Denny Kwan
- Listed as
- architect, designer, engineer
- Firm
- Holmes Culley
- Based in
- San Francisco
- On San Francisco permits
- Jul 2006 to Apr 2026
153 permits since 2000 (engineer on 150 permits, architect on 2 permits, designer on 1 permit): 83 completed, 20 in progress, 21 never finaled, 29 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 153.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 7, 2026 | In progress issued Sep 2026 | 2415 Pierce St | Related California Construction Llc | (e)4-story o/1-basement single family home. remodel (e)dormer to create roof deck horiz.expansion at level-4 within exst bldg footprint . remodel 4 bathrms@levels-3&4. replace in-kind the (e)level-3 deck including waterproofing and decking.Details
(e)4-story o/1-basement single family home. remodel (e)dormer to create roof deck horiz.expansion at level-4 within exst bldg footprint . remodel 4 bathrms@levels-3&4. replace in-kind the (e)level-3 deck including waterproofing and decking. | $274,150 |
| Dec 10, 2025 | In progress issued Jun 2026 | 30 Commonwealth Av | Mccowan Berrones & Company Llc | interior remodel & rear yard addition of (e) single family home includes structural & shoring work.Details
interior remodel & rear yard addition of (e) single family home includes structural & shoring work. | $462,000 |
| Dec 5, 2025 | In progress issued Feb 2026 | 540 El Camino Del Mar | The Toboni Group | structural revisions to pa 202507150799Details
structural revisions to pa 202507150799 | |
| Aug 29, 2025 | In progress issued Sep 2025 | 2417 Green St | Durkin Inc. | revision to bpa#2017-0428-5244(s2). ref bpa#2025-0411-4238: including revised joist depths at the first floor, third floor, and roof, and revised beam framing at northeast corner of roof.Details
revision to bpa#2017-0428-5244(s2). ref bpa#2025-0411-4238: including revised joist depths at the first floor, third floor, and roof, and revised beam framing at northeast corner of roof. | |
| Aug 5, 2025 | Completed final sign-off Jan 2026 | 34 Yerba Buena Av | Alder Construction | installation of a new section of retaining wall at rear of property. replace existing retaining wall in-kind.Details
installation of a new section of retaining wall at rear of property. replace existing retaining wall in-kind. | $40,000 |
| Jul 29, 2025 | In progress issued Nov 2025 | 540 El Camino Del Mar | The Toboni Group | interior remodel within existing building, removal and replacement of some windows and doors, expansion of exterior deck. addition of 39 sqft to kitchen. this permit revises previous permits pa #202506118499 and 202505227075.Details
interior remodel within existing building, removal and replacement of some windows and doors, expansion of exterior deck. addition of 39 sqft to kitchen. this permit revises previous permits pa #202506118499 and 202505227075. | $650,000 |
| Jul 28, 2025 | Completed final sign-off Sep 2025 | 135 Locust St | Thompson Suskind L P | revision pa#: 202502190621. incorporate strucutural sk religion perspector request.Details
revision pa#: 202502190621. incorporate strucutural sk religion perspector request. | |
| Jul 9, 2025 | In progress issued Jul 2026 | 308 Seacliff Av | Van Acker Const Assoc Inc | addition of structural slab & guardrail at rear yard.Details
addition of structural slab & guardrail at rear yard. | $10,000 |
| Jun 13, 2025 | In progress issued May 2026 | 2950 Pacific Av | Plath & Company Inc | facade alt and addition of 2 basement levels to (e).windows replacement,addition of garage and landscaping elements.new ped and vehicular entrance from broadway.interior renovation and relocate of elevator. rev to pa201602028565.Details
facade alt and addition of 2 basement levels to (e).windows replacement,addition of garage and landscaping elements.new ped and vehicular entrance from broadway.interior renovation and relocate of elevator. rev to pa201602028565. | $1,200,000 |
| Jun 11, 2025 | In progress issued Jul 2025 | 540 El Camino Del Mar | The Toboni Group | subterranean expansion of existing bathroom in basement; expansion of existing planter; new exterior stair @ grade.Details
subterranean expansion of existing bathroom in basement; expansion of existing planter; new exterior stair @ grade. | $15,000 |
| Mar 24, 2025 | In progress issued Jun 2025 | 3666 Baker St | Cameron Builders Sf, R M Construction | revision to pa# 202305037030 convert basement storage to media room & change media room to office. remove(e) brick walls in basement, remove (e) wood post & beam and replace interior footings. new slab on grade and interior footings (ref# 202403047022)Details
revision to pa# 202305037030 convert basement storage to media room & change media room to office. remove(e) brick walls in basement, remove (e) wood post & beam and replace interior footings. new slab on grade and interior footings (ref# 202403047022) | $100,000 |
| Feb 19, 2025 | In progress issued Jun 2025 | 3015 Pacific Av | Farallon General Contractors Inc. | basement: foundation replacement. full renovation. (n) guest rm, bath and sauna. 1/f: demo pantry, 2/f: replace fireplace. remodel primary and bedroom, 2 bathrooms, 3/f: bathroom remodel and partial renovation. new residential elevator.Details
basement: foundation replacement. full renovation. (n) guest rm, bath and sauna. 1/f: demo pantry, 2/f: replace fireplace. remodel primary and bedroom, 2 bathrooms, 3/f: bathroom remodel and partial renovation. new residential elevator. | $380,000 |
| Jan 15, 2025 | In progress issued Mar 2025 | 2430 Pacific Av | The Toboni Group | revision to pa 202405091833. after discussion onsite w/ inspector, it was determined the feasibility of construction will require the rear facade to be replaced in kind. the removal of the (e) unreinforced masonry and replacing in kind w/ brick veneer over a wood stud wall.no other proposed changes.Details
revision to pa 202405091833. after discussion onsite w/ inspector, it was determined the feasibility of construction will require the rear facade to be replaced in kind. the removal of the (e) unreinforced masonry and replacing in kind w/ brick veneer over a wood stud wall.no other proposed changes. | $275,000 |
| Jan 15, 2025 | In progress issued Mar 2025 | 2560 Vallejo St | Forma Construction | revision to pa# 2022-0915-2504: addition of a retaining wall at the west side of the rear yardDetails
revision to pa# 2022-0915-2504: addition of a retaining wall at the west side of the rear yard | $60,000 |
| Jan 2, 2025 | In progress issued Jan 2025 | 418 Texas St | Devlin/Mcnally Construction | under pinning 7ft section of foundation per structural details.Details
under pinning 7ft section of foundation per structural details. | |
| Aug 2, 2024 | Completed final sign-off Feb 2025 | 294 Page St | The Toboni Group | revision to pa 202403137671 revised structural set according to findings on site during demo. minor interior work added to attic level - built in cabinetry added in between studs of existing wallDetails
revision to pa 202403137671 revised structural set according to findings on site during demo. minor interior work added to attic level - built in cabinetry added in between studs of existing wall | |
| Jun 13, 2024 | Completed final sign-off Feb 2025 | 135 Locust St | Thompson Suskind L P | revision to pa 202110070082 (original permit) not inclusive of roof work. addition of rated skylight @ roof rev 1 ref pa 202304216262Details
revision to pa 202110070082 (original permit) not inclusive of roof work. addition of rated skylight @ roof rev 1 ref pa 202304216262 | $7,000 |
| Jun 10, 2024 | Expired or cancelled expired Sep 2026 | 529 Hickory St | Jeff King And Company Inc | revised structural design for pa 202209192682 predicated by existing conditionsDetails
revised structural design for pa 202209192682 predicated by existing conditions | |
| Jun 10, 2024 | Expired or cancelled expired Jul 2026 | 525 Hickory St | Jeff King And Company Inc | revised structural design pa 202212027585 predicated by existing conditionsDetails
revised structural design pa 202212027585 predicated by existing conditions | |
| Mar 26, 2024 | In progress filed Mar 2024, not yet issued | 3028 Clay St | Cairn Construction | interior remodel within an (e) building - structural work, replacement of (e) non reinforced masonry walls, expansion of 1st floor (garage) below the grade, (n) second floor below-grade courtyard, replacement of doors, windows, and finishes.Details
interior remodel within an (e) building - structural work, replacement of (e) non reinforced masonry walls, expansion of 1st floor (garage) below the grade, (n) second floor below-grade courtyard, replacement of doors, windows, and finishes. | $1,000,000 |
| Mar 13, 2024 | Completed final sign-off Feb 2025 | 294 Page St | The Toboni Group | interior remodel only - new finishes and remodel of kitchen 203 and bath 308. removal of interior dumbwaiter and shaft at all levels. (e) window 216 to be removed/replace with new door 203c. (e) door 201 to be removed/replace with new window 216. refer to c of a# 2023-007512prj for window repair.Details
interior remodel only - new finishes and remodel of kitchen 203 and bath 308. removal of interior dumbwaiter and shaft at all levels. (e) window 216 to be removed/replace with new door 203c. (e) door 201 to be removed/replace with new window 216. refer to c of a# 2023-007512prj for window repair. | $10,000 |
| Feb 26, 2024 | In progress issued Aug 2024 | 46 Saint Germain Av | Durkin Inc. | interior alterations of kitchen, bedroom, bathrooms and exterior elevations alterations. relocated laundry room & expanded mech room, new office on 2/f.Details
interior alterations of kitchen, bedroom, bathrooms and exterior elevations alterations. relocated laundry room & expanded mech room, new office on 2/f. | $1,500,000 |
| Jan 19, 2024 | Completed final sign-off Jul 2024 | 254 Jersey St | Durkin Inc. | construct new concrete footing and sill plate as per plan at rear.Details
construct new concrete footing and sill plate as per plan at rear. | $10,000 |
| Jan 12, 2024 | In progress issued Mar 2024 | 3368 Jackson St | Farallon General Contractors Inc. | (n) bay wind0w at second level only. addition of 15 habitable square feet. no mechanical or plumbing scope. no work in the public right of way.Details
(n) bay wind0w at second level only. addition of 15 habitable square feet. no mechanical or plumbing scope. no work in the public right of way. | $20,000 |
| Oct 23, 2023 | Completed final sign-off Jul 2024 | 3610 Washington St | Thompson Suskind L P | prority process per ab004: as-built revision at district insp's request to bpa#201901100038 and bpa#202101223106 to incorporate field structural changesDetails
prority process per ab004: as-built revision at district insp's request to bpa#201901100038 and bpa#202101223106 to incorporate field structural changes | |
| Jul 21, 2023 | In progress issued Feb 2024 | 3525 Washington St | Ggd Inc. | horizontal addition on 1st fl family rm, overall building depth to remain. (e) facing window on 3rd floor to shift 2'4" to the north. (e) skylight to be removed. no work in the public right of way. no mechanical, no changes to fixture count.Details
horizontal addition on 1st fl family rm, overall building depth to remain. (e) facing window on 3rd floor to shift 2'4" to the north. (e) skylight to be removed. no work in the public right of way. no mechanical, no changes to fixture count. | $50,000 |
| Jul 5, 2023 | In progress issued Jan 2024 | 3525 Washington St | Ggd Inc. | exterior rear yard grading & installation of retaining walls. remodel of existing rear yard staircase. all existing retaining walls to remain. no wokr in public right of way. no mechanical, no changes to fixture count.Details
exterior rear yard grading & installation of retaining walls. remodel of existing rear yard staircase. all existing retaining walls to remain. no wokr in public right of way. no mechanical, no changes to fixture count. | $30,000 |
| Jun 29, 2023 | Completed final sign-off May 2024 | 3080 Pacific Av | Krekow Jennings Inc. | repair south facade water damaged occurs, replace w/ n sheathing, waterproofing & stucco. enlarge & replace 1 garage door @ e location. replace e roof @ garage area. remove e unused chimney @ east elevation, patch roof & stucco. new copper roof @ e bay window.Details
repair south facade water damaged occurs, replace w/ n sheathing, waterproofing & stucco. enlarge & replace 1 garage door @ e location. replace e roof @ garage area. remove e unused chimney @ east elevation, patch roof & stucco. new copper roof @ e bay window. | $40,000 |
| Jun 15, 2023 | Expired or cancelled withdrawn Nov 2024 | 3973 Clay St | excavation & foundation replacement,all doors & windows, interior remodel throughout, n roof above 2nd flr bedroom, n interior stair to replace extg, n exterior infill addition below extg cantilevered rm on 2nd flr, n reconfigured patio at rear yard, & n exterior facade finish at rear yard.Details
excavation & foundation replacement,all doors & windows, interior remodel throughout, n roof above 2nd flr bedroom, n interior stair to replace extg, n exterior infill addition below extg cantilevered rm on 2nd flr, n reconfigured patio at rear yard, & n exterior facade finish at rear yard. | $300,000 | |
| Apr 27, 2023 | Expired or cancelled cancelled May 2023 | 2552 Baker St | Millan & Associates | new fence @ rear yard, fence is to have 10' 6x6 posts w/stipness steel wire between posts for vine growth.Details
new fence @ rear yard, fence is to have 10' 6x6 posts w/stipness steel wire between posts for vine growth. | $5,000 |
| Apr 18, 2023 | Completed final sign-off Mar 2025 | 1230 Kearny St | Upscale Construction Inc. | structural reinforcement for proposed bathrub under bpa#202201105613.Details
structural reinforcement for proposed bathrub under bpa#202201105613. | $5,000 |
| Mar 28, 2023 | In progress issued Jun 2024 | 2560 Vallejo St | Forma Construction | revision to pa 2022.0915.2504 that includes a facade remodel of an existing 2-unit r-3 building. the drawings in this revision include new windows, doors, siding, parapets, guards, roofing, landscaping, hardscaping, retaining walls, and walkway stairs. levels and elevations have been revised to refDetails
revision to pa 2022.0915.2504 that includes a facade remodel of an existing 2-unit r-3 building. the drawings in this revision include new windows, doors, siding, parapets, guards, roofing, landscaping, hardscaping, retaining walls, and walkway stairs. levels and elevations have been revised to ref | $200,000 |
| Feb 16, 2023 | Completed final sign-off Jul 2025 | 2590 Green St | Urbnbuild Inc, Kenneally Construction | new elevator for accessibility/ mobility w/ related dormer & reconfigure bathroom on 2nd flr and powder room on 3rd flr to accommodate elevator, replace 2 north facing windows.Details
new elevator for accessibility/ mobility w/ related dormer & reconfigure bathroom on 2nd flr and powder room on 3rd flr to accommodate elevator, replace 2 north facing windows. | $650,000 |
| Oct 27, 2022 | Expired or cancelled expired Feb 2025 | 63 Carmel St | Cma Development Inc | rev to pa# 2022-0616-6494, 2022-0207-7504, 2015-0701-0460 s1,s2: basement - storage to omedia room (n) wet bar, 1st fl. windows/glass doors, recesed to provied 3ft protection clearance at rear, 2nd & 3rd fl. reconfigure layout and stair, roof-remove access stairDetails
rev to pa# 2022-0616-6494, 2022-0207-7504, 2015-0701-0460 s1,s2: basement - storage to omedia room (n) wet bar, 1st fl. windows/glass doors, recesed to provied 3ft protection clearance at rear, 2nd & 3rd fl. reconfigure layout and stair, roof-remove access stair | $5,000 |
| Sep 19, 2022 | Completed final sign-off Sep 2026 | 529 Hickory St | Jeff King And Company Inc | renovation/remodl of (e) single family residence; remodel kitchen & (2) baths; add (1) bath; replace interior wall finishes; remove (1) bedroom & convert to walk-in closet; voluntary seismic retrofit; replace (e) brick foundation w/(n) concrete; interior only - no (n) floor area.Details
renovation/remodl of (e) single family residence; remodel kitchen & (2) baths; add (1) bath; replace interior wall finishes; remove (1) bedroom & convert to walk-in closet; voluntary seismic retrofit; replace (e) brick foundation w/(n) concrete; interior only - no (n) floor area. | $385,000 |
| Sep 15, 2022 | Never finaled issued Feb 2023, no final | 2560 Vallejo St | Forma Construction | remodel of (e) 2 unit building. full seismic upgrade w/excavated lower level. reconfiguration of interior spaces. no envelope expansion. minimum notification to rear facade for excavation . (n) fixtures, finishes, lightings, mep (n) solar panels. aluminium clad windows. new rear door. defer sprnikleDetails
remodel of (e) 2 unit building. full seismic upgrade w/excavated lower level. reconfiguration of interior spaces. no envelope expansion. minimum notification to rear facade for excavation . (n) fixtures, finishes, lightings, mep (n) solar panels. aluminium clad windows. new rear door. defer sprnikle | $1,600,000 |
| Aug 5, 2022 | Completed final sign-off Sep 2026 | 308 Seacliff Av | Van Acker Const Assoc Inc | revision to 202201146036. voluntary structural improvements, roof replacement and some windows and doors replaced in kind.Details
revision to 202201146036. voluntary structural improvements, roof replacement and some windows and doors replaced in kind. | $850,000 |
| Jun 22, 2022 | Completed final sign-off Feb 2024 | 3080 Pacific Av | Krekow Jennings Inc. | interior reno of (e) residential home with limited structural upgrades; replace 3 (e) glass doors in kind. replace sideyard gate and railing facing street.Details
interior reno of (e) residential home with limited structural upgrades; replace 3 (e) glass doors in kind. replace sideyard gate and railing facing street. | $1,300,000 |
| Jun 16, 2022 | Expired or cancelled expired Feb 2025 | 63 Carmel St | Cma Development Inc | revision to pa# 201507010460 s1 & 202202077504. revision to foundation design, shoring design and basement layout.Details
revision to pa# 201507010460 s1 & 202202077504. revision to foundation design, shoring design and basement layout. | |
| Jun 2, 2022 | Completed final sign-off May 2024 | 39 Bruton St | Webcor Construction Lp | parcel c2.4 - grading associated to new building under pa #201912169619Details
parcel c2.4 - grading associated to new building under pa #201912169619 | $100,000 |
| Jun 1, 2022 | Completed final sign-off May 2024 | 39 Bruton St | Webcor Construction Lp | parcel c2.4-shoring associated with new building under bpa#201912169619/.Details
parcel c2.4-shoring associated with new building under bpa#201912169619/. | $100,000 |
| Feb 9, 2022 | Completed final sign-off Feb 2022 | 10 Aladdin Tr | Devlin/Mcnally Construction | revision to structural details and special inspection form for permit 201711033069-s2.Details
revision to structural details and special inspection form for permit 201711033069-s2. | |
| Feb 7, 2022 | Expired or cancelled expired Feb 2025 | 63 Carmel St | Cma Development Inc | revision to pa 2015-0701-0460-s1 to create basement storage areaDetails
revision to pa 2015-0701-0460-s1 to create basement storage area | $52,000 |
| Dec 9, 2021 | Completed final sign-off Feb 2025 | 135 Locust St | Thompson Suskind L P | renovation & structural upgrade of exiting house. convertion of attic to habitable space with dormers.removal of building mass at first & second floor levels at rear (west) facade. removal of enclosed stairs at south facade.Details
renovation & structural upgrade of exiting house. convertion of attic to habitable space with dormers.removal of building mass at first & second floor levels at rear (west) facade. removal of enclosed stairs at south facade. | $60,000 |
| Dec 8, 2021 | Never finaled issued Dec 2021, no final | 55 Ashbury Tr | Union Pierce Construction | remodel of (e) kitchenDetails
remodel of (e) kitchen | $300,000 |
| Oct 27, 2021 | Expired or cancelled expired Jan 2024 | 2552 Baker St | Millan & Associates | revision to pa# 2021-1026-2312: relocate bathroom at 1st level, light well infill at 2nd level, plus revised area calculations and structural updatesDetails
revision to pa# 2021-1026-2312: relocate bathroom at 1st level, light well infill at 2nd level, plus revised area calculations and structural updates | $25,000 |
| Oct 22, 2021 | Completed final sign-off Mar 2026 | 1940 Broadway | Centric Building Inc. | unit 4: interior renovation includes replacement of exterior windows and doors with double pane insulated glass, single lite windows changed to divided lite to match street side elevation. kitchen and bathroom remodel.Details
unit 4: interior renovation includes replacement of exterior windows and doors with double pane insulated glass, single lite windows changed to divided lite to match street side elevation. kitchen and bathroom remodel. | $245,000 |
| Oct 22, 2021 | Expired or cancelled expired Feb 2025 | 3600 Washington St | Thompson Suskind L P | underpinning associated wth the foundation replacement at the adjacent property at 135 locust street under pa202110070082Details
underpinning associated wth the foundation replacement at the adjacent property at 135 locust street under pa202110070082 | $15,000 |
| Oct 15, 2021 | Expired or cancelled cancelled Sep 2022 | 59 Carmel St | Cma Development Inc | underpin foundation on west side only adjacent to 63 carmel st.Details
underpin foundation on west side only adjacent to 63 carmel st. | $25,000 |
| Oct 8, 2021 | Completed final sign-off Dec 2021 | 2383 Bush St | Blair Burke General Contractors Inc | revision to pa 2020-1113-8888 moving rear window & re structure of rear wallDetails
revision to pa 2020-1113-8888 moving rear window & re structure of rear wall | |
| Oct 4, 2021 | Completed final sign-off Mar 2023 | 2405 Washington St | Siena Pacific, Inc. | interior kitchen remodel at unit 1. remodel consists of new kithcen layout, new locations for plumbing fixtures, relocation of 1 bathroom and reduction to powder room. no changes on exterior. exterior work under separate pa 202109138303.Details
interior kitchen remodel at unit 1. remodel consists of new kithcen layout, new locations for plumbing fixtures, relocation of 1 bathroom and reduction to powder room. no changes on exterior. exterior work under separate pa 202109138303. | $80,000 |
| Sep 13, 2021 | Completed final sign-off Mar 2023 | 2405 Washington St | Siena Pacific, Inc. | three (3) new windows at rear of the building. interior remodel under separate permit 202110049743Details
three (3) new windows at rear of the building. interior remodel under separate permit 202110049743 | $20,000 |
| Aug 31, 2021 | Never finaled issued Aug 2021, no final | 21 Buena Vista East Av | Rp Construction | revision to pa# 202107083972. partial voluntary strenghening to an existing 4-story wood frame 2 unit residence.Details
revision to pa# 202107083972. partial voluntary strenghening to an existing 4-story wood frame 2 unit residence. | |
| Aug 26, 2021 | Completed final sign-off Sep 2023 | 2511 Baker St | Moroso Construction Inc | enlarge existing garage door opening. regrade and replace affected sidewalk and curb cut.Details
enlarge existing garage door opening. regrade and replace affected sidewalk and curb cut. | $45,000 |
| Jul 15, 2021 | Expired or cancelled expired May 2026 | 475 28th St | Perez Construction Llc., Blair Burke General Contractors Inc | basement addition, addition at kitchen/deck, add bay at rear facade at 2nd level, add 2 powder rooms, remodel 2 bathrooms and kitchen. new ground floor area is 1,198 sq. ft.Details
basement addition, addition at kitchen/deck, add bay at rear facade at 2nd level, add 2 powder rooms, remodel 2 bathrooms and kitchen. new ground floor area is 1,198 sq. ft. | $420,000 |
| Apr 14, 2021 | Completed final sign-off Jun 2021 | 780 12th Av | Dan Barrett Construction | new slab on grade to replace damaged portion of an (e) slab on-grade at the side alley. structural only.Details
new slab on grade to replace damaged portion of an (e) slab on-grade at the side alley. structural only. | $8,000 |
| Mar 4, 2021 | Never finaled issued Jul 2021, no final | 81 Santa Rita Av | Reliable Construction Inc, D K G Construction Inc | ground floor interior remodel: excavation at (e) ground floor mechanical and storage space for relocated master bath and closet, new office and new bathroom. no expansion to building envelope or footprint.Details
ground floor interior remodel: excavation at (e) ground floor mechanical and storage space for relocated master bath and closet, new office and new bathroom. no expansion to building envelope or footprint. | $250,000 |
| Feb 8, 2021 | Completed final sign-off Oct 2021 | 1360 Dolores St | Blair Burke General Contractors Inc | rev to pa202008131669 including but not limited to adding a skylight in thektichen and oening up an (e) load bearing wall.Details
rev to pa202008131669 including but not limited to adding a skylight in thektichen and oening up an (e) load bearing wall. | $60,000 |
| Jan 22, 2021 | Expired or cancelled expired Mar 2024 | 3610 Washington St | Thompson Suskind L P | rev 201901100038 addendum 1: redux excavation below (e) ground level courtyard.omission of basement level sunken courtyard; addition of small lightwell in west alley (not used for required light and ventilation).no changes to building envelope above grade.Details
rev 201901100038 addendum 1: redux excavation below (e) ground level courtyard.omission of basement level sunken courtyard; addition of small lightwell in west alley (not used for required light and ventilation).no changes to building envelope above grade. | |
| Dec 28, 2020 | Never finaled issued Apr 2022, no final | 3669 21st St | Green Gate Energy Solutions Llc, Moroso Construction Inc | erect 3-story single family resident.Details
erect 3-story single family resident. | $1,947,900 |
| Dec 1, 2020 | Expired or cancelled expired Feb 2025 | 135 Locust St | minor grading & installation of retaining walls at rear yard. no work to existing building.Details
minor grading & installation of retaining walls at rear yard. no work to existing building. | $10,000 | |
| Nov 16, 2020 | Completed final sign-off Aug 2021 | 205 Dellbrook Av | replace roof of (e) sunroom rear of house w/ roof deck & stairs from deck to backyard. recessed ltg(6 cans inside/8 outside),2 outlets,radiant floor. using (e) header,replace window with french doors,move 1 partition wall,install 2 windows. to comply w/ nov#202048716.Details
replace roof of (e) sunroom rear of house w/ roof deck & stairs from deck to backyard. recessed ltg(6 cans inside/8 outside),2 outlets,radiant floor. using (e) header,replace window with french doors,move 1 partition wall,install 2 windows. to comply w/ nov#202048716. | $12,000 | |
| Nov 13, 2020 | Completed final sign-off Dec 2021 | 2383 Bush St | Blair Burke General Contractors Inc | amend to 202008131673: add 3-stop elevator, relocating (e) door at rear elevation, adding a plant on (e) floors, add a car turner in the garage; 14 recessed and surface mounted light fixtures that will be added/relocated (sheet e.1).Details
amend to 202008131673: add 3-stop elevator, relocating (e) door at rear elevation, adding a plant on (e) floors, add a car turner in the garage; 14 recessed and surface mounted light fixtures that will be added/relocated (sheet e.1). | $120,000 |
| Sep 11, 2020 | Completed final sign-off Jan 2021 | 668 Sanchez St | fence and attachment to existing site wall (approved pa# 201712277512) at rear yard of residence.Details
fence and attachment to existing site wall (approved pa# 201712277512) at rear yard of residence. | $5,000 | |
| Aug 7, 2020 | Never finaled issued Aug 2022, no final | 3441 Washington St | Farallon General Contractors Inc. | new 2-story horizontal additon to the east side of the building and new 1-story vertical addition with roof terrace. full interior remodel associated in scope of work.Details
new 2-story horizontal additon to the east side of the building and new 1-story vertical addition with roof terrace. full interior remodel associated in scope of work. | $1,000,000 |
| May 7, 2020 | Completed final sign-off Oct 2023 | 2921 Vallejo St | Durkin Inc. | revision to permit application number 2016-0412-4605 s1. new single family residence.Details
revision to permit application number 2016-0412-4605 s1. new single family residence. | |
| Dec 6, 2019 | Completed final sign-off Mar 2021 | 2714 Pacific Av | Cairn Construction | revision to pa #201909161692. (n) shotcrete retaining wall abutting (e) brick wall along prop. line in lieu of underpinning (e) wall; revision to (n) foundations along north & east prop. lines; reframing at upper levels.Details
revision to pa #201909161692. (n) shotcrete retaining wall abutting (e) brick wall along prop. line in lieu of underpinning (e) wall; revision to (n) foundations along north & east prop. lines; reframing at upper levels. | |
| Nov 27, 2019 | Completed final sign-off Dec 2024 | 2808 Vallejo St | Devlin/Mcnally Construction | (n) foundation & interior renovation to (e) 3-story single residential bldg. increase habitable space in (e) basement within (e) bldg envelope.Details
(n) foundation & interior renovation to (e) 3-story single residential bldg. increase habitable space in (e) basement within (e) bldg envelope. | $2,500,000 |
| Sep 16, 2019 | Completed final sign-off Mar 2021 | 2714 Pacific Av | Cairn Construction | interior remodel within (e) building-g/f convert utility rooms into bedroom, convert closet to bathroom,remodel (e) bathroom;1/f remove wall between kit/din, remodel kitch, remodel bathroom, new int stairs; 2/f reconfig bedroom/remodel mast bathroom.(n) glass railing to replace (e) guardrail at roofDetails
interior remodel within (e) building-g/f convert utility rooms into bedroom, convert closet to bathroom,remodel (e) bathroom;1/f remove wall between kit/din, remodel kitch, remodel bathroom, new int stairs; 2/f reconfig bedroom/remodel mast bathroom.(n) glass railing to replace (e) guardrail at roof | $422,000 |
| Aug 5, 2019 | Completed final sign-off Jun 2021 | 3725 Washington St | Upscale Construction Inc. | rev pa# 201505227038; revision to garage facade articulation, rmoval of a portion of a fence on west side, and an additional stone wall at rear yardDetails
rev pa# 201505227038; revision to garage facade articulation, rmoval of a portion of a fence on west side, and an additional stone wall at rear yard | $20,000 |
| Jul 9, 2019 | Completed final sign-off Sep 2020 | 1722 Great Hy | Upscale Construction Inc. | kitchen & bath remodel in each unit, add 2 bathroom, full window replacement, new doors at rear ground level, new level 2 rear deck, stair to grade, 3 new skylightsDetails
kitchen & bath remodel in each unit, add 2 bathroom, full window replacement, new doors at rear ground level, new level 2 rear deck, stair to grade, 3 new skylights | $50,000 |
| Jul 3, 2019 | Expired or cancelled withdrawn Feb 2023 | 2717 Union St | Beyond The Horizon Construction | addition of 491 sq ft roof deck with internal access from 4th fl unit only.Details
addition of 491 sq ft roof deck with internal access from 4th fl unit only. | $105,000 |
| Jun 17, 2019 | Never finaled issued Jan 2020, no final | 2517 Pacific Av | Upscale Construction Inc. | new retaining wall at rear of property.**maher n/a**Details
new retaining wall at rear of property.**maher n/a** | $12,000 |
| Jun 13, 2019 | Expired or cancelled withdrawn Jan 2021 | 2747 Vallejo St | The Toboni Group | dropping slab at garage 12". structural work only with no exterior changesDetails
dropping slab at garage 12". structural work only with no exterior changes | $50,000 |
| Apr 26, 2019 | Completed final sign-off Mar 2020 | 1384 Florida St | Carranza Group Lp | remove & replace damaged foundation and sub-par conditions occurred during water damage remediation strengthen bowing ceiling framing and add additional steel beams work required to complete. ref pa201903084811.Details
remove & replace damaged foundation and sub-par conditions occurred during water damage remediation strengthen bowing ceiling framing and add additional steel beams work required to complete. ref pa201903084811. | $75,000 |
| Apr 25, 2019 | Never finaled issued May 2019, no final | 1900 Lake St | Northington Innovations Inc | voluntary replacing existing foundation with new foundation at the ground level of an existing 3 story plus penthouse wood framed residence.Details
voluntary replacing existing foundation with new foundation at the ground level of an existing 3 story plus penthouse wood framed residence. | $75,000 |
| Jan 24, 2019 | Completed final sign-off Dec 2020 | 2747 Vallejo St | The Toboni Group | interior remodel of stairs from garage & first flr. minor facade remodel consisting of (n) entry stair, revised garage entry & (n) exterior finishesDetails
interior remodel of stairs from garage & first flr. minor facade remodel consisting of (n) entry stair, revised garage entry & (n) exterior finishes | $150,000 |
| Jan 14, 2019 | Never finaled issued Jan 2022, no final | 2106 Divisadero St | horizontal addition at the 1st thrrough 3rd levels, vertical addition at 3rd level. terrace at 2nd level in rear and interior remodel throughout. **maher n/a**Details
horizontal addition at the 1st thrrough 3rd levels, vertical addition at 3rd level. terrace at 2nd level in rear and interior remodel throughout. **maher n/a** | $368,143 | |
| Dec 21, 2018 | Expired or cancelled expired Nov 2021 | 270 Castro St | Blair Burke General Contractors Inc | revision to pa #201805189556. revision to interior structural as needed. reconfigure bath 1, change n. sliding door type in bedroom, enclose e. lightwell to capture space in closet, add window on west wall of study, revise e. structural.Details
revision to pa #201805189556. revision to interior structural as needed. reconfigure bath 1, change n. sliding door type in bedroom, enclose e. lightwell to capture space in closet, add window on west wall of study, revise e. structural. | $32,000 |
| Dec 14, 2018 | Completed final sign-off Mar 2019 | 590 Spruce St | structural work only - structural strengthening: new rear yard grade beam and cross braging. no interior work on ground floor rooms.Details
structural work only - structural strengthening: new rear yard grade beam and cross braging. no interior work on ground floor rooms. | $10,000 | |
| Nov 28, 2018 | Completed final sign-off Dec 2020 | 2747 Vallejo St | The Toboni Group | windows, doors & finishes @ rear facade, interior remodel of the 3 & 4 flrs with associated structural work remodel of (e) family rm kitchen &didint rm, on 3rd flr remodel of (e) master suite bedroom & bathroom on 4th flr addition of elevator from garage to 4th flrDetails
windows, doors & finishes @ rear facade, interior remodel of the 3 & 4 flrs with associated structural work remodel of (e) family rm kitchen &didint rm, on 3rd flr remodel of (e) master suite bedroom & bathroom on 4th flr addition of elevator from garage to 4th flr | $500,000 |
| Nov 13, 2018 | Expired or cancelled expired Apr 2022 | 3903 Washington St | Clayton Timbrell & Co | revision to 201801168690 and 201802050360 add underpinning at garage foundation to allow change in grades shown in previous permits aboveDetails
revision to 201801168690 and 201802050360 add underpinning at garage foundation to allow change in grades shown in previous permits above | |
| Oct 15, 2018 | Never finaled issued Oct 2018, no final | 2625 Scott St | Farallon General Contractors Inc. | interior remodel of a 4-story sfd. to include new mechanical/electrical systems, replacement of st facing windows & doors in kind, (n) sliding glass door & windows at rear of building. in-fill \ =Details
interior remodel of a 4-story sfd. to include new mechanical/electrical systems, replacement of st facing windows & doors in kind, (n) sliding glass door & windows at rear of building. in-fill \ = | $200,000 |
| Oct 10, 2018 | Completed final sign-off Dec 2020 | 81 05th Av | Rwr Construction Inc | revision to pa# 2017-0711-1562 s1 to change to mat slab foundation.Details
revision to pa# 2017-0711-1562 s1 to change to mat slab foundation. | |
| Nov 15, 2017 | Completed final sign-off Jun 2019 | 323 Cumberland St | Design Line Construction, Thompson Suskind L P | (n) retaining wall in rear yard. shoring under separate permit.Details
(n) retaining wall in rear yard. shoring under separate permit. | $60,000 |
| Oct 4, 2017 | Completed final sign-off Sep 2018 | 2922 Sacramento St | Cairn Construction | rev to pa#2016-04-15-4872s: upon demo, it was found that joist ran in a direction not anticipated.this pa to revise (e) structural drawings to show the joist running in the proper direction that matches site conditions. footing found to not exist, now being added along load bearing wall.Details
rev to pa#2016-04-15-4872s: upon demo, it was found that joist ran in a direction not anticipated.this pa to revise (e) structural drawings to show the joist running in the proper direction that matches site conditions. footing found to not exist, now being added along load bearing wall. | |
| Aug 17, 2017 | Completed final sign-off Jul 2018 | 685 Marina Bl | Redhorse Constructors Inc. | revision to issued permit regarding structural drawings due to site conditions requested by the building inspector. revision to #201508144310. maher naDetails
revision to issued permit regarding structural drawings due to site conditions requested by the building inspector. revision to #201508144310. maher na | |
| Apr 28, 2017 | In progress issued Dec 2023 | 2417 Green St | Durkin Inc. | horizontal addition. expansion of (e) garage in basement level, 1st, 2nd, 3rd & 4th story horizontal rear yard addition; alterations to (e) front facade; excavation & full foundation replacement; interior remodel; adu at 1/f sb-9.Details
horizontal addition. expansion of (e) garage in basement level, 1st, 2nd, 3rd & 4th story horizontal rear yard addition; alterations to (e) front facade; excavation & full foundation replacement; interior remodel; adu at 1/f sb-9. | $50,000 |
| Aug 17, 2016 | Completed final sign-off Nov 2017 | 95 Grand View Av | Lindquist Custom Construction Inc | soft story retrofit per sfbc chapter 34b. asce 41-13, new shear walls lower garage/storage include bolting and hold downs, replace center post at upper garage and install shear wall above garage doorsDetails
soft story retrofit per sfbc chapter 34b. asce 41-13, new shear walls lower garage/storage include bolting and hold downs, replace center post at upper garage and install shear wall above garage doors | $30,000 |
| Aug 17, 2016 | Completed final sign-off Jan 2017 | 2130 Jackson St | Moroso Construction Inc | sf/county ordinance 66-13 for mandatory soft story retrofit. the seismic strengthening includes installation of new plywood shear walls at the basement level at existing partition walls. fema p-807.Details
sf/county ordinance 66-13 for mandatory soft story retrofit. the seismic strengthening includes installation of new plywood shear walls at the basement level at existing partition walls. fema p-807. | $42,000 |
| Aug 2, 2016 | Expired or cancelled expired Mar 2019 | 241 Telegraph Hill Bl | Dijeau Poage Construction Inc. | revision to pa#201607152519 structural drawings revised.Details
revision to pa#201607152519 structural drawings revised. | $40,000 |
| Feb 23, 2016 | Completed final sign-off Apr 2017 | 3808 Clay St | Cairn Construction | excavation of 1st floor rear; interior remodel within existing building @ 2nd & 3rd floor; replace portion of roof & includes structural work. remodel (2) baths @ 3rd floor & one additional @ 1st floor.Details
excavation of 1st floor rear; interior remodel within existing building @ 2nd & 3rd floor; replace portion of roof & includes structural work. remodel (2) baths @ 3rd floor & one additional @ 1st floor. | $650,000 |
| Jan 21, 2016 | Completed final sign-off Jan 2018 | 920 Ashbury St | Newel&Co.Inc. Dba:Robertson- Jensen &Co. | basement layout revision, including converting 557 sf of unconditioned space to conditioned space. revision to pa#201506159044Details
basement layout revision, including converting 557 sf of unconditioned space to conditioned space. revision to pa#201506159044 | $30,000 |
| Jan 15, 2016 | Expired or cancelled cancelled Jan 2026 | 2328 Union St | Finbarr Collins Construction Inc. | (n) deck over (e) roof @ 4th floor & associated structural work.Details
(n) deck over (e) roof @ 4th floor & associated structural work. | $100,000 |
| Dec 28, 2015 | Completed final sign-off Jun 2018 | 145 Guerrero St | Saarman Construction,Ltd. | upgrade accessible path of travel to entrance, upgrade accessible office window, public bathrooms. upgrade 10% of units per 11b mobility & 5% to communications. replace exterior windows, roof, new scavenger fans @ roof. replace domestic boilers. seismic retrofit.Details
upgrade accessible path of travel to entrance, upgrade accessible office window, public bathrooms. upgrade 10% of units per 11b mobility & 5% to communications. replace exterior windows, roof, new scavenger fans @ roof. replace domestic boilers. seismic retrofit. | $5,600,000 |
| Nov 6, 2015 | Expired or cancelled withdrawn Jan 2017 | 3773 17th St | revision to appln #201502037340. enclose 73 sq ft of (e) 1st fl deck under (e) 2nd fl deck. add 72 sq ft of conditioned basement.Details
revision to appln #201502037340. enclose 73 sq ft of (e) 1st fl deck under (e) 2nd fl deck. add 72 sq ft of conditioned basement. | $33,000 | |
| Aug 11, 2015 | Completed final sign-off May 2019 | 2646 Union St | Impact Builders Llc, Thompson Suskind L P | the proposed project is an interior renovation and excavation of existing crawl spaces to be covered to living space. seismic upgrade, new foundation and repair work.Details
the proposed project is an interior renovation and excavation of existing crawl spaces to be covered to living space. seismic upgrade, new foundation and repair work. | $350,000 |
| Jun 15, 2015 | Completed final sign-off Jan 2018 | 920 Ashbury St | Newel&Co.Inc. Dba:Robertson- Jensen &Co. | interior remodel & landscape, hardscape, replacing fence, new skylights & replacement of window in kind. replacing deck in kind.Details
interior remodel & landscape, hardscape, replacing fence, new skylights & replacement of window in kind. replacing deck in kind. | $185,000 |
| Apr 15, 2015 | Expired or cancelled expired Aug 2018 | 2208 Broderick St | Newel&Co.Inc. Dba:Robertson- Jensen &Co., Clayton Timbrell & Co | interior remodel of 1st floor, infill below kitchen at rear, structural work at foundation, repalce exterior shingles with stucco. add (n) interior stair from 1st to 2nd floor.Details
interior remodel of 1st floor, infill below kitchen at rear, structural work at foundation, repalce exterior shingles with stucco. add (n) interior stair from 1st to 2nd floor. | $15,000 |
| Mar 30, 2015 | Completed final sign-off May 2016 | 3456 Baker St | Upscale Construction Inc. | interior renovation, foundation replacement & voluntary seismic upgrade, window replacement, rebuild (e) deck rear deck in same location in kind; maher n/aDetails
interior renovation, foundation replacement & voluntary seismic upgrade, window replacement, rebuild (e) deck rear deck in same location in kind; maher n/a | $250,000 |