Stephen Chan
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Stephen Chan Consulting Eng.
- Based in
- Sf
- On San Francisco permits
- Sep 2005 to May 2026
105 permits since 2000 (engineer on 84 permits, architect on 15 permits, authorized agent-others on 5 permits, designer on 1 permit): 64 completed, 8 in progress, 14 never finaled, 19 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 105.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 4, 2026 | Expired or cancelled withdrawn Jun 2026 | 530 Dewey Bl | revision to bpa 202512292882: replace windows withing the same opening in kind. remove and replace (e) french door to (n) 60" x80" sliding door @ balcony on 2nd floor. replace stucco w/ new sheetrock. roof replace. new stucco outside. add 30in to balcony deck.Details
revision to bpa 202512292882: replace windows withing the same opening in kind. remove and replace (e) french door to (n) 60" x80" sliding door @ balcony on 2nd floor. replace stucco w/ new sheetrock. roof replace. new stucco outside. add 30in to balcony deck. | $56,000 | |
| Apr 8, 2026 | In progress filed Apr 2026, not yet issued | 2414 43rd Av | Cbs Construction Inc. | revision to pa# 201901170584 & 202511260566, adu sprinkler removal and occupancy change from r-2 to r-3, replacement gas utilities (furnace, water heater & range) with electric utilities).Details
revision to pa# 201901170584 & 202511260566, adu sprinkler removal and occupancy change from r-2 to r-3, replacement gas utilities (furnace, water heater & range) with electric utilities). | |
| Feb 20, 2026 | In progress issued Mar 2026 | 243 Collins St | front building - comply with nov #202649084: fill in wall opening with wall and new window and replace one (e) window at front of the building. replace one window at the right side and two windows at the rear. add one new bath, remodel hall bath, relocate kitchen and bedrooms in unit #243.Details
front building - comply with nov #202649084: fill in wall opening with wall and new window and replace one (e) window at front of the building. replace one window at the right side and two windows at the rear. add one new bath, remodel hall bath, relocate kitchen and bedrooms in unit #243. | $50,000 | |
| Oct 24, 2025 | In progress issued Nov 2025 | 585 05th Av | Ckg Building Construction | 1)to comply with nov #202538648. 2)remove and replace approx 12' long fire damaged exterior wall on north side of the 3rd floor front study room. 3) re-roof the front pitched portion of roof.Details
1)to comply with nov #202538648. 2)remove and replace approx 12' long fire damaged exterior wall on north side of the 3rd floor front study room. 3) re-roof the front pitched portion of roof. | $60,000 |
| Oct 6, 2025 | In progress issued Jan 2026 | 207 14th Av | Raymond Peng Construction | revision to permit 202407035781. added additional structural repair items.Details
revision to permit 202407035781. added additional structural repair items. | $100,000 |
| May 5, 2025 | Completed final sign-off Dec 2025 | 2224 Lawton St | Apex Pro Contractors Inc | revision to pa# 202410213357: change made to sheet a2: added 22.5" x 22.5" skylight over kitchen, sheet s-2: remove & replace foundation at front of buildingDetails
revision to pa# 202410213357: change made to sheet a2: added 22.5" x 22.5" skylight over kitchen, sheet s-2: remove & replace foundation at front of building | $3,000 |
| Apr 21, 2025 | In progress issued Apr 2025 | 768 47th Av | 1/f: remove interior family wall, complete remodel bathroom. enclose 60 sf lightwell (1/f only) 2/f: complete remodel kitchen/dining. remove hallway/dining wall. replace kitchen window. enclose lightwell outside half bath and convert to laundry. add 1 skylight in masterbath and 3 suntunnels.Details
1/f: remove interior family wall, complete remodel bathroom. enclose 60 sf lightwell (1/f only) 2/f: complete remodel kitchen/dining. remove hallway/dining wall. replace kitchen window. enclose lightwell outside half bath and convert to laundry. add 1 skylight in masterbath and 3 suntunnels. | $100,000 | |
| Feb 10, 2025 | Completed final sign-off Mar 2025 | 3836 Geary Bl | to comply with nov 202311375 legalization of removal & replacement of storefront door & window. no interior workDetails
to comply with nov 202311375 legalization of removal & replacement of storefront door & window. no interior work | $6,500 | |
| Dec 6, 2024 | Completed final sign-off Dec 2025 | 2224 Lawton St | Alvarado Structural Steel, Apex Pro Contractors Inc | revision to pa# 202410213357: changes made to sheet s3: added approx 14 ft of new foundation on the right side of house, and added 2 ft high max site retaining wall at rear.Details
revision to pa# 202410213357: changes made to sheet s3: added approx 14 ft of new foundation on the right side of house, and added 2 ft high max site retaining wall at rear. | $1,000 |
| Nov 19, 2024 | Expired or cancelled expired Apr 2026 | 1327 Grant Av | Zhongwei Construction | revision to pa# 202307313323: 1/f layout change. rear shear wall change to 5'-6" into the building (align w/ 2nd and 3rd rear exterior wall)Details
revision to pa# 202307313323: 1/f layout change. rear shear wall change to 5'-6" into the building (align w/ 2nd and 3rd rear exterior wall) | |
| Sep 23, 2024 | Expired or cancelled withdrawn Oct 2024 | 1695 27th Av | revision to 202406245101: 1st/f change 2 storage rm to 2 bedrooms. replace 2 windows w/ 2 3050 single hung windows. 544 sf unconditional space to conditioned. no change to 2nd/f.Details
revision to 202406245101: 1st/f change 2 storage rm to 2 bedrooms. replace 2 windows w/ 2 3050 single hung windows. 544 sf unconditional space to conditioned. no change to 2nd/f. | $1,000 | |
| Aug 30, 2024 | Expired or cancelled expired Aug 2026 | 1828 29th Av | Fides Construction Inc. | revision to permit 202407226960. replace (e) rear foundation. replace (e) interior foundation.Details
revision to permit 202407226960. replace (e) rear foundation. replace (e) interior foundation. | $10,000 |
| Aug 12, 2024 | In progress filed Aug 2024, not yet issued | 2418 36th Av | g/f: add one wet bar with one cooktop and sink in (e) family room. relocate (e) washer, dryer and laundry sink to garage.Details
g/f: add one wet bar with one cooktop and sink in (e) family room. relocate (e) washer, dryer and laundry sink to garage. | $7,500 | |
| Jul 15, 2024 | Expired or cancelled expired Aug 2026 | 277 Judson Av | revision to pa# 2015-0812-3993 remove and replace foundation near front right portion of storage room at ground fl. add sheet s0,s0.1,s1,s2Details
revision to pa# 2015-0812-3993 remove and replace foundation near front right portion of storage room at ground fl. add sheet s0,s0.1,s1,s2 | $6,000 | |
| Jul 15, 2024 | Completed final sign-off Jul 2026 | 1161 Alemany Bl | Via Us Construction Inc | add 2 bedrooms, 1 family rm, remodel 1 bath, remodel storage rm on 1st fl. add wet bar w/ cooktop on 1st fl. total new condition space in grould fl is 972 sfDetails
add 2 bedrooms, 1 family rm, remodel 1 bath, remodel storage rm on 1st fl. add wet bar w/ cooktop on 1st fl. total new condition space in grould fl is 972 sf | $135,000 |
| Jun 28, 2024 | In progress issued Nov 2024 | 2056 Bush St | Camacho S Concrete Flatwork | new retaining wall at rearDetails
new retaining wall at rear | $40,000 |
| Jun 24, 2024 | Completed final sign-off Oct 2024 | 1695 27th Av | add (1) new bathroom, (2) storage rooms, (1) exterior door, and remove and replace in kind (2) garage doors facing street. all work done on ground floor.no work on second floor.Details
add (1) new bathroom, (2) storage rooms, (1) exterior door, and remove and replace in kind (2) garage doors facing street. all work done on ground floor.no work on second floor. | $45,000 | |
| Jun 11, 2024 | Completed final sign-off Jun 2026 | 114 10th Av | Via Us Construction Inc | interior remodeling: 1/f addition of 507sf to convert storage space tand crawl space to 1 bed, 1 family rm. relocate and remodel 1 bath. add 3 new windows. 2/f: remove (e) wall b/t kitchen and dining. add sliding door to access (e) rear deck. remodel 1 bath. seismic strengthening to lowest level.Details
interior remodeling: 1/f addition of 507sf to convert storage space tand crawl space to 1 bed, 1 family rm. relocate and remodel 1 bath. add 3 new windows. 2/f: remove (e) wall b/t kitchen and dining. add sliding door to access (e) rear deck. remodel 1 bath. seismic strengthening to lowest level. | $100,000 |
| Jun 10, 2024 | Completed final sign-off Dec 2024 | 2078 Bay Shore Bl | Via Us Construction Inc | remove wall between kitchen & living room, and wall between hallway and living room. remodel 2/f 1) kitchen & 1) bathroom (new drywall & insulation). no exterior work and no work on g/f.Details
remove wall between kitchen & living room, and wall between hallway and living room. remodel 2/f 1) kitchen & 1) bathroom (new drywall & insulation). no exterior work and no work on g/f. | $100,000 |
| Mar 21, 2024 | Completed final sign-off Jun 2026 | 114 10th Av | Via Us Construction Inc | remodeling w kitchen @ 2nd fl & bathroom @ 3rd/f. add n bedroom & bath at 2nd/f. n furnace at attic. n bathroom at bedroom #1 at 3rd/f. relocate clset at bedroom #2 at 3rd/f. n skylight.Details
remodeling w kitchen @ 2nd fl & bathroom @ 3rd/f. add n bedroom & bath at 2nd/f. n furnace at attic. n bathroom at bedroom #1 at 3rd/f. relocate clset at bedroom #2 at 3rd/f. n skylight. | $50,000 |
| Dec 1, 2023 | Completed final sign-off Nov 2025 | 2720 35th Av | Cheng Chang Construction | 1/f: add 2 (n) bedroom & 2 new bathroom. 2/f: remodel kitchen, living & dining rooms. modify 1 bathorom and add 1bathroom. relocate interal stairs.(n) opening non-visible to street. in-fill small lighting on 2/f.Details
1/f: add 2 (n) bedroom & 2 new bathroom. 2/f: remodel kitchen, living & dining rooms. modify 1 bathorom and add 1bathroom. relocate interal stairs.(n) opening non-visible to street. in-fill small lighting on 2/f. | $150,000 |
| Jul 31, 2023 | Expired or cancelled expired Apr 2026 | 1327 Grant Av | Zhongwei Construction, Q & Qq Construction Inc | commercial: soft story upgrade for a 3-story building using, 2022 building codes. add automatic door opener at the 1/f commercial unit for abe compliance. residential under 201709158715.Details
commercial: soft story upgrade for a 3-story building using, 2022 building codes. add automatic door opener at the 1/f commercial unit for abe compliance. residential under 201709158715. | $45,000 |
| Jun 23, 2023 | Completed final sign-off Mar 2024 | 235 Arch St | Q & Qq Construction Inc | rev to pa202211146427: add a new column below (e) 8x8 beam; add a 3x4 foundatoin at new column location, remove (e) drop beam; enlarge rear door.Details
rev to pa202211146427: add a new column below (e) 8x8 beam; add a 3x4 foundatoin at new column location, remove (e) drop beam; enlarge rear door. | |
| Oct 11, 2022 | Never finaled issued Nov 2022, no final | 324 10th Av | Building Sensibly, Bd Home Group Inc | comply with nov 202287517. replace wall from fire damage. demo ground slab &excavate- increase ceilng ht. demo interior walls at 2nd fl. reinforce cement (e) rear deck. replace front windows in kind. replace (e) rear deck & stairs. new ret wall & conc stairs @ yard. reroofing under separate permit.Details
comply with nov 202287517. replace wall from fire damage. demo ground slab &excavate- increase ceilng ht. demo interior walls at 2nd fl. reinforce cement (e) rear deck. replace front windows in kind. replace (e) rear deck & stairs. new ret wall & conc stairs @ yard. reroofing under separate permit. | $115,000 |
| Aug 22, 2022 | Completed final sign-off Jan 2023 | 38 Del Monte St | Raymond Peng Construction | g/f: remodel of (e) bathroom & 2/f complete remodel due to fire damage. reroof entire roo & replace charred roof sheathing approx 4x8ft. fire damage repair of approx 8lf of rear ceill blind wall on 2/f.Details
g/f: remodel of (e) bathroom & 2/f complete remodel due to fire damage. reroof entire roo & replace charred roof sheathing approx 4x8ft. fire damage repair of approx 8lf of rear ceill blind wall on 2/f. | $300,000 |
| Aug 15, 2022 | Completed final sign-off Jan 2023 | 38 Del Monte St | Raymond Peng Construction | relocate kitchen to living room. convert kitchen into study room. convert dining room into bedroom.Details
relocate kitchen to living room. convert kitchen into study room. convert dining room into bedroom. | $20,000 |
| Apr 11, 2022 | Never finaled filed Apr 2022, never issued | 88 Stanford Heights Av | North Star Plumbing & Development Inc | complete remodel: remove kitchen floor to open below one enclosed lightwlal on 2/f. add kitchen and bathroom on g/f. add office, batrhoom and living room in (e) crawl space. remove stgairs at rear deck and infill with new deck.Details
complete remodel: remove kitchen floor to open below one enclosed lightwlal on 2/f. add kitchen and bathroom on g/f. add office, batrhoom and living room in (e) crawl space. remove stgairs at rear deck and infill with new deck. | $120,000 |
| Sep 14, 2021 | Never finaled issued Sep 2023, no final | 1354 Funston Av | alter site permit. reference revision to 200710306832. no change to exterior layout. interior change only, (1) to convert ground floor to unit 1, a living dinning room, kitchen bath & two bedrooms. garage no change. (2) convert 2nd and 3rd flr to unit 2.Details
alter site permit. reference revision to 200710306832. no change to exterior layout. interior change only, (1) to convert ground floor to unit 1, a living dinning room, kitchen bath & two bedrooms. garage no change. (2) convert 2nd and 3rd flr to unit 2. | $40,000 | |
| Jun 1, 2021 | In progress issued Mar 2024 | 2523 26th Av | interior remodel, horizontal addition at the rear of an existing 2-story single family residence.Details
interior remodel, horizontal addition at the rear of an existing 2-story single family residence. | $200,000 | |
| Oct 6, 2020 | Completed final sign-off Mar 2021 | 149 Jasper Pl | Sincere Construction Company Inc | revision to pa 201709158735. revised sheet s2, s3 and added s4.Details
revision to pa 201709158735. revised sheet s2, s3 and added s4. | |
| Oct 18, 2019 | Expired or cancelled cancelled Jan 2026 | 5636 California St | exterior stairway repair & replace in-kindDetails
exterior stairway repair & replace in-kind | $15,000 | |
| Sep 13, 2019 | Completed final sign-off Jul 2020 | 1142 Mariposa St | Hyan Construction Company | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $180,000 |
| Sep 5, 2019 | Completed final sign-off Apr 2021 | 2167 27th Av | X T General Construction Inc., East Bay Construction | rear deck addition, bath, kitchen remodel and remove wall between kitchen and living rm on 2nd fl and 2 baths, 2 bedrooms, 1 family rm on 1st flDetails
rear deck addition, bath, kitchen remodel and remove wall between kitchen and living rm on 2nd fl and 2 baths, 2 bedrooms, 1 family rm on 1st fl | $60,000 |
| Aug 21, 2019 | Never finaled issued Oct 2019, no final | 3700 Cabrillo St | A J O Group Build Inc | revision to pa 2017-0915-8718 shearwall types and lengths @ grid line (left side of building)Details
revision to pa 2017-0915-8718 shearwall types and lengths @ grid line (left side of building) | |
| Jul 24, 2019 | Completed final sign-off Jul 2019 | 3947 18th St | Peter Spediacci Company | adminstrative permit to correct pa #201903296720, complying with nov #201920673, item #2 & #3 which are completed in this permit.Details
adminstrative permit to correct pa #201903296720, complying with nov #201920673, item #2 & #3 which are completed in this permit. | |
| Mar 1, 2019 | Completed final sign-off Oct 2022 | 1135 Guerrero St | soft story retrofit per sfebc chapter 4d mandatory soft story program in accordance with 2016 appx a4Details
soft story retrofit per sfebc chapter 4d mandatory soft story program in accordance with 2016 appx a4 | $25,000 | |
| Jan 28, 2019 | Never finaled filed Jan 2019, never issued | 472 Union St | renovation of (e) bath, kitchen in unit #2 at 4725 union st on 3rd fl. to comply with nov #201840721.Details
renovation of (e) bath, kitchen in unit #2 at 4725 union st on 3rd fl. to comply with nov #201840721. | $25,000 | |
| Jan 28, 2019 | Completed final sign-off May 2020 | 15 Nobles Al | to comply with nov #201840721. unit # 2. reference approved pa #201805240034: renovation of (e) bath, kitchen in unit #2 at 15 nobles alley on 3rd fl.Details
to comply with nov #201840721. unit # 2. reference approved pa #201805240034: renovation of (e) bath, kitchen in unit #2 at 15 nobles alley on 3rd fl. | $5,000 | |
| Jan 17, 2019 | Never finaled issued Jun 2022, no final | 2414 43rd Av | Cbs Construction Inc. | unit legalization ord 43-14. 523 sq ft living/dining, kitchen, bedroom & bathroom on 1/fl in (e) (2) units residence. fire sprinkler system to be provided on 1/fl under separate permit.Details
unit legalization ord 43-14. 523 sq ft living/dining, kitchen, bedroom & bathroom on 1/fl in (e) (2) units residence. fire sprinkler system to be provided on 1/fl under separate permit. | $60,000 |
| Oct 15, 2018 | Completed final sign-off Jul 2019 | 2584 27th Av | remove and replace front entry stair in kind.Details
remove and replace front entry stair in kind. | $15,000 | |
| Jan 19, 2018 | Never finaled issued May 2018, no final | 26 Clement St | W. Wong Construction Co. Inc. | voluntary soft story upgrade per ab-094 using cebc 2016 appx a4 maher na 201801199094 demo work to be done first. maher n/aDetails
voluntary soft story upgrade per ab-094 using cebc 2016 appx a4 maher na 201801199094 demo work to be done first. maher n/a | $50,000 |
| Jan 19, 2018 | Never finaled issued May 2018, no final | 26 Clement St | W. Wong Construction Co. Inc. | safe demo at ground floor level, remain vacancy under ab-017 maher na- to be done before soft story under 201801109092. maher n/aDetails
safe demo at ground floor level, remain vacancy under ab-017 maher na- to be done before soft story under 201801109092. maher n/a | $1,500 |
| Oct 12, 2017 | Completed final sign-off Oct 2018 | 2340 16th Av | to comply with nov #201705422. remove and replace front entry stairs.Details
to comply with nov #201705422. remove and replace front entry stairs. | $5,000 | |
| Sep 15, 2017 | Completed final sign-off Sep 2022 | 534 25th Av | Sft Construction Corp | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $50,000 |
| Sep 15, 2017 | Completed final sign-off Nov 2020 | 426 22nd Av | A J O Group Build Inc | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $50,000 |
| Sep 15, 2017 | Expired or cancelled expired Aug 2021 | 3700 Cabrillo St | A J O Group Build Inc | soft story retrofit per sfebc ch 4 d 2016 cebc app a4Details
soft story retrofit per sfebc ch 4 d 2016 cebc app a4 | $50,000 |
| Sep 15, 2017 | Completed final sign-off Mar 2021 | 149 Jasper Pl | A J O Group Build Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $50,000 |
| Sep 15, 2017 | Never finaled issued Jul 2018, no final | 401 Eddy St | Western City Construction Co | add two new bathrms to comply with nov #201757721. no change to exterior facade and number of units. one on 2nd & 3rd fl.Details
add two new bathrms to comply with nov #201757721. no change to exterior facade and number of units. one on 2nd & 3rd fl. | $2,000 |
| Sep 15, 2017 | Completed final sign-off Aug 2020 | 2828 Webster St | A J O Group Build Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. maher ord 155-13 naDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. maher ord 155-13 na | $50,000 |
| Sep 15, 2017 | Completed final sign-off Dec 2019 | 1025 Steiner St | Current Construction | mandatory soft story seismic retrofit ch4d - 2016 cebc appx a-4.Details
mandatory soft story seismic retrofit ch4d - 2016 cebc appx a-4. | $50,000 |
| Sep 15, 2017 | Completed final sign-off Sep 2019 | 1762 Pine St | A J O Group Build Inc | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. maher naDetails
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. maher na | $50,000 |
| Sep 8, 2017 | Completed final sign-off Jul 2019 | 254 Dolores St | Detail General Inc.Dba Detail Ironworks | provide soft story retrofit per city ordinance 66-13 using cebc 2016 appendix a-4.Details
provide soft story retrofit per city ordinance 66-13 using cebc 2016 appendix a-4. | $30,000 |
| Aug 25, 2017 | Completed final sign-off Mar 2018 | 305 Moscow St | Via Us Construction Inc | 1st floor - add 1 bath, 1 living room and storage. no work to be done on the exterior and 2nd floorDetails
1st floor - add 1 bath, 1 living room and storage. no work to be done on the exterior and 2nd floor | $10,000 |
| Aug 21, 2017 | Completed final sign-off Nov 2020 | 801 Pacific Av | Kwong Associates | comply w/nov #201760803. 1/f & basement repair (e) fire damaged retail shops & storage, prepare vanilla shell for future tenant under separate ti permits. 2/f: repair (e) fire damage in rooms & add new bathroom. upgrade restrooms to ada & remodel (e) shower & toilets. replace roll down gate in kindDetails
comply w/nov #201760803. 1/f & basement repair (e) fire damaged retail shops & storage, prepare vanilla shell for future tenant under separate ti permits. 2/f: repair (e) fire damage in rooms & add new bathroom. upgrade restrooms to ada & remodel (e) shower & toilets. replace roll down gate in kind | $80,000 |
| Jun 23, 2017 | Completed final sign-off Feb 2020 | 1224 Washington St | Theodore Design & Constr | soft story retrofit per 2016 sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. (duplicate application resigned by bldg, sffd & his. wet stamped plans retained by contractor - copy of wet stamped plans rereivewed by bldg (richard tam, 6/13/2019, & sffd/retained for dbi.)Details
soft story retrofit per 2016 sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. (duplicate application resigned by bldg, sffd & his. wet stamped plans retained by contractor - copy of wet stamped plans rereivewed by bldg (richard tam, 6/13/2019, & sffd/retained for dbi.) | $30,000 |
| May 3, 2017 | Completed final sign-off Jun 2018 | 38 Pearl St | P & L Construction Co | soft story retrofit per 2013 sfbc mandatory program 2015 iebc app a4Details
soft story retrofit per 2013 sfbc mandatory program 2015 iebc app a4 | $90,000 |
| Nov 7, 2016 | Expired or cancelled withdrawn Oct 2018 | 2828 Webster St | revision to 201510270858 r1 - install plywood sheathing and holdown at perimeter of rear ground unit maher naDetails
revision to 201510270858 r1 - install plywood sheathing and holdown at perimeter of rear ground unit maher na | ||
| Sep 19, 2016 | Expired or cancelled expired Jan 2019 | 534 Precita Av | Hoi's Construction | revision to pa#201212105852, underpinning of (e) foundation @ front of bldg. adjacent to elevator pit. clarify header size over door opening.Details
revision to pa#201212105852, underpinning of (e) foundation @ front of bldg. adjacent to elevator pit. clarify header size over door opening. | $5,000 |
| Jul 25, 2016 | Never finaled issued Sep 2016, no final | 616 Broadway | C&M Development & Construction Inc | repair exterior concrete wall crack outside 4th floor at lightwellDetails
repair exterior concrete wall crack outside 4th floor at lightwell | $3,500 |
| May 3, 2016 | Expired or cancelled cancelled Oct 2016 | 267 18th Av | J L General Construction Inc | design drawing for ground floor seismic retrofit upgrade.Details
design drawing for ground floor seismic retrofit upgrade. | $50,000 |
| Mar 18, 2016 | Completed final sign-off May 2016 | 1631 Shafter Av | revision to pa 201510220484; re: complaint 201541621 dtd. 4-27-15, repair 50% of stair replacement.Details
revision to pa 201510220484; re: complaint 201541621 dtd. 4-27-15, repair 50% of stair replacement. | ||
| Jul 27, 2015 | Never finaled issued Jul 2015, no final | 2486 Geary Bl | 369 Construction, Raymond Peng Construction | voluntary seismic strengthening per plan.Details
voluntary seismic strengthening per plan. | $3,000 |
| Jul 1, 2015 | Completed final sign-off May 2016 | 1336 Shotwell St | comply w/nov #201561341 & 201150228 - add one new bathroom in basement, remodel interior staircase on 1st floor, remodel bathroom on 1st fl. remove & replace the lattice under exterior stair with siding. remodel one bathroom in attic space.Details
comply w/nov #201561341 & 201150228 - add one new bathroom in basement, remodel interior staircase on 1st floor, remodel bathroom on 1st fl. remove & replace the lattice under exterior stair with siding. remodel one bathroom in attic space. | $120,000 | |
| Jun 30, 2015 | Never finaled issued Sep 2016, no final | 400 05th St | Smarter Construction Inc | horizontal addition to existing auto repair shop, document the removal of gas statian facility has been done ref application #2014-0717-1490. fire sprinkler & mpe systems under separate permit. maher ordinance-extended not required.Details
horizontal addition to existing auto repair shop, document the removal of gas statian facility has been done ref application #2014-0717-1490. fire sprinkler & mpe systems under separate permit. maher ordinance-extended not required. | $200,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | C&M Development & Construction Inc | unt #607 - convert from 1 studio unit to 1 bedroom unit. remodel kitchen & bathroom, remove relocate non-load bearing wall. n/a maher ordinanceDetails
unt #607 - convert from 1 studio unit to 1 bedroom unit. remodel kitchen & bathroom, remove relocate non-load bearing wall. n/a maher ordinance | $20,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | C&M Development & Construction Inc | unt #307 - convert from studio to 1 bedroom apartment, remodel kitchen & bathroom, remov enon-load bearing wall. n/a maher ordinanceDetails
unt #307 - convert from studio to 1 bedroom apartment, remodel kitchen & bathroom, remov enon-load bearing wall. n/a maher ordinance | $20,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | C&M Development & Construction Inc | unt #604 - convert from 1 bedroom, 1 bath unit to 2 bedrooms, 2 baths unit, remodel kitchen, remove non-load bearing wall. n/a maher ordinanceDetails
unt #604 - convert from 1 bedroom, 1 bath unit to 2 bedrooms, 2 baths unit, remodel kitchen, remove non-load bearing wall. n/a maher ordinance | $30,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | C&M Development & Construction Inc | unt #403 - convert from 1 bedroom,1 bath unit to 2 bedrooms, 2 bathrooms unit. remodel kitchen, remove non-load bearing wall. n/a maher ordinanceDetails
unt #403 - convert from 1 bedroom,1 bath unit to 2 bedrooms, 2 bathrooms unit. remodel kitchen, remove non-load bearing wall. n/a maher ordinance | $38,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | C&M Development & Construction Inc | unt #204 - convert from 1 bedroom apartment to two bedrooms, two baths unit, remodel kitchen, remove non-load bearing wall. n/a maher ordinanceDetails
unt #204 - convert from 1 bedroom apartment to two bedrooms, two baths unit, remodel kitchen, remove non-load bearing wall. n/a maher ordinance | $30,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | C&M Development & Construction Inc | unt #608 - convert from 1 bedroom, 1 bath unit to 2 bedrooms, 2 baths unit. remodel kitchen, remove & relocate non-load bearing wall. n/a maher ordinanceDetails
unt #608 - convert from 1 bedroom, 1 bath unit to 2 bedrooms, 2 baths unit. remodel kitchen, remove & relocate non-load bearing wall. n/a maher ordinance | $20,000 |
| Jul 14, 2014 | Completed final sign-off Dec 2014 | 11 Dolores St | D3 Construction | #10- remodel kitchen and bathroom. remove wall between kitchen and living room. maher n/a. no windows, doors, wall under this scope, field verify sprinkler system coverage if applicable.Details
#10- remodel kitchen and bathroom. remove wall between kitchen and living room. maher n/a. no windows, doors, wall under this scope, field verify sprinkler system coverage if applicable. | $20,000 |
| Jun 6, 2014 | Never finaled issued Jun 2014, no final | 1501 Haight St | B-Side Inc. | unit 8: remodel kitchen and bathroom, annd washer and dryer.Details
unit 8: remodel kitchen and bathroom, annd washer and dryer. | $30,000 |
| Jun 3, 2014 | Completed final sign-off Nov 2014 | 1240 Bush St | Construction Depot Inc | unit #5 - remodel bathroom (enlarge bathroom) & remodle kitchen. compliance with ordinance no 155-13 not required.Details
unit #5 - remodel bathroom (enlarge bathroom) & remodle kitchen. compliance with ordinance no 155-13 not required. | $25,000 |
| May 12, 2014 | Completed final sign-off Aug 2014 | 828 Jones St | C&M Development & Construction Inc | #22- remodel kitchen and bathroom at 2nd floor unit 22Details
#22- remodel kitchen and bathroom at 2nd floor unit 22 | $22,000 |
| May 2, 2014 | Completed final sign-off May 2016 | 1774 15th Av | comply with nov 201469062. new retaining wall at rear of property. remove fireplaceDetails
comply with nov 201469062. new retaining wall at rear of property. remove fireplace | $15,000 | |
| Jun 17, 2013 | Expired or cancelled expired Mar 2016 | 446 33rd Av | C&M Development & Construction Inc | revision to approved pa# 200911231869 (under construction). adding (n) foundation at front of bldg as per plan.Details
revision to approved pa# 200911231869 (under construction). adding (n) foundation at front of bldg as per plan. | $2,000 |
| Jun 17, 2013 | Completed final sign-off Aug 2014 | 1552 Fillmore St | Pinnacle Remodeling Construction | comply w/ nov #201155307/201164208-soft demo of an (e) restaurant to demolish drywall & (e) service counter & flr tile per ab-017. no work at kitchen area (fire sprinkler system & kitchen cooking equipment/food, ceiling light fixtures & mech system to be remain)Details
comply w/ nov #201155307/201164208-soft demo of an (e) restaurant to demolish drywall & (e) service counter & flr tile per ab-017. no work at kitchen area (fire sprinkler system & kitchen cooking equipment/food, ceiling light fixtures & mech system to be remain) | $3,000 |
| Mar 19, 2013 | Completed final sign-off Nov 2013 | 73 Terra Vista Av | C&M Development & Construction Inc | remodel (e) kitchen & bathroom, remove fireplace, remove kitchen partition wall.Details
remodel (e) kitchen & bathroom, remove fireplace, remove kitchen partition wall. | $29,000 |
| Jul 5, 2012 | Completed final sign-off Jul 2013 | 2 Perine Pl | Davies Construction | chemical/permeation grout underpinning, rer pa #2011.04.11.3826.Details
chemical/permeation grout underpinning, rer pa #2011.04.11.3826. | $5,000 |
| Jul 5, 2012 | Completed final sign-off Jul 2013 | 2109 Steiner St | Davies Construction | revision to pa #2011.04.11.3826: remove two windows for moment frame, rearrange bathroom & master bathroom, reduce kitchen island.Details
revision to pa #2011.04.11.3826: remove two windows for moment frame, rearrange bathroom & master bathroom, reduce kitchen island. | $2,000 |
| Jul 5, 2012 | Completed final sign-off Jul 2013 | 2109 Steiner St | Davies Construction | furnising all materials & equipment & preforming all labor for mixing, pumping & injection of ultrafine cement/permeation grout underpinning grouting to stabilize to the min sections as shown. ref pa #2011.04.11.3826.Details
furnising all materials & equipment & preforming all labor for mixing, pumping & injection of ultrafine cement/permeation grout underpinning grouting to stabilize to the min sections as shown. ref pa #2011.04.11.3826. | $5,000 |
| Mar 27, 2012 | Completed final sign-off Sep 2013 | 33 Sutro Heights Av | New State Construction Inc | convert (e) rear storage to living room & full bath on 1st floor.Details
convert (e) rear storage to living room & full bath on 1st floor. | $25,000 |
| Jun 18, 2009 | Completed final sign-off Jul 2009 | 374 Liberty St | New State Construction Inc | add 2 tiedowns from deck to floor; repalce (e) 2 x 10 with new 2 x 10 pt.Details
add 2 tiedowns from deck to floor; repalce (e) 2 x 10 with new 2 x 10 pt. | $3,000 |
| Apr 20, 2009 | Expired or cancelled expired Feb 2011 | 790 California St | unit 38: remove partition walls at bedroom, kitchen and entrance, add closet to bedroom. remodel kitchen & bathrm under pa #200903134104.Details
unit 38: remove partition walls at bedroom, kitchen and entrance, add closet to bedroom. remodel kitchen & bathrm under pa #200903134104. | $2,000 | |
| Nov 14, 2008 | Completed final sign-off Jan 2010 | 1510 33rd Av | Everwin Group | within (e) ground floor: add 2nd bedroom, closet, relocate laundry room. add 1 walk-in closet and storage room. remove (e) bathroom and replace with new bathroom.Details
within (e) ground floor: add 2nd bedroom, closet, relocate laundry room. add 1 walk-in closet and storage room. remove (e) bathroom and replace with new bathroom. | $10,000 |
| Oct 3, 2008 | Completed final sign-off Mar 2009 | 263 Missouri St | Speedy Construction/See Note: | install skylight within envelope of bldg over kitchen, remove wall between kitchen and living, raise headroom over interior stairway. add posts and footings.Details
install skylight within envelope of bldg over kitchen, remove wall between kitchen and living, raise headroom over interior stairway. add posts and footings. | $7,000 |
| Aug 25, 2008 | Completed final sign-off Oct 2008 | 775 20th Av | voluntary strengthening of basement. as allowed in cbc 2007 sec 3403.2.3.2 exception.Details
voluntary strengthening of basement. as allowed in cbc 2007 sec 3403.2.3.2 exception. | $1,500 | |
| May 15, 2008 | Expired or cancelled expired Dec 2009 | 615 03rd Av | replace (e) wood beam and column with new steel beam and column at ground floor as per plan.Details
replace (e) wood beam and column with new steel beam and column at ground floor as per plan. | $12,000 | |
| Apr 30, 2008 | Completed final sign-off May 2008 | 106 Mateo St | replace approx 18 ft long (e) concrete footing with newDetails
replace approx 18 ft long (e) concrete footing with new | $10,000 | |
| Apr 15, 2008 | Completed final sign-off May 2008 | 33 Prospect Av | installation of soldier beam retaining wall to replace (e) wood beam retaining wall (+/-6'-6" high) at rear yard.Details
installation of soldier beam retaining wall to replace (e) wood beam retaining wall (+/-6'-6" high) at rear yard. | $4,500 | |
| Apr 3, 2008 | Completed final sign-off Apr 2008 | 159 16th Av | remodel (e) 1st floor-remodel (e) bathroom, convert (e) social room to bedroomDetails
remodel (e) 1st floor-remodel (e) bathroom, convert (e) social room to bedroom | $20,000 | |
| Mar 5, 2008 | Completed final sign-off Jan 2009 | 349 Urbano Dr | to comply with nov.200724373. revision to re-instated pa# 2007.09.18.2962. new horizontal rear addition on the 3rd floor for full bathroom and a sun room.Details
to comply with nov.200724373. revision to re-instated pa# 2007.09.18.2962. new horizontal rear addition on the 3rd floor for full bathroom and a sun room. | $19,740 | |
| Feb 28, 2008 | Completed final sign-off Apr 2008 | 306 Crescent Av | Wesco General Contracting Inc | remove and replace water damaged wall and ceiling in covering in rear bedroom at 2nd floor, in kind.Details
remove and replace water damaged wall and ceiling in covering in rear bedroom at 2nd floor, in kind. | $2,000 |
| Feb 26, 2008 | Expired or cancelled suspend Aug 2025 | 306 Crescent Av | remove & replace water damage wall and ceiling covering in rear bedroom @ 2nd floor in kind.Details
remove & replace water damage wall and ceiling covering in rear bedroom @ 2nd floor in kind. | $2,000 | |
| Mar 1, 2007 | Expired or cancelled expired Mar 2008 | 2616 Chestnut St | revision to pa# 2006/06/30/5520. redesign foundation with drill piers.Details
revision to pa# 2006/06/30/5520. redesign foundation with drill piers. | $30,000 | |
| Jan 19, 2007 | Completed final sign-off Jan 2007 | 131 Belvedere St | abatement of nov#200336774- removal of extended metal fire escape platform.Details
abatement of nov#200336774- removal of extended metal fire escape platform. | $500 | |
| Dec 12, 2006 | Expired or cancelled expired Nov 2016 | 342 21st Av | New State Construction Inc | add sheet s4.1 for alternate rafter and floor joist sizes only. to revise app#200308071409.Details
add sheet s4.1 for alternate rafter and floor joist sizes only. to revise app#200308071409. | |
| Jul 27, 2006 | Expired or cancelled expired Mar 2008 | 2616 Chestnut St | separation of (e) garage from (e) single family dwelling see application 200606305520 for separation of single family from garageDetails
separation of (e) garage from (e) single family dwelling see application 200606305520 for separation of single family from garage | $8,000 | |
| Jun 30, 2006 | Expired or cancelled expired Mar 2008 | 2616 Chestnut St | separation of the one story garage from the 3 story main structure of a single family dwelling, replace all windows of 3-story main structure. renovate the single family dewelling,install 1 1/8' cdx plywood over (e)flat roof w/ 5/8" type x gypsun bd at ceiling for 1-hr fire rated roof.Details
separation of the one story garage from the 3 story main structure of a single family dwelling, replace all windows of 3-story main structure. renovate the single family dewelling,install 1 1/8' cdx plywood over (e)flat roof w/ 5/8" type x gypsun bd at ceiling for 1-hr fire rated roof. | $60,000 | |
| Jun 16, 2006 | Completed final sign-off Apr 2007 | 1554 27th Av | enclosing (e) lightwell on 2/f, add new deck at rear, remodel on 1st & 2nd floors.Details
enclosing (e) lightwell on 2/f, add new deck at rear, remodel on 1st & 2nd floors. | $35,000 |