3450 03rd StPlant Construction Co, Lpaddition of single unisex ada restroom and minor alterations, include roof sleeper frame work above roof, for future mechanical equipment under seperate permit. maher - not req'd
Details
Permit
201504032822
Permit issued
Apr 15, 2015
Final sign-off
Dec 2, 2015

addition of single unisex ada restroom and minor alterations, include roof sleeper frame work above roof, for future mechanical equipment under seperate permit. maher - not req'd

Open the permit page

$14,500
Apr 2, 2015Completed
final sign-off Dec 2016
3000 16th StC C I Commercial Construction & Improvvoulntary code and life safety upgrade of (e) retail and office space within the bldg - demo of (e) elevator, stairs, mechanical equip and ele as req'd - new partitions, elevator & stairs
Details
Permit
201504022593
Permit issued
Apr 21, 2015
Final sign-off
Dec 14, 2016

voulntary code and life safety upgrade of (e) retail and office space within the bldg - demo of (e) elevator, stairs, mechanical equip and ele as req'd - new partitions, elevator & stairs

Open the permit page

$825,000
Feb 5, 2015Completed
final sign-off Nov 2015
1555 Mariposa StPlant Construction Company Lppartial remodel on g/f and 1/f of the k-8 school and includes a voluntary seismic rtrofit. this project moves an (e) stair, creates an office area. adds restrooms, adds shear walls and creates three openings to the adjacent building
Details
Permit
201502057610
Permit issued
Oct 23, 2015
Final sign-off
Nov 18, 2015

partial remodel on g/f and 1/f of the k-8 school and includes a voluntary seismic rtrofit. this project moves an (e) stair, creates an office area. adds restrooms, adds shear walls and creates three openings to the adjacent building

Open the permit page

$1,250,000
Jan 29, 2015Completed
final sign-off Oct 2016
1244 Sutter StC C I Commercial Construction & Improvproposed project consists entirely of barrier removal. 1) altering extg toilet facilities on basement, 1st floor and 2nd floor to meet accessibility requirements. 2) replacing extg elevator to meet accessibily requirments. 3)comply with n.o.v. #201314821.
Details
Permit
201501296999
Permit issued
Feb 26, 2015
Final sign-off
Oct 11, 2016

proposed project consists entirely of barrier removal. 1) altering extg toilet facilities on basement, 1st floor and 2nd floor to meet accessibility requirements. 2) replacing extg elevator to meet accessibily requirments. 3)comply with n.o.v. #201314821.

Open the permit page

$225,000
Nov 25, 2014Completed
final sign-off Nov 2015
660 03rd Stfor record purpose only, no work proposed per sf planning commission motion number 19235. change of use only at the 3rd & 4th floors, per the attached nrs. (no construction is proposed.) n/a for maher ordinance.
Details
Permit
201411252480
Permit issued
Feb 24, 2015
Final sign-off
Nov 12, 2015

for record purpose only, no work proposed per sf planning commission motion number 19235. change of use only at the 3rd & 4th floors, per the attached nrs. (no construction is proposed.) n/a for maher ordinance.

Open the permit page

Aug 26, 2014Expired or cancelled
withdrawn Mar 2018
1501 Mariposa StPlant Construction Company Lprevision to appl #2014.0519.6166 & 2014.0616.8444 - to add one additional room & to modify vestibule dimensions. n/a maher ordinance
Details
Permit
201408264736

revision to appl #2014.0519.6166 & 2014.0616.8444 - to add one additional room & to modify vestibule dimensions. n/a maher ordinance

Open the permit page

$10,000
Jul 24, 2014Never finaled
issued Jul 2014, no final
620 Sutter StHathaway Dinwiddie Co.renovate two (e) non compliant restrooms on ground level to full accessibity compliance. install new transition at ground level to meet accessibility compliance.
Details
Permit
201407242074
Permit issued
Jul 28, 2014

renovate two (e) non compliant restrooms on ground level to full accessibity compliance. install new transition at ground level to meet accessibility compliance.

Open the permit page

$35,000
Nov 26, 2013Never finaled
issued Dec 2013, no final
450 Mission StHathaway Dinwiddie Co.4th floor suite 402 t.i. fo r3,116 sf office space, extent of work to include new aull height & partial height partitions & additoin of power/data as needed per layout shown on furniture plan. no new electrical fixtures, no plumbing.
Details
Permit
201311262837
Permit issued
Dec 19, 2013

4th floor suite 402 t.i. fo r3,116 sf office space, extent of work to include new aull height & partial height partitions & additoin of power/data as needed per layout shown on furniture plan. no new electrical fixtures, no plumbing.

Open the permit page

$140,000
Aug 21, 2013Completed
final sign-off Mar 2014
1420 Sutter StCci Com'l Constr & Improv**See 985808***change use from retail to office. tenant improvement of 2nd fl space and porton of gr fl. ada improvement to 2nd fl restrooms, kitchen , stairs. demo of ceiling and floor finishes of gr fl space. installation of new storefront in e opening at gr level, rear of building. mep sep permit
Details
Permit
201308214879
Permit issued
Sep 17, 2013
Final sign-off
Mar 13, 2014

change use from retail to office. tenant improvement of 2nd fl space and porton of gr fl. ada improvement to 2nd fl restrooms, kitchen , stairs. demo of ceiling and floor finishes of gr fl space. installation of new storefront in e opening at gr level, rear of building. mep sep permit

Open the permit page

$350,000
Aug 7, 2013Never finaled
issued Sep 2013, no final
180 New Montgomery StHathaway Dinwiddie Co.modification to existing partition to increase acoustical performance. remove existing partition to increase storage room space, improving exiting and allowing accessibility and improving life safety. mep under separate permit.
Details
Permit
201308073748
Permit issued
Sep 4, 2013

modification to existing partition to increase acoustical performance. remove existing partition to increase storage room space, improving exiting and allowing accessibility and improving life safety. mep under separate permit.

Open the permit page

$10,000
Mar 27, 2013Completed
final sign-off Dec 2013
66 08th StParadigm General Contractorsrevision to bldg permit 201206213148 to accommodate the installation of a new driveway gate & lighting around the gate area, all directed to the ground.
Details
Permit
201303273146
Permit issued
Apr 11, 2013
Final sign-off
Dec 4, 2013

revision to bldg permit 201206213148 to accommodate the installation of a new driveway gate & lighting around the gate area, all directed to the ground.

Open the permit page

$50,000
Mar 22, 2013Completed
final sign-off Mar 2015
380 Fulton Sterect 4 story, no basement, club house/gym/pool office building.
Details
Permit
201303222886
Permit issued
Aug 27, 2013
Final sign-off
Mar 23, 2015

erect 4 story, no basement, club house/gym/pool office building.

Open the permit page

$11,500,000
Jan 23, 2013Never finaled
filed Jan 2013, never issued
1727 Lombard Stto ducument change of use under planning code section 182 (c). from hotel to group housing.
Details
Permit
201301238540

to ducument change of use under planning code section 182 (c). from hotel to group housing.

Open the permit page

Jan 23, 2013Never finaled
filed Jan 2013, never issued
620 Sutter Stto ducument change of use from hotel to group housing.
Details
Permit
201301238536

to ducument change of use from hotel to group housing.

Open the permit page

Jan 23, 2013Never finaled
filed Jan 2013, never issued
1071 Pine Stto comply to complaint 201050891. to document change of use under planning code section 182(c) in response to complaint 201050891.
Details
Permit
201301238537

to comply to complaint 201050891. to document change of use under planning code section 182(c) in response to complaint 201050891.

Open the permit page

Nov 21, 2012Completed
final sign-off Oct 2013
3450 03rd StPlant Construction Company Lpunit #2a - soft demolition, non-bearing partitions, acoustical ceilings, doors, paint, carpte (plumbing, electrical, hvac under separate permit)
Details
Permit
201211214666
Permit issued
Dec 13, 2012
Final sign-off
Oct 30, 2013

unit #2a - soft demolition, non-bearing partitions, acoustical ceilings, doors, paint, carpte (plumbing, electrical, hvac under separate permit)

Open the permit page

$475,000
Nov 21, 2012Completed
final sign-off Oct 2013
3450 03rd StPlant Construction Company Lpunit #2b - soft demolition, non-bearing partitions, acoustical ceilings, doors, paint, carpte (plumbing, electrical, hvac under separate permits) no additional office space.
Details
Permit
201211214668
Permit issued
Dec 13, 2012
Final sign-off
Oct 30, 2013

unit #2b - soft demolition, non-bearing partitions, acoustical ceilings, doors, paint, carpte (plumbing, electrical, hvac under separate permits) no additional office space.

Open the permit page

$475,000
Nov 13, 2012Never finaled
filed Nov 2012, never issued
2340 Stockton StHathaway Dinwiddie Co.this permit is for a change of use from office to post-secondary educational institution.
Details
Permit
201211134025

this permit is for a change of use from office to post-secondary educational institution.

Open the permit page

$50,000
Nov 13, 2012Never finaled
filed Nov 2012, never issued
2801 Leavenworth StHathaway Dinwiddie Co.this permit is to add post-secondary educational institution use to existing office and retail.
Details
Permit
201211134023

this permit is to add post-secondary educational institution use to existing office and retail.

Open the permit page

$50,000
Nov 13, 2012Never finaled
filed Nov 2012, never issued
491 Post StHathaway Dinwiddie Co.this permit is for a change of use from church to post-secondary educational institution.
Details
Permit
201211134021

this permit is for a change of use from church to post-secondary educational institution.

Open the permit page

$50,000
Nov 13, 2012Expired or cancelled
withdrawn Oct 2021
2225 Jerrold AvHathaway Dinwiddie Co.this permit is for a change in use from industrial to vehicle storage/accessory office.
Details
Permit
201211134022

this permit is for a change in use from industrial to vehicle storage/accessory office.

Open the permit page

$50,000
Nov 13, 2012Never finaled
filed Nov 2012, never issued
60 Federal StHathaway Dinwiddie Co.this permit is for a change of use from industrial to post-secondary education institution.
Details
Permit
201211134024

this permit is for a change of use from industrial to post-secondary education institution.

Open the permit page

$50,000
Nov 13, 2012Expired or cancelled
cancelled Mar 2016
121 Wisconsin Stthis permit is for the legitimization for commercial vehicle parking and storage.
Details
Permit
201211134017

this permit is for the legitimization for commercial vehicle parking and storage.

Open the permit page

Jul 25, 2012Never finaled
issued Aug 2012, no final
180 New Montgomery StHathaway Dinwiddie Co.addition of full height walls to create computer labs on 4th & 7th floors. accessibility upgrades on th 5th floor restrooms. no exterior work, no change of use.
Details
Permit
201207255756
Permit issued
Aug 10, 2012

addition of full height walls to create computer labs on 4th & 7th floors. accessibility upgrades on th 5th floor restrooms. no exterior work, no change of use.

Open the permit page

$25,000
Jul 25, 2012Expired or cancelled
cancelled Jan 2026
180 New Montgomery Strespond to notice of correct fire hazards work to include fire & life safety upgrades on all floors. no exterior work, no change of use.
Details
Permit
201207255757

respond to notice of correct fire hazards work to include fire & life safety upgrades on all floors. no exterior work, no change of use.

Open the permit page

$25,000
Jun 26, 2012Never finaled
filed Jun 2012, never issued
150 Hayes Stto comply w/nov #201298713: install prefabricated man door with panic hardware at hayes st, install chainlink fence for security.
Details
Permit
201206263499

to comply w/nov #201298713: install prefabricated man door with panic hardware at hayes st, install chainlink fence for security.

Open the permit page

$2,000
Nov 16, 2011Expired or cancelled
cancelled Mar 2020
2300 Stockton StHathaway Dinwiddie Co.accessibility upgrades & minor modifications to egress system.
Details
Permit
201111169042

accessibility upgrades & minor modifications to egress system.

Open the permit page

$45,000
Apr 28, 2011Completed
final sign-off Mar 2012
79 New Montgomery StHathaway Dinwiddie Co.replace deteriorated and cracked concrete at the encased beams with new concrete located at 4th floor. in response to nov #201117541.
Details
Permit
201104284951
Permit issued
Oct 13, 2011
Final sign-off
Mar 27, 2012

replace deteriorated and cracked concrete at the encased beams with new concrete located at 4th floor. in response to nov #201117541.

Open the permit page

$4,000
Apr 7, 2011Completed
final sign-off May 2011
460 Townsend StHathaway Dinwiddie Co.revision to appl #201005051801 to provide structural details for (n) stair. no change of use & no change to approve design of stair.
Details
Permit
201104073641
Permit issued
Apr 7, 2011
Final sign-off
May 16, 2011

revision to appl #201005051801 to provide structural details for (n) stair. no change of use & no change to approve design of stair.

Open the permit page

Mar 30, 2011Completed
final sign-off May 2011
460 Townsend Strenew pa#9808792 to obtain final inspection.
Details
Permit
201103303107
Permit issued
Mar 30, 2011
Final sign-off
May 13, 2011

renew pa#9808792 to obtain final inspection.

Open the permit page

Mar 30, 2011Completed
final sign-off May 2011
460 Townsend Strenew pa#200008036856 to obtain final inspection.
Details
Permit
201103303108
Permit issued
Mar 30, 2011
Final sign-off
May 13, 2011

renew pa#200008036856 to obtain final inspection.

Open the permit page

Mar 30, 2011Completed
final sign-off May 2011
460 Townsend Strenew pa#9715311 to obtain final inspection.
Details
Permit
201103303105
Permit issued
Mar 30, 2011
Final sign-off
May 13, 2011

renew pa#9715311 to obtain final inspection.

Open the permit page

Mar 21, 2011Completed
final sign-off Apr 2011
655 Sutter Strenew pa#9619566 to obtain final inspection.
Details
Permit
201103212529
Permit issued
Mar 21, 2011
Final sign-off
Apr 8, 2011

renew pa#9619566 to obtain final inspection.

Open the permit page

Mar 9, 2011Never finaled
issued Mar 2019, no final
60 Federal StHathaway Dinwiddie Co.life safety upgrades. response to nov 201054769. new stairway, 5th fl steps and accessible ramp. 3rd floor steps. alterations to modular partitions. response to plumbing nov date 6/24/10. and plumbing work. all moveable partitions are non-permanent. ramp is omitted from this permit.
Details
Permit
201103091746
Permit issued
Mar 5, 2019

life safety upgrades. response to nov 201054769. new stairway, 5th fl steps and accessible ramp. 3rd floor steps. alterations to modular partitions. response to plumbing nov date 6/24/10. and plumbing work. all moveable partitions are non-permanent. ramp is omitted from this permit.

Open the permit page

$325,000
Jan 12, 2011Completed
final sign-off Oct 2011
601 Brannan StHathaway Dinwiddie Co.interior renovations to (e) cafe (450th).
Details
Permit
201101128258
Permit issued
Feb 11, 2011
Final sign-off
Oct 28, 2011

interior renovations to (e) cafe (450th).

Open the permit page

$10,000
Dec 15, 2010Never finaled
issued Dec 2010, no final
180 New Montgomery StHathaway Dinwiddie Co.5th floor - construct one interior partition with entry door to provide new office & accessibility upgrades.
Details
Permit
201012156777
Permit issued
Dec 15, 2010

5th floor - construct one interior partition with entry door to provide new office & accessibility upgrades.

Open the permit page

$2,500
Sep 13, 2010Never finaled
filed Sep 2010, never issued
2211 Van Ness AvHathaway Dinwiddie Co.respond to nov# 201056926 to obtain permit for new partitions at first floor dining area and construction of a kitchen @ unit #202.
Details
Permit
201009130698

respond to nov# 201056926 to obtain permit for new partitions at first floor dining area and construction of a kitchen @ unit #202.

Open the permit page

$5,000
Sep 13, 2010Never finaled
filed Sep 2010, never issued
860 Sutter StHathaway Dinwiddie Co.to comply with nov# 201052696. replace existing deteriorating windows on building exterior.
Details
Permit
201009130696

to comply with nov# 201052696. replace existing deteriorating windows on building exterior.

Open the permit page

$25,000
Sep 7, 2010Never finaled
filed Sep 2010, never issued
680 Sutter StHathaway Dinwiddie Co.work @ unit# 204 only. respond to nov# 201052694 for window replacement & kitchen remodel without permit.
Details
Permit
201009070317

work @ unit# 204 only. respond to nov# 201052694 for window replacement & kitchen remodel without permit.

Open the permit page

$11,000
Aug 24, 2010Completed
final sign-off Oct 2010
180 New Montgomery StHathaway Dinwiddie Co.6th floor:remove 1 extg interior partition and construct new door opening to suite 606
Details
Permit
201008249493
Permit issued
Aug 25, 2010
Final sign-off
Oct 25, 2010

6th floor:remove 1 extg interior partition and construct new door opening to suite 606

Open the permit page

$3,000
Aug 17, 2010Never finaled
issued Jul 2012, no final
79 New Montgomery StHathaway Dinwiddie Co.respond to nov# 201052238. legalize work done without permit. verify occupant load of (e) assembly areas. all interior work.
Details
Permit
201008178985
Permit issued
Jul 10, 2012

respond to nov# 201052238. legalize work done without permit. verify occupant load of (e) assembly areas. all interior work.

Open the permit page

$300,000
Aug 17, 2010Expired or cancelled
cancelled Jan 2020
1153 Bush StHathaway Dinwiddie Co.revision to approved pa# 9816385 & respond to nov# 201051135. new handrails & as-built drawings.
Details
Permit
201008178987

revision to approved pa# 9816385 & respond to nov# 201051135. new handrails & as-built drawings.

Open the permit page

$3,000
Aug 9, 2010Never finaled
filed Aug 2010, never issued
410 Bush StHathaway Dinwiddie Co.replace (e) deteriorating windows on east elevation.
Details
Permit
201008098351

replace (e) deteriorating windows on east elevation.

Open the permit page

$20,000
Jul 29, 2010Never finaled
issued Aug 2010, no final
410 Bush StHathaway Dinwiddie Co.replace (2) existing kilns and minor adjustments to 1-hr passageway. no change of use no exterior work.
Details
Permit
201007297763
Permit issued
Aug 2, 2010

replace (2) existing kilns and minor adjustments to 1-hr passageway. no change of use no exterior work.

Open the permit page

$20,000
Jul 22, 2010Expired or cancelled
cancelled Jul 2016
2151 Van Ness AvHathaway Dinwiddie Co.revision to approv pa# 2007/01/17/1874 r1. install an accessible ramp in lieu of accessible lift.
Details
Permit
201007227241

revision to approv pa# 2007/01/17/1874 r1. install an accessible ramp in lieu of accessible lift.

Open the permit page

$15,000
Jul 20, 2010Completed
final sign-off Aug 2010
1060 Key AvAtlantis Fire Protectioninstall new overhead sprinkler system in 3 modular units used as classrooms. 19 new sprinkler heads total & underground.
Details
Permit
201007206983
Permit issued
Jul 20, 2010
Final sign-off
Aug 19, 2010

install new overhead sprinkler system in 3 modular units used as classrooms. 19 new sprinkler heads total & underground.

Open the permit page

$8,000
Jan 21, 2010Never finaled
issued Apr 2010, no final
901 Alabama StNibbi Bros Assoc Inc.fire dept review per sffd request and as-builts for clubhouse remodel under pa# 2008/05/30/3289 which was not originally routed to sffd.
Details
Permit
201001215058
Permit issued
Apr 30, 2010

fire dept review per sffd request and as-builts for clubhouse remodel under pa# 2008/05/30/3289 which was not originally routed to sffd.

Open the permit page

Oct 15, 2009Completed
final sign-off Mar 2010
1950 Page Stinstall roll down gate to secure game room during hours club is closed
Details
Permit
200910158982
Permit issued
Nov 17, 2009
Final sign-off
Mar 1, 2010

install roll down gate to secure game room during hours club is closed

Open the permit page

$7,000
May 30, 2008Completed
final sign-off Oct 2010
901 Alabama StNibbi Bros Assoc Inc.renovation of (e) clubhouse. demolition of (e)rear gym & construction of new gym & 2-story support sp. incl new exit stair,elevator,baths,dock. existing front bldg to be renovated,including seismic reinforcing of structure, upgrading infrastructure to current codes, and exterior restoration work.
Details
Permit
200805303289
Permit issued
Jan 6, 2009
Final sign-off
Oct 18, 2010

renovation of (e) clubhouse. demolition of (e)rear gym & construction of new gym & 2-story support sp. incl new exit stair,elevator,baths,dock. existing front bldg to be renovated,including seismic reinforcing of structure, upgrading infrastructure to current codes, and exterior restoration work.

Open the permit page

$200,000
Feb 28, 2008Completed
final sign-off Apr 2011
1011 Turk StVila Construction Corevisions to work approved pa# 200709182974-deletion of exterior exit stair (req to comply with 2001 cbc table 10a), addition of required 2nd exit into (e) corridor, permitted under 2007 cbc, section 1015.2.1, except #2, value engineering changes.
Details
Permit
200802285834
Permit issued
Nov 5, 2008
Final sign-off
Apr 22, 2011

revisions to work approved pa# 200709182974-deletion of exterior exit stair (req to comply with 2001 cbc table 10a), addition of required 2nd exit into (e) corridor, permitted under 2007 cbc, section 1015.2.1, except #2, value engineering changes.

Open the permit page

Jan 11, 2008Expired or cancelled
expired Aug 2011
491 Post Stlegalize installation of 2 statues in front of bldg.(post st. elevation) app filed to comply nov complaint #200722712
Details
Permit
200801112355
Permit issued
Dec 18, 2008

legalize installation of 2 statues in front of bldg.(post st. elevation) app filed to comply nov complaint #200722712

Open the permit page

$10,000