Dan Barrett Construction
- Based in
- Pacifica
- On San Francisco permits
- Mar 2014 to Dec 2022
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2022 | Completed final sign-off Jan 2025 | 400 Teresita Bl | lower level renovation, existing storage to be occupied space, adding 1 full bath, 1 wet bar.Details
lower level renovation, existing storage to be occupied space, adding 1 full bath, 1 wet bar. | $195,000 |
| Nov 18, 2021 | Completed final sign-off Jan 2025 | 400 Teresita Bl | 1,000 sf remodel with 90 sf lightwell infill at rear of building. build replacement 350 sf gable roof over lightwell infill area and existing rear of building. locate new bedrooms, remodel & expand (e) kitchen, remodel 2 (e) bathrooms and +1 (n) powder room. rear & side facade work: replace windowsDetails
1,000 sf remodel with 90 sf lightwell infill at rear of building. build replacement 350 sf gable roof over lightwell infill area and existing rear of building. locate new bedrooms, remodel & expand (e) kitchen, remodel 2 (e) bathrooms and +1 (n) powder room. rear & side facade work: replace windows | $200,000 |
| Apr 14, 2021 | Completed final sign-off Jun 2021 | 780 12th Av | new slab on grade to replace damaged portion of an (e) slab on-grade at the side alley. structural only.Details
new slab on grade to replace damaged portion of an (e) slab on-grade at the side alley. structural only. | $8,000 |
| Nov 12, 2019 | Completed final sign-off Aug 2020 | 1930 Gough St | replace retaining wall & fenceDetails
replace retaining wall & fence | $22,000 |
| Nov 15, 2017 | Completed final sign-off Mar 2018 | 1751 48th Av | replacement of 3 vinyl windows and replace with aluminum clad. remove stucco around windows and repair as needed to allow window installation. visible to street.Details
replacement of 3 vinyl windows and replace with aluminum clad. remove stucco around windows and repair as needed to allow window installation. visible to street. | $7,500 |
| Mar 2, 2017 | Completed final sign-off Jun 2017 | 71 Curtis St | revision to 201608266121 remove post and install 2 footings and steel beamDetails
revision to 201608266121 remove post and install 2 footings and steel beam | $2,600 |
| Aug 26, 2016 | Completed final sign-off Jun 2017 | 71 Curtis St | to comply w/ nov 201549474. legalization of illegal unit relocate (e) kitchen per ordinance# 43-14.Details
to comply w/ nov 201549474. legalization of illegal unit relocate (e) kitchen per ordinance# 43-14. | $55,000 |
| Jun 1, 2016 | Completed final sign-off Oct 2016 | 625 Mississippi St | replace appliances in kitchen & bathroom, refinish walls & floor tile, change lighting & cabinetry.Details
replace appliances in kitchen & bathroom, refinish walls & floor tile, change lighting & cabinetry. | $25,000 |
| Oct 14, 2015 | Completed final sign-off Mar 2016 | 1278 23rd Av | interior remodel at 1/f to relocate bathroom and expand 3/f bathroom. all work to be performed within (e) boundary of the building.Details
interior remodel at 1/f to relocate bathroom and expand 3/f bathroom. all work to be performed within (e) boundary of the building. | $30,000 |
| Sep 28, 2015 | Never finaled issued Sep 2015, no final | 1278 23rd Av | exploratory sheetrock removal in kitchen & bathroomDetails
exploratory sheetrock removal in kitchen & bathroom | $2,500 |
| Jul 7, 2015 | Completed final sign-off Oct 2017 | 401 Gates St | 1)conversion of extg attic to habitable area. new doormer in exist attic. 2)repair of dry rotted roof and roof membrane as needed. revision to app#201410078241. per plans submitted 5/17/16 dormer and bay window deleted from scope. no expansion of building.Details
1)conversion of extg attic to habitable area. new doormer in exist attic. 2)repair of dry rotted roof and roof membrane as needed. revision to app#201410078241. per plans submitted 5/17/16 dormer and bay window deleted from scope. no expansion of building. | $15,000 |
| Jun 4, 2015 | Completed final sign-off Nov 2015 | 803 Divisadero St | electrical, plumbing, framing of walls and ceiling, doors, baseboards, paint, sheetrock, interior windows. plmg and elec. to be on seperate permit. no structural work to be done. n/a for maher.no massage.Details
electrical, plumbing, framing of walls and ceiling, doors, baseboards, paint, sheetrock, interior windows. plmg and elec. to be on seperate permit. no structural work to be done. n/a for maher.no massage. | $30,000 |
| Nov 3, 2014 | Completed final sign-off Feb 2015 | 109 Alton Av | dry rot repair, less than 50% on front & back deck, roof repair - plywood repair.Details
dry rot repair, less than 50% on front & back deck, roof repair - plywood repair. | $10,000 |
| Mar 25, 2014 | Completed final sign-off Apr 2014 | 109 Alton Av | removal of existing windows, replace with new windows and repair exterior stucco and interior sheetrock and painting; not visible in streetDetails
removal of existing windows, replace with new windows and repair exterior stucco and interior sheetrock and painting; not visible in street | $10,000 |