Block 1728, lot 028
1278 23rd Ave
- City’s use
- Single Family Residential
- Built
- 1914
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 2,232 sq ft
- Lot
- 2,996 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 6, 2023 | Completed final sign-off Nov 2023 | 1278 23rd Av | Ribas Services | repair 13x13 roof portionDetails
repair 13x13 roof portion | $3,000 |
| Oct 15, 2019 | Never finaled issued Oct 2019, no final | 1278 23rd Av | American Home Renewal Inc | replace 900 sf of lap siding, tear off old, not visible from street.Details
replace 900 sf of lap siding, tear off old, not visible from street. | $24,000 |
| Oct 14, 2015 | Completed final sign-off Mar 2016 | 1278 23rd Av | Dan Barrett Construction | interior remodel at 1/f to relocate bathroom and expand 3/f bathroom. all work to be performed within (e) boundary of the building.Details
interior remodel at 1/f to relocate bathroom and expand 3/f bathroom. all work to be performed within (e) boundary of the building. | $30,000 |
| Sep 28, 2015 | Never finaled issued Sep 2015, no final | 1278 23rd Av | Dan Barrett Construction | exploratory sheetrock removal in kitchen & bathroomDetails
exploratory sheetrock removal in kitchen & bathroom | $2,500 |
| Mar 31, 2015 | Completed final sign-off Jun 2015 | 1278 23rd Av | Transbay Builders Inc. | revision to app#201409186665. repair and replace extg dryrot exterior stair and stucco wall at front. replace extg fireplace with nw gas fire place. repair and replace extg dry rot decking and guardrail with metal guardrail at rear roof deck.Details
revision to app#201409186665. repair and replace extg dryrot exterior stair and stucco wall at front. replace extg fireplace with nw gas fire place. repair and replace extg dry rot decking and guardrail with metal guardrail at rear roof deck. | $20,000 |
| Sep 18, 2014 | Completed final sign-off Jun 2015 | 1278 23rd Av | Transbay Builders Inc. | renovation of (e) s.f.d. add interior open stair on 2/f to connect (n) bathroom & family room with wet bar (456 sq ft) on 1/f. relocate (e) kitchen & half bath on 2/f. remodel (e) bathroom & add master bathroom on 3/f. replace all (e) wooden window with wood clad or alumi clad windows @ front.Details
renovation of (e) s.f.d. add interior open stair on 2/f to connect (n) bathroom & family room with wet bar (456 sq ft) on 1/f. relocate (e) kitchen & half bath on 2/f. remodel (e) bathroom & add master bathroom on 3/f. replace all (e) wooden window with wood clad or alumi clad windows @ front. | $80,000 |
| Sep 10, 2007 | Completed final sign-off Sep 2007 | 1278 23rd Av | Kelton Construction | voluntary anchorbolt retrofit. install anchorbots at 4' internals in existing perimeter foundation. anchors to be 5/8" x12" threded-rod with 2" square washers,, epoxy-set with 7" embedment mininum, construct plywood stiffening panels on exisiting basement walls. panels to be 1/2" cdx plywood, nailedDetails
voluntary anchorbolt retrofit. install anchorbots at 4' internals in existing perimeter foundation. anchors to be 5/8" x12" threded-rod with 2" square washers,, epoxy-set with 7" embedment mininum, construct plywood stiffening panels on exisiting basement walls. panels to be 1/2" cdx plywood, nailed | $12,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Dan Barrett Construction (2), Transbay Builders Inc. (2), American Home Renewal Inc, Kelton Construction, Ribas Services
- Engineers
- Bahman Ghassemzadeh, Michael Chan, Michael Hom
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.