Block 2614, lot 005
270 Castro St
- City’s use
- Multi-Family Residential
- Built
- 1928
- Stories
- 4
- Units
- 2
- Rooms
- 3 bedrooms, 4 bathrooms
- Building
- 3,765 sq ft
- Lot
- 3,118 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 19, 2021 | Completed final sign-off Nov 2021 | 270 Castro St | Blair Burke General Contractors Inc | to obtain final for work approved under 201812218995, 201809140207 & 201805189556. all work is complete.Details
to obtain final for work approved under 201812218995, 201809140207 & 201805189556. all work is complete. | |
| Feb 15, 2019 | Never finaled issued Feb 2019, no final | 272 Castro St | per record at block 2614, lot 005, add second address to upper unit as; 272 castro streetDetails
per record at block 2614, lot 005, add second address to upper unit as; 272 castro street | ||
| Jan 11, 2019 | Expired or cancelled cancelled Nov 2024 | 270 Castro St | (e) two-family residence, 3-story over garage wood framed structure is to be expanded. full interior remodel of upper unit, including bathrooms & kitchen. vertical & horizontal addition to rear of bldg. project will expand upper unit from 2 bed/1.5 bath to 4 bed/3.5 bath. lower unit to remain same.Details
(e) two-family residence, 3-story over garage wood framed structure is to be expanded. full interior remodel of upper unit, including bathrooms & kitchen. vertical & horizontal addition to rear of bldg. project will expand upper unit from 2 bed/1.5 bath to 4 bed/3.5 bath. lower unit to remain same. | $400,000 | |
| Jan 4, 2019 | Never finaled issued Jan 2019, no final | 270 Castro St | street spaceDetails
street space | ||
| Dec 21, 2018 | Expired or cancelled expired Nov 2021 | 270 Castro St | Blair Burke General Contractors Inc | revision to pa #201805189556. revision to interior structural as needed. reconfigure bath 1, change n. sliding door type in bedroom, enclose e. lightwell to capture space in closet, add window on west wall of study, revise e. structural.Details
revision to pa #201805189556. revision to interior structural as needed. reconfigure bath 1, change n. sliding door type in bedroom, enclose e. lightwell to capture space in closet, add window on west wall of study, revise e. structural. | $32,000 |
| Sep 14, 2018 | Expired or cancelled expired Nov 2021 | 270 Castro St | Blair Burke General Contractors Inc | ref pa# construct a retaining wall for an existing unsupported shear cut of soil. this new rtw is located at the rear bedroom on the 2nd fl., n property lineDetails
ref pa# construct a retaining wall for an existing unsupported shear cut of soil. this new rtw is located at the rear bedroom on the 2nd fl., n property line | $68,000 |
| Jun 6, 2018 | Never finaled issued Jun 2018, no final | 270 Castro St | street spaceDetails
street space | ||
| May 18, 2018 | Expired or cancelled expired Nov 2021 | 270 Castro St | Blair Burke General Contractors Inc | interior reno of lower unit, including remodeling kitchen (1) and bath (1) and adding (n) half bath. replace window at rear south elevation with (n) sliding glass pocket door.Details
interior reno of lower unit, including remodeling kitchen (1) and bath (1) and adding (n) half bath. replace window at rear south elevation with (n) sliding glass pocket door. | $50,000 |
| Mar 17, 2005 | Never finaled issued Mar 2005, no final | 270 Castro St | street space & sidewalk repairDetails
street space & sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Blair Burke General Contractors Inc (4)
- Architects
- Ryan Leidner (2)
- Engineers
- Denny Kwan, Peter Sung
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.